Loading...
HomeMy WebLinkAboutSW6110103_Stormwater Report_20230127CUI JSOC - Microgrid Project number: 60652522 Attachment D — Hydrology Report AECOM CUI CUI JSOC - Microgrid Project number: 60652522 ATTACHMENT D — Table of Contents I REVISED 1. Stormwater Worksheets....................................................................................... 2 2. NCDEQ - BUA Figures and Worksheets............................................................... 6 3. EISA Section 438 Army LID Planning and Cost Tool Report ............................... 12 4. Hydraflow Hydrographs Output - Summary Reports .......................................... 14 5. Hydraflow Hydrographs Output - 10-Year Hydrograph and Routing Reports ..... 24 6. NOAAAtlas-14 Rainfall Data.............................................................................. 42 7. Bioretention Underdrain Calculations................................................................. 45 8. Erosion & Sediment Control - Outlet Protection Calculations ............................ 49 AECOM 161111 CUI Stormwater Worksheets CUI PN97470 - Page 2 of 58 CUI JSOC Microgrid Installand and Integration Project: 60652522 Date: 26 JAN 2023 Design By: ACF Checked By: Pre -Development Drainage Areas A=COM READY -TO -ADVERTISE REVISED NRCS (HSG "A" SOILS) RATIONAL AREA A.0 Area, A (ac.) CN CN x A 55% 14% 0% 30.3% Imp. CNw = 52 C C x A Cw = 0.32 Wooded 0.338 30 10.1 0.05 0.0169 Grassed 0.088 39 3.4 0.15 0.0132 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.186 98 18.2 0.90 0.1670 Subtotal 0.612 31.8 0.1971 AREA B.0 Area, A (ac.) CN CN x A 0% 13% 0% 86.9% Imp. CNw = 90 C C x A Cw = 0.80 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.040 39 1.6 0.15 0.0060 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.265 98 26.0 1 0.90 0.2389 Subtotal 0.305 27.6 0.2449 TOTAL PRE -DEVELOPED SITES 1 0.9171 1 59.34 1 CNw = 65 1 1 0.44 1 Cw = 0.48 MC_SWM_WORKSHEETS.xlsx, PreDev DAs- 1/26/202314:40 PM 1 of 3 CUI PN97470 - Page 3 of 58 CUI JSOC Microgrid Installand and Integration Project: 60652522 Date: 26 JAN 2023 Design By: ACF Checked By: Post -Development Drainage Areas A=COM READY -TO -ADVERTISE REVISED NRCS (HSG "A" SOILS) RATIONAL AREA A.1 (to CONTAINMENT with overflow to SCM) Area, A (ac.) CN CN x A 0% 6% 1% 93.3% Imp. CNw = 94 C C x A Cw = 0.85 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.012 39 0.5 0.15 0.0018 #57 stone, 6 inches 0.002 46 0.1 0.20 0.0004 Impervious 0.195 98 19.1 0.90 0.1753 Subtotal 0.209 19.7 0.1775 AREA A.2 (to SCM - BIORETENTION) Area, A (ac.) CN CN x A 0% 30% 0% 61.7% Imp. 8.7% CNw = 81 C C x A Cw = 0.69 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.099 39 3.9 0.15 0.0148 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.206 98 20.2 0.90 0.1855 Bioretention SCM 0.029 100 2.9 1.00 1 0.0290 Subtotal 0.334 27.0 0.2293 AREA A.3 (bypass SCM, uncontrolled) Area, A (ac.) CN CN x A 0% 0% 0% 100.0% Imp. CNw = 98 C C x A Cw = 0.90 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.000 39 0.0 0.15 0.0000 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.069 98 6.8 0.90 0.0621 Subtotal 0.069 6.8 0.0621 AREA B.0 (bypass SCM, uncontrolled) Area, A (ac.) CN CN x A 0% 0% 42% 57.6% Imp. CNw = 76 C C x A Cw = 0.60 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.000 39 0.0 0.15 0.0000 #57 stone, 6 inches 0.117 46 5.4 0.20 0.0235 Impervious 0.160 98 15.6 0.90 0.1437 Subtotal 0.2771 1 21.1 0.1672 AREA B.1 (to "Drainage Area 1 ") Area, A (ac.) I CN I CN x A C C x A USE UNDERGROUND INFILTRATION TRENCH DISCHARGES FROM., - ROUTING CALCULATIONS IN EXISTING PERMIT SW6110103 u.u000 2-yr = 0.19 cfs, 10-yr = 3.16 cfs, 25-yr = 5.47, 100-yr = 9.18 cfs - ,,,,r. _._J 0.0254 :Nw = 98 0.0254 Cw TOTAL - AREA A.0 1 0.6121 1 53.37 1 CNw = 87 1 1 0.47 1 Cw = 0.77 TOTAL - AREA B.0 1 0.2771 1 21.05 1 CNw = 76 1 1 0.17 1 Cw = 0.60 TOTAL POST -DEVELOPED SITES 1 0.8891 1 74.42 1 CNw = 84 1 1 0.64 1 Cw = 0.72 JSOC_SWM_WORKS HEETS.xlsx, PostDev DAs- 1/26/202314:40 PM 2of3 CUI PN97470 - Page 4 of 58 cul JSOC Microgrid Installand and Integration Project: 60652522 Date: 26 JAN 2023 Design By: ACF Checked By: Peak Runoff Rate Comparison A B C D E F G H J K L M A=COM READY -TO -ADVERTISE REVISED SITE 1 Peak Runoff Rate (cfs) 95th 1- ear 2-year 10- ear 100- ear Pre -Developed 0.00 0.02 0.18 1.02 2.91 Post -Developed 0.18 0.32 0.38 3.67 5.88 Runoff Difference (cfs) [B -A] 1 0.18 0.30 0.20 2.65 2.97 Runoff Difference (%) C / A -- 1500% 111% 260% 102% SITE 2 Peak Runoff Rate (cfs) 95th 1- ear 2-year 10- ear 1 00-ear Pre -Developed 0.53 1.14 1.45 2.29 3.61 Post -Developed 0.18 0.55 0.79 1.50 2.69 Runoff Difference (cfs) [F - E] 1 -0.35 -0.59 -0.66 -0.79 -0.92 Runoff Difference % G / E -66% -52% -46% -34% -25% SITES 1 & 2 Peak Runoff Rate (cfs) 95th 1- ear 2-year 10- ear 1 00-ear Pre -Developed 0.53 1.14 1.59 3.29 6.48 Post -Developed 0.32 0.86 1.17 4.98 8.56 Runoff Difference (cfs) [K - J] 1 -0.21 -0.28 -0.42 1.69 2.08 Runoff Difference % L / J -40% -25% -26% 51.4% 32% Drainage Area and 10-Year Runoff Comparison N P Q R Value Overall Drainage Areas (acres) 45.5 Site Development Drainage Areas acres 0.92 Site vs. Overall % of Area N / P 2.02% 7 Site vs. Overall (% of 10-year Runoff) [M10YR X QJ 1.04% (based on proportional area) approximate % change in 10-year peak rate, with respect to the overall drainage area JSOC_SWM_WORKS HEETS.xlsx, Peak Rate Comparisons - 1/26/20231 4:40 PM 3of3 cul PN97470 - Page 5 of 58 CUI NCDEQ — BUA Figures and Worksheets CUI PN97470 - Page 6 of 58 CUI Q Y U U S��E� 2 E OVERALL �� S�� EXISTING CULVERT DRAINAGE AREA f 30" RCP @ 2.2% ONL A = 45.5 ac. EXISTING DITCH m. ALONG RAILROAD L PROJECT AREA 'IJIL.57 ACRES JIM LIM OVERALL PROJECT AREA 1" = 1000' L Y 7 L LIM Z n L to, N 0 O N NO N O N N O " O oU av No mU) J U) FZU N U oW N O 0 n E L i• / _ A�. I A ddlk� l \ `._ �❑ n BUILDING \ 3-1549 i FIGURE 2 "DRAINAGE AREA 1" PROJECT AREA = LIMIT OF WORK = 155,722 SF (3.58 ACRES) EXISTING UNDERGROUND _ SWM INFILTRATION TRENCH PERMIT #SW6110103 1 \ \ 0 \ \ a . � \ INV=24 J100\ y Pty.Pr ---- - \ 7L INV = 241.6' I FIGI EXISTING CULVEF 30" RCP @ 2.2% Lu W Q O F- a W to cn N _- - 100' 50' 0 100' 200' DEVELOPMENT AREAS - SITE 1 & SITE 2 1"=100' 1000' 500' 0 1000, 2000' 1" = 100' 1"=1000' co 0 W z� as Lu tU z W 02 a 0 J J J W a> �W W o O co co 0 o U z z N O O t— N N Z H N z � 0 2 LL Co z O H a z 0 N z V a� N O `��° N Q00,0 c JVOfl ti � o z � L Z O W 40 O �aU)Q CUI PN97470 - Page 7 of 58 CUI 0 [FO7A.3(BYPASSES ESIGN] SCM) 0ac.) EXISTING BUA = 2,536 SF lle�\ NEW BUA = 470 SF [FOR 10-YEAR DESIGN] AREA A.1 (TO CONTAINMENT) 9,097 SF (0.209 ac.) 8,486 SF IMPERVIOUS [FOR TREATMENT DESIGN] EXISTING BUA = 1,166 SF NEW BUA = 7,320 SF 0 m I----------` 1,191 SF NEW BUA (BYPASSES SCM) - k Uvils TO DEVELOPMENT LEGEND NEW SCM FOR DETERMINATION OF "DEVELOPMENT' AND "BUILT -UPON A 12,890 SF DEVELOPMENT: NEW IMPERVIOUS 470 SF NEW IMPERVIOUS (NEW BUA - SUBJECT TO PERMITTING) BYPASSING SCM EXISTING DEVELOPMENT: REMOVE IMPERVIOUS [FOR 10-YEAR DESIGN] 1,023 SF (REMOVED BUA) AREA A.2 (TO SCM) EXISTING DEVELOPMENT: ON EXISTING IMPERVI 14,550 SF (0.334 ac.) 4,576 SF F (EXISTING BUA) 8,980 SF IMPERVIOUS 1,262 SF BIORETENTION SCM [FOR TREATMENT DESIGN] EXISTING BUA = 3,410 SF ` NEW BUA = 5,570 SF REMOVED BUA = 1,023 SF [FOR 10-YEAR DESIGN] TOTAL AREA A.0 (TO BMP FOR 10-YEAR) ` 23,647 SF (0.543 ac.) 17,466 SF IMPERVIOUS - [FOR TREATMENT DESIGN] ° EXISTING BUA = 4,576 SF ° NEW BUA = 12,890 SF g\�E •��••' REMOVED BUA = 1,023 SF •�••'� ''•_••••• S\FEZ _••• "DRAINAGE AREA 1" MATCHLINE - SEE FIGURE 3 FOR CONTINUATION DEVELOPMENT AREA - SITE 1 50' 25' 0 50' 100, ill = 50' 1 "=50' -Am— mmmmIIIIIl N 0 i aL I.L REVISED w H Fna aw Lua az w� a_j 05 w 00 w 0 Go 0 90 Z Z N 0 O N N Z erl N m 6� N Z 0 °? LL Z C H az0N Z v 101� CV O � U) N Q oo(0 J V Z � Q LOL . . r r 0 z Z N L Z o�/ �W� W ^ 0 O � a U) Q CUI PN97470 - Page 8 of 58 CUI al a Y U BUILDING - ` 3-1549 \ SEE FIGURE 2 FOR AREA ` 60 SF EXISTING BUA (BYPASSES SC \ MATCHLINE - SEE FIGURE 2 FOR CONTINUATION UG SFARMIWPiCF "DRAINAGE AREA 1" E ` 361 SF EXISTING BUA = LIMI O K Q ° ("DRA AGE AREA 1 ") � = 155 22 SF (1. 8 ID O / A°V o ° ° \ \ �� 83 SF N W BU�\( Y1 ES SCM) v,_0 54 SF NEW BUA, ("DRAIN GE \ AR A l "); SEE FIGURE 2 F R LO ATION OF EXIS ` 5,623 S G BUA v '' PASSES SC v, \ \ 5,117 SF REMOV BUA (BYPASSES SCM) INV = 241.6' EXISTING CULVERT 30" RCP @ 2.2% N v \ V = 243.Q' �v [FOR 10-YEAR PN] _ AREA B.0 (BYPA ES SC ! 12,072 SF (0.277 ac ) 6,957 SF IMPERVI S [1,229 o%RENCH] EXISTING BUA = 5,6 3 SF [682 S t ENCH] ' NEW BUA = 1,274 SF [5 7 SF to T C REMOVED BUA = 5,1 7 F �\ o f �RENN ��NG \ DEVELOPMENT AREA - SITE 2 ill =50' IT�KZ y TO EXISTING DEVELOPMENT LEGEND BYPASSES TRENCH SCM FOR DETERMINATION OF "DEVELOPMENT' AND "BUILT -UPON AREA" (BUA) 1,274 SF 547 SF DEVELOPMENT: NEW IMPERVIOUS (NEW BUA -SUBJECT TO PERMITTING) 5,117 SF 0 SF EXISTING DEVELOPMENT: REMOVE IMPERVIOUS (REMOVED BUA) 5,683 SF 682 SF EXISTING DEVELOPMENT: ON EXISTING IMPERVIOUS (EXISTING BUA) W cn Lu 0 0 W N ca N N ZM 0 i ■■ 0) n REVISED N w co co aw Lua az w� a_j 05 w 00 w 0 Go 0 o 0 Z LL Z N O N N C� Z erl N m H � N ?O °? LL Z O H az0N Z V 101� N D 4� ~ N Q O 0 J V Z � O .. ti O z 0 J_ O L �p �W� 16 ^ U O � a U) Q CUI PN97470 - Page 9 of 58 CUI A=COM 10 South Jefferson Street, Suite 1600 Roanoke, Virginia 24011 Civil Calculation Sheet JSOC - Microgrid Fort Bragg, North Carolina REVISED Job No.: 60652522 Designed By: A. Freeland hecked By: Date: 26 JAN 2023 Subject: Treatment Volume (Required) -- Stormwater Control Measure Volume (Provided) Job Title: JSOC Microgrid; Fort Bragg NC Rev. No.: 1 READY -TO -ADVERTISE TREATMENT VOLUME SITE #1 (Added to existing permit as "Drainage Area 2") Values: BUA (Impervious Area) = 12,890 sq. ft. = 0.30 acres Treatment Depth = 1.00 inches (NCDEQ treatment storm) Treatment Volume (minimum) = cu. ft. Required Treatment Volume, Provided = I 1,0921cu. ft. Notes: (1) The provided treatment volume is taken at the 264.375 contour area of 1456 square feet for a depth of 0.75 feet (9 inches). The minimum filter media area at contour elevation of 264.0 is 1,260 square feet. (2) The containment tank provides 1,600 cubic feet of storage, which is held and drained later to the bioretention SCM during dry periods. (3) The required treatment volume is based only on development at Site 1. Any reduction to development (impervious area) within Site 2 are excluded. TREATMENT VOLUME SITE #2 (new BUA contributing to "Drainage Area 1" of existing permit) Values: BUA (Impervious Area) = 547 sq. ft. = 0.01 acres Treatment Depth = 1.00 inches (NCDEQ treatment storm) Treatment Volume (minimum) = 46 cu. ft. Required Treatment Volume, Provided = Approximately Notes: 2,0921cu. ft. 45.51times more volume than required (1) The treatment volume is provided by the surplus treatment capacity of the existing underground infiltration SCM. The original design required 4,750 cf of treatment and provided 6,842 cf - resulting in a treatment volume surplus of 2,092 cf.. (Other documents state 6,991 cf is the provided volume) JSOC-NCDEQ Treatment Worksheet.xlsx Print Date: 1/26/2023 CUI PN97470 - Page 10 of 58 CUI A=COM 10 South Jefferson Street, Suite 1600 Roanoke, Virginia 24011 Civil Calculation Sheet JSOC - Microgrid Fort Bragg, North Carolina REVISED AECOM Job No.: 60652522 Designed By: A. Freeland Checked By: B. Fisher Subject: Bioretention - Infiltration Drawdown Check Date: 26 JAN 2023 Page No.: 1 Job Title: JSOC - Microgrid Installation and Integration Rev. No.: 1 INFILTRATION DRAWDOWN CALCULATION r: immmum aurrace Nrea ror are irrrurrarrvrr >vsxem SA = FS* DV * 12 K * T where- SA = required minimum surface area of infiltration system (ft2) FS = factor of safety (minimum of 2 is recommended) OV = design volume (W) K = hydraulic conductivity of soil (irVhr) T = maximum dewatering time (72 hours) Soil Infiltration (Ksat) Test Result ID in/hr ft/hr B-2 46.77 3.90 Elevation @Test Location SHWT = Seasonal High Water Table Bioretention Infiltration Maximum Ponded Depth 9.0 inches Time to Drain - Average Test Rate Maximum Allowed Drain Time 0.19 hrs 72 hrs Time to Drain < 72 hours --> okay Bottom Elevation 260.0 feet Ground Elevation 268.2 feet SHWT Depth 13.0 feet SHWT Elevation 255.2 feet Separation, Design (between Bottom and SHWT) 4.8 feet Separation, Minimum Required 2.0 feet Separation (design) > Separation (min) --> okay Using NCDEQ Equation 2 (above) ... FS = 2.0 DV = 1074 cu. Ft. (minimum treatment volume, provided) K = 0.5 in/hr (use conservative minimum rate) T = 72 hours SA (min) = 716 sq. ft. (minimum surface area, calculated) SA (design) = 1260 sq. ft. (minimum surface area, provided) SA (design) > SA (min) --> okay JSOC_NCDEQ Drawdown Worksheet.xlsx Print Date: 1/26/2023 CUI PN97470 - Page 11 of 58 CUI EISA Section 438 Army LID Planning and Cost Tool Report CUI PN97470 - Page 12 of 58 CUI Army LID Planning and Cost Tool Report PROJECT INFO SITE INFO AND EISA VOLUME Date 8/30/2022 REQUIREMENT Army Command IMCOM Project limit of disturbance (ac) 0.61 Army Installation Fort Bragg 95% rainfall depth (in) 1.8 Project name 60652522 - JSOC (SITE #1) Soil type Sandy Project description Site # 1 (0.61 acres) User Name Master Planner Structural BMP Bioretention: Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: Hydrologic Soil Group (HSG) Pre -project curve number (CN) Post -project curve number (CN) IPC/ACF Pre -project runoff volume (cf) Post -project runoff volume (cf) EISA Section 438 retention volume requirement (cf) LID PLANNING SUMMARY Surface area (sf) 1260 9097 I Runoff volume retained (cf) 1506 0 0 1195 0 0 Total retention volume provided by BMPs (cf): 2701 Project complies with EISA Section 438. A 52 87 0 1666 1666 Non-structural BMP Surface area (ac) Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass): 0.00 Veg. Filter Strip (Slope G2%, Short Grass): 0.00 Veg. Filter Strip (Slope G2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass): 0.00 LID COST SUMMARY CUI PN97470 - Page 13 of 58 CUI Hydraflow Hydrographs Output Summary Reports I REVISED CUI PN97470 - Page 14 of 58 CUI Hydraflow Table of Contents JSOC_SWM_Sites_RTA-Rev1.gpw Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 2 - Year SummaryReport......................................................................................................................... 4 3 - Year SummaryReport......................................................................................................................... 5 10 -Year SummaryReport......................................................................................................................... 6 100 - Year SummaryReport......................................................................................................................... 7 OFReport.................................................................................................................... 8 CUI PN97470 - Page 15 of 58 CUI 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v202O.4 { PRE A.0 (SITE 1) ,?sue PRE B.0 (SITE 2) 3 -PRE (COMBINE�OST A.1 �OST A.2 �OST A.3 �OST B.0 8 - ROUTE TANK 9 - Inflow to SCM (BIOI 10 - ROUTE SCM Legend Hid. Origin Description 1 SCS Runoff PRE A.0 (SITE 1) 2 SCS Runoff PRE B.0 (SITE 2) 3 Combine PRE (COMBINED) 4 SCS Runoff POST A.1 5 SCS Runoff POST A.2 6 SCS Runoff POST A.3 7 SCS Runoff POST B.0 (SITE 2) 8 Reservoir ROUTE TANK 9 Combine Inflow to SCM (BIOIRET) 10 Reservoir ROUTE SCM 11 Combine POST A.0 (SITE 1) 12 Combine POST (COMBINED) 11 -POST A.0 (SITE 1) 12 - POST (COMBINED) 2) Project: JS0C_SWM_Sites_RTA-Rev1.gpw Thursday, 01 / 26 / 2023 CUI Hydrograph Return Period RecP� y raflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr �1-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 0.024 0.184 0.000 ------- 1.022 ------- ------- 2.913 PRE A.0 (SITE 1) 2 SCS Runoff ------ 1.138 1.450 0.531 ------- 2.292 ------- ------- 3.606 PRE B.0 (SITE 2) 3 Combine 1,2 1.140 1.590 0.531 ------- 3.293 ------- ------- 6.477 PRE (COMBINED) 4 SCS Runoff ------ 0.872 1.081 0.455 ------- 1.640 ------- ------- 2.515 POST A.1 5 SCS Runoff ------ 0.841 1.149 0.288 ------- 2.024 ------- ------- 3.448 POST A.2 6 SCS Runoff ------ 0.315 0.382 0.181 ------- 0.564 ------- ------- 0.851 POST A.3 7 SCS Runoff ------ 0.552 0.793 0.143 ------- 1.503 ------- ------- 2.690 POST B.0 (SITE 2) 8 Reservoir 4 0.016 0.077 0.000 ------- 1.621 ------- ------- 2.497 ROUTE TANK 9 Combine 5,8 0.841 1.149 0.288 ------- 3.642 ------- ------- 5.928 Inflow to SCM (BIOIRET) 10 Reservoir 9 0.032 0.142 0.000 ------- 3.207 ------- ------- 5.105 ROUTE SCM 11 Combine 6,10 0.315 0.382 0.181 ------- 3.674 ------- ------- 5.875 POSTA.0 (SITE 1) 12 Combine 7,11 0.863 1.170 0.322 ------- 4.984 ------- ------- 8.558 POST (COMBINED) is 3-yr storm placeholder for 95th percentI le rainfall results Proj. file: JS0C_SWM_Sites_RTA-Rev1.gpw Thursday, 01 / 26 / 2023 Hydrograph Summary Report CUI Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.024 1 723 327 ------ ------ ------ PRE A.0 (SITE 1) 2 SCS Runoff 1.138 1 717 2,377 ------ ------ ------ PRE B.0 (SITE 2) 3 Combine 1.140 1 717 2,704 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 0.872 1 717 1,901 ------ ------ ------ POST A.1 5 SCS Runoff 0.841 1 718 1,689 ------ ------ ------ POST A.2 6 SCS Runoff 0.315 1 717 744 ------ ------ ------ POST A.3 7 SCS Runoff 0.552 1 718 1,114 ------ ------ ------ POST B.0 (SITE 2) 8 Reservoir 0.016 1 950 301 4 268.70 1,602 ROUTE TANK 9 Combine 0.841 1 718 1,990 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 0.032 1 974 644 9 264.75 1,353 ROUTE SCM 11 Combine 0.315 1 717 1,388 6,10 ------ ------ POSTA.0 (SITE 1) 12 Combine 0.863 1 718 2,501 7,11 ------ ------ POST (COMBINED) JS0C_SWM_Sites_RTA-Rev1.gpw Return Period: 1 Year Thursday, 01 / 26 / 2023 Hydrograph Summary Report CUI Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.184 1 720 715 ------ ------ ------ PRE A.0 (SITE 1) 2 SCS Runoff 1.450 1 717 3,070 ------ ------ ------ PRE B.0 (SITE 2) 3 Combine 1.590 1 718 3,784 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 1.081 1 717 2,390 ------ ------ ------ POST A.1 5 SCS Runoff 1.149 1 718 2,323 ------ ------ ------ POST A.2 6 SCS Runoff 0.382 1 717 911 ------ ------ ------ POST A.3 7 SCS Runoff 0.793 1 718 1,593 ------ ------ ------ POST B.0 (SITE 2) 8 Reservoir 0.077 1 751 790 4 268.72 1,608 ROUTE TANK 9 Combine 1.149 1 718 3,113 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 0.142 1 761 1,767 9 264.77 1,379 ROUTE SCM 11 Combine 0.382 1 717 2,678 6,10 ------ ------ POSTA.0 (SITE 1) 12 Combine 1.170 1 718 4,270 7,11 ------ ------ POST (COMBINED) JS0C_SWM_Sites_RTA-Rev1.gpw Return Period: 2 Year Thursday, 01 / 26 / 2023 Hydrograph Summary Report CUI Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.000 1 n/a 0 ------ ------ ------ PRE A.0 (SITE 1) 2 SCS Runoff 0.531 1 718 1,074 ------ ------ ------ PRE B.0 (SITE 2) 3 Combine 0.531 1 718 1,074 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 0.455 1 717 951 ------ ------ ------ POST A.1 5 SCS Runoff 0.288 1 718 595 ------ ------ ------ POST A.2 6 SCS Runoff 0.181 1 717 413 ------ ------ ------ POST A.3 7 SCS Runoff 0.143 1 719 331 ------ ------ ------ POST B.0 (SITE 2) 8 Reservoir 0.000 1 n/a 0 4 267.08 951 ROUTE TANK 9 Combine 0.288 1 718 595 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 0.000 1 n/a 0 9 264.28 595 ROUTE SCM 11 Combine 0.181 1 717 413 6,10 ------ ------ POSTA.0 (SITE 1) 12 Combine 0.322 1 718 744 7,11 ------ ------ POST (COMBINED) JS0C_SWM_Sites_RTA-Rev1.gpw Return Period: 3 Year Thursday, 01 / 26 / 2023 