January 24, 2023
Mr. Zahid Khan
North Carolina Department of Environmental Quality
Mooresville Regional Office
610 East Center Avenue, Suite 301
Mooresville, North Carolina 28115
Re: 4411— Carringdon Subdivision, Weddington, NC
SW3160702
Dear Zahid:
200 South Tryon Street, Suite 1400
Charlotte, NC 28202
Office: 704-376-1555
colejeneststone.com
Construction of the storm water management facilities associated with the referenced project, as permitted under the
North Carolina Department of Environmental Quality Storm Water Permit No. SW3160702, has been partially
completed. A copy of the Designer's Certification covering installation of Wet Detention Basin #2 and Wet Detention
Basin #3 is attached. Wet Detention Basin #1 has been previously certified. Wet Detention Basin #4 remains to be
certified.
Please let us know if you require anything further.
Best regards,
R. Todd Fisher, PE
Principal I Director of Engineering
Enclosure
cc: Mr. DJ Moton — M/I Homes of Charlotte
Ms. Bonnie A. Fisher, PE — La Bella Associates
Mr. Robert B. Hayes, El - CJS
State Stormwater Permit
Permit No. SW3160702
M/1 Homes of Charlotte, LLC
High Density Development, Carringdon, in Union County
Designer's Certification
1 R. Todd Fisher , as a duly registered _ Professional Engineer _ in the
State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
Carringdon Subdivision Wet Detention Basin #2 and #3
(Project Name)
for M/1 Homes of Charlotte _(Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
Signature
Registration Number 025163
Date 01 /24/23
cc: NCQ-DEMLR Regional Office
SEAL
CARO
:•z
SEAL '
25163
;ODD ...• ;
11nnu►0
Page 1 of 1
Certification Requirements:
X 1 The drainage area to the system contains approximately the permitted
acreage.
_X 2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
X .3. All the built -upon area associated with the project is graded such that the
runoff drains to the system. (as per approved plan)
X 4. All roof drains are located such that the runoff is directed into the system.
(as per approved plan)
X 5. The outlet/bypass structure elevations are per the approved plan.
X 6. The outlet structure is located per the approved plans.
X _7. Trash rack is provided on the outlet/bypass structure. (solid top)
X 8 All slopes are grassed with permanent vegetation, per the vegetation plan.
_X _9. Vegetated slopes are no steeper than 3.1.
X 10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
X _11. The permitted amounts of surface area and/or volume have been
provided.
X 12. Required drawdown devices are correctly sized and located per the
approved plans.
X 13. All required design depths are provided.
X 14. All required parts of the system are provided, such as plantings, a forebay,
filter media and a vegetated filter.
X 15. The required system dimensions are provided per the approved plans.
�n Colelenest&Stone
I � 1 BOLTON & MENK,INC.
11/01/22 Field Observation
Report
Project Title:
Harlow's Crossing (Carringdon)
Project Address:
Weddington-Matthews Road
Weddin ton, NC 28104
Project Number:
4411.16
Date of Visit:
10/17/2022
Observed By:
Robert B. Hayes, El, CMCSI
Time of Arrival:
9:21 AM
Contractor:
I M/1 Homes of Charlotte (Developer)
Weather Conditions: I Partly Cloudy Temperature (F) 62°
Present at Site:
Anne Loftin
Transmitted via:
® E-Mail ❑ Overnight ❑ Courier ❑ Hand Delivery ❑ Pick -Up
A stormwater control measure (SCM) inspection visit was made on 10/17/22, to observe final construction
of BMP #2 conditions for certification asbuilts. The following is a summary of observations.
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Repo rts\2022\22-1 017 - Field Report for BMP #2\4411 - BMP #2
Conversion Field Report (22-1017).docx P a g e 11
(D Co■eleneS &Stone
BOLON & MENK,IN£
11/01/ 2 Field Observation
Repot
R3Ds PRO J4� «1yc mmmGme c nUuct . wn 6d m&G\20222 d @7-FydRepo, U BMP42 kv-BMP G
Conversion Field Re&,(222@7)6o Page12
�n Colelenest&Stone 11/01/22 Field Observation
I � 1 BOLTON & MENK,INC. Report
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #2\4411 - BMP #2
Conversion Field Report (22-1017).docx P a g e 13
�n Colelenest&Stone 11/01/22 Field Observation
I � 1 BOLTON & MENK,INC. Report
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #2\4411 - BMP #2
Conversion Field Report (22-1017).docx P a g e 14
�n Colelenest&Stone
I � 1 BOLTON & MENK,INC.
3
11/01/22 Field Observation
Report
Planted littoral shelf
�s
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Repo rts\2022\22-1 017 - Field Report for BMP #2\4411 - BMP #2
Conversion Field Report (22-1017).docx P a g e 15
�n Colelenest&Stone 11/01/22 Field Observation
I � 1 BOLTON & MENK,INC. Report
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #2\4411 - BMP #2
Conversion Field Report (22-1017).docx P a g e 16
�n Colelenest&Stone 11/01/22 Field Observation
I � 1 BOLTON & MENK,INC. Report
�
•_
i t V -.
r..� .✓: � a.R R�➢Ci. `S � s .J �C ,d j'�` }{d � __
fs
P—
sy
St
1
K
.�y`
i� rvia°"
V. �-e�' •.
S \L
a � �C Z _' `},y, r �
� n
. y"
# �
.ye .??+` .s4.'_ }� _
r l4i
ti ia��F tdY'�.
