HomeMy WebLinkAbout20170891 Ver 2_USACE Permit_20230208U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2020-01006 County: Brunswick County U.S.G.S. Quad: Cape Fear (digital)
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee:
Address:
Alan Reyner
Middle Island POA, Inc
1837 West Buchanan Street
Columbia, SC 29206
Size (acres) Nearest Town Village of Bald Head Island
Nearest Waterway Cape Creek River Basin Cape Fear
USGS HUC 03030005 Coordinates Latitude: 33.8691. Longitude: -77.9835
Location description: The two project areas are located on Cape Creek Road on Bald Head
Island, Brunswick County, NC.
Description of project area and activity: The proposal is to replace two (2) existing timber bridges
with two (2) vinyl sheet pile sided land bridges with three (3) culvert pipes each. The bridges
and culvert pipes will fill approximately 955 square feet of freshwater and coastal wetlands.
Please note, a Coastal Area Management Act (CAMA) permit authorization must
be obtained from the North Carolina Division of Coastal Management (DCM) prior
to commencing any work on this project.
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344);
IX
Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Nationwide Permit Number: 14
SEE ATTACHED NWP GENERAL AND REGIONAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict
accordance with the attached conditions and your submitted application and attached
information and drawings dated November 16, 2022. Any violation of the attached conditions
or deviation from your submitted plans may subject the permittee to a stop work order, a
restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide
and/or regional general permit authorization is modified, suspended or revoked. If, prior to the
expiration date identified below, the nationwide and/or regional general permit authorization is
reissued and/or modified, this verification will remain valid until the expiration date identified below,
provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or
regional general permit authorization expires or is suspended, revoked, or is modified, such that the
activity would no longer comply with the terms and conditions of the nationwide permit, activities
which have commenced (i.e., are under construction) or are under contract to commence in reliance
upon the nationwide and/or regional general permit, will remain authorized provided the activity is
completed within twelve months of the date of the nationwide and/or regional general permit's
expiration, modification or revocation, unless discretionary authority has been exercised on a case -
by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401
Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-
807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area
Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal
Management in Wilmington, NC, at (910) 796-7215.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain
any other required Federal, State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps
of Engineers regulatory program, please contact Gregory Currey at (910) 523-1151 or
Gregory.E.Currey(a)usace.army.mil.
Digitally signed by Gregory
Gregory Currey Currey
Date: 2023.02.08 14:43:16
Corps Regulatory Official:-05'00'
Expiration Date of Verification: March 14, 2026
Date: February 8, 2023
The Wilmington District is committed to providing the highest level of support to the public. To help
us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at
https://regulatory.ops.usace.army.mil/customer-service-survey/
Copies furnished by email:
Bruce Marek
Cameron Luck (NC DCM)
Amanda Cannon (NC DCM)
Holley Snider (NC DWR)
Action ID Number: SAW-2020-01006 County: Brunswick County
Permittee: Alan Reyner
Middle Island POA Inc
Project Name: Middle Island Timber Bridge Replacement/BHI/Brunswick
Date Verification Issued: February 8, 2023
Project Manager: Gregory Currey
Upon completion of the activity authorized by this permit and any mitigation required by the
permit, sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Gregory Currey
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army
Corps of Engineers representative. Failure to comply with any terms or conditions of this
authorization may result in the Corps suspending, modifying or revoking the authorization
and/or issuing a Class I administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed
in accordance with the terms and condition of the said permit, and required mitigation was
completed in accordance with the permit conditions.
Signature of Permittee Date
ca4; c4
ca5 cb,5
Unvegetoted: 460 sf
(=9'x51.1) Under Exist
North Bridge. See ✓D
165+125
=290 sit
Coastal Wetlands Only
(Below NHW)
0000000000
15+70+45+
65=195 sft
Joint 404 & CWL
0'
UPLANDS
TRACT -A Middle Island POA
MAP CABINET 31 PAGE
345 DEED BOOK 3647
PAGE 219 �-
/ TagQer
Shau/de
Grade
I- Toper Exist
+fi 6 SL of
Landbridge
Iupland a.Keevmant
of lard War
LEGEND ' — .�F er
NHW/ Coastal Wetland On/yUPLANDS
Joint 404/Coastal Wet/ands
Property Line
Existing Timber Bridge
7/te�lne
Upland Development
J tJ 2x60=120 /f
Vinyl Sheet Pile
Boundary for fill Below NHW
470 sft(=18'x26.1 t)
Below NHW Fill xl Depth
=470 cf/27 = 18 cy
•• Ill •Qty3
54.4't Existing /tuber Bridge Length
55'Nominal Length
TA
7s5., COASTAL WETLANDS ONLY
51 CWwf1yPip. Rfp,vp /
Joint 404
Coastal
Wetlands .
750 Joint WI
5 of Comer Riprop
'Li CJ^.=f "LI C.
Joint 404/
Coastal Wetlan
700 Joint WL
5 sf Comer Riprop
55
1
STX-ren0;1a@":I i"a" _47.-"L�e_SaV0'S
t r\. 41- 1_t'
450 Jaht WL
5 of Omar Ripmp
k+
Joint 404/
Coastal
Wetlands
Temporary Disturbance: Appx
Qty 28. Ptsyp .fx6 pil- to
temp support; sheet pi e whaler.
_Sheet Pile What r
_` S (Permanent)
Upland Development Area
r 1 300+235
18" Culvert Pipe x 20' ( _ J =535 sft
For Rood Vertical Toper
Spot Elev.
Riprop Stabirzation:
Under Culvert Pipe Ends
(Below NWL):
Qty 6x5=30sf.
At Comers (Joint Wet/and)
4x5=20 sf.
Culvert Pipe Disturbance/
Excavation Below NHW"'
To Level Bed 18"Vominal 0
Culvert Pipe: 20'x3Bockhoe
Bucket Width=60sfx3
=180sf xl Depth=180cf=Icy
20'
elkic
725.E CWL Only be/ow NNW
Jr5.f Culvert Pipe Riprop
Norm
•
l High Water
Note: Wetland Below NHW per
CAMA to be considered as
Coastal Wetlands Only
65sf Joint N4
5 sf Corner Riprop
S 34"13'05" W
77 118'
Joint 404/
Coastal
Wetlands
North Land Bridge Disturbances
290.tsf Coast/ Wet/ands Only Disturbance
+1951- sf Joint 404 & Coastal Disturbance
=485t sf Wetlands North Disturbance=0.011 oc
+4601- sf unvegetated
+535t sf upland disturbance
=1480thsf North Land Bridge Total = 0.034 ac
340tsf South Wetland Disturbance
+4851-sf North Wetland Disturbance
=825tsf Wet/and Oisturbonces=0.02ac
1155tsf South Disturbed Land Areo
+14801-sf North Disturbed Land Area
=26351.sf Project Disturbed Areo=0.06ac
4.0 ' Scale: 1 "=10' on 8.5x 11
0
\
PLANDS
Existingiber Bridge 54.4 it x 11'±
Exist/ '- Top Elevation 4.54'
P osed Sheet Pile Sided Land Bridge
out to out 4dth; Rood Width 12t
Nominal Land Bridge Length = 55 t
With upland Anchorage of' Sheet Pile: 60t
Top Elev to meet VBH/ Village Min 6 FMSL
Taper Exist Gravel Rood up to new top.
See Dwg C3 R3 for Land Bridge Cross
—..."-Section. C2 R3 is Longitudinal Section
.Shoul
Taper
der':
Grade
Exist Grove/
Road Edge
Exist grovel
Rood Edge
NORTH BRIDGE
CAMA 8.18 MIPOA
REPLACEMENT OF TIMBER BRIDGE
WITH LAND BRIDGE MAJOR MOD
WETLANDS DISTURBANCES
Land Bridge Appx Total
Fill Between Sheet Pile:
=55 x 18'x5'=4950tcf
='Ti95't° -cu yds
r l-/G-z2_
WD1
BRUCE MAREK, P.E.
5489 EASTWIND RD WILMINGTON
NORTH CAROLINA 28403
(910) 799-9245
Upland Development
J 1..r- 2x38'nominal=76 /f
Vinyl Sheet Pile
Boundary for Fill Below
390 sft(=18'x21.67'f)
Below NHW Fill x 1 Depth
=390cf/27= 15 cy
■• II •et),3
18" Culvert Pipe x 20'
cc5; cb4
cc4' "'• cb3
Unvegetated: 290 sf
(=9'x32.2) Under Exist
South Bridge. See ✓D
120+130
=250 sft
Coastal Wet/ands Only
(Below NHW)
sow
35+20+25+
10=90 sft
Joint 404 & CWL
0'
UPLANDS
tTCT—A Middle Island POA
MAP CABINET 31 PAGE
345 DEED BOOK 3647
PAGE 219
' Upland Development
265J sf o// withJn 20'
Of land bridge
LEGEND
NHW/ Coastal Wetland Only
Joint 404/Coastal Wet/ands
UPLANDS
Property Line
— —
Existing Timber Bridge
teal/ne yy�
Nal/ in 17Yiak®_,. e'.
Ebrotion 9.00'
Joint 404/
Coastal
Wetlands
32.2' Existing Timber Bridge
Normal High Water
Length
n.l
COASTAL WETLANDS
ONLY
35'±Lan. Bridge Nomnrol -Leagt
blow AMY % %
PO PAW
Joint
etlands
2CHJoint
Ilt
5.f Comer
\\\\\`i fuirLVu1f 11111 poe ABM
TEo7C7ladiirM IIIMMII _J111\lam 4UNiMI
1111T111-■■■■-- lMei
\CC\� \Ott\\\CI Om.. INIA17 Vv..aLp�ilJ� Vini
„'111L11lI lliiiikiiiii ri�eeer-, q, hill
�er' cfo l i'� ♦
iti-. ,c,lf .��t� r .,,>_t• r".1'JR
UPLANDS
a Temporary Disturbance: Appx
NHW Oty 20. Ptsyp 11x6 pi/es to
temp support: sheet pile w
,,_-'--Sheet Pile Whaler
(Permanent)
Upland Development Area
r 1 265+260
=525sft
For Rood Vertical Taper
Spot Bev.
Riprop Stabilization:
Under Culvert Pipe Ends
(Below NWL):
Oty 6x5=30sf.
At Corners (Joint Wet/a
4x5=20 sf.
Culvert Pipe Disturbance/
Excavation Below NHW;
To Level Bed 18 Nominal 0
Culvert Pipe: 20'x Backhoe
Bucket Width=60sfx3
=180sf x1 Oepth=180cf=7cy
20'
250 Joint IH.
5 ,r canes
Joint 404/
Coastal
,Wetlands
/30ef C$t any be NNW
.5.K5sf Culvert Pipe Mpeop
Note: Wetland Below NHW per
CAMA to be considered as
Coastal Wetlands Only
Normal High Water
South Lond Bridge Disturbances
250tsf Coostl Wetlands only Disturbance
+ 90t sf Joint 404 & Coastal Disturbance
=340. sf Wetlands South Disturbance=0.008 oc
+2901. sf unvegetated
+5251. sf upland disturbance
=1155tsf South Land Bridge Total = 0.027 ac
40 ' Scale: 1 "=10' on 8. 5x11
0'
Existing Timber Bridge 32.2t x 11 t
Existing Top Elevation 4.83'
Proposed Sheet Pile Sided Land Bridge
18' out to out width; Road Width 12 t
Nominal Lond Bridge Length = 35t
With up/and Anchorage of Sheet Pile: 38'th
Top Elev to meet VBH/ Vi//oge Min 6 FMSL
Taper Exist Gravel Rood up to new top.
See Dwg C3 R3 for Lond Bridge Typical Cross
qrtzSection. Longitudinal Section Similar to C2 R3
n
/SOUTH BRIDGE
CAMA 8.18 MIPOA
REPLACEMENT OF TIMBER BRIDGE
WITH LAND BRIDGE MAJOR MOD
WETLANDS DISTURBANCES
Vim.
9e
Upland Development..
2501, >/. all Mein 20
r ge der do.
•
Tail
®Palmetto
Tall O/d
Palmetto
P.Lpyer
Lme
UPLANDS
Joint
404/
Coastal
etlands
1
Land Bridge Appx Total
Fill, Between Sheet Pile:
=35'x18'x5'=3150 cf
—120 cu yds
340tsf South Wetland Disturbance
+485tsf North Wetland Disturbance
=825tsf Wetland Disturbances=0.02oc
11551sf South Disturbed Land Area
+14801-sf North Disturbed Land Area
=2635tsf Project Disturbed Area=0.06oc
WD2
BRUCE MAREK, P.E.
5489 EASTWIND RD WILMINGTON
NORTH CAROLINA 28403
(910) 799.9245
Nationwide Permit 14
Linear Transportation Projects
Effective Date: February 25, 2022 / Expiration Date: March 14, 2026
Authority: Sections 10 and 404
Activities required for crossings of waters of the United States associated with the construction,
expansion, modification, or improvement of linear transportation projects (e.g., roads,
highways, railways, trails, driveways, airport runways, and taxiways) in waters of the United
States. For linear transportation projects in non -tidal waters, the discharge of dredged or fill
material cannot cause the loss of greater than 1/2-acre of waters of the United States. For
linear transportation projects in tidal waters, the discharge of dredged or fill material cannot
cause the loss of greater than 1/3-acre of waters of the United States. Any stream channel
modification, including bank stabilization, is limited to the minimum necessary to construct or
protect the linear transportation project; such modifications must be in the immediate vicinity of
the project.
This NWP also authorizes temporary structures, fills, and work, including the use of temporary
mats, necessary to construct the linear transportation project. Appropriate measures must be
taken to maintain normal downstream flows and minimize flooding to the maximum extent
practicable, when temporary structures, work, and discharges of dredged or fill material,
including cofferdams, are necessary for construction activities, access fills, or dewatering of
construction sites. Temporary fills must consist of materials, and be placed in a manner, that
will not be eroded by expected high flows. Temporary fills must be removed in their entirety
and the affected areas returned to pre -construction elevations. The areas affected by
temporary fills must be revegetated, as appropriate.
This NWP cannot be used to authorize non -linear features commonly associated with
transportation projects, such as vehicle maintenance or storage buildings, parking lots, train
stations, or aircraft hangars.
Notification: The permittee must submit a pre -construction notification to the district engineer
prior to commencing the activity if: (1) the loss of waters of the United States exceeds 1/10-
acre; or (2) there is a discharge of dredged or fill material in a special aquatic site, including
wetlands. (See general condition 32.) (Authorities: Sections 10 and 404)
Note 1: For linear transportation projects crossing a single waterbody more than one time at
separate and distant locations, or multiple waterbodies at separate and distant locations, each
crossing is considered a single and complete project for purposes of NWP authorization.
Linear transportation projects must comply with 33 CFR 330.6(d).
Note 2: Some discharges of dredged or fill material for the construction of farm roads or forest
roads, or temporary roads for moving mining equipment, may qualify for an exemption under
Section 404(f) of the Clean Water Act (see 33 CFR 323.4).
Note 3: For NWP 14 activities that require pre -construction notification, the PCN must include
any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be
used to authorize any part of the proposed project or any related activity, including other
separate and distant crossings that require Department of the Army authorization but do not
require pre -construction notification (see paragraph (b)(4) of general condition 32). The district
engineer will evaluate the PCN in accordance with Section D, "District Engineer's Decision."
The district engineer may require mitigation to ensure that the authorized activity results in no
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
more than minimal individual and cumulative adverse environmental effects (see general
condition 23).