Hydrograph Summary Report CUI Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.022 1 718 2,311 ------ ------ ------ PRE A.0 (SITE 1) 2 SCS Runoff 2.292 1 717 5,003 ------ ------ ------ PRE B.0 (SITE 2) 3 Combine 3.293 1 718 7,314 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 1.640 1 717 3,736 ------ ------ ------ POST A.1 5 SCS Runoff 2.024 1 717 4,183 ------ ------ ------ POSTA.2 6 SCS Runoff 0.564 1 717 1,366 ------ ------ ------ POST A.3 7 SCS Runoff 1.503 1 718 3,051 ------ ------ ------ POST B.0 (SITE 2) 8 Reservoir 1.621 1 718 2,136 4 268.91 1,685 ROUTE TANK 9 Combine 3.642 1 718 6,319 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 3.207 1 720 4,973 9 264.96 1,714 ROUTE SCM 11 Combine 3.674 1 720 6,339 6,10 ------ ------ POSTA.0 (SITE 1) 12 Combine 4.984 1 719 9,390 7,11 ------ ------ POST (COMBINED) JS0C_SWM_Sites_RTA-Rev1.gpw Return Period: 10 Year Thursday, 01 / 26 / 2023 Hydrograph Summary Report CUI Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.913 1 718 5,915 ------ ------ ------ PRE A.0 (SITE 1) 2 SCS Runoff 3.606 1 717 8,126 ------ ------ ------ PRE B.0 (SITE 2) 3 Combine 6.477 1 718 14,041 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 2.515 1 717 5,881 ------ ------ ------ POST A.1 5 SCS Runoff 3.448 1 717 7,327 ------ ------ ------ POST A.2 6 SCS Runoff 0.851 1 717 2,086 ------ ------ ------ POST A.3 7 SCS Runoff 2.690 1 717 5,597 ------ ------ ------ POST B.0 (SITE 2) 8 Reservoir 2.497 1 718 4,281 4 268.98 1,713 ROUTE TANK 9 Combine 5.928 1 717 11,608 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 5.105 1 720 10,262 9 265.11 2,062 ROUTE SCM 11 Combine 5.875 1 718 12,348 6,10 ------ ------ POSTA.0 (SITE 1) 12 Combine 8.558 1 718 17,945 7,11 ------ ------ POST (COMBINED) JS0C_SWM_Sites_RTA-Rev1.gpw Return Period: 100 Year Thursday, 01 / 26 / 2023 Cul $ Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -------- 2 69.8703 13.1000 0.8658 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.2597 14.6000 0.8369 -------- 10 88.2351 15.5000 0.8279 -------- 25 102.6072 16.5000 0.8217 -------- 50 114.8193 17.2000 0.8199 -------- 100 127.1596 17.8000 0.8186 -------- File name: SampleFHA.idf Intensity = B / (Tc + D)^E Thursday, 01 / 26 / 2023 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc = time in minutes. Values may exceed 60. )m\60652522\400 Technical\431 Civil\Calculations\Stormwater\Models\Hvdraflow\NC NRCS FortBraaa Atlas-14.oco Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.07 3.71 1.80 0.00 5.45 0.00 0.00 8.20 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PN97470 - Page 23 of 58 CUI 10-Year Hydrograph and Routing Reports I REVISED CUI PN97470 - Page 24 of 58 CUI Hydraflow Table of Contents JS0C_SWM_Sites_RTA-Rev1.gpw Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Watershed Model Schematic...................................................................................... 1 10 -Year HydrographReports................................................................................................................... 2 Hydrograph No. 1, SCS Runoff, PRE A.0 (SITE 1).................................................................. 2 Hydrograph No. 2, SCS Runoff, PRE B.0 (SITE 2).................................................................. 3 Hydrograph No. 3, Combine, PRE (COMBINED).................................................................... 4 Hydrograph No. 4, SCS Runoff, POST A.1.............................................................................. 5 Hydrograph No. 5, SCS Runoff, POST A.2.............................................................................. 6 Hydrograph No. 6, SCS Runoff, POST A.3.............................................................................. 7 Hydrograph No. 7, SCS Runoff, POST B.0 (SITE 2)............................................................... 8 Hydrograph No. 8, Reservoir, ROUTE TANK.......................................................................... 9 PondReport - TANK......................................................................................................... 10 Hydrograph No. 9, Combine, Inflow to SCM(BIOIRET)........................................................ 11 Hydrograph No. 10, Reservoir, ROUTE SCM........................................................................ 12 PondReport - SCM-Rev1.................................................................................................. 13 Hydrograph No. 11, Combine, POST A.0 (SITE 1)............................................................... 14 Hydrograph No. 12, Combine, POST (COMBINED).............................................................. 15 OFReport.................................................................................................................. 16 CUI PN97470 - Page 25 of 58 CUI 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v202O.4 { PRE A.0 (SITE 1) ,?sue PRE B.0 (SITE 2) 3 -PRE (COMBINE�OST A.1 �OST A.2 �OST A.3 �OST B.0 8 - ROUTE TANK 9 - Inflow to SCM (BIOI 10 - ROUTE SCM Legend Hid. Origin Description 1 SCS Runoff PRE A.0 (SITE 1) 2 SCS Runoff PRE B.0 (SITE 2) 3 Combine PRE (COMBINED) 4 SCS Runoff POST A.1 5 SCS Runoff POST A.2 6 SCS Runoff POST A.3 7 SCS Runoff POST B.0 (SITE 2) 8 Reservoir ROUTE TANK 9 Combine Inflow to SCM (BIOIRET) 10 Reservoir ROUTE SCM 11 Combine POST A.0 (SITE 1) 12 Combine POST (COMBINED) 11 -POST A.0 (SITE 1) 12 - POST (COMBINED) 2) Project: JS0C_SWM_Sites_RTA-Rev1.gpw Thursday, 01 / 26 / 2023 cul 2 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 1 PRE A.0 (SITE 1) Hydrograph type = SCS Runoff Peak discharge = 1.022 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,311 cuft Drainage area = 0.610 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 PRE A.0 (SITE 1) Hyd. No. 1 -- 10 Year 2 4 6 8 10 12 14 Hyd No. 1 Q (cfs) 2.00 1.00 0.00 16 18 20 22 24 26 Time (hrs) cul PN97470 - Page 27 of 58 Hydrograph Report cul 3 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Hyd. No. 2 PRE B.0 (SITE 2) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.310 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.45 in Distribution Storm duration = 24 hrs Shape factor Thursday, 01 / 26 / 2023 = 2.292 cfs = 11.95 hrs = 5,003 cuft = 90 = 0 ft = 6.00 min = Type II = 484 Q (cfs) 3.00 PRE B.0 (SITE 2) Hyd. No. 2 -- 10 Year Q (cfs) 3.00 2.00 2.00 1.00 1.00 0.00 0.0 2.0 Hyd No. 4.0 6.0 8.0 10.0 12.0 14.0 16.0 2 0.00 18.0 20.0 Time (hrs) cul PN97470 - Page 28 of 58 cul 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 