It is a direct violation of your approved plan to initiate
any land disturbing activities PRIOR to holding a
scheduled Pre -Construction Conference
Please contact our office at 704-736-8501 to schedule
our Pre -Construction Conference prior to any land
disturbance. Your copy of the approved plan and
grading certificate will be delivered to you and/or your
grader onsite at the meeting.
° r SOIL EROSION and SEDIMENTATION CONTROL
`' Lincoln County Natural Resources Department
RNAT�K L 115 West Main Street, Lincolnton, NC 28092 704-736-8501 Fax: 704-736-8504
LETTER OF APPROVAL
Project Name: Victory Baptist Church
Submitted By: Shabeldeen Engineering
Project ID 9: 23-COM-02
Date received by LCNRD: 1/12/23
Location: 6041 King Wilkinson Rd., Denver, NC 28037
Plan Type: Commercial
Watershed: Catawba River Basin
Acres Approved: 0.85 acres
Contact Office to Schedule Pre -Construction Conference Prior to Any Land
Disturbance
Date: 2/3/23
Victory Baptist Church of Denver
c/o Grayson Ramsey
6041 King Wilkinson Road
Denver, NC 28037
Dear Mr. Grayson Ramsey,
This office has reviewed the subject Soil Erosion and Sedimentation Control Plan. We find the plan to be
acceptable and hereby issue this Letter of Plan Approval. If any modifications, performance reservations, or
recommendations are applicable, a list is enclosed and incorporated as a part of this letter of approval. If
any modifications are not incorporated into the plan and implemented in the field, the site will be in violation
of the Soil Erosion and Sedimentation Control Ordinance of Lincoln County. This plan approval shall expire
two (2) years following the date of approval, it no land -disturbing activity has been undertaken, as is
required by Lincoln County Soil Erosion and Sedimentation Control Ordinance Section 9(b).
Title 15A NCAC 413 .0118(a) requires that a copy of the approved Soil Erosion and Sedimentation
Control Plan be on file at the job site. The Certificate of Approval that will be presented at the completion of
the Pre -Construction Meeting must be posted at the primary entrance of the job site before construction
begins and until establishment of permanent groundcover is required by 15A NCAC 4B .0127(b). Also, this
letter gives notice required by G.S. 113A-61.1 (a) and Lincoln County Soil Erosion and Sedimentation
Control Ordinance Section 11(f) of our right of periodic inspection to insure compliance with the approved
plan.
Lincoln County's Soil Erosion and Sedimentation Control Ordinance is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement of this
project, the Soil Erosion and Sedimentation Control Plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66) and
Lincoln County Soil Erosion and Sedimentation Control Ordinance Section 9(d), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply
to this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there is
any change in the information included on the form.
Your cooperation is appreciated and we look forward to working with you on this project. If there are
any questions, please do not hesitate to contact this office at the above number.