GENERAL CONDITIONS
Note: To qualify for NWP authorization, the prospective permittee must comply with the
following general conditions, as applicable, in addition to any regional or case -specific
conditions imposed by the division engineer or district engineer. Prospective permittees should
contact the appropriate Corps district office to determine if regional conditions have been
imposed on an NWP. Prospective permittees should also contact the appropriate Corps district
office to determine the status of Clean Water Act Section 401 water quality certification and/or
Coastal Zone Management Act consistency for an NWP. Every person who may wish to obtain
permit authorization under one or more NWPs, or who is currently relying on an existing or
prior permit authorization under one or more NWPs, has been and is on notice that all of the
provisions of 33 CFR 330.1 through 330.6 apply to every NWP authorization. Note especially
33 CFR 330.5 relating to the modification, suspension, or revocation of any NWP
authorization.
1. Navigation.
(a) No activity may cause more than a minimal adverse effect on navigation.
(b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or
otherwise, must be installed and maintained at the permittee's expense on authorized facilities
in navigable waters of the United States.
(c) The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein authorized,
or if, in the opinion of the Secretary of the Army or his authorized representative, said structure
or work shall cause unreasonable obstruction to the free navigation of the navigable waters,
the permittee will be required, upon due notice from the Corps of Engineers, to remove,
relocate, or alter the structural work or obstructions caused thereby, without expense to the
United States. No claim shall be made against the United States on account of any such
removal or alteration.
2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle
movements of those species of aquatic life indigenous to the waterbody, including those
species that normally migrate through the area, unless the activity's primary purpose is to
impound water. All permanent and temporary crossings of waterbodies shall be suitably
culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the
movement of those aquatic species. If a bottomless culvert cannot be used, then the crossing
should be designed and constructed to minimize adverse effects to aquatic life movements.
3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided
to the maximum extent practicable. Activities that result in the physical destruction (e.g.,
through excavation, fill, or downstream smothering by substantial turbidity) of an important
spawning area are not authorized.
4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as
breeding areas for migratory birds must be avoided to the maximum extent practicable.
2
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless
the activity is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48, or
is a shellfish seeding or habitat restoration activity authorized by NWP 27.
6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies,
asphalt, etc.). Material used for construction or discharged must be free from toxic pollutants in
toxic amounts (see section 307 of the Clean Water Act).
7. Water Supply Intakes. No activity may occur in the proximity of a public water supply
intake, except where the activity is for the repair or improvement of public water supply intake
structures or adjacent bank stabilization.
8. Adverse Effects from Impoundments. If the activity creates an impoundment of water,
adverse effects to the aquatic system due to accelerating the passage of water, and/or
restricting its flow must be minimized to the maximum extent practicable.
9. Management of Water Flows. To the maximum extent practicable, the pre -construction
course, condition, capacity, and location of open waters must be maintained for each activity,
including stream channelization, storm water management activities, and temporary and
permanent road crossings, except as provided below. The activity must be constructed to
withstand expected high flows. The activity must not restrict or impede the passage of normal
or high flows unless the primary purpose of the activity is to impound water or manage high
flows. The activity may alter the pre -construction course, condition, capacity, and location of
open waters if it benefits the aquatic environment (e.g., stream restoration or relocation
activities).
10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-
approved state or local floodplain management requirements.
11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or
other measures must be taken to minimize soil disturbance.
12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls
must be used and maintained in effective operating condition during construction, and all
exposed soil and other fills, as well as any work below the ordinary high water mark or high
tide line, must be permanently stabilized at the earliest practicable date. Permittees are
encouraged to perform work within waters of the United States during periods of low -flow or
no -flow, or during low tides.
13. Removal of Structures and Fills. Temporary structures must be removed, to the
maximum extent practicable, after their use has been discontinued. Temporary fills must be
removed in their entirety and the affected areas returned to pre -construction elevations. The
affected areas must be revegetated, as appropriate.
14. Proper Maintenance. Any authorized structure or fill shall be properly maintained,
including maintenance to ensure public safety and compliance with applicable NWP general
conditions, as well as any activity -specific conditions added by the district engineer to an NWP
authorization.
15. Single and Complete Project. The activity must be a single and complete project. The
same NWP cannot be used more than once for the same single and complete project.
3
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
16. Wild and Scenic Rivers.
(a) No NWP activity may occur in a component of the National Wild and Scenic River System,
or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status, unless the appropriate Federal agency with
direct management responsibility for such river, has determined in writing that the proposed
activity will not adversely affect the Wild and Scenic River designation or study status.
(b) If a proposed NWP activity will occur in a component of the National Wild and Scenic River
System, or in a river officially designated by Congress as a "study river" for possible inclusion
in the system while the river is in an official study status, the permittee must submit a pre -
construction notification (see general condition 32). The district engineer will coordinate the
PCN with the Federal agency with direct management responsibility for that river. Permittees
shall not begin the NWP activity until notified by the district engineer that the Federal agency
with direct management responsibility for that river has determined in writing that the proposed
NWP activity will not adversely affect the Wild and Scenic River designation or study status.
(c) Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land
management agency responsible for the designated Wild and Scenic River or study river (e.g.,
National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and
Wildlife Service). Information on these rivers is also available at: http://www.rivers.gov/.
17. Tribal Rights. No activity or its operation may impair reserved tribal rights, including, but
not limited to, reserved water rights and treaty fishing and hunting rights.
18. Endangered Species.
(a) No activity is authorized under any NWP which is likely to directly or indirectly jeopardize
the continued existence of a threatened or endangered species or a species proposed for such
designation, as identified under the Federal Endangered Species Act (ESA), or which will
directly or indirectly destroy or adversely modify the critical habitat of such species. No activity
is authorized under any NWP which "may affect" a listed species or critical habitat unless ESA
section 7 consultation addressing the consequences of the proposed activity on listed species
or critical habitat has been completed. See 50 CFR 402.02 for the definition of "effects of the
action" for the purposes of ESA section 7 consultation, as well as 50 CFR 402.17, which
provides further explanation under ESA section 7 regarding "activities that are reasonably
certain to occur" and "consequences caused by the proposed action."
(b) Federal agencies should follow their own procedures for complying with the requirements
of the ESA (see 33 CFR 330.4(f)(1)). If pre -construction notification is required for the
proposed activity, the Federal permittee must provide the district engineer with the appropriate
documentation to demonstrate compliance with those requirements. The district engineer will
verify that the appropriate documentation has been submitted. If the appropriate
documentation has not been submitted, additional ESA section 7 consultation may be
necessary for the activity and the respective federal agency would be responsible for fulfilling
its obligation under section 7 of the ESA.
(c) Non-federal permittees must submit a pre -construction notification to the district engineer if
any listed species or designated critical habitat might be affected or is in the vicinity of the
activity, or if the activity is located in designated critical habitat, and shall not begin work on the
activity until notified by the district engineer that the requirements of the ESA have been
satisfied and that the activity is authorized. For activities that might affect Federally -listed
4
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
endangered or threatened species or designated critical habitat, the pre -construction
notification must include the name(s) of the endangered or threatened species that might be
affected by the proposed activity or that utilize the designated critical habitat that might be
affected by the proposed activity. The district engineer will determine whether the proposed
activity "may affect" or will have "no effect" to listed species and designated critical habitat and
will notify the non- Federal applicant of the Corps' determination within 45 days of receipt of a
complete pre -construction notification. For activities where the non -Federal applicant has
identified listed species or critical habitat that might be affected or is in the vicinity of the
activity, and has so notified the Corps, the applicant shall not begin work until the Corps has
provided notification that the proposed activity will have "no effect" on listed species or critical
habitat, or until ESA section 7 consultation has been completed. If the non -Federal applicant
has not heard back from the Corps within 45 days, the applicant must still wait for notification
from the Corps.
(d) As a result of formal or informal consultation with the FWS or NMFS the district engineer
may add species specific permit conditions to the NWPs.
(e) Authorization of an activity by an NWP does not authorize the "take" of a threatened or
endangered species as defined under the ESA. In the absence of separate authorization (e.g.,
an ESA Section 10 Permit, a Biological Opinion with "incidental take" provisions, etc.) from the
FWS or the NMFS, the Endangered Species Act prohibits any person subject to the jurisdiction
of the United States to take a listed species, where "take" means to harass, harm, pursue,
hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct.
The word "harm" in the definition of "take" means an act which actually kills or injures wildlife.
Such an act may include significant habitat modification or degradation where it actually kills or
injures wildlife by significantly impairing essential behavioral patterns, including breeding,
feeding or sheltering.
(f) If the non-federal permittee has a valid ESA section 10(a)(1)(B) incidental take permit with
an approved Habitat Conservation Plan for a project or a group of projects that includes the
proposed NWP activity, the non-federal applicant should provide a copy of that ESA section
10(a)(1)(B) permit with the PCN required by paragraph (c) of this general condition. The district
engineer will coordinate with the agency that issued the ESA section 10(a)(1)(B) permit to
determine whether the proposed NWP activity and the associated incidental take were
considered in the internal ESA section 7 consultation conducted for the ESA section
10(a)(1)(B) permit. If that coordination results in concurrence from the agency that the
proposed NWP activity and the associated incidental take were considered in the internal ESA
section 7 consultation for the ESA section 10(a)(1)(B) permit, the district engineer does not
need to conduct a separate ESA section 7 consultation for the proposed NWP activity. The
district engineer will notify the non-federal applicant within 45 days of receipt of a complete
pre- construction notification whether the ESA section 10(a)(1)(B) permit covers the proposed
NWP activity or whether additional ESA section 7 consultation is required.
(g) Information on the location of threatened and endangered species and their critical habitat
can be obtained directly from the offices of the FWS and NMFS or their worldwide Web pages
at http://www.fws.gov/ or http://www.fws.gov/ipac and
http://www.nmfs.noaa.gov/pr/species/esa/ respectively.
19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for ensuring
that an action authorized by NWP complies with the Migratory Bird Treaty Act and the Bald
and Golden Eagle Protection Act. The permittee is responsible for contacting the appropriate
local office of the U.S. Fish and Wildlife Service to determine what measures, if any, are
5
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
necessary or appropriate to reduce adverse effects to migratory birds or eagles, including
whether "incidental take" permits are necessary and available under the Migratory Bird Treaty
Act or Bald and Golden Eagle Protection Act for a particular activity.
20. Historic Properties.
(a) No activity is authorized under any NWP which may have the potential to cause effects to
properties listed, or eligible for listing, in the National Register of Historic Places until the
requirements of Section 106 of the National Historic Preservation Act (NHPA) have been
satisfied.
(b) Federal permittees should follow their own procedures for complying with the requirements
of section 106 of the National Historic Preservation Act (see 33 CFR 330.4(g)(1)). If pre -
construction notification is required for the proposed NWP activity, the Federal permittee must
provide the district engineer with the appropriate documentation to demonstrate compliance
with those requirements. The district engineer will verify that the appropriate documentation
has been submitted. If the appropriate documentation is not submitted, then additional
consultation under section 106 may be necessary. The respective federal agency is
responsible for fulfilling its obligation to comply with section 106.
(c) Non-federal permittees must submit a pre -construction notification to the district engineer if
the NWP activity might have the potential to cause effects to any historic properties listed on,
determined to be eligible for listing on, or potentially eligible for listing on the National Register
of Historic Places, including previously unidentified properties. For such activities, the pre -
construction notification must state which historic properties might have the potential to be
affected by the proposed NWP activity or include a vicinity map indicating the location of the
historic properties or the potential for the presence of historic properties. Assistance regarding
information on the location of, or potential for, the presence of historic properties can be sought
from the State Historic Preservation Officer, Tribal Historic Preservation Officer, or designated
tribal representative, as appropriate, and the National Register of Historic Places (see 33 CFR
330.4(g)). When reviewing pre -construction notifications, district engineers will comply with the
current procedures for addressing the requirements of section 106 of the National Historic
Preservation Act. The district engineer shall make a reasonable and good faith effort to carry
out appropriate identification efforts commensurate with potential impacts, which may include
background research, consultation, oral history interviews, sample field investigation, and/or
field survey. Based on the information submitted in the PCN and these identification efforts, the
district engineer shall determine whether the proposed NWP activity has the potential to cause
effects on the historic properties. Section 106 consultation is not required when the district
engineer determines that the activity does not have the potential to cause effects on historic
properties (see 36 CFR 800.3(a)). Section 106 consultation is required when the district
engineer determines that the activity has the potential to cause effects on historic properties.
The district engineer will conduct consultation with consulting parties identified under 36 CFR
800.2(c) when he or she makes any of the following effect determinations for the purposes of
section 106 of the NHPA: no historic properties affected, no adverse effect, or adverse effect.
(d) Where the non -Federal applicant has identified historic properties on which the proposed
NWP activity might have the potential to cause effects and has so notified the Corps, the non -
Federal applicant shall not begin the activity until notified by the district engineer either that the
activity has no potential to cause effects to historic properties or that NHPA section 106
consultation has been completed. For non-federal permittees, the district engineer will notify
the prospective permittee within 45 days of receipt of a complete pre -construction notification
whether NHPA section 106 consultation is required. If NHPA section 106 consultation is
6
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
required, the district engineer will notify the non -Federal applicant that he or she cannot begin
the activity until section 106 consultation is completed. If the non -Federal applicant has not
heard back from the Corps within 45 days, the applicant must still wait for notification from the
Corps.
(e) Prospective permittees should be aware that section 110k of the NHPA (54 U.S.C.
306113) prevents the Corps from granting a permit or other assistance to an applicant who,
with intent to avoid the requirements of section 106 of the NHPA, has intentionally significantly
adversely affected a historic property to which the permit would relate, or having legal power to
prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation
with the Advisory Council on Historic Preservation (ACHP), determines that circumstances
justify granting such assistance despite the adverse effect created or permitted by the
applicant. If circumstances justify granting the assistance, the Corps is required to notify the
ACHP and provide documentation specifying the circumstances, the degree of damage to the
integrity of any historic properties affected, and proposed mitigation. This documentation must
include any views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if the
undertaking occurs on or affects historic properties on tribal lands or affects properties of
interest to those tribes, and other parties known to have a legitimate interest in the impacts to
the permitted activity on historic properties.
21. Discovery of Previously Unknown Remains and Artifacts. Permittees that discover any
previously unknown historic, cultural or archeological remains and artifacts while
accomplishing the activity authorized by NWP, they must immediately notify the district
engineer of what they have found, and to the maximum extent practicable, avoid construction
activities that may affect the remains and artifacts until the required coordination has been
completed. The district engineer will initiate the Federal, Tribal, and state coordination required
to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in
the National Register of Historic Places.
22. Designated Critical Resource Waters. Critical resource waters include, NOAA-managed
marine sanctuaries and marine monuments, and National Estuarine Research Reserves. The
district engineer may designate, after notice and opportunity for public comment, additional
waters officially designated by a state as having particular environmental or ecological
significance, such as outstanding national resource waters or state natural heritage sites. The
district engineer may also designate additional critical resource waters after notice and
opportunity for public comment.
(a) Discharges of dredged or fill material into waters of the United States are not authorized
by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, 50, 51, 52, 57 and 5258 for
any activity within, or directly affecting, critical resource waters, including wetlands adjacent to
such waters.
(b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, 38,
and 54, notification is required in accordance with general condition 32, for any activity
proposed by permittees in the designated critical resource waters including wetlands adjacent
to those waters. The district engineer may authorize activities under these NWPs only after
she or he determines that the impacts to the critical resource waters will be no more than
minimal.