3 PRE (COMBINED) Hydrograph type = Combine Peak discharge = 3.293 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 7,314 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 0.920 ac PRE (COMBINED) Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 3 Hyd No. 1 Hyd No. 2 Time (hrs) CUI PN97470 - Page 29 of 58 cul 5 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 4 POST A.1 Hydrograph type = SCS Runoff Peak discharge = 1.640 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 3,736 cuft Drainage area = 0.210 ac Curve number = 94 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 w POST A.1 Hyd. No. 4 -- 10 Year 2.0 4.0 6.0 8.0 Hyd No. 4 Q (cfs) 2.00 1.00 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) cul PN97470 - Page 30 of 58 cul 6 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 5 POST A.2 Hydrograph type = SCS Runoff Peak discharge = 2.024 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 4,183 cuft Drainage area = 0.330 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 3.00 2.00 1.00 2.0 4.0 Hyd No. 5 6.0 8.0 POST A.2 Hyd. No. 5 -- 10 Year Q (cfs) 3.00 2.00 1.00 ..n•-- , ' I ' 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) cul PN97470 - Page 31 of 58 cul 7 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 6 POST A.3 Hydrograph type = SCS Runoff Peak discharge = 0.564 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 1,366 cuft Drainage area = 0.070 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) POST A.3 Hyd. No. 6 -- 10 Year Q (cfs) MI MENNEN 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 6 20.0 Time (hrs) cul PN97470 - Page 32 of 58 cul 8 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 7 POST B.0 (SITE 2) Hydrograph type = SCS Runoff Peak discharge = 1.503 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 3,051 cuft Drainage area = 0.280 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 POST B.0 (SITE 2) Hyd. No. 7 -- 10 Year 2 4 6 8 10 12 14 Hyd No. 7 Q (cfs) 2.00 1.00 0.00 16 18 20 22 24 Time (hrs) CUI PN97470 - Page 33 of 58 Hydrograph cul Report 9 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 8 ROUTE TANK Hydrograph type = Reservoir Peak discharge = 1.621 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,136 cuft Inflow hyd. No. = 4 - POST A.1 Max. Elevation = 268.91 ft Reservoir name = TANK Max. Storage = 1,685 cuft Storage Indication method used Q (cfs) 2.00 1.00 ROUTE TANK Hyd. No. 8 -- 10 Year 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 8 Hyd No. 4 ® Total storage used = 1,685 cuft Q (cfs) 2.00 1.00 0.00 20.0 Time (hrs) CUI PN97470 - Page 34 of 58 Pond Report c` l 10 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Pond No. 1 - TANK Pond Data Trapezoid -Bottom L x W = 25.0 x 16.0 ft, Side slope = 0.00: 1, Bottom elev. = 264.70 ft, Depth = 5.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 264.70 400 0 0 0.50 265.20 400 200 200 1.00 265.70 400 200 400 1.50 266.20 400 200 600 2.00 266.70 400 200 800 2.50 267.20 400 200 1,000 3.00 267.70 400 200 1,200 3.50 268.20 400 200 1,400 4.00 268.70 400 200 1,600 4.50 269.20 400 200 1,800 5.00 269.70 400 200 2,000 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 12.00 Inactive Inactive Inactive Crest Len (ft) = 4.97 Inactive Inactive Inactive Span (in) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 268.70 0.00 0.00 0.00 No. Barrels = 1 0 0 0 WeirCoeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 265.00 0.00 0.00 0.00 Weir Type = 1 --- --- --- Length (ft) = 40.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) Stage / Discharge Elev (ft) 5.00 4.00 3.00 2.00 1.00 0 00 269.70 268.70 267.70 266.70 265.70 264.70 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 Total Q Discharge (cfs) CUI PN97470 - Page 35 of 58 cul 11 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 9 Inflow to SCM (BIOIRET) Hydrograph type = Combine Peak discharge = 3.642 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 6,319 cuft Inflow hyds. = 5, 8 Contrib. drain. area = 0.330 ac Inflow to SCM (BIOIRET) Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 — Hyd No. 9 Hyd No. 5 Hyd No. 8 Time (hrs) cul PN97470 - Page 36 of 58 cul 12 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 10 ROUTE SCM Hydrograph type = Reservoir Peak discharge = 3.207 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 1 min Hyd. volume = 4,973 cuft Inflow hyd. No. = 9 - Inflow to SCM (BIOIRET) Max. Elevation = 264.96 ft Reservoir name = SCM-Rev1 Max. Storage = 1,714 cuft Storage Indication method used. ROUTE SCM Q (cfs) Hyd. No. 10 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 — Hyd No. 10 Hyd No. 9 ® Total storage used = 1,714 cult Time (hrs) CUI PN97470 - Page 37 of 58 Pond Report c` l 13 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Pond No. 3 - SCM-Rev1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 263.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 263.50 00 0 0 0.50 264.00 1,262 210 210 1.00 264.50 1,525 696 906 1.50 265.00 2,003 879 1,785 2.00 265.50 3,144 1,276 3,061 2.50 266.00 3,144 1,572 4,633 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 12.00 0.00 0.00 0.00 Crest Len (ft) = 10.00 10.00 0.00 0.00 Span (in) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 264.75 265.50 0.00 0.00 No. Barrels = 1 0 0 0 WeirCoeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 262.40 0.00 0.00 0.00 Weir Type = 1 Broad --- --- Length (ft) = 40.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 3.00 08 0.00 0.00 2.00 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 4.00 6.00 8.00 10.00 12.00 14.00 Elev (ft) 266.50 265.50 264.50 ' 263.50 16.00 Discharge (cfs) CUI PN97470 - Page 38 of 58 cul 14 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 11 POST A.0 (SITE 1) Hydrograph type = Combine Peak discharge = 3.674 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 1 min Hyd. volume = 6,339 cuft Inflow hyds. = 6, 10 Contrib. drain. area = 0.070 ac POST A.0 (SITE 1) Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 — Hyd No. 11 Hyd No. 6 Hyd No. 10 Time (hrs) cul PN97470 - Page 39 of 58 cul 15 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Thursday, 01 / 26 / 2023 Hyd. No. 12 POST (COMBINED) Hydrograph type = Combine Peak discharge = 4.984 cfs Storm frequency = 10 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 9,390 cuft Inflow hyds. = 7, 11 Contrib. drain. area = 0.280 ac POST (COMBINED) Q (cfs) Hyd. No. 12 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 12 Hyd No. 7 Hyd No. 11 Time (hrs) cul PN97470 - Page 40 of 58 Cul 16 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -------- 2 69.8703 13.1000 0.8658 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.2597 14.6000 0.8369 -------- 10 88.2351 15.5000 0.8279 -------- 25 102.6072 16.5000 0.8217 -------- 50 114.8193 17.2000 0.8199 -------- 100 127.1596 17.8000 0.8186 -------- File name: SampleFHA.idf Intensity = B / (Tc + D)^E Thursday, 01 / 26 / 2023 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc = time in minutes. Values may exceed 60. )m\60652522\400 Technical\431 Civil\Calculations\Stormwater\Models\Hvdraflow\NC NRCS FortBraaa Atlas-14.oco Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.07 3.71 1.80 0.00 5.45 0.00 0.00 8.20 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PN97470 - Page 41 of 58 CUI NOAA Atlas-14 Rainfall Data CUI PN97470 - Page 42 of 58 NOAA Atlas 14, Volume 2, Version 3 Location name: F ragg, North Carolina, USA*'� Latitude: 35., Longitude:-79.3504° 3 Elevation: 419.14 ft** `source: ESRI Maps_ ''^x�, "'source: USGS ,...s' POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.439 0.519 0.604 0.667 0.740 0.793 0.843 0.889 0.944 0.987 5-min (0.399-0.485) (0.472-0.573) (0.549-0.667) (0.605-0.735) (D.669-0.815) (0.714-0.872) (0.755-0.926) (0.792-0.976) (0.834-1.04) (0.865-1.09) 0.701 0.829 0.967 1.07 1.18 1.26 1.34 1.41 1.49 1.55 10-min (0.638-0.775) (0.755-0.917) (0.878-1.07) (0.967-1.18) ( 1.07-1.3D) (1.14-1.39) (1.20-1.47) 11 1.26-1.55) (1.32-1.64) ( 1.36-1.71) 0.876 1.04 1.22 1.35 1.50 1.60 1.69 1.78 1.88 1.95 15-min (0.797-0.968) (0.949-1.15) 1 (1.11-1.35) 1 (1.22-1.49) 1 (1.35-1.65) 1 (1.44-1.76) 1 (1.52-1.86) 11 (1.58-1.95) (1.66-2.07) (1.71-2.15) 1.20 1.44 1.74 1.95 2.22 2.41 2.59 2.77 2.99 3.16 30-min 1 ( .09-1.33) (1.31-1.59) (1.58-1.92) (1.77-2.15) (2.00-2.44) (2.17-2.65) (2.32-2.85) (2.47-3.04) (2.64-3.29) (2.77-3.47) 1.50 1.81 2.23 2.54 2.95 3.27 3.57 3.88 4.29 4.61 60-min (1 .36-1.66) (1.65-2.00) (2.02-2.46) (2.31-2.80) (2.66-3.25) (2.94-3.59) (3.20-3.93) (3.46-4.26) (3.794.72) ( 4.D4-5.07) 1.76 2.13 2.66 3.07 3.61 4.03 4.46 4.89 5.47 5.92 2-hr 1 ( .59-1.96) (1.93-2.37) (2.40-2.97) (2.77-3.42) (3.23-4.02) (3.60-4.49) (3.95-4.96) (4.31-5.43) ( 4.77-6.08) (5.12-6.59) 3-hr 1.68-62608 2.04 2552 2.56-3316 2.96 3066 3.50135 3.93 4191 4. 65348 4.80 6008 5.40 6392 5.87-67459 6.63 6-hr 2.01 2.46 2.44-62097 3.06 3?73 3. 54 34 4.216.17 4.73 5185 5. 6 6555 5.81-7.29 6.56 8832 7. 4 9417 2. 4. 9. 12-hr 2.372�90 2.87 3051 3.62D .44 4. 26819 5.03 6321 5. 9-47 07 6.36 7496 7.06 8?92 8.02-310.3 8.78-141.4 3.07 3.71 4.68 5.45 6.50 7.34 8.20 9.10 10.3 11.3 24-hr (2.85-3.33) (3.444.03) (4.33-5.08) (5.03-5.90) (5.98-7.04) (6.73-7.94) (7.50-8.87) 11 (8.30-9.83) (9.38-11.2) (10.2-12.2) 3.58 4.31 5.40 6.26 7.43 8.37 9.33 10.3 11.7 12.8 2-day (3.32-3.86) (4.014.65) (5.01-5.82) (5.80-6.74) 1 (6.86-8.00) (7.70-9.01) (8.57-10.0) 11 (9.44-11.1) (10.6-12.6) (11.6-13.8) 3.79 4.57 5.68 6.57 7.78 8.75 9.74 10.8 12.2 13.3 3-day (3.54-4.07) (4.264.90) (5.29-6.10) (6.11-7.04) (7.21-8.34) (8.08-9.38) 1 (8.97-10.5) (9.88-11.6) (11.1-13.1) (12.1-14.3) 4.01 4.82 5.97 6.88 8.14 9.13 10.2 11.2 12.7 13.8 4-day (3.75-4.29) (4.51-5.16) (5.58-6.38) (6.42-7.34) (7.56-8.69) (8.46-9.75) 1 (9.38-10.9) 1 (10.3-12.0) (11.6-13.6) (12.6-14.8) 12 4.1 7-day 3 4 33 4496 5. 85493 6. 7025 7.23 8030 8.47-9.74 9.44-10.9 10.4- 2.1 11 5-13.3 12.18-15.0 13 9516.3 5.3064 619417 10-day 5. 5.9.12 7.88209 8.11.3 9.37o1D.6 10.4-11.8 113�13.0 1213-14.1 1317415.8 1417617.0 0. 17618.8 20-day 2.3 6.7.1457 7.98 8495 9.4 D.6 10.6 ,2.9 1212.1 7 131415.0 1415-16.4 155.5 1713 19.8 18 50 30-day 8 8 9738 9.88- 1.1 115�12.9 12.18-14.3 14.4-16.2 15.17---17.6 16.19-19.1 18.11 0.5 19.7 2.5 21 0-24.0 11.2 13.2 15.1 16.6 18.5 20.0 21.4 22.8 24.6 26.0 45-day (10.6-11.9) 11 (12.5-13.9) 11 (14.3-15.9) (15.7-17.5) (17.5-19.5) (18.8-21.1) (20.1-22.6) 1 (21.4-24.1) (23.1-26.1) (24.3-27.6) 13.4 15.7 17.9 19.5 21.6 23.2 24.7 26.2 28.1 29.6 60-day (12.8-14.2) (14.9-16.6) (16.9-18.8) (18.5-20.5) (20.4-22.7) (21.9-24.4) (23.3-26.0) (24.7-27.6) (26.4-29.7) (27.7-31.3) t Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical CUI PN97470 - Page 43 of 58 NOAA Atlas 14, Volume 2, Version 3 Location name: F ragg, North Carolina, USA*'� Latitude: 35., Longitude:-79.3504° 3 Elevation: 419.14 ft** `source: ESRI Maps_ ''^x�, "'source: USGS ,...s' POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in incheslhour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5.27 6.23 7.25 8.00 8.88 9.52 10.1 10.7 11.3 11.8 5-min (4.79-5.82) (5.66-6.88) (6.59-8.00) (7.26-8.82) (8.03-9.78) (8.57-10.5) (9.06-11.1) (9.50-11.7) ( 10.0-12.5) 10.4-13.0) 4.21 4.97 5.80 6.40 7.08 7.58 8.04 8.45 8.96 9.32 10-min (3.83-4.65) (4.53-5.50) (5.27-6.41) (5.80-7.05) (6.40-7.79) (6.83-8.33) (7.20-8.83) (7.54-9.29) ( 7.91-9.85) (8.17-10.3) 3.50 4.17 4.89 5.39 5.98 6.40 6.78 7.11 7.52 7.80 15-min (3.19-3.87) (3.80-4.61) (4.44-5.40) (4.89-5.94) (5.40-6.58) (5.76-7.04) (6.07-7.44) (6.34-7.81) (6.64-8.26) (6.84-8.58) 2.40 2.88 3.47 3.91 4.43 4.82 5.19 5.53 5.98 6.32 30-min (2.19-2.65) (2.62-3.18) (3.16-3.84) (3.55-4.31) (4.00-4.88) (4.34-5.30) (4.65-5.70) (4.93-6.08) (5.28-6.57) (5.54-6.95) 1.50 1.81 2.23 2.54 2.95 3.27 3.57 3.88 4.29 4.61 60-min (1 .36-1.66) (1.65-2.00) (2.02-2.46) (2.31-2.80) (2.66-3.25) (2.94-3.59) (3.20-3.93) (3.46-4.26) (3.79-4.72) 4.04-5.07) 0.878 1.06 1.33 1.53 1.81 2.02 2.23 2.44 2.73 2.96 2-hr (0.794-0.980) (0.962-1.19) 1 (1.20-1.48) 1 (1.38-1.71) 11 (1.62-2.01) 1 (1.80-2.24) (1.98-2.48) (2.15-2.72) (2.39-3.04) (2.56-3.29) 1.09 1.8 3-hr 0.560-0 691 0.6778--0 837 0.8594105 0.987---11.22 1.17-31a45 1.31-41764 1.45-61482 1.60--2?02 1. 00.30 1.95 2853 1g3953 6-hr 0.336-04 11 0.407---0 496 0.511-0 623 0.592--0..725 0.703-0 864 0.790-0 977 0.879--11.09 0.970-1.22 1.10-21.39 1 67 0.532 12-hr 0.197-0.241 0.238-0.292 0.300--0 368 0.350-0430 0.4D18-0516 0.4772-0586 0.5228-0 661 0.586-0. 40 0.666-0 854 .863 0.728-0 946 0.128 0.155 0.195 0.227 0.271 0.306 0.342 0.379 0.430 0.471 24-hr (0.119-0.139) (0.143-0.168) (0.181-0.212) (0.209-0.246) (0.249-0.293) (0.281-0.331) (0.313-0.370) (0.346-0.410) (0.391-0.465) (0.426-0.509) 0.074 0.090 0.112 0.130 0.155 0.174 0.194 0.215 0.243 0.266 2-day (0.069-0.080) (0.084-0.097) (0.104-0.121) (0.121-0.140) (0.143-0.167) (0.160-0.188) (0.178-0.209) (0.197-0.232) (0.222-0.263) (0.241-0.287) 0.053 0.063 0.079 0.091 0.108 D.122 0.135 D.150 0.169 0.184 3-day (0.049-0.057) (0.059-0.068) (0.074-0.085) (0.085-0.098) (0.100-0.116) (0.112-0.130) (0.125-0.145) (0.137-0.161) (0.154-0.182) (0.168-0.199) 0.042 0.050 0.062 0.072 0.085 1.095 0.106 0.117 0.132 0.144 4-day (0.039-0.045) (0.047-0.054) (0.058-0.066) (0.067-0.076) (0.079-0.090) (0.088-0.102) (0.098-0.113) (0.108-0.125) (0.121-0.141) (0.131-0.154) 0.021 7-day 0.026-0 030 0.031 0 035 0.038-0043 0. 