Loading...
HomeMy WebLinkAbout20221723 Ver 1_Design/Maps/Site Plans_20230109PATH:P:\805\805-76 FOX RUN\DWG\CONSTRUCTION\805-76 FOX RUN - PLAN SHEETS.DWG STORMWATER MANAGEMENT PLAN FOR Fox Aviv 8runswick County North Caralina GTE CAPE FEAR ENGINEERING 151 Poole Rd. Suite 100 1 Leland, NC, 28451 TEL (910) 383-1044 1 FAX (910) 383-1045 www.capefearengineering.com 1 N.C. LICENSE # C-1621 INDEX COVER 1-1 NOTES, ABBREVIATIONS, AND LEGEND 1-3 STORMDRAIN INDEX PB-1 PROJECT BOUNDARY DA-1 DRAINAGE AREAS AND IMPERVIOUS ALLOCATIONS SD-1 STORMDRAIN PLAN SD-2 GRADING PLAN SE-1 SEDIMENT AND EROSION CONTROL PLAN P-1 STORMWATER POND #1 DETAILS P-2 STORMWATER AMENITY POND #A, #B, AND #C DETAILS D-1 SITE DETAILS D-11 STORMDRAIN DETAILS - 1 D-12 STORMDRAIN DETAILS - 2 D-13 LOT GRADING DETAILS D-14 SEDIMENTATION AND EROSION CONTROL DETAILS - 1 D-15 SEDIMENTATION AND EROSION CONTROL DETAILS - 2 D-16 NCGO1 STORMWATER REQUIREMENTS - 1 D-17 NCGO1 STORMWATER REQUIREMENTS - 2 FINAL DESIGN NOT FOR CONSTRUCTION (..... 0%111111W/, N. 11/1/22 P.E. 11/1/22 DATE CIVIL GENERAL NOTES: 1. ALL CONSTRUCTION SHALL COMPLY WITH THE BRUNSWICK COUNTY DEVELOPMENT REGULATIONS AND STANDARDS AND THE CURRENT VERSION OF THE NCDOT STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR SHALL HIRE A NC LICENSED GEOTECHNICAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING FIRM TO DEVELOP A COMPREHENSIVE TESTING PLAN IN ACCORDANCE WITH THE ABOVE NOTED STANDARDS AND SPECIFICATIONS, AND TO PERFORM CONSTRUCTION TESTING. A COPY OF THE TESTING PLANS AND RESULTS SHALL BE PROVIDED TO THE ENGINEER FOR REVIEW. 3. EXISTING UTILITY INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION, VERIFICATION, SUPPORT AND PROTECTION OF ALL ABOVEGROUND AND UNDERGROUND UTILITIES TO REMAIN IN PLACE, INCLUDING ANY UTILITIES NOT INDICATED ON CONTRACT DRAWINGS. ANY CONFLICTS OR DISCREPANCIES SHALL BE BROUGHT TO THE OWNER'S AND ENGINEER'S ATTENTION IMMEDIATELY. 4. CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES, TREES, PAVEMENT, UTILITIES, AND OTHER PROPERTY UNLESS THEY ARE TO BE DEMOLISHED. ANY PROPERTY NOT AUTHORIZED FOR REMOVAL, BUT DAMAGED BY THE CONTRACTOR SHALL BE RESTORED BY THE CONTRACTOR TO THE OWNER'S SATISFACTION AT NO ADDITIONAL EXPENSE TO THE OWNER. 5. CONTRACTOR SHALL MAKE EVERY EFFORT TO SAVE PROPERTY IRONS, MONUMENTS, OTHER PERMANENT POINTS AND LINES OF REFERENCE AND CONSTRUCTION STAKES. PROPERTY IRONS, MONUMENTS, AND OTHER PERMANENT POINTS OF REFERENCE DESTROYED BY THE CONTRACTOR SHALL BE REPLACED BY A NORTH CAROLINA LICENSED LAND SURVEYOR AT THE CONTRACTOR'S EXPENSE. 6. IN ADVANCE OF STARTING WORK, CONTRACTOR TO EXAMINE THE PROJECT SITE AND MAKE ANY AND ALL INVESTIGATIONS AND EVALUATIONS AS NECESSARY TO DETERMINE EXISTING CONDITIONS ON -SITE AND VERIFY ANY OR UNFORESEEN ITEMS THAT MAY IMPACT COMPLETE EXECUTION OF DESIGN. ANY CONFLICTS OR DISCREPANCIES SHALL BE BROUGHT TO THE OWNERS'S AND ENGINEER'S ATTENTION IMMEDIATELY. 7. THE CONTRACTOR SHALL MAKE SURE THAT WORK PERFORMED UNDER THIS CONTRACT SHALL NOT IMPACT THE OPERATION OF ANY ADJACENT PROPERTIES. 8. CONTRACTOR SHALL SEQUENCE WORK AS NECESSARY TO ENSURE THAT ALL UTILITY SERVICES, INCLUDING FIRE HYDRANTS, REMAIN OPERATIONAL DURING CONSTRUCTION. 