23. Mitigation. The district engineer will consider the following factors when determining
appropriate and practicable mitigation necessary to ensure that the individual and cumulative
adverse environmental effects are no more than minimal:
7
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
(a) The activity must be designed and constructed to avoid and minimize adverse effects, both
temporary and permanent, to waters of the United States to the maximum extent practicable at
the project site (i.e., on site).
(b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating for
resource losses) will be required to the extent necessary to ensure that the individual and
cumulative adverse environmental effects are no more than minimal.
(c) Compensatory mitigation at a minimum one -for -one ratio will be required for all wetland
losses that exceed 1V10-acre and require pre -construction notification, unless the district
engineer determines in writing that either some other form of mitigation would be more
environmentally appropriate or the adverse environmental effects of the proposed activity are
no more than minimal, and provides an activity -specific waiver of this requirement. For wetland
losses of 'V10-acre or less that require pre -construction notification, the district engineer may
determine on a case -by -case basis that compensatory mitigation is required to ensure that the
activity results in only minimal adverse environmental effects.
(d) Compensatory mitigation at a minimum one -for -one ratio will be required for all losses of
stream bed that exceed 3/100-acre and require pre -construction notification, unless the district
engineer determines in writing that either some other form of mitigation would be more
environmentally appropriate or the adverse environmental effects of the proposed activity are
no more than minimal, and provides an activity -specific waiver of this requirement. This
compensatory mitigation requirement may be satisfied through the restoration or enhancement
of riparian areas next to streams in accordance with paragraph (e) of this general condition. For
losses of stream bed of 3/100-acre or less that require pre -construction notification, the district
engineer may determine on a case -by -case basis that compensatory mitigation is required to
ensure that the activity results in only minimal adverse environmental effects. Compensatory
mitigation for losses of streams should be provided, if practicable, through stream
rehabilitation, enhancement, or preservation since streams are difficult -to -replace resources
(see 33 CFR 332.3(e)(3)).
(e) Compensatory mitigation plans for NWP activities in or near streams or other open waters
will normally include a requirement for the restoration or enhancement, maintenance, and legal
protection (e.g., conservation easements) of riparian areas next to open waters. In some cases,
the restoration or maintenance/protection of riparian areas may be the only compensatory
mitigation required. If restoring riparian areas involves planting vegetation, only native species
should be planted. The width of the required riparian area will address documented water
quality or aquatic habitat loss concerns. Normally, the riparian area will be 25 to 50 feet wide
on each side of the stream, but the district engineer may require slightly wider riparian areas to
address documented water quality or habitat loss concerns. If it is not possible to restore or
maintain/protect a riparian area on both sides of a stream, or if the waterbody is a lake or
coastal waters, then restoring or maintaining/protecting a riparian area along a single bank or
shoreline may be sufficient. Where both wetlands and open waters exist on the project site, the
district engineer will determine the appropriate compensatory mitigation (e.g., riparian areas
and/or wetlands compensation) based on what is best for the aquatic environment on a
watershed basis. In cases where riparian areas are determined to be the most appropriate form
of minimization or compensatory mitigation, the district engineer may waive or reduce the
requirement to provide wetland compensatory mitigation for wetland losses.
8
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
(f) Compensatory mitigation projects provided to offset losses of aquatic resources must
comply with the applicable provisions of 33 CFR part 332.
(1) The prospective permittee is responsible for proposing an appropriate compensatory
mitigation option if compensatory mitigation is necessary to ensure that the activity results
in no more than minimal adverse environmental effects. For the NWPs, the preferred
mechanism for providing compensatory mitigation is mitigation bank credits or in -lieu fee
program credits (see 33 CFR 332.3(b)(2) and (3)). However, if an appropriate number and
type of mitigation bank or in -lieu credits are not available at the time the PCN is submitted
to the district engineer, the district engineer may approve the use of permittee- responsible
mitigation.
(2) The amount of compensatory mitigation required by the district engineer must be
sufficient to ensure that the authorized activity results in no more than minimal individual
and cumulative adverse environmental effects (see 33 CFR 330.1(e)(3)). (See also 33 CFR
332.3(f)).
(3) Since the likelihood of success is greater and the impacts to potentially valuable
uplands are reduced, aquatic resource restoration should be the first compensatory
mitigation option considered for permittee-responsible mitigation.
(4) If permittee-responsible mitigation is the proposed option, the prospective permittee is
responsible for submitting a mitigation plan. A conceptual or detailed mitigation plan may
be used by the district engineer to make the decision on the NWP verification request, but a
final mitigation plan that addresses the applicable requirements of 33 CFR 332.4(c)(2)
through (14) must be approved by the district engineer before the permittee begins work in
waters of the United States, unless the district engineer determines that prior approval of
the final mitigation plan is not practicable or not necessary to ensure timely completion of
the required compensatory mitigation (see 33 CFR 332.3(k)(3)). If permittee-responsible
mitigation is the proposed option, and the proposed compensatory mitigation site is located
on land in which another federal agency holds an easement, the district engineer will
coordinate with that federal agency to determine if proposed compensatory mitigation
project is compatible with the terms of the easement.
(5) If mitigation bank or in -lieu fee program credits are the proposed option, the mitigation
plan needs to address only the baseline conditions at the impact site and the number of
credits to be provided (see 33 CFR 332.4(c)(1)(ii)).
(6) Compensatory mitigation requirements (e.g., resource type and amount to be provided
as compensatory mitigation, site protection, ecological performance standards, monitoring
requirements) may be addressed through conditions added to the NWP authorization,
instead of components of a compensatory mitigation plan (see 33 CFR 332.4(c)(1)(ii)).
(g) Compensatory mitigation will not be used to increase the acreage losses allowed by the
acreage limits of the NWPs. For example, if an NWP has an acreage limit of 12-acre, it cannot
be used to authorize any NWP activity resulting in the loss of greater than 12-acre of waters of
the United States, even if compensatory mitigation is provided that replaces or restores some
of the lost waters. However, compensatory mitigation can and should be used, as necessary,
to ensure that an NWP activity already meeting the established acreage limits also satisfies the
no more than minimal impact requirement for the NWPs.
9
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
(h) Permittees may propose the use of mitigation banks, in -lieu fee programs, or permittee-
responsible mitigation. When developing a compensatory mitigation proposal, the permittee
must consider appropriate and practicable options consistent with the framework at 33 CFR
332.3(b). For activities resulting in the loss of marine or estuarine resources, permittee-
responsible mitigation may be environmentally preferable if there are no mitigation banks or in -
lieu fee programs in the area that have marine or estuarine credits available for sale or transfer
to the permittee. For permittee-responsible mitigation, the special conditions of the NWP
verification must clearly indicate the party or parties responsible for the implementation and
performance of the compensatory mitigation project, and, if required, its long-term
management.
(i) Where certain functions and services of waters of the United States are permanently
adversely affected by a regulated activity, such as discharges of dredged or fill material into
waters of the United States that will convert a forested or scrub -shrub wetland to an
herbaceous wetland in a permanently maintained utility line right-of-way, mitigation may be
required to reduce the adverse environmental effects of the activity to the no more than
minimal level.
24. Safety of Impoundment Structures. To ensure that all impoundment structures are
safely designed, the district engineer may require non -Federal applicants to demonstrate that
the structures comply with established state or federal, dam safety criteria or have been
designed by qualified persons. The district engineer may also require documentation that the
design has been independently reviewed by similarly qualified persons, and appropriate
modifications made to ensure safety.
25. Water Quality.
(a) Where the certifying authority (state, authorized tribe, or EPA, as appropriate) has not
previously certified compliance of an NWP with CWA section 401, a CWA section 401 water
quality certification for the proposed discharge must be obtained or waived (see 33 CFF
330.4(c)). If the permittee cannot comply with all of the conditions of a water quality
certification previously issued by certifying authority for the issuance of the NWP, then the
permittee must obtain a water quality certification or waiver for the proposed discharge in order
for the activity to be authorized by an NWP.
(b) If the NWP activity requires pre -construction notification and the certifying authority has
not previously certified compliance of an NWP with CWA section 401, the proposed discharge
is not authorized by an NWP until water quality certification is obtained or waived. If the
certifying authority issues a water quality certification for the proposed discharge, the permittee
must submit a copy of the certification to the district engineer. The discharge is not authorized
by an NWP until the district engineer has notified the permittee that the water quality
certification requirement has been satisfied by the issuance of a water quality certification or a
waiver.
(c) The district engineer or certifying authority may require additional water quality
management measures to ensure that the authorized activity does not result in more than
minimal degradation of water quality.
26. Coastal Zone Management. In coastal states where an NWP has not previously received
a state coastal zone management consistency concurrence, an individual state coastal zone
management consistency concurrence must be obtained, or a presumption of concurrence
must occur (see 33 CFR 330.4(d)). If the permittee cannot comply with all of the conditions of a
10
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
coastal zone management consistency concurrence previously issued by the state, then the
permittee must obtain an individual coastal zone management consistency concurrence or
presumption of concurrence in order for the activity to be authorized by an NWP. The district
engineer or a state may require additional measures to ensure that the authorized activity is
consistent with state coastal zone management requirements.
27. Regional and Case -By -Case Conditions. The activity must comply with any regional
conditions that may have been added by the Division Engineer (see 33 CFR 330.4(e)) and with
any case specific conditions added by the Corps or by the state, Indian Tribe, or U.S. EPA in
its CWA section 401 Water Quality Certification, or by the state in its Coastal Zone
Management Act consistency determination.
28. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and
complete project is authorized, subject to the following restrictions:
(a) If only one of the NWPs used to authorize the single and complete project has a specified
acreage limit, the acreage loss of waters of the United States cannot exceed the acreage limit
of the NWP with the highest specified acreage limit. For example, if a road crossing over tidal
waters is constructed under NWP 14, with associated bank stabilization authorized by NWP
13, the maximum acreage loss of waters of the United States for the total project cannot
exceed 'V3-acre.
(b) If one or more of the NWPs used to authorize the single and complete project has
specified acreage limits, the acreage loss of waters of the United States authorized by those
NWPs cannot exceed their respective specified acreage limits. For example, if a commercial
development is constructed under NWP 39, and the single and complete project includes the
filling of an upland ditch authorized by NWP 46, the maximum acreage loss of waters of the
United States for the commercial development under NWP 39 cannot exceed 1/2-acre, and the
total acreage loss of waters of United States due to the NWP 39 and 46 activities cannot
exceed 1 acre.
29. Transfer of Nationwide Permit Verifications. If the permittee sells the property
associated with a nationwide permit verification, the permittee may transfer the nationwide
permit verification to the new owner by submitting a letter to the appropriate Corps district
office to validate the transfer. A copy of the nationwide permit verification must be attached to
the letter, and the letter must contain the following statement and signature:
"When the structures or work authorized by this nationwide permit are still in existence at the
time the property is transferred, the terms and conditions of this nationwide permit,
including any special conditions, will continue to be binding on the new owner(s) of the
property. To validate the transfer of this nationwide permit and the associated liabilities
associated with compliance with its terms and conditions, have the transferee sign and
date below."
(Transferee)
(Date)
30. Compliance Certification. Each permittee who receives an NWP verification letter from
the Corps must provide a signed certification documenting completion of the authorized activity
and implementation of any required compensatory mitigation. The success of any required
permittee-responsible mitigation, including the achievement of ecological performance
11
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
standards, will be addressed separately by the district engineer. The Corps will provide the
permittee the certification document with the NWP verification letter. The certification
document will include:
(a) A statement that the authorized activity was done in accordance with the NWP
authorization, including any general, regional, or activity -specific conditions;
(b) A statement that the implementation of any required compensatory mitigation was
completed in accordance with the permit conditions. If credits from a mitigation bank or in -lieu
fee program are used to satisfy the compensatory mitigation requirements, the certification
must include the documentation required by 33 CFR 332.3(I)(3) to confirm that the permittee
secured the appropriate number and resource type of credits; and
(c) The signature of the permittee certifying the completion of the activity and mitigation. The
completed certification document must be submitted to the district engineer within 30 days of
completion of the authorized activity or the implementation of any required compensatory
mitigation, whichever occurs later.
31. Activities Affecting Structures or Works Built by the United States. If an NWP activity
also requires permission from the Corps pursuant to 33 U.S.C. 408 because it will alter or
temporarily or permanently occupy or use a U.S. Army Corps of Engineers (USACE) federally
authorized Civil Works project (a "USACE project"), the prospective permittee must submit a
pre -construction notification. See paragraph (b)(10) of general condition 32. An activity that
requires section 408 permission and/or review is not authorized by an NWP until the
appropriate Corps office issues the section 408 permission or completes its review to alter,
occupy, or use the USACE project, and the district engineer issues a written NWP verification.
32. Pre -Construction Notification.
(a) Timing. Where required by the terms of the NWP, the permittee must notify the district
engineer by submitting a pre -construction notification (PCN) as early as possible. The district
engineer must determine if the PCN is complete within 30 calendar days of the date of receipt
and, if the PCN is determined to be incomplete, notify the prospective permittee within that 30
day period to request the additional information necessary to make the PCN complete. The
request must specify the information needed to make the PCN complete. As a general rule,
district engineers will request additional information necessary to make the PCN complete only
once. However, if the prospective permittee does not provide all of the requested information,
then the district engineer will notify the prospective permittee that the PCN is still incomplete
and the PCN review process will not commence until all of the requested information has been
received by the district engineer. The prospective permittee shall not begin the activity until
either:
(1) He or she is notified in writing by the district engineer that the activity may proceed
under the NWP with any special conditions imposed by the district or division engineer; or
(2) 45 calendar days have passed from the district engineer's receipt of the complete
PCN and the prospective permittee has not received written notice from the district or
division engineer. However, if the permittee was required to notify the Corps pursuant to
general condition 18 that listed species or critical habitat might be affected or are in the
vicinity of the activity, or to notify the Corps pursuant to general condition 20 that the
activity might have the potential to cause effects to historic properties, the permittee
cannot begin the activity until receiving written notification from the Corps that there is "no
12
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
effect" on listed species or "no potential to cause effects" on historic properties, or that
any consultation required under Section 7 of the Endangered Species Act (see 33 CFR
330.4(f)) and/or section 106 of the National Historic Preservation Act (see 33 CFR
330.4(g)) has been completed. If the proposed activity requires a written waiver to exceed
specified limits of an NWP, the permittee may not begin the activity until the district
engineer issues the waiver. If the district or division engineer notifies the permittee in
writing that an individual permit is required within 45 calendar days of receipt of a complete
PCN, the permittee cannot begin the activity until an individual permit has been obtained.
Subsequently, the permittee's right to proceed under the NWP may be modified,
suspended, or revoked only in accordance with the pr set forth in 33 CFR 330.5(d)(2).
(b) Contents of Pre -Construction Notification: The PCN must be in writing and include the
following information:
(1) Name, address and telephone numbers of the prospective permittee;
(2) Location of the proposed activity;
(3) Identify the specific NWP or NWP(s) the prospective permittee wants to use to
authorize the proposed activity;
(4)
(i) A description of the proposed activity; the activity's purpose; direct and indirect
adverse environmental effects the activity would cause, including the anticipated
amount of loss of wetlands, other special aquatic sites, and other waters expected to
result from the NWP activity, in acres, linear feet, or other appropriate unit of measure; a
description of any proposed mitigation measures intended to reduce the adverse
environmental effects caused by the proposed activity; and any other NWP(s), regional
general permit(s), or individual permit(s) used or intended to be used to authorize any
part of the proposed project or any related activity, including other separate and distant
crossings for linear projects that require Department of the Army authorization but do
not require pre -construction notification. The description of the proposed activity and
any proposed mitigation measures should be sufficiently detailed to allow the district
engineer to determine that the adverse environmental effects of the activity will be no
more than minimal and to determine the need for compensatory mitigation or other
mitigation measures.