4 -0 049 0.050-0 058 0.056-0065 006 -0 072 D. 68-D 079 0.076-0 089 0. 8 -0 097 10-day .142 0.021--0 024 0.02 -0 028 0.030-0034 0.03 -0 038 0.039-0 044 0.043-D 049 0047--0 054 0.051 D 059 0.057--0 066 0. 61--0 071 021 123 1.127 1.14 20-115 day 0.014-0 016 0.017--0 019 0.020-0022 0.02 -0 025 0. 0028 0.028-0031 0.03 0-0 034 0.033-D 037 0.036-0 041 0.039-0 044 0.112 30-day .121 0.01 -0 013 0.014-0 015 0.016-0018 0.018-002D 0.020-0 022 0.02 -0 024 0.023--0 026 0.025-D 028 0.027--0 031 0.029-0 033 0.01D 0.012 0.014 0.015 0.017 1.018 0.020 1.021 0.023 0.024 45-day (0.010-0.011) (0.012-0.013) (0.013-0.015) (0.015-0.016) (0.016-0.018) (0.017-0.020) (0.019-0.021) (0.020-0.022) (0.021-0.024) (0.023-0.026) 0.009 O.D11 0.012 0.014 0.015 0.016 0.017 D.018 0.020 0.021 60-day (0.009-0.010) (0.010-D.D11) (0.012-0.013) (O.D13-D.014) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-D.D19) (0.018-0.021) (0.019-0.022) frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). rsinparenthesis are PF estimates at lower and upper hounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a EP,.�afn,121,on uration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not dagainst probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. fer to NOAA Atlas 14 document for more information. Back to Top PF graphical CUI PN97470 - Page 44 of 58 CUI Bioretention SCM Underdrain Calculations CUI PN97470 - Page 45 of 58 cul NCDEQ Stormwater Design Manual 0 Environmental Quality When an impoundment is located in karst topography, gravelly sands, or fractured bedrock, a liner may be needed to sustain a permanent pool of water. If geotechnical tests confirm the need for a liner, acceptable options can include: 6 to 12 inches of clay soil (minimum 15 percent passing the #200 sieve and a maximum permeability of 1 x 10-5 cm/sec), a 30 mil poly -liner, or a bentonite liner. Underdrain Systems Underdrain systems are utilized in several SCM designs, and can have many different configurations. The underdrain system will either daylight, connect to another SCM, or connect to the conveyance system. All piping within the underdrain system should have a minimum slope of 0.5 percent and should be constructed of Schedule 40 or SDR 35 smooth wall PVC pipe. The underdrain pipes should be designed to carry 2-10 times the maximum flow exfiltrating from the SCM medium. Choose a value within this range to reflect the expected stability of the drainage area. This maximum flow is computed from Darcy's law and assuming maximum ponding and complete saturation along the depth of the medium. Manning's formula is then used to size the pipe. Due to the risk of underdrain clogging, designers are encouraged to install more than one underdrain of smaller diameter in order to facilitate drainage. The minimum size of pipe should be 4-inch diameter. The spacing of collection laterals should be no greater than 10 feet center to center, and a minimum of two pipes should be installed to allow for redundancy (Hunt and White, 2001). A minimum of 4 rows of perforations should be provided around the diameter of the pipe (more for pipes 10 inches in diameter and larger), and the perforations should be placed 6 inches on center within each row for the entire length of the drainage lateral. Perforations should be 3/8-inch in diameter. The underdrain pipes should have a minimum of 3 inches of washed #57 stone above and on each side of the pipe (stone is not required below the pipe). Above the stone, either filter fabric or two inches of choking stone is recommended to protect the underdrain from blockage. Avoid filter fabric if there is any question about the future stability of the drainage area. Above the filtering device, a minimum of 2 inches of washed sand should be installed. Choking stone (#8 or #89) in lieu of filter fabric is recommended if there is potential for higher sediment loads that would lead to clogging. Pipe socks are also not recommended. Typically, bioretention SCMs in the Piedmont region of North Carolina will require underdrains with an up -turned elbow. The number of pipes needed for the underdrain system can be determined using the following 3- step process: 1. Determine flow rate through the soil media and apply a safety factor of 10 (this is now the underdrain design flow, Q). 2. Use Equation 1 below FILTER MEDIA SURFACE AREA —1260 SF 6 i n/h r = 0.5 ft/h r ... 0.5* 1260 / 3600 = 0.175 cfs x 10 = 1.75 cfs 2 i n/h r = 0.16 ft/h r ... 0.16* 1260 / 3600 = 0.056 cfs x 10 = 0.56 cfs A-5. Common SCM Structures & Materials 12 Revised: 2-11-2018 cul PN97470 - Page 46 of 58 NCDEQ Stormwater Design Manual cul En vironmental Quality Equation 1: Underdrain Pipe Size (3) for 6 in/hr (MAX): Q = 1.75 cfs --> D = 9.82 inches 8 for 4 in/hr: Q = 1.16 cfs --> D = 8.41 inches D = 16 So.s for 3 in/hr: Q = 0.88 cfs --> D = 7.57 inches for 2 in/hr (MIN): Q = 0.56 cfs --> D = 6.41 inches where: D = Diameter of single pipe (inches) n = Roughness factor (recommended to be 0.011) S = Internal slope (recommended to be 0.5%) Q = Underdrain design flow (cfs) 3. The only unknown is D. This is the diameter of a single pipe that could carry all the water were it to be the only underdrain. Underdrain pipe diameters are typically either 4 inches or 6 inches. Table 1 and 2 below convert D (in inches) to an equal number of 4 or 6 inch underdrains at 0.5% slope. Table 1: Number of 4" Pipes Required in the Underdrain 5.13 2 5.95 3 4 - 4" underdrains to 6.66 4 handle a media infiltration rate of u p to 2 in/hr. 7.22 5 7.75 6 8.20 7 Table 2: Number of 6" Pipes Required in the Underdrain ff ' is Less Than No. of 6" Pipes 2 - 6" underdrains to 7.84 2 handle a media infiltration rate up to 3 in/hr. 9.11 3 4 - 6" underdrains to 10.13 4 handle a media infiltration rate of up to 6 in/hr. A-5. Common SCM Structures & Materials 13 Revised: 2-11-2018 SUMMARY: Selecting underdrains for 3 in/hr (nominal) target. USE two 6-inch underdrains connected to one 8-inch underdrain manifold. Turn up manifold with 90d elbows to set the internal water storage�IWS) depth as shown on drawings. PN97470 - Paae 47 of cul NCDEQ Stormwater Design Manual Environmental Quality R i ill 4 C P_ I Outlets of SCMs are the devices that control the flow of stormwater out of the SCM to