Loading...
HomeMy WebLinkAboutNCC230427_ESC Approval Submitted_20230215ROY COOPER Governor ELIZABETH BISER �` = I Secretary DOUGLAS ANSEL Interim Director NORTH CAROLINA EnWronmentaf Quality December 19, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Iron Creek Investments, LLC Attention: Jonathan D. Edwards, Jr., Member/Manager 4119 Sheep Pasture Road Spring Hope, NC 27882 RE: Project Name: Contractor's Yard - Edwards Project ID: RANDO-2023-012 Acres Approved: 1.58 County: Randolph City: Liberty Address: 10121 Old Liberty Rd. River Basin: Cape Fear Stream Classification: WS-III Submitted By: Drye-McGlamery Engineering, PLLC Date Received by LQS: December 13, 2022 Plan Type: Revised Dear Jonathan D. Edwards, Jr.: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following ;the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq,nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO10000 permit require that the following documentation be kept on file at the job site: jgLDzE North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Winston-Salem Regional Office � 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 336-776-9800 r Letter of Approval with Modifications Iron Creek Investments, LLC December 19, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Contractor's Yard - Edwards Project ID: RANDO-2023-012 County: Randolph Modifications pursuant to applicable North Carolina General_ Statutes and/or Regulations: 1. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 413.0110] 2. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 3. The NCGO 1 has a $100 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCGOI coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities