Loading...
HomeMy WebLinkAboutNCC230438_Site Plan or Location Map (5)_20230215O O Q u E 0 E Y 0 O 0 m O a 0 a E Y c O O O a c -0 0 Q ° O O O o z � O O � z -- O o O m w c O E O u N O ul ul u c o _ Q � i T TQ O Q E 0 o a c 0 � o o � c E o Q CV m j0 > w o Q ° m i O L Q � Q i 0 E u o Q) o Q o E >, o T 0 � o i° E Q O - rri T N > N O 0 N N O a) N E f z O O N u O a� �Q o � u O u� m 0 O u �o 0 aE m O 0� MIN. 10 GA. LINE WIRES DATE TYPE PLANTWO RATE REGION JAN. 1 - MAY 1 RYE (GRAIN) 120 LBS/ACRE PIEDMONT JAN. 1 - MAY 1 ANNUAL LESPEDEZA (KOBE) 50 LBS/ACRE PIEDMONT MAY 1 - AUG. 15 GERMAN MILLET 40 LBS/ACRE PIEDMONT MAY 1 - AUG. 15 SMALL -STEMMED SUDANGRASS 50 LBS/ACRE PIEDMONT AUG. 15 - DEC. 30 RYE (GRAIN) 120 LBS/ACRE PIEDMONT DEC. 1 - APR. 15 RYE (GRAIN) 120 LBS/ACRE COASTAL PLAIN DEC. 1 - APR. 15 ANNUAL LESPEDEZA (KOBE) 50 LBS/ACRE COASTAL PLAIN APR. 15 - AUG. 15 GERMAN MILLET 40 LBS/ACRE COASTAL PLAIN AUG. 15 - DEC. 30 RYE (GRAIN) 120 LBS/ACRE COASTAL PLAIN FEB. 15 - MAY 15 RYE (GRAIN) 120 LBS/ACRE MOUNTAINS - ABOVE 2500 FEET FEB. 1 - MAY 1 RYE (GRAIN) 120 LBS/ACRE MOUNTAINS - BELOW 2500 FEET FEB. 15 - MAY 15 ANNUAL LESPEDEZA (KOREAN) 50 LBS/ACRE MOUNTAINS - ABOVE 2500 FEET FEB. 1 - MAY 1 ANNUAL LESPEDEZA (KOREAN) 50 LBS/ACRE MOUNTAINS - BELOW 2500 FEET MAY 15 - AUG. 15 GERMAN MILLET 40 LBS/ACRE MOUNTAINS MAY 15 - AUG. 15 SMALL -STEMMED SUDANGRASS 50 LBS/ACRE MOUNTAINS AUG. 15 - DEC. 15 RYE (GRAIN) 120 LBS/ACRE MOUNTAINS TEMPORARY SEEDING SCHEDULE AND SEEDBED PREPARATION N.T.S. _ 8' MAX. _I VARIARI F AC f11RFl:TFf1 AY THE FNI;INFFR IIN. 12-1 /2 GA. ITERMEDIATE VIRES GRADE I� FRONT VIEW I� I II I II I =1 I =1 NOTES 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 0 I (V TEMPORARY SILT FENCE N.T.S. SILT FENCE OUTLET N.T.S. STEEL POST WOVEN WIRE FABRIC - SILT FENCE GEOTEXTILE FABRIC FILL SLOPE * FOR REPAIR OF SILT FENCE FAILURES, - GRADE USE No. 57 WASHED STONE. FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH 8" MIN. COVER BASIN. OVER SKIRT ANCHOR SKIRT AS DIRECTED BY ENGINEER MAINTENANCE/SPECIFICATION NOTES 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. 3. SILT FENCE OUTLETS SHOULD NOT BE LOCATED WHERE THE OUTFLOW WILL ERODE THE SOIL BELOW. SEEDBED PREPARATION: 1. TILL OR DISK THE PREPARED AREAS TO BE SEEDED TO A MINIMUM DEPTH OF FOUR INCHES. 2. REMOVE STONES LARGER THAN THREE INCHES ON ANY SIDE, STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT SURFACE. 3. IF NOT INCORPORATED DURING THE SOIL PREPARATION PROCESS, ADD pH MODIFIER AND FERTILIZERS AT THE RATE SPECIFIED IN THE SOIL TEST REPORT. IF THERE IS NO SOIL TEST REPORT, FOLLOW SOIL AMENDMENTS BELOW. 4. RE -COMPACT THE AREA UTILIZING A CULTIPACKER ROLLER. THE FINISHED GRADE SHALL BE A SMOOTH EVEN SOIL SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. 5. EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN 1 INCH DEEP, AND GRASSES AND LEGUMES NO MORE THAN j INCH. BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGING, AND THEN LIGHTLY FIRMED WITH A ROLLER OR CULTIPACKER. HYDROSEEDED MIXTURES SHOULD INCLUDE A WOOD FIBER (CELLULOSE) MULCH. NOTES: 1. CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. 2. THIS SEEDING SCHEDULE IS FOR EROSION AND SEDIMENT CONTROL ONLY. SEE LANDSCAPE PLAN FOR FINAL SEEDING. 3. THE CONTRACTOR SHALL PROVIDE GROUND COVER ON DESIGNATED AREAS AND SLOPES GREATER THAN 3:1 WITHIN 7 DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING 4. CONTRACTOR SHALL PROVIDE GROUND COVER IN 14 DAYS ON ALL OTHER AREAS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. 5. PERMANENT GROUND COVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION. CONSTRUCTION SPECIFICATIONS MATERIALS 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120°F. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.25 LB/LINEAR FT MINIMUM STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. CONSTRUCTION 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. MAINTENANCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. Li STEEL POST SET MAX 2' APART MIN 2' INTO SOLID GROUND [�11 T CCI.1l�C FENCE, FILTER FABRIC, AND AND HARDWARE CLOTH IN TRENCH. KHA DETAIL NO:01.302.RO2 NOTES: APPLICABLE AT ALL POINTS OF INGRESS & EGRESS UNTIL SITE IS STABILIZED. FREQUENT CHECKS OF THE DEVICE AND TIMELY Sp• MAINTENANCE MUST BE PROVIDED. 2"-3" WASHED STONE CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE NOTES: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. STEEL POST WOVEN WIRE FABRIC Z HARDWARE CLOTH FILTER OF #57 WASHED STONE � z ON FGROUND ILTER FABRIC APRON 6" BURY 6" UPPER EDGE OF BURY WIRE FENCE AND 4" FILTER FABRIC APRON IN TRENCH HARDWARE CLOTH LJ SIDE VIEW 6. COMPLETE GRADING BEFORE PREPARING SEEDBEDS, AND INSTALL ALL NECESSARY EROSION CONTROL PRACTICES SUCH AS, DIKES, WATERWAYS, AND BASINS. 7. IF SOILS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 INCHES USING A RIPPER, HARROW, OR CHISEL PLOW. 8. THE USE OF AN APPROPRIATE MULCH WILL HELP ENSURE ESTABLISHMENT UNDER NORMAL CONDITIONS, AND IS ESSENTIAL TO SEEDING SUCCESS UNDER HARSH SITE CONDITIONS. SOIL AMENDMENTS: LATE WINTER THROUGH SUMMER: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. FALL: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1000 LB/ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: LATE WINTER THROUGH SUMMER: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. FALL: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. KHA DETAIL NO:01.104.RO1 KHA DETAIL NO:01.303.RO2 NOTES 1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. 2. FILTER TYPES SHALL BE APPROVED BY THE CITY INSPECTOR PRIOR TO INSTALLATION. 3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE ENGINEER. 4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE. 5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). 6. FILTER BAGS SHALL NOT BE ALLOWED IN EXISTING CITY OR NCDOT ROADS. CATCH BASIN INLET PROTECTION N.T.S. SECTION TEMPORARY CONSTRUCTION ENTRANCE N.T.S. In' uini PLAN VIEW KHA DETAIL NO:01.101.RO2 PLYWOOD 48%24" BLACK LETTERS PAINTED WHITE 6" HEIGHT 0.5" LAG N CONCRETE o SCREWS WASHOUT SIDE M FRONT VIEW VIEW 3%3%8' WOOD POSTS "CONCRETE CONCRETE WASHOUT wasHouT' slcN SIGN DETAIL (SEE NOTE 2) SANDBAGS (TYP.) J 0 O J 0 O J 0 O J 0 O J o O m N N \ N N \ N N \ N N \ N O w N - N N \ Q 0 0 0 0 00 m z w un un z z O w w O Q O O D O O a_ 1 z O C� u IZ u IZ v on > W m 0 o m w w w m m IZ > > w w o m m LLJ w I�I�I�INI�I0 0 cmco CV O z z z o C/j = N w O r �w mr Q J Q CO O �_ � O O c U Qo � z X � w w Q O N Q w = O O 1 O zcnOw O � ON J � = w 1 w � � co w cn � J � CV > N LJ W a z CV O ■� LJ pima_-00 CV OR STAPLES .% CA 10 MIL. oFusio PLASTIC LINING PIT SUMP cCAIl �9 SECTION B-B = 043114 :�'•.F �.: �Z NOTES � Q •.!y� � N: �O �� 1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD. 2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE TEMPORARY �� C..• • �`� CONCRETE WASHOUT FACILITY. II 3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE 10/31/22 REMOVED FROM THE SITE AND DISPOSED OF OR RECYCLED. 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE z m TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED, AND pc U U STABILIZED TO PREVENT EROSION. w N = 5. PIT CAPACITY IS MINIMUM OF 6 CUBIC FEET PER 10 CUBIC YARDS OF CONCRETE. N w CD cn cn CONCRETE WASHOUT STATION 04 o o m N.T.S. KHA DETAIL NO:01.102.RO1 = 0 \ w z z Li Q0 U Q Ul Q w U Li 00� _ Ul fn fn U GRATE 1" REBAR FOR BAG ZEMOVAL FROM INLET FILTER BAG DUMP L04 CATCH BASIL 10I212m2ldril:7 OUTLET INSTALLATION KHA DETAIL NO:01.201.RO1 U z Z z O � V) Q z�� Q OO LL ^ Lu QO I..L LLJ a LLI U O � FL�Un V z o 1 � � z SHEET NUMBER C3.2