Loading...
HomeMy WebLinkAboutSW3221008_Supplement-EZ Form_20230208SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFQM'--'—" 1 Project Name 2 Project Area (ac) 3 Coastal Wetland Area (ac) Is this project High or Low Density? Does this project use an off -site SCM? The Estates at Marvin Branch 27.71 Low No TH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 200 8 Will the vegetated setback remain vegetated? Yes 9 f BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 s streambank stabilization proposed on this project? No NU 11 Infiltration System 1 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 Storm Filter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Mason Greeson, PE Principal 28 Organization: Civil & Environmental Consultants, Inc. 29 Street address: City, State, Zip: Phone number(s): 3701 Arco Corporate Drive, Suite 400 Charlotte, NC 28273 980.260.2120 30 31 32 Email: mgreeson@cecinc.com Certification Statement: I certify, under penalty of lawthatthis Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. . SA6 SEAL - 043168 ids 'VC IN oG�� Signature of Designer Date 2/8/2023 DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LID 1 4 Type of SCM Curb Cut w/ grass swale Infiltration Basin 5 Total drainage area (sq ft) 1,207,091 179,467 6 Onsite drainage area (sq ft) 1,207,091 179,467 7 Offsite drainage area (sq ft) 0 0 8 Total BUA in project (sq ft) 236854 sf 35525 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 176000 sf 14898 sf 10 New BUA not on subdivided lots (subject to permitting) (so 60854 sf 20627 sf 11 Offsite BUA (sq ft) sf sf 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft) sf sf Sidewalk (sq ft) 11156 sf 2423 sf Roof (sq ft) sf sf Roadway (sq ft) Future (sq ft) Other, please specify in the comment box below (sq ft) 49698 sf 18204 sf sf sf 13 New infiltrating permeable pavement on Isubdivided lots (sq ft) sf sf 14 New infiltrating permeable pavement not on subdivided lots (sq ft) sf sf 15 Existing BUA that will remain (not subject to permitting) (sq ft) sf sf 16 Existing BUA that is already permitted (sq ft) sf sf 17 Existing BUA that will be removed (sq ft) sf sf 18 Percent BUA 20% 20% 19 Design storm (inches) 3 20 Design volume of SCM (cu ft) 12721 cf 21 Calculation method for design volume ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): LD-1 Column is for the SCM required for Goose Creek rules only. The are draining to this facility is for controlling the difference in Pre and Post runoff volume for the 1 yr 24 hr storm event. INFILTRATION SYSTEM I Drainage area number 1 3 Is the SCM sized to treat the SW from all surfaces at build -out? No 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical" for trenches)? 31 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 18 Proposed slope of the subgrade surface (%) 0 19 Are terraces or baffles provided? No 20 Type of pretreatment: Other Solla noro 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes 22 SHWT elevation (fmsl) 577.00 23 Depth to SHWT per soils report (in) 72.00 24 Ground elevation at boring in soils report (fmsl) 583.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? No 26 Soil infiltration rate (in/hr) 0.31 27 Factor of safety (FS) (2 is recommended): 2.00 I Elevations 29 1 Bottom elevation (fmsl) 581 ft 30 IStorage elevation (fmsl) 582. ft 31 1 Bypass elevation (fmsl) 582 ft t-orbasms only 32 Bottom surface area (ft) 13703 ft 33 Storage elevation surface area (ft) 14567. ft For Trenches Only 34 Length (ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone porosity (% ) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? "'um es/Drawtlown 44 Design volume of SCM (cu ft) 12721 cf 46 Please use this space to provide any additional information about the infiltration system(s): roposed Infiltration Basin with amended soils is to promote infitration of runoff from fference in volume for Pre and Post developed conditions for the 1 year 24hr storm ient per the Goose Creek regulations in Union County NC. Pretreament consists of ;reened gutters, stone/gravel outlet protection, overland sheet flow through �getative media (grass), and debris removal on a biweekly basis thorughout he high Infiltration 1 11:08 AM 2/8/2023 LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow.? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 101 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 5 6 Are curb outlet swales proposed? Yes 7 Maximum longitudinal slope of curb outlet swale(s) (%) 4 8 Bottom width of curb outlet swale(s) (feet) 2 ft 9 Maximum side slope of curb outlet swale(s) (H:V) 3:1 10 Minimum length of curb outlet swale(s) (feet) 100 ft 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule .1003 proposed? No ADDITIO ORMATION 15 Please use this space to provide any additional information about this low density project: The swale calcs are based on swales numbered 6-10, Swale 11 is for the bypass channel flow, and the vegetated path are natural ground conveyance overland throguh the 200 vegetated buffer. Multiple side slopes are presented for each type. 3:1 for the swales and 10:1 or flatter fro the vegetated paths. Swale # Drainage Area BUA (ac) Pervious area C Q (cfs) Slope M V.11- (fps) V.-I (fps) Flow depth (ft) 1 2 3 4 5 1.48 0.41 1.07 0.50 5.65 3.30 5.00 4.70 0.60 6 1.23 0.33 0.90 0.50 4.69 4.11 5.00 4.79 0.49 7 1.17 0.38 0.79 0.50 3.55 3.95 5.00 4.33 0.48 8 0.68 0.23 0.45 0.50 2.59 2.22 5.00 3.21 0.30 9 0.62 0.23 0.39 0.50 2.36 2.22 5.00 3.12 0.29 10 0.62 0.23 0.39 0.50 2.36 1.49 5.00 2.72 0.33 11 7.87 0.00 7.87 0.50 30.06 1.00 5.00 4.37 1.14 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 r30