9. THE CONTRACTOR SHALL RESTORE ANY ACCESS ROADS AND STAGING AREAS USED BACK TO THEIR ORIGINAL CONDITION. ALL DISTURBED AREAS SHALL BE VEGETATED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. 10. THE CONTRACTOR SHALL TAKE ADEQUATE PROTECTIVE MEASURES TO ENSURE THAT EXISTING PAVEMENT SURFACES ARE NOT DAMAGED FROM TRACKED CONSTRUCTION EQUIPMENT OR ANY OTHER POSSIBLE SOURCE WHEN EQUIPMENT IS BEING MOVED DURING AND AFTER WORK IS BEING CONDUCTED. CONTRACTOR SHALL REPAIR ANY PAVED AREAS DAMAGED DURING CONSTRUCTION TO THE SATISFACTION OF THE OWNER. 11. EXISTING PAVEMENTS AND ALL OTHER AREAS ADJACENT TO THE SITE SHALL BE KEPT CLEAN AT ALL TIMES. DO NOT ALLOW BUILD UP OF SOIL, MUD, DUST OR OTHER DEBRIS. 12. CONTRACTOR IS RESPONSIBLE FOR ALL SURVEYING AND STAKING TO COMPLETE THE WORK. 13. ANY AND ALL MATERIAL QUANTITIES INDICATED ON THIS PLAN SET ARE FOR REFERENCE ONLY. CONTRACTOR MUST VERIFY ALL MATERIAL QUANTITIES SHOWN. 14. THE WETLANDS DEPICTED IN THIS PLAN SET WERE DELINEATED BY SOUTHERN ENVIRONMENTAL GROUP, INC. AND SURVEYED BY DANFORD AND ASSOCIATES. 15. WETLAND PERMITTING IS BEING PERFORMED BY SOUTHERN ENVIRONMENTAL GROUP, INC. EXISTING CONDITION AND SURVEY NOTES: 1. ALL EXISTING CONDITIONS AND AND TOPOGRAPHICAL SURVEY BY DANFORD AND ASSOCIATES. 2. CAPE FEAR ENGINEERING, INC. MAKES NO GUARANTEE THAT THE UTILITIES AND SITE FEATURES SHOWN COMPRISE ALL UTILITIES AND SITE FEATURES IN THE AREA EITHER IN SERVICE OR ABANDONED. CAPE FEAR ENGINEERING, INC. FURTHER DOES NOT WARRANT THAT THE UTILITIES AND SITE FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED. CAPE FEAR ENGINEERING HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. 3. THE SITE IS LOCATED IN ZONE "X" ACCORDING TO FLOOD INSURANCE RATE MAP FOR BRUNSWICK COUNTY, N.C. COMMUNITY -MAP NUMBER 3720200700K DATED AUGUST 28, 2018 AND COMMUNITY -MAP NUMBER 3720201700K DATED AUGUST 28, 2018. THE ZONE "X" AREA IS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN. SIGNAGE, STRIPING, AND MARKING NOTES: 1. ANY SIGNAGE FOR THE SITE SHALL BE SUBMITTED FOR APPROVAL BY BRUNSWICK COUNTY AT A LATER DATE. NO SIGNAGE SHALL BE INSTALLED WITHOUT FIRST OBTAINING THE PROPER APPROVALS. CONTACT THE COUNTY AT (910)457-7961 FOR ADDITIONAL INFORMATION REGARDING SIGNAGE. 2. CONTRACTOR SHALL COMPLY WITH THE CURRENT NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES, NCDOT ROADWAY STANDARD DRAWINGS, AND THE 2018 NCDOT PROJECT SPECIAL PROVISIONS UNLESS OTHERWISE NOTED. 3. CONFORM ALL SIGNS AND TRAFFIC CONTROL DEVICES TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). (CURRENT VERSION) 4. USE THE COLOR WHITE FOR ALL PAVEMENT MARKINGS AND SYMBOLS UNLESS OTHERWISE NOTED. 5. DO NOT LOCATE PAVEMENT MARKING SYMBOLS AS TO ENCROACH INTO INTERSECTION AREAS. 6. ANY EXISTING PAVEMENT MARKINGS IN THE VICINITY OF THE PROJECT LIMITS THAT ARE DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED. 7. ARROWS PROVIDED ON PAVEMENT ARE TO SHOW TRAFFIC CIRCULATION ON THE PLANS ONLY AND ARE NOT INTENDED TO REPRESENT PAVEMENT MARKINGS TO BE INSTALLED. GENERAL UTILITY NOTES: 1. WATER SERVICE IS PUBLIC BY BRUNSWICK COUNTY. ALL WATERLINE MATERIALS, CONSTRUCTION AND WORKMANSHIP SHALL CONFORM TO BRUNSWICK COUNTY AND NCDEQ STANDARDS AND SPECIFICATIONS. 