(ii) For linear projects where one or more single and complete crossings require pre -
construction notification, the PCN must include the quantity of anticipated losses of
wetlands, other special aquatic sites, and other waters for each single and complete
crossing of those wetlands, other special aquatic sites, and other waters (including
those single and complete crossings authorized by an NWP but do not require PCNs).
This information will be used by the district engineer to evaluate the cumulative adverse
environmental effects of the proposed linear project and does not change those non-
PCN NWP activities into NWP PCNs.
(iii) Sketches should be provided when necessary to show that the activity complies with
the terms of the NWP. (Sketches usually clarify the activity and when provided results in
a quicker decision. Sketches should contain sufficient detail to provide an illustrative
description of the proposed activity (e.g., a conceptual plan), but do not need to be
detailed engineering plans).
13
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
(5) The PCN must include a delineation of wetlands, other special aquatic sites, and other
waters, such as lakes and ponds, and perennial and intermittent streams, on the project
site. Wetland delineations must be prepared in accordance with the current method
required by the Corps. The permittee may ask the Corps to delineate the special aquatic
sites and other waters on the project site, but there may be a delay if the Corps does the
delineation, especially if the project site is large or contains many wetlands, other special
aquatic sites, and other waters. Furthermore, the 45-day period will not start until the
delineation has been submitted to or completed by the Corps, as appropriate.
(6) If the proposed activity will result in the Toss of greater than 'V10-acre of wetlands or
31100-acre of stream bed and a PCN is required, the prospective permittee must submit a
statement describing how the mitigation requirement will be satisfied, or explaining why
the adverse environmental effects are no more than minimal and why compensatory
mitigation should not be required. As an alternative, the prospective permittee may submit
a conceptual or detailed mitigation plan.
(7) For non-federal permittees, if any listed species (or species proposed for listing) or
designated critical habitat (or critical habitat proposed for such designation) might be
affected or is in the vicinity of the activity, or if the activity is located in designated critical
habitat (or critical habitat proposed for such designation), the PCN must include the
name(s) of those endangered or threatened species (or species proposed for listing) that
might be affected by the proposed activity or utilize the designated critical habitat (or
critical habitat proposed for such designation) that might be affected by the proposed
activity. For NWP activities that require pre -construction notification, Federal permittees
must provide documentation demonstrating compliance with the Endangered Species Act.
(8) For non-federal permittees, if the NWP activity might have the potential to cause
effects to a historic property listed on, determined to be eligible for listing on, or potentially
eligible for listing on, the National Register of Historic Places, the PCN must state which
historic property might have the potential to be affected by the proposed activity or include
a vicinity map indicating the location of the historic property. For NWP activities that
require pre -construction notification, Federal permittees must provide documentation
demonstrating compliance with section 106 of the National Historic Preservation Act.
(9) For an activity that will occur in a component of the National Wild and Scenic River
System, or in a river officially designated by Congress as a "study river" for possible
inclusion in the system while the river is in an official study status, the PCN must identify
the Wild and Scenic River or the "study river" (see general condition 16); and
(10) For an NWP activity that requires permission from, or review by, the Corps pursuant
to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or use a U.S.
Army Corps of Engineers federally authorized civil works project, the pre -construction
notification must include a statement confirming that the project proponent has submitted a
written request for section 408 permission from, or review by, the Corps office having
jurisdiction over that USACE project.
(c) Form of Pre -Construction Notification: The nationwide permit pre -construction notification
form (Form ENG 6082) should be used for NWP PCNs. A letter containing the required
information may also be used. Applicants may provide electronic files of PCNs and supporting
materials if the district engineer has established tools and procedures for electronic submittals.
(d) Agency Coordination:
14
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
(1) The district engineer will consider any comments from Federal and state agencies
concerning the proposed activity's compliance with the terms and conditions of the NWPs
and the need for mitigation to reduce the activity's adverse environmental effects so that
they are no more than minimal.
(2) Agency coordination is required for:
(i) All NWP activities that require pre -construction notification and result in the loss of
greater than 12-acre of waters of the United States;
(ii) NWP 13 activities in excess of 500 linear feet, fills greater than one cubic yard per
running foot, or involve discharges of dredged or fill material into special aquatic sites;
and
(iii) NWP 54 activities in excess of 500 linear feet, or that extend into the waterbody
more than 30 feet from the mean low water line in tidal waters or the ordinary high
water mark in the Great Lakes.
(3) When agency coordination is required, the district engineer will immediately provide
(e.g., via email, facsimile transmission, overnight mail, or other expeditious manner) a
copy of the complete PCN to the appropriate Federal or state offices (FWS, state natural
resource or water quality agency, EPA, and, if appropriate, the NMFS). With the exception
of NWP 37, these agencies will have 10 calendar days from the date the material is
transmitted to notify the district engineer via telephone, facsimile transmission, or email
that they intend to provide substantive, site -specific comments. The comments must
explain why the agency believes the adverse environmental effects will be more than
minimal. If so, contacted by an agency, the district engineer will wait an additional 15
calendar days before making a decision on the pre- construction notification. The district
engineer will fully consider agency comments received within the specified time frame
concerning the proposed activity's compliance with the terms and conditions of the NWPs,
including the need for mitigation to ensure that the net adverse environmental effects of
the proposed activity are no more than minimal. The district engineer will provide no
response to the resource agency, except as provided below. The district engineer will
indicate in the administrative record associated with each pre -construction notification that
the resource agencies' concerns were considered. For NWP 37, the emergency
watershed protection and rehabilitation activity may proceed immediately in cases where
there is an unacceptable hazard to life or a significant loss of property or economic
hardship will occur. The district engineer will consider any comments received to decide
whether the NWP 37 authorization should be modified, suspended, or revoked in
accordance with the procedures at 33 CFR 330.5.
(4) In cases of where the prospective permittee is not a Federal agency, the district
engineer will provide a response to NMFS within 30 calendar days of receipt of any
Essential Fish Habitat conservation recommendations, as required by section 305(b)(4)(B)
of the Magnuson -Stevens Fishery Conservation and Management Act.
(5) Applicants are encouraged to provide the Corps with either electronic files or multiple
copies of pre -construction notifications to expedite agency coordination.
15
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
DISTRICT ENGINEER'S DECISION
1. In reviewing the PCN for the proposed activity, the district engineer will determine whether
the activity authorized by the NWP will result in more than minimal individual or cumulative
adverse environmental effects or may be contrary to the public interest. If a project proponent
requests authorization by a specific NWP, the district engineer should issue the NWP
verification for that activity if it meets the terms and conditions of that NWP, unless he or she
determines, after considering mitigation, that the proposed activity will result in more than
minimal individual and cumulative adverse effects on the aquatic environment and other
aspects of the public interest and exercises discretionary authority to require an individual
permit for the proposed activity. For a linear project, this determination will include an
evaluation of the single and complete crossings of waters of the United States that require
PCNs to determine whether they individually satisfy the terms and conditions of the NWP(s),
as well as the cumulative effects caused by all of the crossings of waters of the United States
authorized by an NWP. If an applicant requests a waiver of an applicable limit, as provided for
in NWPs 13, 36, or 54, the district engineer will only grant the waiver upon a written
determination that the NWP activity will result in only minimal individual and cumulative
adverse environmental effects.
2. When making minimal adverse environmental effects determinations the district engineer
will consider the direct and indirect effects caused by the NWP activity. He or she will also
consider the cumulative adverse environmental effects caused by activities authorized by an
NWP and whether those cumulative adverse environmental effects are no more than minimal.
The district engineer will also consider site specific factors, such as the environmental setting
in the vicinity of the NWP activity, the type of resource that will be affected by the NWP activity,
the functions provided by the aquatic resources that will be affected by the NWP activity, the
degree or magnitude to which the aquatic resources perform those functions, the extent that
aquatic resource functions will be lost as a result of the NWP activity (e.g., partial or complete
loss), the duration of the adverse effects (temporary or permanent), the importance of the
aquatic resource functions to the region (e.g., watershed or ecoregion), and mitigation required
by the district engineer. If an appropriate functional or condition assessment method is
available and practicable to use, that assessment method may be used by the district engineer
to assist in the minimal adverse environmental effects determination. The district engineer may
add case -specific special conditions to the NWP authorization to address site -specific
environmental concerns.
3. If the proposed activity requires a PCN and will result in a loss of greater than 1V10-acre of
wetlands or 31100-acre of stream bed, the prospective permittee should submit a mitigation
proposal with the PCN. Applicants may also propose compensatory mitigation for NWP
activities with smaller impacts, or for impacts to other types of waters. The district engineer will
consider any proposed compensatory mitigation or other mitigation measures the applicant
has included in the proposal in determining whether the net adverse environmental effects of
the proposed activity are no more than minimal. The compensatory mitigation proposal may be
either conceptual or detailed. If the district engineer determines that the activity complies with
the terms and conditions of the NWP and that the adverse environmental effects are no more
than minimal, after considering mitigation, the district engineer will notify the permittee and
include any activity -specific conditions in the NWP verification the district engineer deems
necessary. Conditions for compensatory mitigation requirements must comply with the
appropriate provisions at 33 CFR 332.3(k). The district engineer must approve the final
mitigation plan before the permittee commences work in waters of the United States, unless
the district engineer determines that prior approval of the final mitigation plan is not practicable
or not necessary to ensure timely completion of the required compensatory mitigation. If the
16
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
prospective permittee elects to submit a compensatory mitigation plan with the PCN, the
district engineer will expeditiously review the proposed compensatory mitigation plan. The
district engineer must review the proposed compensatory mitigation plan within 45 calendar
days of receiving a complete PCN and determine whether the proposed mitigation would
ensure that the NWP activity results in no more than minimal adverse environmental effects. If
the net adverse environmental effects of the NWP activity (after consideration of the mitigation
proposal) are determined by the district engineer to be no more than minimal, the district
engineer will provide a timely written response to the applicant. The response will state that the
NWP activity can proceed under the terms and conditions of the NWP, including any activity -
specific conditions added to the NWP authorization by the district engineer.
4. If the district engineer determines that the adverse environmental effects of the proposed
activity are more than minimal, then the district engineer will notify the applicant either:
(a) That the activity does not qualify for authorization under the NWP and instruct the applicant
on the procedures to seek authorization under an individual permit;
(b) that the activity is authorized under the NWP subject to the applicant's submission of a
mitigation plan that would reduce the adverse environmental effects so that they are no more
than minimal; or
(c) that the activity is authorized under the NWP with specific modifications or conditions.
Where the district engineer determines that mitigation is required to ensure no more than
minimal adverse environmental effects, the activity will be authorized within the 45-day PCN
period (unless additional time is required to comply with general conditions 18, 20, and/or 31),
with activity -specific conditions that state the mitigation requirements. The authorization will
include the necessary conceptual or detailed mitigation plan or a requirement that the applicant
submit a mitigation plan that would reduce the adverse environmental effects so that they are
no more than minimal. When compensatory mitigation is required, no work in waters of the
United States may occur until the district engineer has approved a specific mitigation plan or
has determined that prior approval of a final mitigation plan is not practicable or not necessary
to ensure timely completion of the required compensatory mitigation.
FURTHER INFORMATION
1. District engineers have authority to determine if an activity complies with the terms and
conditions of an NWP.
2. NWPs do not obviate the need to obtain other federal, state, or local permits, approvals, or
authorizations required by law.
3. NWPs do not grant any property rights or exclusive privileges.
4. NWPs do not authorize any injury to the property or rights of others.
5. NWPs do not authorize interference with any existing or proposed Federal project (see
general condition 31).
DEFINITIONS
Best management practices (BMPs): Policies, practices, procedures, or structures
implemented to mitigate the adverse environmental effects on surface water quality resulting
from development. BMPs are categorized as structural or non-structural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment
(creation), enhancement, and/or in certain circumstances preservation of aquatic resources for
17
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
the purposes of offsetting unavoidable adverse impacts which remain after all appropriate and
practicable avoidance and minimization has been achieved.
Currently serviceable: Useable as is or with some maintenance, but not so degraded as to
essentially require reconstruction.
Direct effects: Effects that are caused by the activity and occur at the same time and place.
Discharge: The term "discharge" means any discharge of dredged or fill material into waters of
the United States.
Ecological reference: A model used to plan and design an aquatic habitat and riparian area
restoration, enhancement, or establishment activity under NWP 27. An ecological reference
may be based on the structure, functions, and dynamics of an aquatic habitat type or a riparian
area type that currently exists in the region where the proposed NWP 27 activity is located.
Alternatively, an ecological reference may be based on a conceptual model for the aquatic
habitat type or riparian area type to be restored, enhanced, or established as a result of the
proposed NWP 27 activity. An ecological reference takes into account the range of variation of
the aquatic habitat type or riparian area type in the region.
Enhancement: The manipulation of the physical, chemical, or biological characteristics of an
aquatic resource to heighten, intensify, or improve a specific aquatic resource function(s).
Enhancement results in the gain of selected aquatic resource function(s), but may also lead to
a decline in other aquatic resource function(s). Enhancement does not result in a gain in
aquatic resource area.
Establishment (creation): The manipulation of the physical, chemical, or biological
characteristics present to develop an aquatic resource that did not previously exist at an
upland site. Establishment results in a gain in aquatic resource area.
High Tide Line: The line of intersection of the land with the water's surface at the maximum
height reached by a rising tide. The high tide line may be determined, in the absence of actual
data, by a line of oil or scum along shore objects, a more or less continuous deposit of fine
shell or debris on the foreshore or berm, other physical markings or characteristics, vegetation
lines, tidal gages, or other suitable means that delineate the general height reached by a rising
tide. The line encompasses spring high tides and other high tides that occur with periodic
frequency but does not include storm surges in which there is a departure from the normal or
predicted reach of the tide due to the piling up of water against a coast by strong winds such
as those accompanying a hurricane or other intense storm.
Historic Property: Any prehistoric or historic district, site (including archaeological site),
building, structure, or other object included in, or eligible for inclusion in, the National
Register of Historic Places maintained by the Secretary of the Interior. This term includes
artifacts, records, and remains that are related to and located within such properties. The term
includes properties of traditional religious and cultural importance to an Indian tribe or Native
Hawaiian organization and that meet the National Register criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non -linear
project in the Corps Regulatory Program. A project is considered to have independent utility if
it would be constructed absent the construction of other projects in the project area. Portions of
a multi -phase project that depend upon other phases of the project do not have independent
18
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
utility. Phases of a project that would be constructed even if the other phases were not built
can be considered as separate single and complete projects with independent utility.
Indirect effects: Effects that are caused by the activity and are later in time or farther removed
in distance but are still reasonably foreseeable.
Loss of waters of the United States: Waters of the United States that are permanently
adversely affected by filling, flooding, excavation, or drainage because of the regulated activity.