the conveyance system (stormwater pipe, natural drainageway, etc.). While most of the water quality treatment takes place within the SCM, the outlet design is often integral to treatment efficiency, as well as being a critical factor in stormwater volume control. Water quality is affected by how quickly the water is removed from the treatment unit, thereby affecting sedimentation time and possibly causing resuspension of particles. The depth from which the water is drawn also affects water quality, since the water is typically cleaner the higher it is in the water column. Finally, the design of the outlet is also the main means of controlling peak flow volumes and rates. Outlet designs are specific for each SCM depending on the goals to be achieved. The following sections will discuss many of the most common outlet designs. Hydraulic calculations for outlets types as well as storage and drawdowns are provided in Part B, Calculation Guidance. It should be noted that floatation issues should be considered with any structure (outlet box, riser, etc.) placed within a SCM. Designers should consider including provisions such as adjustable weirs to regulate and optimize water surface elevations and bottom drains and valves to allow the SCM to be drained for repairs and maintenance A drawdown orifice should have a turned -down elbow or other safeguard in order to prevent trash or other material floating on the surface from clogging the pipe. An example is shown in Figure 5. A-5. Common SCM Structures & Materials 14 Revised: 2-11-2018 cul PN97470 - Page 48 of 58 CUI Erosion & Sediment Control Outlet Protection CUI PN97470 - Page 49 of 58 Channel Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Sep 6 2022 OVERFLOW FROM CONTAINMENT TO BIORETENTION (OP-1) Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.58 Q (cfs) = 1.600 Area (sqft) = 0.47 Invert Elev (ft) = 264.00 Velocity (ft/s) = 3.38 Slope (%) = 0.50 Wetted Perim (ft) = 1.73 N-Value = 0.013 Crit Depth, Yc (ft) = 0.54 Top Width (ft) = 0.99 Calculations EGL (ft) = 0.76 Compute by: Known Q Known Q (cfs) = 1.60 Elev (ft) Section Depth (ft) 266.00 2.00 265.50 1.50 265.00 1.00 gyp 264.50 - 0.50 264.00 0.00 263.50 -0.50 0 1 2 3 CUI Reach (ft) PN97470 - Page 50 of 58 cul Depth Q Area Veloc wp (ft) (cfs) (sgft) (ft/s) (ft) 0.10 0.053 0.041 1.29 0.64 0.20 0.223 0.113 1.98 0.93 0.30 0.494 0.198 2.49 1.16 0.40 0.850 0.294 2.89 1.37 0.50 1.268 0.395 3.21 1.57 0.60 1.698 0.493 3.44 1.77 0.70 2.113 0.588 3.59 1.98 0.80 2.462 0.674 3.65 2.22 0.90 2.685 0.745 3.60 2.50 1.00 2.518 0.785 3.21 3.14 Hydraflow Express - OVERFLOW FROM CONTAINMENT TO BIORETENTION (OP-1) - 09/6/22 1 cul PN97470 - Page 51 of 58 cul Yc TopWidth Energy (ft) (ft) (ft) 0.10 0.60 0.13 0.20 0.80 0.26 0.30 0.92 0.40 0.39 0.98 0.53 0.48 1.00 0.66 0.56 0.98 0.78 0.63 0.92 0.90 0.68 0.80 1.01 0.71 0.60 1.10 0.68 0.00 1.16 Hydraflow Express - OVERFLOW FROM CONTAINMENT TO BIORETENTION (OP-1) - 09/6/22 2 cul PN97470 - Page 52 of 58 Channel Report Hydraflow Express Extension for AUtodeskS Civil 31DO by Autodesk, Inc. BIORETENTION OUTFALL (OP-2) Circular Diameter (ft) = 1.00 Invert Elev (ft) = 262.40 Slope (%) = 0.50 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 1.90 Elev (ft) 264.00 263.50 263.00 262.50 262.00 261.50 Tuesday, Sep 6 2022 Highlighted Depth (ft) = 0.65 Q (cfs) = 1.900 Area (sqft) = 0.54 Velocity (ft/s) = 3.50 Wetted Perim (ft) = 1.88 Crit Depth, Yc (ft) = 0.59 Top Width (ft) = 0.95 EGL (ft) = 0.84 Section Depth (ft) .60 1.10 0.10 -0.40 1 1 -0.90 1 2 3 CUI Reach (ft) PN97470 - Page 53 of 58 cul Depth Q Area Veloc Wp (ft) (cfs) (sgft) (ft/s) (ft) 0.10 0.053 0.041 1.29 0.64 0.20 0.223 0.113 1.98 0.93 0.30 0.494 0.198 2.49 1.16 0.40 0.850 0.294 2.89 1.37 0.50 1.268 0.395 3.21 1.57 0.60 1.698 0.493 3.44 1.77 0.70 2.113 0.588 3.59 1.98 0.80 2.462 0.674 3.65 2.22 0.90 2.685 0.745 3.60 2.50 1.00 2.518 0.785 3.21 3.14 Hydraflow Express - BIORETENTION OUTFALL (OP-2) - 09/6/22 1 cul PN97470 - Page 54 of 58 cul Yc Topwidth Energy (ft) (ft) (ft) 0.10 0.60 0.13 0.20 0.80 0.26 0.30 0.92 0.40 0.39 0.98 0.53 0.48 1.00 0.66 0.56 0.98 0.78 0.63 0.92 0.90 0.68 0.80 1.01 0.71 0.60 1.10 0.68 0.00 1.16 Hydraflow Express - BIORETENTION OUTFALL (OP-2) - 09/6/22 2 cul PN97470 - Page 55 of 58 Culvert Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Thursday, Jan 26 2023 BIORET OUTFALL TO OP-2 (10-YR) I REVISED Invert Elev Dn (ft) = 262.20 Calculations Pipe Length (ft) = 40.00 Qmin (cfs) = 1.00 Slope (%) = 0.50 Qmax (cfs) = 4.00 Invert Elev Up (ft) = 262.40 Tailwater Elev (ft) _ (dc+D)/2 Rise (in) = 12.0 Shape = Circular Highlighted Span (in) = 12.0 Qtotal (cfs) = 3.30 No. Barrels = 1 Qpipe (cfs) = 3.30 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 4.47 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.20 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 263.09 HGL Up (ft) = 263.45 Embankment Hw Elev (ft) = 263.77 Top Elevation (ft) = 265.23 Hw/D (ft) = 1.37 Top Width (ft) = 5.00 Flow Regime = Inlet Control Crest Width (ft) = 10.00 Ele (ft) 26600 265.OD 264.00 20.00 262 0D 261.OD c Name> Circular Culvert HGL Embank Hw Depth (R) 360 2.60 1.60 0.60 -0 40 -1.40 Reach (R) Cul PN97470 - Page 56 of 58 cul REVISED0 (OP-1) .. .. OALa = , E ' D- 6 (using 0 ' � - s �.USE NCDOT... 1 I1 i . I '1911 ii' a � r • • ��� �� II III 'a��� '�� I' I. ►_ NMI � ii � rNN��rl� rtr • � � ,� �� �� �� , .� ■off®iI�I� iR'�i�; I� � • JI lm � �0.0 � E I .��wm.�erwrwrnrw�w����ftifti������� ���1111� rlr rrl 1 Curves may not be extrapolated. Figure 8.06b Design of outlet pr❑teation from a round pipe flowing full, maximum tailwater condition (Tw? 0.5 diameter). CONTAINMENT TANK TO 13IORETENTION BASIN (OP-1) 12" DUCTILE IRON PIPE @ 0.5% SLOPE Q10 = 1.6 cfs (from 10-yr reservoir V10 = 3.4 fps Qfull = 2.7 cfs (full discharge, gravity flow only) Vfull = 3.7 fps (full velocity, gravity flow only) 8.06.4 Rev. 12/93 cul PN97470 - Page 57 of 58 cul REVISED (OP-2) Outlet W = Do + O.4La pipe diameter (Ors) La Tailw ter 5136 30 20 .i 10 USE minimum 0 3 5 50 100 Discharge (P/sec) Curves may not be extrapolated. Figure 8.06b Design of outlet pr❑teation from a round pipe flowing full, maximum tailwater condition (Tw? 0-5 diameter). 13IORETENTION BASIN OUTFALL (OP-2) 12" DIP @ 0.5% SLOPE Q10 = 3.3 cfs (from 10-yr reservoir routing output) V10 = 4.2 fps (from continuity) Qfull = 2.7 cfs (full discharge, gravity flow only) Vfull = 3.7 fps (full velocity, gravity flow only) 8.06.4 Rev. 12/93 PN97470 - Page 58 of 58 z N_ Q Q 1 � i o Lo to USE 100p minimum cul