2. SEWER SERVICE IS PUBLIC BY BRUNSWICK COUNTY. ALL SEWER MATERIALS, CONSTRUCTION, AND WORKMANSHIP SHALL CONFORM TO BRUNSWICK COUNTY AND NCDEQ STANDARDS AND SPECIFICATIONS. 3. A NORTH CAROLINA LICENSED UTILITY CONTRACTOR SHALL PERFORM ALL UTILITY WORK INVOLVED IN CONSTRUCTING THIS PROJECT. 4. THE WATER AND SEWER LINES PROPOSED FOR THE PROJECT REQUIRE PERMITTING THROUGH NCDEQ. ALL INSTALLATION OF UTILITIES SHALL BE INSTALLED IN ACCORDANCE WITH PERMITS FROM NCDEQ. 5. THE CONTRACTOR SHALL SCHEDULE A PRE -CONSTRUCTION MEETING WITH BRUNSWICK COUNTY AND ENGINEER PRIOR TO INITIATING WORK. 6. CONTRACTOR SHALL ISOLATE ALL NEW PIPING FROM EXISTING PIPING UNTIL ALL NEW PIPING HAS BEEN TESTED, CERTIFIED, AND ACCEPTED FOR SERVICE. 7. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITY LINES PRIOR TO THE INSTALLATION OF ANY NEW LINES. 8. ALL FILL MATERIAL IS TO BE IN PLACE AND COMPACTED BEFORE INSTALLATION OF PROPOSED UTILITIES. IF NOT, CONTRACTOR SHALL ENSURE THAT MINIMUM COVER REQUIREMENTS ARE MET AND THAT UTILITIES ARE ADEQUATELY PROTECTED. 9. EXISTING UTILITIES SHALL BE PROTECTED DURING CONSTRUCTION. CONTRACTOR SHALL HAND EXCAVATE WHEN ADJACENT TO EXISTING UTILITIES. 10. CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITY'S INSPECTORS AND ENGINEER AT LEAST 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE AND/OR BEGINNING UTILITY LINE INSTALLATION. 11. CONTRACTOR SHALL NOTIFY AND RECEIVE APPROVAL FROM THE UTILITY AUTHORITY'S INSPECTORS AND ENGINEER AT LEAST 10 DAYS PRIOR TO ANY UTILITY DISRUPTIONS. 12. THE UTILITY DRAWINGS DO NOT SHOW EVERY OFFSET, TRANSITION, AND FITTING THAT MAY BE REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINATION OF AND PROVIDING FITTINGS AND CONCRETE THRUST BLOCKS NECESSARY FOR COMPLETION OF THE SYSTEM. WATER NOTES: 1. MINIMUM UTILITY SEPARATIONS SANITARY SEWER STORM SEWER - 10-FEET (LATERALLY) - 18-INCHES (VERTICAL - WATER OVER SEWER (PREFERRED) - 12-INCHES (VERTICAL) 2. A WATER MAIN THAT CROSSES A SEWER SHALL BE LAID A MINIMUM VERTICAL DISTANCE OF 18 INCHES FROM THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SEWER, EITHER ABOVE OR BELOW THE SEWER, WITH PREFERENCE TO THE WATER MAIN LOCATED ABOVE THE SEWER. ONE FULL LENGTH OF WATER PIPE SHALL BE LOCATED SO THAT BOTH JOINTS WILL BE AS FAR FROM THE SEWER AS POSSIBLE. IF THE VERTICAL SEPARATION IS LESS THAN 18", THE SEWER AND WATERMAIN SHALL BOTH BE DUCTILE IRON PIPE OR FERROUS MATERIAL FOR A DISTANCE OF 10' ON EACH SIDE OF THE CROSSING (20' LENGTH CENTERED AT CROSSING - NO JOINTS). ALTERNATIVES MAY BE APPROVED AS OUTLINED IN 15A NCAC 18C .0906(f). 3. ALL WATERLINES SHALL HAVE A MINIMUM OF 36-INCHES OF COVER FROM THE ELEVATION OF FINISHED GRADE, OR SHALL BE DUCTILE IRON PIPE OR FERROUS MATERIAL. 4. ALL WATERLINES SHALL HAVE A MINIMUM OF 12-INCHES OF SEPARATION BETWEEN THE PROPOSED UNDERGROUND POWER AND COMMUNICATION LINES. COORDINATE WITH THE SITE ELECTRICAL CONTRACTOR. 5. WHERE A WATERLINE PASSES UNDER A STORM DRAIN PIPE THAT IS GREATER OR EQUAL TO 36" DIAMETER OR LESS THAN 12-INCHES OF VERTICAL SEPARATION, THE WATERLINE SHALL BE DUCTILE IRON PIPE OR FERROUS MATERIAL FOR A DISTANCE OF 10' ON EACH SIDE OF THE CROSSING (20' LENGTH CENTERED AT CROSSING - NO JOINTS). ALTERNATIVES MAY BE APPROVED AS OUTLINED IN 15A NCAC 18C .0904(c). 