Loading...
HomeMy WebLinkAboutNC0043974_Wasteload Allocation_19830727LJI3 au Facility Name: Existing Proposed L-r NPDES WASTE LOAD ALLOCATION Engineer Date Rec. # faC 6D — 0,2 Cc(o� Permit No.: )1Cd9C 13?-2-1`' Pipe No.: 04o / County: Date: 6 `lpz Design Capacity (MGD): 0. OtD L Industrial (% of Flow): Domestic (% of Flow): Receiving Stream: L,..T � (reek_ _ Class: C- Sub -Basin • 1-40 /_ ea J Crik2ctll!!{-- (Please attach) Requestor• ^VG K/A"f Rcgional Office/Ye:.- 31q (Guideline limitations, if applicable, are to be listed on the back of this form.) Design Temp • c276' C Drainage Area• (9,/ Avg. Streamflow: =� 7Q10 : _ (? ' 0 _ Winter 7Q10: 0, U 30Q2 • . GA a Location of D.O.minimum (miles below outfall): Slope: E Velocity (fps) : r)i 1 K1 (base e, per day, 20°C) : K2 (base e, per day, 20°C) • 0 c., 0 N a, L 4, Effluent Characteristics .Monthly Average ,),,,l / Comments 13°I)C i /0 114, 4 Ntb Ai a Li- i/kyi 1)6 (0 p„,,,n _5 3o 3() kitt7/1 re( 'r01f,'.)i'i,- IO(, I((, . c r,,0 /-2 (,--1() (r-Y `5 s ,U, Original Allocation Revised Allocation Confirmation Prepared By: I> Effluent Characteristics Monthly Average 6014 /e✓ Comments L, P •1 Date(s) of Revision(s) (Please attach previous allocation) LU47.A•-^-" Reviewed By: Date: 1 7- 0'3 REQUEST NO. « 662 ********************* WASTELOAD ALLOCATION APPROVAL FORM ********************* FACILITY NAME BUCKLAND SCHOOL TYPE OF WASTE DOMESTIC COUNTY GATES REGIONAL OFFICE WASHINGTON REQUESTOR « RAVE ADKINS RECEIVING STREAM « UT COLE CREEK SI.JJ3BASIN « 03-01-01 7Q10 : 0 CFS W7010 « 0 CFS 3002 « 0 CFS DRAINAGE AREA « 0.1 SQ.MI. STREAM CLASS «C-NSW ************************ RECOMMENDED EFFLUENT LIMITS :**************.******** WASTEFLOW(S) (MGD) t .006 .006 BOD-5 (MG/L) « 5 10 NH3-N (MG/L) « 2 4 D.O. (MG/L) « 6 6 PH (SU) « 6-8.5 6-8.5 FECAL COLIFORM (/100ML)« 1000 1000 TSS (MG/L) « 30 30 TOT. NITROGEN (MG/L) « 3 3 TOT. PHOSPHORUS (MG/L.) « 1 1 COLUMN 1-SUMMER LIMITS COLUMN -WINTER LIMITS *************************************************************************fit*:M* FACILITY IS : PROPOSED ( ) EXISTING (j) NEW ( ) LIMITS ARE : REVISION ( V) CONFIRMATION ( ) OF THOSE PREVIOUSLY ISSUED REVIEWED AND RECOMMENDED BY: MODELER SUF'ERVISOR,MODELING GROUP REGIONAL SUPERVISOR PERMITS MANAGER APPROVED BY « DATE « DATE «_7_a7-1913 --_DATE « o ✓ / `��3 DATE «_gs DIVISION DIRECTOR :&' �f� %ATF «._ o _ hod4 yr 0 3. Igeoch o oil/z,v, DK.. clOrpt S ********** MODEL RESULTS ********** DISCHARGER :WINTER MODEL—BUCKLAND SCHOOL RECEIVING STREAM :UT COLE CR ***************************************************************:*:**** THE END D.O. IS 8.23 MG/L ********************************************************************** THE END CBOD IS 3.66 MG/L ********************************************************:**:************ THE END NBOD IS 0.00 MG/L ********************************************************************** THE D.O. MIN. OF SEGMENT 1 IS 5.45 MG/L THIS MINIMUM IS LOCATED AT SEGMENT MILEPOINT 0.1 WHICH IS LOCATED IN REACH NUMBER 1 THE WLA FOR SEGMENT 1 REACH 1 IS 111 MG/L OF CBOD THE WLA FOR SEGMENT 1 REACH 1 IS 0 MG/L OF NBOD THE REQUIRED EFFLUENT D.O. IS 6 MG/L THE WASTEFLOW ENTERING SEG 1 REACH 1 IS 0.006 MGD THE WLA FOR SEGMENT 1 REACH 2 IS 0 MG/L OF CBOD THE WLA FOR SEGMENT 1 REACH 2 IS 0 MG/L OF NBOD THE REQUIRED EFFLUENT D.O. IS 0 MG/L THE WASTEFLOW ENTERING SEG 1 REACH 2 IS 0 MGD *********** cat******` **********`***************************************