Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20230207 Ver 1_Site Plan_20230203Full Pond/
Normal Water .Level. .. _
Shoreline
to I
La ke
(At Full Pond/ Normal Water Level)
S ' %e. I©w )( 14)00,
3' CA-6 6'j e 'C I C)CO"
1 (J00 ' 1 e> 3+1-)
u nao16 ed
►r��a1 ���+urba�ace.
Please approximately sketch the following information on this plan, length of shoreHne
(provide dimensions for each item, such as 10 ft x 100 f'r)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ formal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 3 of 3