6. ALL LOTS ARE REQUIRED TO HAVE DOUBLE METER BOXES PER BRUNSWICK COUNTY STANDARDS. SANITARY SEWER NOTES: 1. MAXIMUM SPACE BETWEEN CLEANOUTS ON SERVICE LINES IS 100-FEET. CLEANOUTS SHALL BE PLACED AT ALL VERTICAL AND HORIZONTAL CHANGES OF DIRECTION. 2. MANHOLES AND CLEANOUTS LOCATED IN PAVEMENT, CONCRETE OR OTHER TRAFFIC AREAS SHALL BE SET FLUSH TO FINISHED GRADE AND BE HEAVY-DUTY TRAFFIC RATED. 3. MANHOLES AND CLEANOUTS IN UNPAVED AND NON -TRAFFIC AREAS SHALL BE SET AT 1-INCH ABOVE FINISHED GRADE. 4. ALL SEWER LINES SHALL HAVE A MINIMUM OF 36-INCHES OF COVER FROM THE ELEVATION OF FINISH GRADE, OR SHALL BE DUCTILE IRON PIPE OR FERROUS MATERIAL. 5. MINIMUM UTILITY SEPARATIONS: WATER SEE WATER NOTES ABOVE STORM SEWER 18-INCHES (VERTICAL) 6. WHERE SANITARY SEWERS PASS UNDER STORMDRAIN PIPE AND THE VERTICAL SEPARATION IS LESS THAN 18-INCHES, ENGINEERING SOLUTIONS, SUCH AS DUCTILE IRON PIPE OR BRIDGING SHALL BE PROVIDED TO PREVENT CRUSHING THE UNDERLYING PIPE. 7. WHERE SANITARY SEWERS PASS OVER STORMDRAIN PIPE AND THE VERTICAL SEPARATION IS LESS THAN 18-INCHES, THE SANITARY SEWER SHALL MEET THE MATERIALS, TESTING METHODS, AND ACCEPTABILITY STANDARDS FOR WATER MAINS (15A NCAC 18C). 8. ALL SEWER WITHIN 50' OF WATERS CLASSIFIED AS WS-II, WS-III, WS-IV, B, SA, ORW, HQW, OR SB FROM HIGH WATER OR TIDE ELEVATION, WETLANDS THAT ARE DIRECTLY ABUTTING THESE WATERS, AND WETLANDS CLASSIFIED AS UWL OR SWL SHALL MEET THE MATERIALS, TESTING, AND ACCEPTABILITY STANDARDS FOR WATERMAINS AS SPECIFIED IN 15A NCAC 18C. 9. ALL SEWER WITHIN 10' OF ANY OTHER STREAM (AS LISTED ABOVE), LAKE, IMPOUNDMENT, WETLANDS CLASSIFIED AS WL, WATERS CLASSIFIED AS C, SC, OR WS-V, OR GROUND WATER LOWERING AND SURFACE DRAINAGE DITCHES SHALL MEET THE MATERIALS, TESTING, AND ACCEPTABILITY STANDARDS FOR WATERMAINS AS SPECIFIED IN 15A NCAC 18C. 10. CONTRACTOR SHALL EXERCISE EXTREME CAUTION AND TAKE ADEQUATE PRECAUTIONS WHEN INSTALLING UTILITIES IMMEDIATELY ADJACENT TO WETLANDS TO ENSURE THAT WETLANDS ARE NOT IMPACTED OR DISTURBED. SEDIMENTATION OPERATION & MAINTENANCE NOTES: 1. THE TOTAL AREA OF DISTURBANCE IS APPROXIMATELY 47.0 ACRES. 2. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 3. TEMPORARY CONSTRUCTION ENTRANCE SHALL BE INSPECTED WEEKLY IN ORDER TO KEEP SEDIMENT FROM BEING TRANSPORTED OFFSITE. PAVEMENT NOTES: 1. CONTRACTOR SHALL PROVIDE JOINTS IN CONCRETE WALKS AND DRIVES (CONTRACTION, EXPANSION AND DOWELED CONSTRUCTION JOINTS) AS REQUIRED TO CONTROL CRACKING. 2. WHERE CONCRETE DRIVES ABUT ASPHALT PAVEMENT, BUILDINGS, OR OTHER STRUCTURE, THE CONTRACTOR SHALL INSTALL A THICKENED CONCRETE EDGE AND EXPANSION JOINT. 3. ALL PAVEMENTS SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT NCDOT STANDARDS AND SPECIFICATIONS. RETAINING WALL NOTES: 1. ALL RETAINING WALLS ARE SHOWN FOR REFERENCE ONLY. RETAINING WALLS SHALL BE DESIGNED BY A STRUCTURAL ENGINEER IF THEY MEET THE FOLLOWING TWO BUILDING CODES: 1.1. 1807.2.4 RETAINING SYSTEMS ADJACENT TO STRUCTURES: RETAINING SYSTEMS LESS THAN 5 FEET (1524 MILLIMETERS) IN CUMULATIVE VERTICAL RELIEF AND ADJACENT TO A STRUCTURE LOCATED CLOSER THAN THE VERTICAL RELIEF SHALL BE DESIGNED UNDER THE RESPONSIBLE CHARGE OF A REGISTERED DESIGN PROFESSIONAL. 