The loss of stream bed includes the acres of stream bed that are permanently adversely
affected by filling or excavation because of the regulated activity. Permanent adverse effects
include permanent discharges of dredged or fill material that change an aquatic area to dry
land, increase the bottom elevation of a waterbody, or change the use of a waterbody. The
acreage of loss of waters of the United States is a threshold measurement of the impact to
jurisdictional waters or wetlands for determining whether a project may qualify for an NWP; it is
not a net threshold that is calculated after considering compensatory mitigation that may be
used to offset losses of aquatic functions and services. Waters of the United States temporarily
filled, flooded, excavated, or drained, but restored to pre -construction contours and elevations
after construction, are not included in the measurement of loss of waters of the United States.
Impacts resulting from activities that do not require Department of the Army authorization, such
as activities eligible for exemptions under section 404(f) of the Clean Water Act, are not
considered when calculating the loss of waters of the United States.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These
waters are defined at 33 CFR part 329.
Non -tidal wetland: A non -tidal wetland is a wetland that is not subject to the ebb and flow of
tidal waters. Non- tidal wetlands contiguous to tidal waters are located landward of the high
tide line (i.e., spring high tide line).
Open water: For purposes of the NWPs, an open water is any area that in a year with normal
patterns of precipitation has water flowing or standing above ground to the extent that an
ordinary high water mark can be determined. Aquatic vegetation within the area of flowing or
standing water is either non -emergent, sparse, or absent. Vegetated shallows are considered
to be open waters. Examples of "open waters" include rivers, streams, lakes, and ponds.
Ordinary High Water Mark: The term ordinary high water mark means that line on the shore
established by the fluctuations of water and indicated by physical characteristics such as a
clear, natural line impressed on the bank, shelving, changes in the character of soil,
destruction of terrestrial vegetation, the presence of litter and debris, or other appropriate
means that consider the characteristics of the surrounding areas.
Perennial stream: A perennial stream has surface water flowing continuously year-round
during a typical year.
Practicable: Available and capable of being done after taking into consideration cost, existing
technology, and logistics in light of overall project purposes.
Pre -construction notification: A request submitted by the project proponent to the Corps for
confirmation that a particular activity is authorized by nationwide permit. The request may be a
permit application, letter, or similar document that includes information about the proposed
work and its anticipated environmental effects. Pre- construction notification may be required
by the terms and conditions of a nationwide permit, or by regional conditions. A pre-
19
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
construction notification may be voluntarily submitted in cases where pre -construction
notification is not required and the project proponent wants confirmation that the activity is
authorized by nationwide permit.
Preservation: The removal of a threat to, or preventing the decline of, aquatic resources by an
action in or near those aquatic resources. This term includes activities commonly associated
with the protection and maintenance of aquatic resources through the implementation of
appropriate legal and physical mechanisms. Preservation does not result in a gain of aquatic
resource area or functions.
Re-establishment: The manipulation of the physical, chemical, or biological characteristics of a
site with the goal of returning natural/historic functions to a former aquatic resource. Re-
establishment results in rebuilding a former aquatic resource and results in a gain in aquatic
resource area and functions.
Rehabilitation: The manipulation of the physical, chemical, or biological characteristics of a site
with the goal of repairing natural/historic functions to a degraded aquatic resource.
Rehabilitation results in a gain in aquatic resource function but does not result in a gain in
aquatic resource area.
Restoration: The manipulation of the physical, chemical, or biological characteristics of a site
with the goal of returning natural/historic functions to a former or degraded aquatic resource.
For the purpose of tracking net gains in aquatic resource area, restoration is divided into two
categories: Re-establishment and rehabilitation.
Riffle and pool complex: Riffle and pool complexes are special aquatic sites under the
404(b)(1) Guidelines. Riffle and pool complexes sometimes characterize steep gradient
sections of streams. Such stream sections are recognizable by their hydraulic characteristics.
The rapid movement of water over a course substrate in riffles results in a rough flow, a
turbulent surface, and high dissolved oxygen levels in the water. Pools are deeper areas
associated with riffles. A slower stream velocity, a streaming flow, a smooth surface, and a
finer substrate characterize pools.
Riparian areas: Riparian areas are lands next to streams, lakes, and estuarine -marine
shorelines. Riparian areas are transitional between terrestrial and aquatic ecosystems, through
which surface and subsurface hydrology connects riverine, lacustrine, estuarine, and marine
waters with their adjacent wetlands, non -wetland waters, or uplands. Riparian areas provide a
variety of ecological functions and services and help improve or maintain local water quality.
(See general condition 23.)
Shellfish seeding: The placement of shellfish seed and/or suitable substrate to increase
shellfish production. Shellfish seed consists of immature individual shellfish or individual
shellfish attached to shells or shell fragments (i.e., spat on shell). Suitable substrate may
consist of shellfish shells, shell fragments, or other appropriate materials placed into waters for
shellfish habitat.
Single and complete linear project: A linear project is a project constructed for the purpose of
getting people, goods, or services from a point of origin to a terminal point, which often
involves multiple crossings of one or more waterbodies at separate and distant locations. The
term "single and complete project" is defined as that portion of the total linear project proposed
or accomplished by one owner/developer or partnership or other association of
owners/developers that includes all crossings of a single water of the United States (i.e., a
20
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
single waterbody) at a specific location. For linear projects crossing a single or multiple
waterbodies several times at separate and distant locations, each crossing is considered a
single and complete project for purposes of NWP authorization. However, individual channels
in a braided stream or river, or individual arms of a large, irregularly shaped wetland or lake,
etc., are not separate waterbodies, and crossings of such features cannot be considered
separately.
Single and complete non -linear project: For non -linear projects, the term "single and complete
project" is defined at 33 CFR 330.2(i) as the total project proposed or accomplished by one
owner/developer or partnership or other association of owners/developers. A single and
complete non -linear project must have independent utility (see definition of "independent
utility"). Single and complete non -linear projects may not be "piecemealed" to avoid the limits
in an NWP authorization.
Stormwater management: Stormwater management is the mechanism for controlling
stormwater runoff for the purposes of reducing downstream erosion, water quality degradation,
and flooding and mitigating the adverse effects of changes in land use on the aquatic
environment.
Stormwater management facilities: Stormwater management facilities are those facilities,
including but not limited to, stormwater retention and detention ponds and best management
practices, which retain water for a period of time to control runoff and/or improve the quality
(i.e., by reducing the concentration of nutrients, sediments, hazardous substances and other
pollutants) of stormwater runoff.
Stream bed: The substrate of the stream channel between the ordinary high water marks. The
substrate may be bedrock or inorganic particles that range in size from clay to boulders.
Wetlands contiguous to the stream bed, but outside of the ordinary high water marks, are not
considered part of the stream bed.
Stream channelization: The manipulation of a stream's course, condition, capacity, or location
that causes more than minimal interruption of normal stream processes. A channelized
jurisdictional stream remains a water of the United States.
Structure: An object that is arranged in a definite pattern of organization. Examples of
structures include, without limitation, any pier, boat dock, boat ramp, wharf, dolphin, weir,
boom, breakwater, bulkhead, revetment, riprap, jetty, artificial island, artificial reef, permanent
mooring structure, power transmission line, permanently moored floating vessel, piling, aid to
navigation, or any other manmade obstacle or obstruction.
Tidal wetland: A tidal wetland is a jurisdictional wetland that is inundated by tidal waters. Tidal
waters rise and fall in a predictable and measurable rhythm or cycle due to the gravitational
pulls of the moon and sun. Tidal waters end where the rise and fall of the water surface can no
longer be practically measured in a predictable rhythm due to masking by other waters, wind,
or other effects. Tidal wetlands are located channelward of the high tide line.
Tribal lands: Any lands title to which is either: (1) Held in trust by the United States for the
benefit of any Indian tribe or individual; or (2) held by any Indian tribe or individual subject to
restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign
21
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
authority, unextinguished aboriginal title, treaty, statute, judicial decisions, executive order or
agreement, and that give rise to legally enforceable remedies.
Vegetated shallows: Vegetated shallows are special aquatic sites under the 404(b)(1)
Guidelines. They are areas that are permanently inundated and under normal circumstances
have rooted aquatic vegetation, such as seagrasses in marine and estuarine systems and a
variety of vascular rooted plants in freshwater systems.
Waterbody: For purposes of the NWPs, a waterbody is a "water of the United States." If a
wetland is adjacent to a waterbody determined to be a water of the United States, that
waterbody and any adjacent wetlands are considered together as a sing e aquatic unit (see 33
CFR 328.4(c)(2)).
22
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
REGIONAL CONDITIONS:
The following Regional Conditions have been approved by the Wilmington District for the
Nationwide Permits (NWPs) published in the January 13, 2021, and December 27, 2021,
Federal Register (86 FR 2744 and 86 FR 73522) announcing the reissuance of 52 existing
(NWPs) and five new NWPs, as well as the reissuance of NWP general conditions and
definitions with some modifications.
A. EXCLUDED WATER AND/OR AREAS
The Corps has identified waters that will be excluded from the use of all NWP's during certain
timeframes. These waters are:
1. Anadromous Fish Spawning Areas. Work in waters of the U.S. designated by either the
North Carolina Division of Marine Fisheries (NCDMF) or the North Carolina Wildlife Resources
Commission (NCWRC) as anadromous fish spawning areas are prohibited from February 15th
through June 30th, without prior written approval from the Corps and the appropriate wildlife
agencies (NCDMF, NCWRC and/or the National Marine Fisheries Service (NMFS)). Work in
waters of the U.S. designated by NCWRC as primary nursery areas in inland waters are
prohibited from February 15th through September 30th, without prior written approval from the
Corps and the appropriate wildlife agencies. Work in waters of the U.S. designated by NCDMF
as primary nursery areas shall be coordinated with NCDMF prior to being authorized by this
NWP. Coordination with NCDMF may result in a required construction moratorium during
periods of significant biological productivity or critical life stages.
2. Trout Waters Moratorium. Work in waters of the U.S. in the designated trout watersheds
of North Carolina are prohibited from October 15th through April 15th without prior written
approval from the NCWRC, or from the Eastern Band of Cherokee Indians (EBCI) Fisheries
and Wildlife Management (FWM) office if the project is located on EBCI trust land. (See
Section C.3. below for information on the designated trout watersheds).
3. Sturgeon Spawning Areas. No in -water work shall be conducted in waters of the U.S.
designated by the National Marine Fisheries Service as Atlantic sturgeon critical habitat from
February 1st through June 30th. No in -water work shall be conducted in waters of the U.S. in
the Roanoke River designated as Atlantic sturgeon critical habitat from February 1st through
June 30th, and August 1st through October 31st, without prior written approval from NMFS.
4. Submerged Aquatic Vegetation. Impacts to Submerged Aquatic Vegetation (SAV) are not
authorized by any NWP, except NWP 48, NWP 55 and NWP 56, unless Essential Fish Habitat
(EFH) consultation has been completed pursuant to the Magnuson -Stevens Fisheries
Conservation and Management Act (Magnuson -Stevens Act). Permittees shall submit a PCN
(See NWP General Condition 32) to the District Engineer prior to commencing the activity if the
project would affect SAV. The permittee may not begin work until notified by the Corps that the
requirements of the Magnuson -Stevens Act have been satisfied and that the activity is verified.
B. REGIONAL CONDITIONS APPLICABLE TO ALL NWP's
1. Critical Habitat in Western NC. For proposed activities within waters of the U.S. that
require a Pre -Construction Notification (PCN) and are located in the thirteen counties listed
below, permittees must provide a copy of the PCN to the U.S. Fish and Wildlife Service
(USFWS), 160 Zillicoa Street, Asheville, North Carolina 28801 and the Corps Asheville
Regulatory Field Office. Please see General Condition 18 for specific PCN requirements
23
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
related to the Endangered Species Act and the below website for information on the location of
designated critical habitat.
Counties with tributaries that drain to designated critical habitat that require notification to the
Asheville U.S. Fish and Wildlife Service: Avery, Cherokee, Graham, Haywood, Henderson,
Jackson, Macon, Mecklenburg, Mitchell, Swain, Transylvania, Union and Yancey.
Website and office addresses for Endangered Species Act Information:
The Wilmington District has developed the following website for permittees which provides
guidelines on how to review linked websites and maps in order to fulfill NWP General
Condition 18 (Endangered Species) requirements:
http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram/AgencyCoordination/ESA.
aspx.
Permittees who do not have internet access may contact the appropriate U.S. Fish and Wildlife
Service offices listed below or Corps at (910) 251-4850.
Below is a map of the USFWS Field Office Boundaries:
Asheville U.S. Fish and Wildlife Service Office counties: All counties west of and
including Anson, Stanly, Davidson, Forsythe and Stokes Counties.
U.S. Fish and Wildlife Service
Asheville Field Office
160 Zillicoa Street
Asheville, NC 28801
Telephone: (828) 258-3939
Raleigh U.S. Fish and Wildlife Service Office counties: All counties east of and including
Richmond, Montgomery, Randolph, Guilford, and Rockingham Counties.
U.S. Fish and Wildlife Service
Raleigh Field Office
Post Office Box 33726
Raleigh, NC 27636-3726
Telephone: (919) 856-4520
24
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
2. Special Designation Waters. Prior to the use of any NWP that involves a discharge of
dredged or fill material in any of the following identified waters and/or adjacent wetlands in
North Carolina, permittees shall submit a PCN to the District Engineer prior to commencing the
activity (see General Condition 32). The North Carolina waters and wetlands that require
additional PCN requirements are:
"Primary Nursery Areas" (PNA), including inland PNA, as designated by the North Carolina
Marine Fisheries Commission and/or the North Carolina Wildlife Resources Commission. The
definition of and designated PNA waters can be found in the North Carolina State
Administrative Code at Title 15A, Subchapters 3R and 10C (15A NCAC 03R .0103; 15A NCAC
10C .0502; and 15A NCAC 10C .0503) and at the following web pages:
• http://reports.oah.state.nc.us/ncac/title%2015a%20-
%20environmental%20quality/chapter%2003%20-
%20marine%20fisheries/subchapter%20r/15a%20ncac%2003r%20.0103.pdf
• http://reports.oah.state.nc.us/ncac/title%2015a%20-
%20environmental%20quality/chapter%2010%20-
%20wildlife%20resources%20and%20water%20safety/subchapter%20c/15a%20ncac%2010c
%20.0502.pdf
• http://reports.oah.state.nc.us/ncac/title%2015a%20-
%20environmental%20quality/chapter%2010%20-
%20wildlife%20resources%20and%20water%20safety/subchapter%20c/15a%20ncac%2010c
%20.0503.pdf
3. Trout Waters. Prior to any discharge of dredge or fill material into streams, waterbodies or
wetlands within the 294 designated trout watersheds of North Carolina, the permittee shall
submit a PCN (see General Condition 32) to the District Engineer prior to commencing the
activity. The permittee shall also provide a copy of the PCN to the appropriate NCWRC office,
or to the EBCI FWM Office (if the project is located on EBCI trust land), to facilitate the
determination of any potential impacts to designated Trout Waters.
NCWRC and NC Trout Watersheds:
NCWRC
Counties that are entirely
Counties that are
Contact**
within Trout Watersheds*
partially within Trout
Watersheds*
25
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
Mountain
Coordinator
645 Fish
Hatchery
Rd., Building
B
Marion, NC
Alleghany Jackson
Ashe Macon
Avery Swain
Graham Transylvania
Haywood Watauga
Burke McDowell
Buncombe Mitchell
Caldwell Polk
Cherokee Rutherford
Clay Surry
Henderson Wilkes
Madison Yancey
28752
828-803-
6054
For NCDOT
Projects:
NCDOT
Coordinator
12275 Swift
Rd.
