Loading...
HomeMy WebLinkAboutNCC230303_ESC Approval Submitted_20230207ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLASANSEL Interim Director Darren Lucas 3010 High Pines Church Rd. Asheboro, NC 27205 �m NORTH CAROLINA Environmental Quality January 11, 2023 LETTER OF APPROVAL RE: Project Name: Zoo Parkway Townhomes Project ID: RANDO-2023-016 Acres Approved: 2.5 County: Randolph City: Asheboro Address: NC-159 River Basin: Cape Fear Stream Classification: C Submitted By: Summey Engineering Associates, PLLC Date Received by LQS: December 21, 2022 Plan Type: New Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed atdeq.nc.gov/NCGOI. Please direct questions about the eNOI form to the _Stormwater Progra n staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: EQ5 North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 336-776-9800 Letter of Approval Darren Lucas January 11, 2023 Page 2 of 2 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Tamera Eplin, PE Regional Engineer Land Quality Section Enclosures: Certificate of Approval Summey Engineering Associates, PLLC ATTN: Zach Gardner, PE PO Box 968 Asheboro, NC 27204