1.2. 1807.2.5 RETAINING SYSTEMS: RETAINING SYSTEMS PROVIDING A CUMULATIVE VERTICAL RELIEF GREATER THAN 5 FEET (1524 MILLIMETERS) IN HEIGHT WITHIN A HORIZONTAL SEPARATION DISTANCE OF 50 FEET (15 M) OR LESS, INCLUDING RETAINING WALLS OR MECHANICALLY STABILIZED EARTH WALLS, SHALL BE DESIGNED UNDER THE RESPONSIBLE CHARGE OF A REGISTERED DESIGN PROFESSIONAL. STORMWATER AND GRADING NOTES: 1. THE PROJECT WILL REQUIRE A STATE STORMWATER PERMIT ISSUED BY NCDEQ AND APPROVAL FROM BRUNSWICK COUNTY. 2. NO FEDERAL OR STATE SURFACE WATERS, REGULATORY FLOOD ZONES, PROTECTED VEGETATED SETBACKS, OR PROTECTED RIPARIAN BUFFERS EXIST WITHIN THE PROJECT AREA. 3. ALL RUNOFF FROM IMPERVIOUS SURFACES IS TO BE DIRECTED TO THE STORMWATER COLLECTION SYSTEM. 4. ALL STORMWATER RUNOFF SHALL BE DIRECTED AWAY FROM THE BUILDINGS AND TO THE STORMWATER COLLECTION SYSTEM. 5. CONTRACTOR SHALL COORDINATE WITH THE UTILITY PROVIDERS FOR REQUIRED UTILITY ADJUSTMENTS AND/OR RELOCATIONS. 6. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. 7. DURING CONSTRUCTION, CONTRACTOR SHALL PERFORM GRADING IN A MANNER AND SEQUENCE THAT WILL PROVIDE PROPER DRAINAGE AT ALL TIMES. 8. UPON THE COMPLETION OF CONSTRUCTION AND SITE STABILIZATION, ALL PROPOSED AND EXISTING PIPES AFFECTED BY CONSTRUCTION SHALL BE CLEANED OUT TO REMOVE ALL ACCUMULATED SILT AND DEBRIS. 9. UPON COMPLETION OF CONSTRUCTION AND SITE STABILIZATION, ACCUMULATED SILT FROM THE PROJECT CONSTRUCTION SHALL BE REMOVED FROM THE STORMWATER POND. 10. UNLESS OTHERWISE NOTED, ALL STORMDRAIN MATERIALS, CONSTRUCTION AND WORKMANSHIP SHALL CONFORM TO NCDOT STANDARDS AND SPECIFICATIONS. 11. ALL STORMDRAIN TO BE ADS "HP" PIPE OR ENGINEER APPROVED EQUAL. ALL STORMDRAIN TO BE INSTALLED, INSPECTED, AND TESTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND MANUFACTURERS RECOMMENDATIONS. SEQUENCE OF LAND DISTURBANCE: 1. SCHEDULE A PRE -CONFERENCE MEETING WITH DEQ-DEMLR WILMINGTON REGIONAL OFFICE UPON THE COMMENCEMENT OF LAND DISTURBING ACTIVITIES ON THE SITE. 2. DETERMINE AND MARK LIMITS OF DISTURBANCE. 3. INSTALL STONE CONSTRUCTION ENTRANCE, AND SILT FENCE. 4. INSTALL SEDIMENT BASINS, SKIMMER DEWATERING DEVICES AND TEMPORARY DIVERSIONS. 5. DEMOLISH EXISTING SITE FEATURES PER DEMOLITION PLAN. 6. TOPSOIL REMOVAL AND STORAGE. ALL ROOTS, STUMPS, OR OTHER DEBRIS SHALL BE REMOVED FROM TOPSOIL PRIOR TO STOCKPILING. SURFACE DRAINAGE PRIOR TO STORMDRAIN INSTALLATION SHALL BE DIRECTED TO TEMPORARY DIVERSIONS AS APPLICABLE FOR CONVEYANCE TO SEDIMENT BASIN. 7. INSTALL STORMDRAIN AND INLET/OUTLET PROTECTION. 8. BRING SITE TO FINAL GRADE. SPREAD STOCKPILED TOPSOIL OVER DISTURBED AREAS. 9. INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES EVERY 7 DAYS AND AFTER EACH SIGNIFICANT RAINFALL EVENT (1.0" OR GREATER). 10. PLACE TEMPORARY SEEDING, INCLUDING MULCHING AND CRIMPING, ON ALL PERIMETER SWALES AND ALL AREAS WITH SLOPES GREATER THAN 3:1 THAT ARE TO BE LEFT IDLE FOR MORE THAN 7 DAYS. PLACE TEMPORARY SEEDING, INCLUDING MULCHING AND CRIMPING, ON ALL OTHER DISTURBED AREAS THAT ARE TO BE LEFT IDLE FOR MORE THAN 14 DAYS. 11. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE, WATER AND REPLACE AS REQUIRED TO ESTABLISH A VIGOROUS STAND OF GRASS. TEMPORARY IRRIGATION MAY BE REQUIRED UNTIL GRASS IS FULLY ESTABLISHED. 12. CONTRACTOR SHALL MAINTAIN GRASS AS REQUIRED. THIS INCLUDES BUT IS NOT LIMITED TO IRRIGATING AND MOWING GRASS AND RE -SEEDING / RE -SODDING BARE OR ERODED AREAS. 13. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM SILT FENCE AND OTHER EROSION CONTROL MEASURES AND SPREAD EVENLY ACROSS THE SITE. GRASS THESE AREAS IMMEDIATELY AND REMOVE ALL EROSION CONTROL MEASURES. 14. IF SEDIMENT CAN NOT BE SPREAD EVENLY ACROSS THE SITE BECAUSE THE SITE HAS ALREADY BEEN STABILIZED / VEGETATED, CONTRACTOR SHALL BE RESPONSIBLE FOR TRANSPORTING SEDIMENT OFFSITE AND DISPOSING OF SEDIMENT IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS. ABBREVIATIONS ADA CO CL D.E DIP ESMT. EX. EXT. FES FH FM GV HI JB LF LO MAX. M.0 MEP MIN. NCDEQ NDB PG PV ROW SD SEP. SR SS SSMH STA. SW TYP. U.E. WL AMERICANS WITH DISABILITIES ACT CLEANOUT CENTERLINE DRAINAGE EASEMENT DUCTILE IRON PIPE EASEMENT EXISTING EXTENSION FLARED END SECTION FIRE HYDRANT FORCEMAIN GATE VALVE AND BOX HIGH JUNCTION BOX LINEAR FEET LOW MAXIMUM MAP CABINET MECHANICAL -ELECTRICAL -PLUMBING MINIMUM NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY NYOPLAST DRAINAGE BASIN PAGE PLUG VALVE RIGHT OF WAY STORMDRAIN SEPARATION STATE ROAD SANITARY SEWER SANITARY SEWER MANHOLE STATION STORMWATER TYPICAL UTILITY EASEMENT WATERLINE LEGEND PROPERTY BOUNDARY EX. CONTOUR PERIPHERY BUFFER WETLAND BUFFER EX. STORMDRAIN EX. WATERLINE EX. GRAVITY SEWER EX. FORCEMAIN EX. WATER VALVE EX. FIRE HYDRANT EX. WATER SERVICE EX. SSMH EX. OVERHEAD ELECTRIC EX. POWER POLE EX. GUY WIRE EX. TELEPHONE PEDESTAL EX. FENCE ADJOINER SW POND EXISTING ASPHALT EX. SEWER CLEANOUT 404 WETLANDS POTENTIALLY EXCLUDED/ISOLATED WETLANDS PROPOSED 404 WETLAND IMPACTS CONCRETE BUILDING OUTLINE CURBING ---30--- SD ---w SS FM >< WV C -- OE X X X ORNAMENTAL FENCE LOT NUMBER/BUILDING NUMBER PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR HIGH/LOW POINT 6" WATERLINE 8" GRAVITY SEWER DUCTILE IRON PIPE SEWER MANHOLE FIRE HYDRANT ASSEMBLY GATE VALVE DUCTILE IRON TEE WATER SERVICE SEWER SERVICE STORMDRAIN PIPE STORMDRAIN INLET JUNCTION BOX HEADWALL FLARED END SECTION WITH RIP RAP FLARED END SECTION WITHOUT RIP RAP CO 0 allaf �oo❖.❖..o•O.❖.❖.� .................. .:::::::::::.:.:.:4s4 O 0 0 a P6WL P8SS - • t ii EASEMENT INLET PROTECTION SILT FENCE LIMITS OF DISTURBANCE TREE PROTECTION TEMPORARY DIVERSION DITCH TEMPORARY CONSTRUCTION ENTRANCE SILT FENCE ROCK OUTLET SWALE CENTERLINE PIPE INLET PROTECTION tt SF - - - - - -LOD- TP - TDD ►w.w.wi • i NOTES: SEE SHEET 1-1 FOR GENERAL NOTES AND LEGEND. ALL WORK SHALL COMPLY WITH BRUNSWICK COUNTY PLANNED DEVELOPMENT (PD) APPROVAL. A COPY OF THE APPROVED PLAN HAS BEEN PROVIDED FOR REFERENCE/COORDINATION. ANY CONFLICTS OR DISCREPANCIES BETWEEN THE APPROVED PD AND CONSTRUCTION PLANS/ SPECS SHOULD BE BROUGHT TO ENGINEER'S AND OWNER'S ATTENTION IMMEDIATELY FOR RESOLUTION. FINAL DESIGN NOT FOR CONSTRUCTION ♦ REVISED PER EXPRESS STORMWATER MEETING COMMENTS MTH 11/4/2022 A ISSUED FOR REGULATORY REVIEW MTH 11/1/2022 REV. DESCRIPTION REV. BY DATE • REVISIONS r • \��0\111111111/ww/ / 11 /4/22 • • CAPE FEAR ENGINEERING 151 Poole Rd. Suite 100 I Leland, NC, 28451 TEL (910) 383-1044 I FAX (910) 383-1045 www.capefearengineering.com I N.C. LICENSE # C-1621 J PROJECT 805-76 NUMBER: SCALE : AS SHOWN DATE : NOVEMBER 2022 TRACKING : FOX RUN • r NOTES, ABBREVIATIONS, AND LEGEND ,17.,OCK CHECK DAM PROJECT NUMBER 805-76 SHEET NUMBER I-1 TOTAL 404 AREA = 123078 SF (2.83 AC) TOTAL 404 IMPACTS = 3361 SF (0.08 AC) TOTAL IMPACTS TO RELATIVELY PERMANENT WATERS (RPW) = 15800 SF (.36 AC) TOTAL AREA OF RELOCATED DITCH = 12324 SF (.28 AC) TOTAL ISOLATED AREA = 20762 SF (0.48 AC) TOTAL ISOLATED IMPACTS = 20762 SF (0.48 AC) 4. 4. on so • sio ow NEB PROPOSED DITCH RELOCATION EXISTING DITCH (RPW) #1 INFILL APPROXIMATELY 4300 SF (.10 ACRE) DISTURBANCE EXISTING DITCH (RPW) #4 NO PROPOSED DISTURBANCE EXISTING DITCH (RPW) #3 INFILL APPROXIMATELY 9100 SF (.21 ACRE) DISTURBANCE - u 18B ME NMI i 4. 1 1 1 1 EXISTING DITCH (RPW) #2 INFILL APPROXIMATELY 2400 SF (.06 ACRE) DISTURBANCE 1 1 1 1 1 100 404 IMPACT #1 ± 3361 SF (0.08 AC) 0 100 200 1 INCH = 100 FEET HORIZONTAL r ISSUED FOR REGULATORY REVEIW J CAPE FEARENGINEERING 151 Poole Rd. Suite 100 Leland, NC, 28451 TEL (910) 383-1044 I FAX (910) 383-1045 www.capefearengineering.com I N.C. LICENSE # C-1621 J LSCALE: AS SHOWN PROJECT NUMBER: 805-76 DATE: TRACKING : OCTOBER 2022 FOX RUN WETLAND EXHIBIT PROJECT NUMBER 805-76 SHEET NUMBER EX- 1 / O) CO TOP OF EMBANKMENT = 41.0' 111IIIIIIIII111-III-IIIIII111-1 �• iTi—iTI—ITI—ITi—iTj1 7 48" HP 72 LF @ 0.00% 'III NORMAL POOL= 37.00' ' 11111 MAIN AMENITY POND #C 'III 1l I I I=III=III=III=111=III=III=III=111=III=11 ' FES #10 / I.E. 35.00 FOREBAY & WETPOND SECTION --.011111 • • TOP OF EMBANKMENT = 41.0' 111 111111111�,��1111, 111111111111 11111 111111- 1111 l I I- NORMAL POOL= 36.50' I- III -III- 1 Th III- 1111=- MAIN AMENITY POND #B II' 1j 1 -11 II- • • 0' " 11=111=111=111=111=111=111=III= • 3^ • D • ,• �• 7:7 • • TOP OF EMBANKMENT = 41.0' 1 �1� .II ICI I�� �I� .II ICI I.. .I._•� I NORMAL POOL= 36.00' II 11 II MAIN AMENITY POND #A jj111 1= '11,11 �.��... - 1111111 V J FES #300 TOP OF EMBANKMENT = 41.0' —1 I I-11-11-111-11 III n—III—III—III—III- NOT TO SCALE NOTES: 1. FAIRCLOTH SKIMMER (OR ENGINEER APPROVED EQUAL) TO BE INSTALLED ON PRIMARY OUTLET STRUCTURE BOX AND TO REMAIN IN PLACE UNTIL SITE IS PERMANENTLY STABILIZED PER NCDEQ/LQS S&E PERMIT. 2. ORIFICE/SKIMMER ASSEMBLY AT OUTLET STRUCTURE TO BE TEMPORARILY COVERED WITH WIRE AND 57 STONE UNTIL SITE IS STABLE (3) 4'X1.25', (1) 4'X4' ALUMINUM FABRICATED TRASH RACK W/ SQ. OPENINGS <_5" SECURED TO CONCRETE BOX FAIRCLOTH SKIMMER (OR ENGINEER APPROVED EQUAL) 5.0" SKIMMER W/ 5.00" 0 ORIFICE TOP OF WEIR (3 SIDES) EL. 37.50' 5" PVC SCREW TYPE PLUG REMOVE SKIMMER ONCE SITE HAS BEEN STABILIZED AND INSTALL PERMANENT ORIFICE PIPE 5" PVC TEE U NWL EL. 35.50' TOP OF BOX EL. ±39.50' 6" rP) C.> 412" MIN :. MI 4 12" 5" PVC CAP WITH 5.0" HOLE DRILLED rl sQ a 4zS"HP.. .' o yr 3,5 o ...7" RVC ISTUBBEU • s .a • .. . . > .. • 1NT . aox. Q„ : '.:` . \\//\\/�. �; ° : a4 s . •: / / 12" EXTENDED 3 1 /\ TOP BERM EL. 41.00' /y/>i \//\/\ 6" (TYP) 48" HP OUTLET PIPE / .BASE \�I 6" BASE \// SECTION VIEW 8" MIN STONE BEDDING 5.00" PVC CAP WITH 5.00" HOLE DRILLED 8" MIN STONE BEDDING SEE TOP TRASH RACK DETAIL FRONT VIEW 3^-1 1—I 1 I-111-1 I I—III-1 I I-11 I —III —I TOP OF BOX EL. ±39.50' TOP OF WEIR (3 SIDES) = 37.50' 5'X5' CONCRETE BOX PRE -CAST OR BUILT IN PLACE 12" EXTENDED BASE PVC TEE AND ORIFICE 4-7 \. 