Oakboro,
NC 28129
704-984-
1070
EBCI
Counties that are within
Contact**
Trout Watersheds*
Office of
Qualla Boundary and non -
Natural
contiguous tracts of trust
Resources
land located in portions of
P.O. Box 1747,
Swain, Jackson, Haywood,
Cherokee, NC
Graham and Cherokee
28719
Counties.
(828) 359-6113
*NOTE: To determine PCN requirements, contact the Corps Asheville Regulatory Field Office
at (828) 271-7980 or view maps showing trout watersheds in each County at the following
webpage: http://www.saw.usace.army.mil/Missions/Requlatory-Permit-Proqram/Agency-
Coordination/Trout/.
**If a project is located on EBCI trust land, submit the PCN in accordance with Regional
Condition C.16. Contact the Corps Asheville Regulatory Field Office at (828) 271-7980 with
questions.
4. Western NC Waters and Corridors. The permittee shall submit a PCN (see General
Condition 32) to the District Engineer prior to commencing the activity in waters of the U.S. if
the activity will occur within any of the following identified waters in western North Carolina,
within 0.5 mile on either side of these waters, or within 0.75 mile of the Little Tennessee River,
as measured from the top of the bank of the respective water (i.e., river, stream, or creek):
Brasstown Creek
Burningtown Creek
26
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
Cane River
Caney Fork
Cartoogechaye Creek
Chattooga River
Cheoah River
Cowee Creek
Cullasaja River
Deep Creek
Ellijay Creek
French Broad River
Garden Creek
Hiwassee River
Hominy Creek
lotla Creek
Little Tennessee River (within the river or within 0.75 mile on either side of this river)
Nantahala River
Nolichucky River
North Fork French Broad River
North Toe River
Nottley River
Oconaluftee River (portion not located on trust/EBCI land)
Peachtree Creek
Shooting Creek
Snowbird Creek
South Toe River
Stecoah Creek
Swannanoa River
Sweetwater Creek
Tuckasegee River (also spelled Tuckaseegee or Tuckaseigee)
Valley River
Watauga Creek
Watauga River
Wayah Creek
West Fork French Broad River
To determine PCN requirements, contact the Corps Asheville Regulatory Field Office at (828)
271-7980 or view maps for all corridors at the following webpage:
http://www.saw.usace.army.mil/Missions/Requlatory-Permit-Proqram/Agency-
Coordination/Designated-Special-Waters.aspx .
5. Limitation of Loss of Stream Bed. NWPs may not be used for activities that may result in
the loss of more than 0.05 acres of stream bed, except for NWP 32.
6. Pre -Construction Notification for Loss of Stream Bed Exceeding 0.02 acres. The
permittee shall submit a PCN to the District Engineer prior to commencing the activity (see
General Condition 32) prior to the use of any NWP for any activity that results in the loss of
more than 0.02 acres of stream bed. This applies to NWPs that do not have PCN requirements
as well as those NWPs that require a PCN.
7. Mitigation for Loss of Stream Bed. For any NWP that results in a loss of more than 0.02
acres of stream bed, the permittee shall provide a mitigation proposal to compensate for more
than minimal individual and cumulative adverse impacts to the aquatic environment, unless the
27
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
District Engineer determines in writing that either some other form of mitigation would be more
environmentally appropriate or the adverse effects of the proposed activity are minimal. For
stream bed losses of 0.02 acres or less that require a PCN, the District Engineer may
determine, on a case -by -case basis, that compensatory mitigation is required to ensure that
the activity results in minimal adverse effect on the aquatic environment.
8. Riprap. For all NWPs that allow for the use of riprap material for bank stabilization, the
following conditions shall be applied:
a. Filter cloth must be placed underneath the riprap as an additional requirement of its use in
North Carolina waters. The placement of filter fabric is not required if the riprap will be pushed
or "keyed" into the bank of the waterbody. A waiver from the specifications in this Regional
Condition must be requested in writing.
b. Riprap shall be placed only on the stream banks, or, if it is necessary to be placed in the
stream bed, the finished top elevation of the riprap should not exceed that of the original
stream bed.
9. Culvert Placement. For all NWPs that allow for culvert placement, the following conditions
shall be applied:
a. For all NWPs that involve the construction/installation of culverts, measures shall be
included in the construction/installation that will promote the safe passage of fish and other
aquatic organisms
Placement of culverts and other structures in streams shall be below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48 inches, and 20% of the
culvert diameter for culverts having a diameter less than or equal to 48 inches. If the culvert
outlet is submerged within a pool or scour hole and designed to provide for aquatic passage,
then culvert burial into the streambed is not required.
Culvert burial is not required for structures less than 72 inch diameter/width, where the slope of
the culvert will be greater than 2.5%, provided that all alternative options for flattening the
slope have been investigated and aquatic life movement/connectivity has been provided when
possible (e.g., rock ladders, cross vanes, sills, baffles etc.). Culvert burial is not required when
bedrock is present in culvert locations.
Installation of culverts in wetlands shall ensure continuity of water movement and be designed
to adequately accommodate high water or flood conditions. When roadways, causeways, or
other fill projects are constructed across FEMA-designated floodways or wetlands, openings
such as culverts or bridges shall be provided to maintain the natural hydrology of the system
as well as prevent constriction of the floodway that may result in destabilization of streams or
wetlands.
28
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
Circular
Culvert ^�
Rise
(Diameter}
A waiver from the depth specifications in this condition may be requested, in writing, by the
permittee and issued by the Corp. This waiver request must be specific as to the reasons(s) for
the request. The waiver will be issued if it can be demonstrated that the proposed design
would result in less impacts to the aquatic environment. Culverts placed across wetland fills
purely for the purposes of equalizing surface water do not have to be buried, but the culverts
must be of adequate size and/or number to ensure unrestricted transmission of water.
b. Bank -full flows (or less) shall be accommodated through maintenance of the existing bank -
full channel cross sectional area. Additional culverts or culvert barrels at such crossings shall
be allowed only to receive bank -full flows.
Approach Fill
Roadway
Bard:Bill
/../7///*/7/
--
Baffle/ Stream
Blockage Bottom
Culvert buried
below streambed
to appropriate
depth (if required).
c. Culverts shall be designed and installed in such a manner that the original stream profiles
are not altered and allow for aquatic life movement during low flows. The dimension, pattern,
and profile of the stream above and below a pipe or culvert shall not be modified by widening
the stream channel or by reducing the depth of the stream in connection with the construction
activity. The width, height, and gradient of a proposed culvert shall be such as to pass the
average historical low flow and spring flow without adversely altering flow velocity. If the width
of the culvert is wider than the stream channel, the culvert shall include multiple boxes/pipes,
baffles, benches and/or sills to maintain the natural width of the stream channel. If multiple
culverts/pipes/barrels are used, low flows shall be accommodated in one culvert/pipe and
additional culverts/pipes shall be installed such that they receive only flows above bankfull.
10. Utility Lines. For all NWPs that allow for the construction and installation of utility lines, the
following conditions shall be applied:
a. Utility lines consisting of aerial electric power transmission lines crossing navigable waters
of the U.S. (which are defined at 33 CFR part 329) must comply with the applicable minimum
clearances specified in 33 CFR 322.5(i).
29
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
b. The work area authorized by this permit, including temporary and/or permanent fills, will be
minimized to the greatest extent practicable. Justification for work corridors exceeding forty
(40) feet in width is required and will be based on pipeline diameter and length, size of
equipment required to construct the utility line, and other construction information deemed
necessary to support the request. The permittee is required to provide this information to the
Corps with the initial PCN package.
c. A plan to restore and re -vegetate wetland areas cleared for construction must be submitted
with the required PCN. Cleared wetland areas shall be re -vegetated, as appropriate, with
species of canopy, shrub, and herbaceous species. The permittee shall not use fescue grass
or any other species identified as invasive or exotic species by the NC Native Plant Society
(NCNPS): https://ncwildflower.org/invasive-exotic-species-list/.
d. Any permanently maintained corridor along the utility right of way within forested wetlands
shall be considered a loss of aquatic function. A compensatory mitigation plan will be required
for all such impacts associated with the requested activity if the activity requires a PCN and the
cumulative total of permanent conversion of forested wetlands exceeds 0.1 acres, unless the
District Engineer determines in writing that either some other form of mitigation would be more
environmentally appropriate or the adverse effects of the proposed activity are minimal.
Where permanently maintained corridor within forested wetlands is 0.1 acres or less, the
District Engineer may determine, on a case -by -case basis, that compensatory mitigation is
required to ensure that the activity results in minimal adverse effects on the aquatic
environment.
e. When directional boring or horizontal directional drilling (HDD) under waters of the U.S.,
including wetlands, permittees shall closely monitor the project for hydraulic fracturing or
"fracking." Any discharge from hydraulic fracturing or "fracking" into waters of the U.S.,
including wetlands, shall be reported to the appropriate Corps Regulatory Field Office within 48
hours. Restoration and/or compensatory mitigation may be required as a result of any
unintended discharges.
11. Temporary Access Fills. The permittee shall submit a PCN to the District Engineer prior
to commencing the activity if the activity will involve the discharge of dredged or fill material
into more than 0.1 acres of wetlands or 0.02 acres of stream channel for the construction of
temporary access fills and/or temporary road crossings. The PCN must include a restoration
plan that thoroughly describes how all temporary fills will be removed, how pre -project
conditions will be restored, and include a timetable for all restoration activities.
12. Federal Navigation Channel Setbacks. Authorized structures and fills located in or
adjacent to Federally authorized waterways must be constructed in accordance with the latest
setback criteria established by the Wilmington District Engineer. You may review the setback
policy at http://www.saw.usace.army.mil/Missions/Navigation/Setbacks.aspx. This general
permit does not authorize the construction of hardened or permanently fixed structures within
the Federally Authorized Channel Setback, unless the activity is approved by the Corps. The
permittee shall submit a PCN (see General Condition 32) to the District Engineer to obtain a
written verification prior to the construction of any structures or fills within the Federally
Authorized Channel Setback.
13. Northern Long-eared Bat — Endangered Species Act Compliance. The Wilmington
District, U.S. Army Corps of Engineers has consulted with the United States Fish and Wildlife
30
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
Service (USFWS) in regard to the threatened northern long-eared bat (NLEB) (Myotis
septentrionalis) and Standard Local Operating Procedures for Endangered Species (SLOPES)
have been approved by the Corps and the USFWS. This condition concerns effects to the
NLEB only and does not address effects to other federally listed species and/or federally
designated critical habitat.
a. Procedures when the Corps is the lead federal* agency for a project:
The permittee must comply with (1) and (2) below when:
• the project is located in the western 41 counties of North Carolina, to include non-federal aid
North Carolina Department of Transportation (NCDOT) projects, OR;
• the project is located in the 59 eastern counties of North Carolina and is a non-NCDOT
project.
*Generally, if a project is located on private property or on non-federal land, and the project is
not being funded by a federal entity, the Corps will be the lead federal agency due to the
requirement to obtain Department of the Army authorization to impact waters of the U.S. If the
project is located on federal land, contact the Corps to determine the lead federal agency.
(1) A permittee using an NWP must check to see if their project is located in the range of the
NLEB by using the following website:
http://www.fws.gov/midwest/endangered/mammals/nleb/pdf/WNSZone.pdf. If the project is
within the range of the NLEB, or if the project includes percussive activities (e.g., blasting, pile
driving, etc.), the permittee is then required to check the appropriate website in the paragraph
below to discover if their project:
• is located in a 12-digit Hydrologic Unit Code area ("red HUC" - shown as red areas on the
map), AND/OR;
• involves percussive activities within 0.25 mile of a red HUC.
Red HUC maps - for the western 41 counties in NC (covered by the Asheville Ecological
Services Field Office), check the project location against the electronic maps found at:
http://www.fws.gov/asheville/htmls/project review/NLEB in WNC.html. For the eastern 59
counties in NC (covered by the Raleigh Ecological Services Field Office), check the project
location against the electronic maps found at: https://www.fws.gov/raleigh/NLEB RFO.html.
(2) A permittee must submit a PCN to the District Engineer, and receive written verification
from the District Engineer, prior to commencing the activity, if the activity will involve any of the
following:
• tree clearing/removal and/or, construction/installation of wind turbines in a red HUC,
AND/OR;
. bridge removal or maintenance, unless the bridge has been inspected and there is no
evidence of bat use, (applies anywhere in the range of the NLEB), AND/OR:
. percussive activities in a red HUC, or within 0.25 mile of a red HUC.
31
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
The permittee may proceed with the activity without submitting a PCN to either the Corps or
the USFWS, provided the activity complies with all applicable NWP terms and general and
regional conditions, if the permittee's review under A.(1) and A.(2) above shows that the
project is:
. located outside of a red HUC (and there are no percussive activities), and the activity will
NOT include bridge removal or maintenance, unless the bridge has been inspected and there
is no evidence of bat use, OR;
. located outside of a red HUC and there are percussive activities, but the percussive activities
will not occur within 0.25-mile of a red HUC boundary, and the activity will NOT include bridge
removal or maintenance, unless the bridge has been inspected and there is no evidence of bat
use, OR;
. located in a red HUC, but the activity will NOT include tree clearing/removal;
construction/installation of wind turbines; bridge removal or maintenance, unless the bridge
has been inspected and there is no evidence of bat use, and/or; any percussive activities.
b. Procedures when the USACE is not the lead federal agency:
For projects where another federal agency is the lead federal agency - if that other federal
agency has completed project -specific ESA Section 7(a)(2) consultation for the NLEB, and has
(1) determined that the project would not cause prohibited incidental take of the NLEB, and (2)
completed coordination/consultation that is required by the USFWS (per the directions on the
respective USFWS office's website), that project may proceed without PCN to either the
USACE or the USFWS, provided all General and Regional Permit Conditions are met.
The NLEB SLOPES can be viewed on the USACE website at:
http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-
Coordination/ESA/. Permittees who do not have internet access may contact the USACE at
(910) 251- 4633.
14. West Indian Manatee Protection. In order to protect the endangered West Indian
manatee (Trichechus manatus) the Permittee shall implement the USFWS' Manatee
Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at
https://www.fws.gov/raleigh/pdfs/ManateeGuidelines2017.pdf.
15. ESA Programmatic Biological Opinions. The Wilmington District, USFWS, NCDOT, and
the FHWA have conducted programmatic Section 7(a)(2) consultation for a number of federally
listed species and designated critical habitat (DCH), and programmatic consultation
concerning other federally listed species and/or DCH may occur in the future. The result of
completed programmatic consultation is a Programmatic Biological Opinion (PBO) issued by
the USFWS. These PBOs contain mandatory terms and conditions to implement the
reasonable and prudent measures that are associated with "incidental take" of whichever
species or critical habitat is covered by a specific PBO. Authorization under NWPs is
conditional upon the permittee's compliance with all the mandatory terms and conditions
associated with incidental take of the applicable PBO (or PBOs), which are incorporated by
reference in the NWPs. Failure to comply with the terms and conditions associated with
incidental take of an applicable PBO, where a take of the federally listed species occurs, would
constitute an unauthorized take by the permittee, and would also constitute permittee non-
compliance with the authorization under the NWPs. If the terms and conditions of a specific
PBO (or PBOs) apply to a project, the Corps will include this/these requirements in any NWP
verification that may be issued for a project. For an activity/project that does not require a
PCN, the terms and conditions of the applicable PBO(s) also apply to that non -notifying
32
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
activity/project. The USFWS is the appropriate authority to determine compliance with the
terms and conditions of its PBO and the ESA. All PBOs can be found on our website at:
https://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-
Coordination/ESA/.
