Loading...
HomeMy WebLinkAboutNCC216652_MODIFICATION Supporting Documents_20230201�, pE,x OAT O�' h C January 31, 2023 Ben Karaduman Triangle Math & Science Academy 104 Towerview Court Cary, NC 27513 WATER RESOURCES Re: Letter of Plan Approval - For Plan Revision Adding 9.7 Acres of Disturbed Project Name: Triangle Math & Science Academy Project Location: 351 New Hill Olive Chapel Road Project Number: 21-005 Submitted By:. Kimley-Horn and Associates Date Submitted: September 1, 2021 Disturbed Area: 26.40 Contains additional 9.7 acres from the plan revision The Soil Erosion and Sedimentation Control Plan (S&E) you submitted has been reviewed and accepted. The Town of Apex (Town) hereby issues this Letter of Plan Approval. The Town's S&E program is performance oriented, requiring protection of the natural resources and adjoining properties. If at any time during this project it is determined by Town staff that the approved S&E Plan is inadequate to meet the Town's S&E ordinance, this office may require revisions to the S&E Plan and its implementation to ensure compliance with the S&E ordinance (Section 5- 154). In accordance with Section 5-158 of the Town's S&E ordinance, you are hereby notified that this office has the right to periodically inspect any land -disturbing activities to ensure compliance with the approved S&E Plan and ordinance. You are to notify this office twenty- four (24) hours before starting work. You are also required to keep the working drawings on site. This plan approval is required by the Division of Energy, Mineral and Land Resources to apply for a modification to already issued Certificate of Coverage for the project. TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org Letter of Plan Approval Page 2 of 2 The approval of an S&E Plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations, and rules. In addition, the Town's NPDES Phase II permit requires site contractors to control construction site wastes that may cause adverse water quality impacts. Please have your site contractor review the attached Town Construction Site Waste Management Plan to become familiar with the requirements. Town staff will inspect your site to ensure these waste management practices are being implemented. You will need to provide evidence of compliance if applicable. I look forward to working with you on this project and if you have any questions, please call (919) 372-7470. Regards, James Misciagno, CES, CPESC Stormwater Engineering Enclosures: Town Construction Site Waste Management Plan TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org