50 0 50 100 TEMPORARY POOL 37.50' NORMAL POOL= 35.50' 1 INCH =50 FEET WETLANDS VEGETATION NOTE: THE VEGETATED SHELF SHALL BE PLANTED WITH A MINIMUM OF THREE DIVERSE WETLAND SPECIES. A MINIMUM OF 50 PLANTS PER 200 SF OF SHELF AREA SHALL BE PROVIDED. PLANTS SHOULD GENERALLY BE PLANTED 24" TO 36" ON CENTER AND SHOULD YIELD FULL COVERAGE IN 1-2 YEARS. THE FOLLOWING SPECIES OF WETLANDS VEGETATION ARE SUITABLE FOR PLANTING ALONG THE 6:1 VEGETATED SHELF: PLANTS SUITED FOR SHELF THAT'S UNDERWATER - SAGITTARIA LANCIFOLIA (BULL TONGUE) - SAGITTARIA LATIFOLIA (DUCK POTATO) - SAURURUS CERNUUS (LIZARDTAIL) PLANTS SUITED FOR SHELF THAT'S ABOVE WATER - ASCLEPIAS INCARNATA (SWAMP MILKWEED) - CAREX TENERA (QUILL SEDGE) - CHELONE GLABRA (WHITE TURTLEHEAD) IF ONE OR MORE OF THE SUGGESTED SPECIES IS UNAVAILABLE, APPROPRIATE WETLANDS VEGETATION COMMON TO THE COASTAL NORTH CAROLINA REGION MAYBE SUBSTITUTED. SEE CHAPTER C.3 (TABLE 3) OF THE 2017 STATE STORMWATER BMP MANUAL FOR LIST OF OTHER RECOMMENDED WETLAND PLANTS. 50 FT 44 FT OTTOM ELEV. = 40.0' EMERGENCY SPILLWAY 1 TOP OF EMBANKMENT ELEVATION = 41.0' 1 NOT TO SCALE VARIES h 10'� IE= 35.00' 3:1 MAX TOP OF EMBANKMENT = 41.0' 6' WIDE SHELF EMBANKMENT SECTION MIDDLE OF 6:1 SHELF) BOTTOM OF 6:1 SHELF EL= 35.0' BOTTOM EL= 28.0' _ SEDIMENT CLEANOUT EL= 27.0' /// 1/ 7//7//% ///7/ NOT TO SCALE 10' min. TOP FOREBAY= 35.00' 111��111�111=111-1 FOREBAY ITT T CLEANOUT - 31. 71-111-111-111-1 I -II III11111 I111-111111- 6'- 0" OO _LI (,.____ O O y O 0 PLAN VIEW SEE TOP TRASH RACK DETAIL 4'-0" 5'-0" .7 TEMPORARY POOL 37.50' NORMAL POOL= 35.50' MAIN POOL POND #1 BOTTOM EL - 28.0' SEDIMENT CLEANOUT II-I-III-III-III-IIIII-III-III-III-III-III-II-I-I- 1 =1-I 1-I-I-I 11-111-111-111-111-111-111-111-111-111-111-111- TOP OF EMBANKMENT = 41.00' III-111-1I1-1I1-1I1-1I1-11I-III-III =I 11- 11=11 1- =111.I - =II'li�lll- =1' TRASH RACK ISOMETRIC VIIEW EMERGENCY SPILLWAY= 40.0' WELDED ALUMINUM FABRICATED TRASH RACK W/ SQ. OPENINGS <_5" SECURED TO CONCRETE BOX 1 OpI tk q�GRo 101 VICINITY MAP NOT TO SCALE mwAIW NOTES: SEE SHEET 1-1 FOR GENERAL NOTES AND LEGEND. ALL WORK SHALL COMPLY WITH BRUNSWICK COUNTY PLANNED DEVELOPMENT (PD) APPROVAL. A COPY OF THE APPROVED PLAN HAS BEEN PROVIDED FOR REFERENCE/COORDINATION. ANY CONFLICTS OR DISCREPANCIES BETWEEN THE APPROVED PD AND CONSTRUCTION PLANS/ SPECS SHOULD BE BROUGHT TO ENGINEER'S AND OWNER'S ATTENTION IMMEDIATELY FOR RESOLUTION. FINAL DESIGN NOT FOR CONSTRUCTION 4, REVISED PER EXPRESS STORMWATER MEETING COMMENTS MTH 11/4/2022 A ISSUED FOR REGULATORY REVIEW MTH 11 /1 /2022 REV. DESCRIPTION REV.BY DATE REVISIONS ( GFE CAPE FEAR ENGINEERING 151 Poole Rd. Suite 100 I Leland, NC, 28451 TEL (910) 383-1044 I FAX (910) 383-1045 www.capefearengineering.com I N.C. LICENSE # C-1621 PROJECT 805-76 NUMBER: SCALE : AS SHOWN DATE: NOVEMBER 2022 TRACKING : FOX RUN STORMWATER POND #1 DETAILS POND BOTTOM EL.28.00' OUTLET STRUCTURE #10 NOT TO SCALE PROJECT NUMBER 805-76 SHEET NUMBER P-1