16. Work on Eastern Band of Cherokee Indian Land.
Notifying NWPs - All PCNs submitted for activities in waters of the U.S. on Eastern Band of
Cherokee Indians (EBCI) trust land (i.e., Qualla Boundary and non-contiguous tracts of trust
land located in portions of Swain, Jackson, Haywood, Graham and Cherokee Counties),
must comply with the requirements of the latest MOU between the Wilmington District and
the EBCI.
Non -notifying NWPs - Prior to the use of any non -notifying NWP for activities in waters of
the U.S. on EBCI trust land (i.e., Qualla Boundary and non-contiguous tracts of trust land
located in portions of Swain, Jackson, Haywood, Graham and Cherokee Counties), all
prospective permittees must comply with the requirements of the latest MOU between the
Wilmington District and the EBCI; this includes coordinating the proposed project with the
EBCI Natural Resources Program and obtaining a Tribal Approval Letter from the Tribe.
The EBCI MOU can be found at the following URL: http://saw-reg.usace.army.mil/FO/Final-
MOU-EBCI-USACE.pdf
17. Sedimentation and Erosion Control Structures and Measures.
All PCNs will identify and describe sedimentation and erosion control structures and
measures proposed for placement in waters of the U.S. The structures and measures
should be depicted on maps, surveys or drawings showing location and impacts to
jurisdictional wetlands and streams.
C. REGIONAL CONDITIONS APPLICABLE TO NWP 14
a. If appropriate, permittees shall employ natural channel design (see definition below and
NOTE below) to the maximum extent practicable for stream relocations. All stream relocation
proposals shall include a Relocation and Monitoring Plan and a functional assessment of
baseline conditions (e.g., use of the North Carolina Stream Assessment Methodology).
Compensatory mitigation may be required for stream relocations.
Natural Channel Design means a geomorphologic approach to stream restoration based on an
understanding of valley type, general watershed conditions, dimension, pattern, profile,
hydrology and sediment transport of natural, stable channels (reference condition) and
applying this understanding to the reconstruction of a stable channel.
NOTE: For more information on Natural Channel Design, permittees should reference North
Carolina Stream Mitigation Guidance on the Corps RIBITS (Regulatory In -lieu Fee and Bank
Information Tracking System) website or at the following World Wide Web Page:
https://ribits.ors.usace.army.mil/ords/f?p=107:2
b. In designated trout watersheds, a PCN is not required for impacts to a maximum of 0.007
acres (0.02 acres for temporary dewatering). In designated trout waters, the permittee shall
submit a PCN (see Regional Conditions C.3. above and General Condition 32) to the District
Engineer prior to commencing the activity if 1) impacts (other than temporary dewatering to
work in dry conditions) to jurisdictional aquatic resources exceed 0.007 acres; 2) temporary
33
Nationwide Permit 14 - Activities, Regional Conditions, General Conditions, and Definitions
impacts to streams or waterbodies associated with dewatering to work in dry conditions
exceed 0.02 acres; 3) the project will involve impacts to wetlands; 4) the primary purpose of
the project is for commercial development; 5) the project involves the replacement of a bridge
or spanning structure with a culvert or non -spanning structure in waters of the United States; or
6) the activity will be constructed during the trout waters moratorium (October 15 through April
15).
D. SECTION 401 WATER QUALITY CERTIFICATION (WQC) AND/OR COASTAL ZONE
MANAGEMENT ACT (CZMA) CONSISTENCY DETERMINATION SUMMARY AND
APPLICABLE CONDITIONS
The CZMA Consistency Determination and all Water Quality Certifications for the NWPs can
be found at: https://www.saw.usace.army.mil/Missions/Regulatory-Permit-
Program/Permits/2017-Nationwide-Permits/
34
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
NORTH CAROLINA
Environmental Quality
January 30, 2023
DWR # 20170891v2
Brunswick County
Middle Island Property Owners Association, Inc.
Attn: Alan Reyner
1837 W. Buchanan Street
Columbia, SC 29206
Subject: Approval of Individual 401 Water Quality Certification
Replacement of Two (2) Timber Bridges
USACE Action ID. No. SAW-2020-01006
Dear Mr. Reyner:
Attached hereto is a copy of Certification No. WQC005612 issued to Alan Reyner and Middle Island
Property Owners Association, Inc, dated January 30, 2023. This approval is for the purpose and design
described in your application. The plans and specifications for this project are incorporated by reference
as part of this Water Quality Certification. If you change your project, you must notify the Division and
you may be required to submit a new application package with the appropriate fee. If the property is sold,
the new owner must be given a copy of this Certification and is responsible for complying with all
conditions. [15A NCAC 02H .0507(d)(2)].
This Water Quality Certification does not relieve the permittee of the responsibility to obtain all other
required Federal, State, or Local approvals before proceeding with the project, including those required
by, but not limited to, Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and
Trout Buffer regulations.
This Water Quality Certification neither grants nor affirms any property right, license, or privilege in any
lands or waters, or any right of use in any waters. This Water Quality Certification does not authorize
any person to interfere with the riparian rights, littoral rights, or water use rights of any other person
and does not create any prescriptive right or any right of priority regarding any usage of water. This
Water Quality Certification shall not be interposed as a defense in any action respecting the
determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed
by virtue of this Water Quality Certification to possess any prescriptive or other right of priority with
respect to any other consumptive user.
Upon the presentation of proper credentials, the Division may inspect the property.
This Water Quality Certification shall expire on the same day as the expiration date of the corresponding
Section 404 Permit. The conditions shall remain in effect for the life of the project, regardless of the
expiration date of this Water Quality Certification.
GDE-1;
NORTH CAROLINA
North Carolina Department of Environmental Quality I Division of Water Resources
127 Cardinal Drive Ext. I Wilmington, North Carolink 28405
910.796.7215
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 2 of 14
Non-compliance with or violation of the conditions herein set forth may result in revocation of this
Water Quality Certification for the project and may also result in criminal and/or civil penalties.
If you are unable to comply with any of the conditions of this Water Quality Certification you must notify
the Wilmington Regional Office within 24 hours (or the next business day if a weekend or holiday) from
the time the permittee becomes aware of the circumstances.
The permittee shall report to the Wilmington Regional Office any noncompliance with, and/or any
violation of, stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment
impacts to streams or wetlands. Information shall be provided orally within 24 hours (or the next
business day if a weekend or holiday) from the time the permittee became aware of the non-compliance
circumstances.
This approval and its conditions are final and binding unless contested [G.S. 143-215.5].
This Certification can be contested as provided in Chapter 150B of the North Carolina General Statutes by
filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative
Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter
150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code.
Additional information regarding requirements for filing a Petition and Petition forms may be accessed at
http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000.
A party filing a Petition must serve a copy of the Petition on:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
If the party filing the Petition is not the permittee, then the party must also serve the recipient of the
Certification in accordance with N.C.G.S 150B-23(a).
This letter completes the Division's review under section 401 of the Clean Water Act and 15A NCAC 02H
.0500. Please contact Holley Snider at 910-796-7303 or holley.snider@ncdenr.gov if you have any
questions or concerns.
Electronic cc:
Sincerely,
DocuSigned by:
Fortita saaaln4,v,—Lit4
E3ABA14AC7DC434...
Morella Sanchez -King
Regional Operations Supervisor
Bruce Marek, consultant
Greg Currey, USACE Wilmington Regulatory Field Office
Todd Bowers, EPA
DWR 401 & Buffer Permitting Branch Electronic file
D_E QNORTH CAROLINA
DP 1, Bnl MEMnrn nGI Quality
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
LD_E
NORTH CAROLINA ��`��`
DP 1,Bnl M EMnnmonGl Ooal
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 3 of 14
Filename: 20170915v2_VBHI_MI Property Owners_IWQC_BrunsCo_Jan.23
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 4 of 14
NORTH CAROLINA 401 WATER QUALITY CERTIFICATION
CERTIFICATION #WQC005612 is issued in conformity with the requirements of Section 401, Public Laws
92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500
and 15A NCAC 02B .0200, to Alan Reyner and Middle Island Property Owners Association, Inc, who have
authorization for the impacts listed below, as described within your application received by the N.C.
Division of Water Resources (Division) on December 12, 2022, and by Public Notice issued by the Division
of Coastal Management on December 7, 2022.
The State of North Carolina certifies that this activity will comply with water quality requirements and
the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if
conducted in accordance with the application, the supporting documentation, and conditions
hereinafter set forth.
The following impacts are hereby approved. No other impacts are approved, including incidental
impacts. [15A NCAC 02H .0506(b)]
Type of Impact
Amount Approved
(units) Permanent
Amount Approved (units)
Temporary
Plan Location or
Reference
404/401 Wetlands
Excavation for culvert
install
Fill for Bridge
0.004 acres
+/-198 sq. ft.
0.019 acrs
+/- 825 sq.ft.
N/A
CAMA permit
Application, project
narrative and
Sheets WD-1,
Open Waters
WD-2, C1 R3,
Fill
Excavation for
construction
0.019 acres
+/- 860 sq. ft.
0.004 acres
+/-180sq.ft.
N/A
C2 R3, and C 3 R3
This approval requires you to follow the conditions listed in the certification below.
CONDITIONS OF CERTIFICATION [15A NCAC 02H .0507(c)]:
1. Concrete construction materials used for bridge construction and bulkhead components, such as
deadman anchors, tie -back systems and concrete caps, shall be managed in a manner that
prevents contact with waters of the State. A dry work area shall be maintained to prevent direct
contact between curing concrete and adjacent surface water. Water that inadvertently contacts
uncured concrete shall not be discharged to surface waters due to the potential for elevated pH
and possible aquatic life and fish kills. Any water that contacts uncured concrete shall be
captured, treated, and disposed of properly.
Citation: 15A 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B .0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (2) Oils,
NORTH CAROLINA ��`1
Ueprhnnnl of BMrunMnnfal Owl
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 5 of 14
deleterious substances, or colored or other wastes: only such amounts as shall not render the
waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or
adversely affect the palatability of fish, aesthetic quality, or impair the waters for any designated
uses. As cited in Wetland Standards: (2) Floating or submerged debris, oil, deleterious
substances, or other material shall not be present in amounts that cause adverse impacts on
existing wetland uses.
2. If activities must occur during periods of high biological activity (e.g. sea turtle nesting, fish
spawning, or bird nesting), then biological monitoring may be required at the request of
other state or federal agencies and coordinated with these activities.
All moratoriums on construction activities established by the NC Wildlife Resources
Commission (WRC), US Fish and Wildlife Service (USFWS), NC Division of Marine Fisheries
(DMF), or National Marine Fisheries Service (NMFS) shall be implemented. Exceptions to
this condition require written approval by the resource agency responsible for the given
moratorium.
Work within a designated trout watershed of North Carolina (as identified by the
Wilmington District of the US Army Corps of Engineers), or identified state or federal
endangered or threatened species habitat, shall be coordinated with the appropriate WRC,
USFWS, NMFS, and/or DMF personnel.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 04E3.0125
Justification: In order to protect against impairment of water quality standards and best usage of
receiving and downstream waters, water quality based management practices must be
employed to protect against direct or indirect discharge of waste or other sources of water
pollution. Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule (including, at minimum: aquatic life propagation, survival,
and maintenance of biological integrity, wildlife, secondary contact recreation, agriculture), and
that activities must not cause water pollution that precludes any best use on a short-term or
long-term basis.
3. The Permittee shall adhere specially to 15A NCAC 02B .0221 Tidal Salt Water Quality for Class SA
Waters (3)(g) pH: shall be normal for waters in the area, which generally shall range between
6.8 and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural
conditions; (I) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU; if turbidity
exceeds this level due to natural background conditions, the existing turbidity level shall not be
increased.
Citation: 15A NCAC 02E3.0221
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule [including, at minimum: aquatic life propagation, survival,
and maintenance of biological integrity (including fishing, fish, and Primary Nursery Areas
(PNAs)), wildlife, and secondary contact recreation]; and that activities must not cause water
pollution that precludes any best use on a short-term or long-term basis.
NORTH CAROLINP. ��`1
ueprlmenl of BMrunm9nfal Owl
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 6 of 14
4. Due to the possibility that compaction and/or other site alterations might prevent the
temporary wetland impact area from re -attaining jurisdictional wetland status; the permittee
shall provide an update on the wetland areas temporarily impacted by the temporary on -site
detour. This update shall be conducted two growing seasons after completion of the work and
shall consist of photographs and a brief report on the progress of the areas in re -attaining
wetland jurisdictional status. Upon submission of this update to the NCDWR, the permittee
shall schedule an agency field meeting with the NCDWR to determine if the wetland areas
temporarily impacted by this project have re -attained jurisdictional wetland status. If the
wetland areas temporarily impacted by this project have not re -attained jurisdictional wetland
status, the NCDWR shall determine if compensatory wetland mitigation is to be required.
Citation: 15A NCAC 02H.0506(b)(2) and (b)(3)
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. In determining that the proposed activity will
comply with stae water quality standards (including designated uses, numeric criteria, narrative
criteria and the state's antidegradation policy), the Division must evaluate if the activity has
avoided and minimized impacts to waters, would cause or contribute to a violation of standards
or would result in secondary or cumulative impacts.
5. All wetlands impacted by the placement of temporary fill or clearing activities shall be restored
to the preconstruction contours and elevations. The impacted areas shall be revegetated with
appropriate native species including woody species.
Citation: 15A NCAC 02H .0506(b)(2)
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. In determining that the proposed activity will
comply with state water quality standards (including designated uses, numeric criteria, narrative
criteria and the state's antidegradation policy), the Division must evaluate if the activity has
avoided and minimized impacts to waters, would cause or contribute to a violation of standards
or would result in secondary or cumulative impacts.
6. The permittee shall report to the DWR Wilmington Regional Office any noncompliance with,
and/or any violation of, stream or wetland standards [15A NCAC 02B .0200], including but not
limited to sediment impacts to streams or wetlands. Information shall be provided orally within
24 hours (or the next business day if a weekend or holiday) from the time the permittee became
aware of the non-compliance circumstances.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
Justification: Timely reporting of non-compliance is important in identifying and minimizing
detrimental impacts to water quality and avoiding impacts due to water pollution that precludes
any best use on a short-term or long-term basis.
7. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint
of the approved impacts (including temporary impacts).
NORTH CAROLINP. ��`1
ueprlmenl of BMrunm9nfal Owl
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 7 of 14
Citation: 15A NCAC 02H .0506; 15A NCAC 02H .0507(c)
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule (including, at minimum: aquatic life propagation, survival,
and maintenance of biological integrity; wildlife; secondary contact recreation; agriculture); and
that activities must not cause water pollution that precludes any best use on a short-term or
long-term basis.
8. When applicable, all construction activities shall be performed and maintained in full
compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973).
Regardless of applicability of the Sediment and Pollution Control Act, all projects shall
incorporate appropriate Best Management Practices for the control of sediment and erosion so
that no violations of state water quality standards, statutes, or rules occur.
Design, installation, operation, and maintenance of all sediment and erosion control measures
shall be equal to or exceed the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual, or for linear transportation projects, the North
Caroline Department of Transportation Sediment and Erosion Control Manual.
All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) sites,
including contractor -owned or leased borrow pits associated with the project. Sufficient
materials required for stabilization and/or repair of erosion control measures and stormwater
routing and treatment shall be on site at all times.
For borrow pit sites, the erosion and sediment control measures shall be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual. Reclamation measures and implementation shall comply with the
reclamation in accordance with the requirements of the Sedimentation Pollution Control Act
and the Mining Act of 1971.
