HomeMy WebLinkAbout#5396 - 10 - 2010 - FINALINSPECTION REPORT ROUTING SHEET
To be attached to all inspection reports in-house only.
Laboratory Cert. #:
Laboratory Name:
Inspection Type:
Inspector Name(s):
Inspection Date:
Date Report Completed:
Date Forwarded to Reviewer:
Reviewed by:
Date Review Completed:
Cover Letter to use:
Unit Supervisor:
Date Received:
Date Forwarded to Alberta:
Date Mailed:
5396
Town of Weaverville, Ivy River WTP
Field Maintenance
Jason Smith
October 5 and 28th 2010
November 16, 2010
November 16, 2010
David Livingston _
November 1$ 2010
Insp. Initial X Insp. Reg. _ Insp. No Finding _ Insp. CP
Gary Francies
11 /18/2010
�t
++�
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
November 22, 2010
5396
Mr, Anthony Laughter
Town of Weaverville, Ivy River WTP
P.O. Box 338
Weaverville, NC 28787
SUBJECT: North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC)
Maintenance Inspection
Dear Mr. Laughter:
Dee Freeman
Secretary
Enclosed is a report for the inspection performed on October 5 and 28, 2010 by Jason Smith. Where finding(s)
are cited in this report, a response is required. Within thirty days of receipt, please supply this office with a
written item for item description of how these finding(s) were corrected. If the finding(s) cited in the enclosed
report are not corrected, enforcement actions may be recommended. For certification maintenance, your
laboratory must continue to carry out the requirements set forth in 15A NCAC 2H .0800,
Copies of the checklists completed during the inspection may be requested from this office. Thank you for your
cooperation during the inspection. If you wish to obtain an electronic copy of this report by email, or if you have
questions or need additional information please contact me at 828-296-4677.
Sincerely,
�jt�� Ct.9—cam
Gary Francies
Unit Supervisor
Laboratory Section
CC: Jason Smith
Central files
DENR DWQ LabaratorySection NC Wastewater/Groundwater Laboratory Certification Branch One
1623 Mai! Service Center, Raleigh, North Carolina 27699.1623 N01$ffiCaT0111
Location:4405 Reedy Creek Road, Raleigh, North Carolina27607-6445 rtflt'�11Jf
Phone: 919.733-39081FRX 919-733-6241
Internet: vAvw,dwglab.org
An Equal OpporunitytAifirma±yeActoncmpioyer Customer Service:1-877-623-6748 vN4w.noxaterquaRy.org
LABORATORY NAME:
NPDES PERMIT #:
ADDRESS:
CERTIFICATE #:
DATE OF INSPECTION:
TYPE OF INSPECTION:
AU DITOR(S):
LOCAL PERSON(S) CONTACTED
INTRODUCTION:
On -Site Inspection Report
Town of Weaverville, Ivy River WTP
NCO085154
P.O. Box 338
Weaverville, NC 28787
5396
October 5 and 28, 2010
Field Maintenance
Jason Smith
Anthony Laughter
This laboratory was, inspected to verify its compliance with the -requirements of 15A NCAC 2M .0800 for
the analysis of environmental samples.
This laboratory inspection was performed in conjunction with a laboratory requested technical assistance
visit. The laboratory received unacceptable results on their annual Proficiency Testing (PT) for Total
Residual Chlorine (TRC). Technical assistance for verifying the internal calibration curves of the old and
new meters was provided on October 5, 2010. The laboratory later analyzed known samples and was
unable to obtain acceptable results. Additional technical assistance was provided on October 28, 2010
once a new set of known samples from two separate vendors arrived. It was determined that a
combination of interference from the store bought water and the flow through cell (which is not used for
sample analysis) caused the low results. The use of deionized water provided by the inspector and not
using the flow through cell resulted in acceptable results on the known samples. Results from the PT
sample analyzed are still pending at this time.
The laboratory was clean and well organized. The facility has all the equipment necessary to perform the
analyses. Finding A is a new policy that has been implemented by our program since the last inspection.
FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS:
General Laboratory
Comment: Previous PT samples were not analyzed in the same manner as samples. The flow through
cell was used for PT samples, but not for routine samples. The Quality Assurance Policies for Field
Laboratories states: The analysis of PT samples is designed to evaluate the entire process used to
routinely report environmental analytical results. Therefore, PT samples must be analyzed and"the
process documented in the same manner as environmental samples. The analyst stated, during the
inspection, that the flow through cell would no longer be used in the laboratory. No further response is
necessary for this finding.
A. Finding: The laboratory needs to increase the documentation of purchased materials and
reagents, as well as, documentation of standards and reagents prepared in the laboratory.
Page 2
#5396 Town of Weaverville, Ivy River WTP
Requirement. All chemicals, reagents, standards and consumables used by the laboratory
must have the following information documented: Date Received, Date Opened (in use).
Vendor, Lot Number, and Expiration Date_ A system (e.g., traceable identifiers) must be in
place that links standard/reagent preparation information to analytical batches in which the
solutions are used. Documentation of solution preparation must include the analyst's initials,
date of preparation, the volume or weight of standard(s) used, the solvent and final volume of
the solution. This information as well as the vendor and/or manufacturer; lot number, and
expiration date must be retained for chemicals, reagents, standards and consumables used for
a period of five years. Consumable materials such as pH buffers and lots of pre -made
standards are included in this requirement. Ref: Quality Assurance Policies for Field
Laboratories.
V. PAPER TRAIL INVESTIGATION:
No paper trail performed.
V. CONCLUSIONS:
Correcting the above -cited finding will help this lab
requirements. The inspector would like to thank the
data review process. Please respond to all findings.
Report prepared by: Jason Smith
Report reviewed by: David Livingston
to produce quality data and meet certification
staff for its assistance during the inspection and
Date: November 16, 2010
Date: November 18, 2010