7 FFF
me
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #2\4411 - BMP #2
Conversion Field Report (22-1017).docx P a g e 17
�n Colelenest&Stone 11/01/22 Field Observation
I � 1 BOLTON & MENK,INC. Report
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #2\4411 - BMP #2
Conversion Field Report (22-1017).docx P a g e 18
�n Colelenest&stone 11/01/22 Field Observation
� 1 BOLTON & MENK,INC. Report
Name and Firm:
Cc: DJ Moton — M/I Homes of Charlotte, LLC
Todd Fisher, PE - CJS
Information contained in this Field Observation Report prepared by Bolton & Menk, Inc., dba ColeJenest
& Stone, has been prepared to the best of our knowledge according to observable conditions at the site.
The failure to include any items in this report does not alter the responsibility of the Contractor to
complete all work in accordance with the Contract Documents. This information will be approved record
unless written notice to the contrary is received within seven (7) calendar days of the issue date of
this document.
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #2\4411 - BMP #2
Conversion Field Report (22-1017).docx P a g e 19
�n Colelenest&Stone
I � 1 BOLTON & MENK,INC.
11/01/22 Field Observation
Report
Project Title:
Harlow's Crossing (Carringdon)
Project Address:
Weddington-Matthews Road
Weddin ton, NC 28104
Project Number:
4411.16
Date of Visit:
10/17/2022
Observed By:
Robert B. Hayes, El, CMCSI
Time of Arrival:
9:03 AM
Contractor:
I M/I Homes of Charlotte (Developer)
Weather Conditions: I Partly Cloudy Temperature (F) 62'
Present at Site:
Anne Loftin
Transmitted via:
® E-Mail ❑ Overnight ❑ Courier ❑ Hand Delivery ❑ Pick -Up
A stormwater control measure (SCM) inspection visit was made on 10/17/22, to observe final construction
of BMP #3 conditions for certification asbuilts. The following is a summary of observations.
ion Observations:
1. Installed Outlet control structure.
'o®
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Repo rts\2022\22-1 017 - Field Report for BMP #3\4411 - BMP #3
Conversion Field Report (22-1017).docx P a g e 11
�n Colelenest&Stone
I � 1 BOLTON & MENK,INC.
11/01/22 Field Observation
Report
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #3\4411 - BMP #3
Conversion Field Report (22-1017).docx P a g e 12
�n Colelenest&Stone 11/01/22 Field Observation
I � 1 BOLTON & MENK,INC. Report
2. Vegetated embankments
n II �:ry
r �
- - - -.
_. X�
_kr�a Mil
v `-Mri
. a..rsti rFr� :�v.. �.,•.. ��A-`.' �� -,. ..- _.-., .L:,h:�" xG`5s8. _. �.. R4' � ^. ,
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #3\4411 - BMP #3
Conversion Field Report (22-1017).docx P a g e 13
�n Colelenest&Stone
I � 1 BOLTON & MENK,INC.
3. Planted littoral shelf
11/01/22 Field Observation
Report
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 - Field Report for BMP #3\4411 - BMP #3
Conversion Field Report (22-1017).docx P a g e 14
�n Colelenest&Stone
I � 1 BOLTON & MENK,INC.
tMM77 WIT,
A!"
11/01/22 Field Observation
Report
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 - Field Report for BMP #3\4411 - BMP #3
Conversion Field Report (22-1017).docx P a g e 15
�n Colelenest&Stone 11/01/22 Field Observation
I � 1 BOLTON & MENK,INC. Report
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #3\4411 - BMP #3
Conversion Field Report (22-1017).docx P a g e 16
�n Colelenest&Stone 11/01/22 Field Observation
I � 1 BOLTON & MENK,INC. Report
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #3\4411 - BMP #3
Conversion Field Report (22-1017).docx P a g e 17
�n Colelenest&Stone 11/01/22 Field Observation
I � 1 BOLTON & MENK,INC. Report
6. Damn & outlet dischar e
h
N .::r . a..rli"raP� fit+•^ � oz ... od' . rr• tiv �,rg"�#_�r fa.:..� .m..i.,.. .._ �= s �, .
36 K`
w
i h
� AJ •t��b1y�n. . '��yis'` "bA� �t '� _ l+ v ',S
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #3\4411 - BMP #3
Conversion Field Report (22-1017).docx P a g e 18
he �
.�. A
i�
�(�
4
C
h -{ �
2r..°`lZ2,
�n Colelenest&Stone
I � 1 BOLTON & MENK,INC.
Name and Firm:
Cc: DJ Moton — M/I Homes of Charlotte, LLC
Todd Fisher, PE - CJS
11/01/22 Field Observation
Report
Information contained in this Field Observation Report prepared by Bolton & Menk, Inc., dba ColeJenest
& Stone, has been prepared to the best of our knowledge according to observable conditions at the site.
The failure to include any items in this report does not alter the responsibility of the Contractor to
complete all work in accordance with the Contract Documents. This information will be approved record
unless written notice to the contrary is received within seven (7) calendar days of the issue date of
this document.
P:\SDSKPROJ\4411\_Correspondences\Construction Admin\Field Reports\2022\22-1017 -Field Report for BMP #3\4411 - BMP #3
Conversion Field Report (22-1017).docx P a g e 110