If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), SA, WS-
I, WS-II, High Quality Waters (HQW), or Outstanding Resource Waters (ORW), then the
sedimentation and erosion control designs shall comply with the requirements set forth in 15A
NCAC 04B .0124, Design Standards in Sensitive Watersheds.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCACO28.0200; 15A NCAC 028
.0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12)
Oils, deleterious substances, or colored or other wastes: only such amounts as shall not render
the waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or
adversely affect the palatability of fish, aesthetic quality, or impair the waters for any designated
uses; and (21) turbidity in the receiving water shall not exceed 50 Nephelometric Turbidity Units
(NTU) in streams not designated as trout waters and 10 NTU in streams, lakes, or reservoirs
designated as trout waters; for lakes and reservoirs not designated as trout waters, the turbidity
shall not exceed 25 NTU; if turbidity exceeds these levels due to natural background conditions,
the existing turbidity level shall not be increased. As cited in Wetland Standards: (c)(1) Liquids,
NORTH CAROLINP. ��`1
ueprlmenl of BMrunm9nfal Owl
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 8 of 14
fill or other solids, or dissolved gases shall not be present in amounts that may cause adverse
impacts on existing wetland uses; and (3) Materials producing color or odor shall not be present
in amounts that may cause adverse impacts on existing wetland uses.
9. Sediment and erosion control measures shall not be installed in wetland or waters except within
the footprint of temporary or permanent impacts otherwise authorized by this Certification. If
placed within authorized impact areas, then placement of such measures shall not be conducted
in a manner that results in dis-equilibrium of any wetlands, streambeds, or streambanks. Any
silt fence installed within wetlands shall be removed from wetlands and the natural grade
restored within two (2) months of the date that DEMLR or locally delegated program has
released the specific area within the project to ensure wetland standards are maintained upon
completion of the project.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 026.0200; 15A NCAC 026
.0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12)
Oils, deleterious substances, or colored or other wastes: only such amounts as shall not render
the waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or
adversely affect the palatability of fish, aesthetic quality, or impair the waters for any designated
uses; and (21) turbidity in the receiving water shall not exceed 50 Nephelometric Turbidity Units
(NTU) in streams not designated as trout waters and 10 NTU in streams, lakes, or reservoirs
designated as trout waters; for lakes and reservoirs not designated as trout waters, the turbidity
shall not exceed 25 NTU; if turbidity exceeds these levels due to natural background conditions,
the existing turbidity level shall not be increased. As cited in Wetland Standards: (c)(1) Liquids,
fill or other solids, or dissolved gases shall not be present in amounts that may cause adverse
impacts on existing wetland uses; and (3) Materials producing color or odor shall not be present
in amounts that may cause adverse impacts on existing wetland uses.
10. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used
along streambanks or within wetlands.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
Justification: A project that affects waters shall not be permitted unless the existing uses
(including aquatic life propagation and biological integrity), and the water quality to protect
such uses, are protected. Protections are necessary to ensure any remaining surface waters or
wetlands, and any surface waters or wetlands downstream, continue to support existing uses
during and after project completion. The Division must evaluate if the activity has avoided and
minimized impacts to waters, would cause or contribute to a violation of standards, or would
result in secondary or cumulative impacts.
11. If the project is covered by NPDES Construction Stormwater Permit Number NCG010000 or
NPDES Construction Stormwater Permit Number NCG250000, full compliance with permit
conditions including the erosion & sedimentation control plan, inspections and maintenance,
self -monitoring, record keeping and reporting requirements is required.
NORTH CAROLINP. ��`1
ueprlmenl of BMrunm9nfal Owl
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 9 of 14
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028.0200; 15A NCAC 028
.0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12)
Oils, deleterious substances, or colored or other wastes: only such amounts as shall not render
the waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or
adversely affect the palatability of fish, aesthetic quality, or impair the waters for any designated
uses; and (21) turbidity in the receiving water shall not exceed 50 Nephelometric Turbidity Units
(NTU) in streams not designated as trout waters and 10 NTU in streams, lakes, or reservoirs
designated as trout waters; for lakes and reservoirs not designated as trout waters, the turbidity
shall not exceed 25 NTU; if turbidity exceeds these levels due to natural background conditions,
the existing turbidity level shall not be increased. As cited in Wetland Standards: (c)(1) Liquids,
fill or other solids, or dissolved gases shall not be present in amounts that may cause adverse
impacts on existing wetland uses; and (3) Materials producing color or odor shall not be present
in amounts that may cause adverse impacts on existing wetland uses.
12. All work in or adjacent to streams shall be conducted so that the flowing stream does not come
in contact with the disturbed area. Approved best management practices from the most current
version of the NC Sediment and Erosion Control Manual, or the NC Department of
Transportation Construction and Maintenance Activities Manual, such as sandbags, rock berms,
cofferdams, and other diversion structures shall be used to minimize excavation in flowing
water.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028.0200
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12)
Oils, deleterious substances, or colored or other wastes: only such amounts as shall not render
the waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or
adversely affect the palatability of fish, aesthetic quality, or impair the waters for any designated
uses; and (21) turbidity in the receiving water shall not exceed 50 Nephelometric Turbidity Units
(NTU) in streams not designated as trout waters and 10 NTU in streams, lakes, or reservoirs
designated as trout waters; for lakes and reservoirs not designated as trout waters, the turbidity
shall not exceed 25 NTU; if turbidity exceeds these levels due to natural background conditions,
the existing turbidity level shall not be increased.
13. Culverts shall be designed and installed in such a manner that the original stream profiles are
not altered and allow for aquatic life movement during low flows. The dimension, pattern, and
profile of the stream above and below a pipe or culvert shall not be modified by widening the
stream channel or by reducing the depth of the stream in connection with the construction
activity. The width, height, and gradient of a proposed culvert shall be such as to pass the
average historical low flow and spring flow without adversely altering flow velocity. If the width
of the culvert is wider than the stream channel, the culvert shall include multiple boxes/pipes,
baffles, benches and/or sills to maintain the natural width of the stream channel. If multiple
NORTH CAROLINP. ��`1
ueprlmenl of BMrunm9nfal Owl
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 10 of 14
culverts/pipes/barrels are used, low flows shall be accommodated in one culvert/pipe and
additional culverts/pipes shall be installed such that they receive only flows above bankfull.
Placement of culverts and other structures in streams shall be below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48 inches, and 20% of the
culvert diameter for culverts having a diameter less than or equal to 48 inches, to allow low flow
passage of water and aquatic life. If the culvert outlet is submerged within a pool or scour hole
and designed to provide for aquatic passage, then culvert burial into the streambed is not
required.
For structures less than 72" in diameter/width, and topographic constraints indicate culvert
slopes of greater than 2.5% culvert burial is not required, provided that all alternative options
for flattening the slope have been investigated and aquatic life movement/connectivity has
been provided when possible (e.g. rock ladders, cross -vanes, sills, baffles etc.). Notification,
including supporting documentation to include a location map of the culvert, culvert profile
drawings, and slope calculations, shall be provided to DWR 30 calendar days prior to the
installation of the culvert.
When bedrock is present in culvert locations, culvert burial is not required, provided that there
is sufficient documentation of the presence of bedrock. Notification, including supporting
documentation such as a location map of the culvert, geotechnical reports, photographs, etc.
shall be provided to DWR a minimum of 30 calendar days prior to the installation of the culvert.
If bedrock is discovered during construction, then DWR shall be notified by phone or email
within 24 hours of discovery.
Installation of culverts in wetlands shall ensure continuity of water movement and be designed
to adequately accommodate high water or flood conditions. When roadways, causeways, or
other fill projects are constructed across FEMA-designated floodways or wetlands, openings
such as culverts or bridges shall be provided to maintain the natural hydrology of the system as
well as prevent constriction of the floodway that may result in destabilization of streams or
wetlands.
The establishment of native woody vegetation and other soft stream bank stabilization
techniques shall be used where practicable instead of rip -rap or other bank hardening methods.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. Ensuring that structures are installed
properly in waters will ensure that surface water quality standards are met and conditions of
waters are suitable for all best uses.
14. Bridge deck drains shall not discharge directly into streams or wetlands. Stormwater shall be
directed across the bridge and pre-treated through site -appropriate means to the maximum
extent practicable (e.g. grassed swales, pre -formed scour holes, vegetated buffers, etc.) before
entering streams or wetlands.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
NORTH CAROLINP. ��`1
ueprlmenl of BMrunm9nfal Owl
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 11 of 14
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. Ensuring that in -stream structures
are installed properly will ensure that surface water quality standards are met and conditions of
waters are suitable for all best uses.
15. Application of fertilizer to establish planted/seeded vegetation within disturbed riparian areas
and/or wetlands shall be conducted at agronomic rates and shall comply with all other Federal,
State and Local regulations. Fertilizer application shall be accomplished in a manner that
minimizes the risk of contact between the fertilizer and surface waters.
Citation: 15A 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028.0200; 15A NCAC 02B.0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12)
Oils, deleterious substances, or colored or other wastes: only such amounts as shall not render
the waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or
adversely affect the palatability of fish, aesthetic quality, or impair the waters for any designated
uses. As cited in Wetland Standards: (c)(1) Liquids, fill or other solids, or dissolved gases shall not
be present in amounts that may cause adverse impacts on existing wetland uses; and (3)
Materials producing color or odor shall not be present in amounts that may cause adverse
impacts on existing wetland uses.
16. All proposed and approved temporary fill and culverts shall be removed and the impacted area
shall be returned to natural conditions within 60 calendar days after the temporary impact is no
longer necessary. The impacted areas shall be restored to original grade, including each
stream's original cross -sectional dimensions, planform pattern, and longitudinal bed profile. All
temporarily impacted sites shall be restored and stabilized with native vegetation.
Citation: 15A NCAC 02H.0506(b); 15A NCAC 02H .0507(c)
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Protections are necessary to ensure any
remaining surface waters or wetlands, and any surface waters or wetlands downstream,
continue to support existing uses after project completion.
17. All proposed and approved temporary pipes/culverts/rip-rap pads etc. in streams or wetlands
shall be installed as outlined in the most recent edition of the North Carolina Sediment and
Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual or
the North Carolina Department of Transportation Best Management Practices for Construction
and Maintenance Activities so as not to restrict stream flow or cause dis-equilibrium during use
of this Certification.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. Ensuring that structures are installed
NORTH CAROLINP. ��`1
ueprlmenl of BMrunm9nfal Owl
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 12 of 14
properly in waters will ensure that surface water quality standards are met and conditions of
waters are suitable for all best uses.
18. Any rip -rap required for proper culvert placement, stream stabilization, or restoration of
temporarily disturbed areas shall be restricted to the area directly impacted by the approved
construction activity. All rip -rap shall be placed such that the original streambed elevation and
streambank contours are restored and maintained and shall consist of clean rock or masonry
material free of debris or toxic pollutants. Placement of rip -rap or other approved materials
shall not result in de -stabilization of the stream bed or banks upstream or downstream of the
area or be installed in a manner that precludes aquatic life passage.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. The Division must evaluate if the
activity has avoided and minimized impacts to waters, would cause or contribute to a violation
of standards, or would result in secondary or cumulative impacts.
19. Any rip -rap used for stream or shoreline stabilization shall be of a size and density to prevent
movement by wave, current action, or stream flows, and shall consist of clean rock or masonry
material free of debris or toxic pollutants. Rip -rap shall not be installed in the streambed except
in specific areas required for velocity control and to ensure structural integrity of bank
stabilization measures.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028 .0201
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. The Division must evaluate if the
activity has avoided and minimized impacts to waters, would cause or contribute to a violation
of standards, or would result in secondary or cumulative impacts.
20. All mechanized equipment operated near surface waters shall be inspected and maintained
regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or
other toxic materials. Construction shall be staged in order to minimize the exposure of
equipment to surface waters to the maximum extent practicable. Fueling, lubrication, and
general equipment maintenance shall be performed in a manner to prevent, to the maximum
extent practicable, contamination of surface waters by fuels and oils.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B
.0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12)
Oils, deleterious substances, or colored or other wastes: only such amounts as shall not render
the waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or
adversely affect the palatability of fish, aesthetic quality, or impair the waters for any designated
NORTH CAROLINP. ��`1
ueprlmenl of BMrunm9nfal Owl
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 13 of 14
uses. As cited in Wetland Standards: (c)(1) Liquids, fill or other solids, or dissolved gases shall not
be present in amounts that may cause adverse impacts on existing wetland uses; and (3)
Materials producing color or odor shall not be present in amounts that may cause adverse
impacts on existing wetland uses.
21. Heavy equipment working in wetlands shall be placed on mats or other measures shall be taken
to minimize soil disturbance and compaction.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028 .0231
Justification: Wetland standards require maintenance or enhancement of existing uses of
wetlands such that hydrologic conditions necessary to support natural biological and physical
characteristics are protected; populations of wetland flora and fauna are maintained to protect
biological integrity of the wetland; and materials or substances are not present in amounts that
may cause adverse impact on existing wetland uses.
22. In accordance with 143-215.85(b), the permittee shall report any petroleum spill of 25 gallons or
more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill
regardless of amount occurring within 100 feet of surface waters; and any petroleum spill less
than 25 gallons that cannot be cleaned up within 24 hours.
Citation: 15A NCAC 02H .0507(c); N.C.G.S 143-215.85(b)
Justification: Person(s) owning or having control over oil or other substances upon notice of
discharge must immediately notify the Department, or any of its agents or employees, of the
nature, location, and time of the discharge and of the measures which are being taken or are
proposed to be taken to contain and remove the discharge. This action is required in order to
contain or divert the substances to prevent entry into the surface waters. Surface water quality
standards require that conditions of waters be suitable for all best uses provided for in state rule
(including, at minimum: aquatic life propagation, survival, and maintenance of biological
integrity; wildlife; secondary contact recreation; agriculture); and that activities must not cause
water pollution that precludes any best use on a short-term or long-term basis.
23. The permittee and their authorized agents shall conduct all activities in a manner consistent
with State water quality standards (including any requirements resulting from compliance with
§303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal
Law.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. The Division must evaluate if the
activity has avoided and minimized impacts to waters, would cause or contribute to a violation
of standards, or would result in secondary or cumulative impacts.
24. The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this certification in the construction and maintenance of this project, and shall
provide each of its contractors and/or agents associated with the construction or maintenance
of this project with a copy of this Water Quality Certification. A copy of this Water Quality
NORTH CAROLINP. ��`1
ueprlmenl of BMrunm9nfal Owl
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: E5322B7C-9194-48FB-9310-7D085E711 F9C
Middle Island Property Owners Association, Inc.
DWR# 20170891v2
Individual Certification #WQC005612
Page 14 of 14
Certification shall be available at the project site during the construction and maintenance of
this project.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
Justification: Those actually performing the work should be aware of the requirements of this
401 Water Quality Certification to minimize water quality impacts.
This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in
your application shall expire upon expiration of the 404Permit. The conditions in effect on the date of
issuance shall remain in effect for the life of the project, regardless of the expiration date of this
Certification. [15A NCAC 02H .0507(c)]
MSK/hs
D_E
NORTH CAROLNA ��`��`
Oapar4nanl M E Mn nmunGl Oual
This, the 30th day of January 2023
DocuSigned by:
Eieraa, SalAt615-4114
E3ABA14AC7DC434...
Morella Sanchez -King
Regional Operations Supervisor
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000