Loading...
HomeMy WebLinkAbout20230179 Ver 1_11B.200311_DWR 20230179v1_Bridge 122_Alleghany_NWP 3 Application__NCWRC Comments_20230208 } '. WIN North Carolina Wildlife Resources Commission 9 Cameron Ingram, Executive Director February 8,2023 Lori Beckwith U.S. Army Corps of Engineers,Asheville Regulatory Field Office 151 Patton Avenue,Room 208 Asheville,NC 28801 Dave Wanucha NCDEQ,DWR 450 Hanes Mill Road, Suite 300 Winston Salem,NC 27105 SUBJECT: Comments on NWT 3 Application for Replacement of Bridge 122 on SR 1479 over Big Pine Creek,Alleghany County(WBS 1113.200311) DWR 20230179 ver.l Dear Ms.Beckwith and Mr. Wanucha, The North Carolina Department of Transportation(NCDOT) applied for a Nationwide 404 Permit and 401 Certification for the subject project. North Carolina Wildlife Resources Commission(NCWRC) staff are familiar with the wildlife resources in the project area. Comments on the application from the NCWRC are offered to help conserve the wildlife resources affected by the project and to promote wildlife-based recreation in accordance with applicable provisions of the state and federal Environmental Policy Acts (G.S. 113A-1through 113-10; 1 NCAC 25 and 42 U.S.C. 4332(2)(c),respectively),the Clean Water Act of 1977 (33 U.S.C. 466 et seq.), and the Fish and Wildlife Coordination Act(48 Stat. 401, as amended; 16 U.S.C. 661-667d). The project involves replacing the existing timber bridge over Ping Pine Creek with a similar structure. As noted in the prior correspondence from NCDOT,the NCWRC believes that the trout moratorium can be waived for this project. This stream has poor quality and trout were not detected in the most recent sampling. The NCWRC has no concerns with the proposed project. Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh,NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 11B.200311 Page 2 February 8,2023 Alleghany County Thank you for the opportunity to review and provide recommendations on this project. Please contact me at or(828)476-1966 if you have any questions about these comments. Cordially, IIZ� - Dave McHenry,NCWRC Western DOT Coordinator ec: Kevin Hining,NCDOT Division 11 Environmental Supervisor