Loading...
HomeMy WebLinkAboutNCC192967_NOT Closeout Documents_20230201ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLAS R ANSEL Interim Director NORTH CAROLINA Environmental Quality INSPECTION REPORT Attached is a copy of the inspection report prepared following an onsite inspection of this project. This report is intended to inform you of the projecfs compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and the NPDES Stormwater Discharge Permit. Note that effective August 1, 2013, the NPDES and State Stormwater programs were transferred to our Division. Please note that the attached inspection report has been expanded to include the NPDES compliance items including reporting and rain gauge requirements. Please review this report carefully as it may contain corrective actions needed or comments, which will assist you in meeting the required performance standards of the Act and the NPDES Stormwater permit conditions. If you need additional information pertaining to the North Carolina Sedimentation Pollution Control Act and the NPDES Stormwater program, refer to the North Carolina Division of Energy, Mineral, and Land Resources website at: http://portal.ncdenr.org/web/Ir/. It is our desire that any and all problems be discussed and resolved at the earliest possible time. Please contact me at (828)-296-4500 if you have any questions. Sincerely, Mack Granger Environmental Specialist D North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Q'®�11n Asheville Regional Office 1 2090 US. Highway 70 j 5wannanoa, North Carolina 28778 eoa�"memauue��l� 828.296.4500 North Carolina Department of Environmental Quality Land Resources: 2090 US Highway 70, Swannanoa, NC 28778 (828) 296-4500 County: Burke Project: Main Street waterline Replacement River basin: Catawba Person financially responsible: Town of Valdese - Seth Eckard, Town Manager Project #: BURKE-2020-008 Address: P.O. Box 339, Valdese, NC 28690 1. Project Location: Main Street (US 70), Valdese Pictures: Yes - Digital 2. Weather and soil conditions: Sunny, Dry 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): NIA Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: January 25, 2023 Yes 10. Comments: This inspection was performed per request for closeout. At the time of inspection the site was stabilized. No corrective actions were noted. The project is approved for permit closeout. Please file an electronic Notice of Termination (eNOT) at deq.nc.govINCG0I Reported by: Mack Granger Others present: Stan Aiken Date of inspection: January 24, 2023 Time arriving on site: 12:30 PM Time leaving site: 12:45 PM cc: