Loading...
HomeMy WebLinkAbout#5354 - 01 - 2010 - FINALINSPECTION REPORT ROUTING SHEET To be attached to all Inspection reports in-house only. Laboratory Cert. #: Laboratory Name: Inspection Type: Inspector Name(s): Inspection Date: Date Report Completed: Date Forwarded to Reviewer Reviewed by: Date Review Completed: Cover Letter to use: Unit Supervisor: Date Received: Date Forwarded to Alberta: Date Mailed: 5354 MGM Brakes Field Maintenance Jason Smith January 26, 2010 March 2 2010 March 3, 2010 Chet Whiting March 12, 2010 Insp. Initial _ Insp. Reg. X Insp. No Finding _ Insp. CP Gary _Francies 3/12/2010 C:.� Beverly Eaves Perdue Governor 5354 Mr. Tom Fasig MGM Brakes P.O. Box 70 Murphy, NC 28906 r f� North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director March 25, 2010 SUBJECT: North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) Maintenance Inspection Dear Mr. Fasig: Dee Freeman Secretary Enclosed is a report for the inspection performed on January 26, 2010 by Mr. Jason Smith. No findings are cited in this report, a response is not required. We appreciate the fine job you and your staff are doing. As a certification requirement, your laboratory must continue to carry out the requirements set forth in 15A NCAC 2H .0800. Copies of the checklists completed during the inspection may be requested from this office. Thank you for your cooperation during the inspection. If you wish to obtain an electronic copy of this report by email, or if you have questions or need additional information please contact me at 828-296-4677, Sincerely, Gary Francies Unit Supervisor Laboratory Section cc: Asheville Regional Office Jason Smith DENR DWQ laboratory Section NC Wastewater/Groundwater laboratory Certification Branch 1623 Mail Service Center, Raleigh, North Carolina 27699-1623 Location: 4405 Reedy Creek Road. Raleigh, North Carolina 27607-6445 Phone: 919-733-3908 t FAX: 919-733-6241 Internet: www.dwglab.org Nne orthCarolina atltralll� f An Equal Opportunity t Affirmative Action Employer Customer Service:1-877-623-6748 www.ncwatefquality.org XXIOI_X-Y&113�� CERTIFICATE : AUDITOR(S): LOCAL PERSON(S) CONTACTED: I. INTRODUCTION: MGM Brakes P.O. Box 70 Murphy, NC 28906 5354 January 26, 2010 Field Maintenance Jason Smith Tom Fasig This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. The laboratory was clean and well organized. The facility has all the equipment necessary to perform the analyses. Comment: The laboratory did not have an adequate system of traceability. The North Carolina Wastewater/Groundwater Laboratory Certification document, Quality Assurance Policies 'for Field Laboratories, states all chemicals, reagents, standards and consumables used by the laboratory must have the following information documented: Date Received, Date Opened (in use), Vendor, Lot Number, and Expiration Date. A system (e.g., traceable identifiers) must be in place that links standard/reagent preparation information to analytical batches in which the solutions are used. Documentation .of solution preparation must include the analyst's initials, date of preparation, the volume or weight of standard(s) used, the solvent and final volume of the solution. This information as well as the vendor and/or manufacturer, lot number, and expiration date must be retained for chemicals, reagents, standards and consumables used for a period of five years. Consumable materials such as pH buffers and lots of pre -made standards are included in this requirement. This is a new policy implemented on December 12, 2009. The form to begin documenting this was received on February 2, 2010. No further response is necessary for this finding. —StandardTemRerature .. t Comment: Temperature was not analyzed immediately. The Code of Federal Regulations, Title 40, Part 136; Federal Register Vol. 72, No. 47, March 12, 2007; Table 11 requires immediate analysis of temperature. An email received February 2, 2010 stated that a handheld thermometer had been obtained, checked against an MIST certified thermometer, and put into use in order to analyze samples upon collection. Updated benchsheets which document that temperature is analyzed immediately upon collection were also received. No further response is necessary for this finding. Page 2 #5354 MGM Brakes pH — Standard Methods, 18'h Edition, 4500 H+ B Comment: The time of calibration of the pH meter was not documented. The North Carolina Wastewater/Groundwater Laboratory Certification document, Quality Assurance Policies for Field Laboratories, states that the time of calibration must be documented whenever sample analysis is performed. Updated benchsheets were received February 2, 2010 which includes this documentation. No further response is necessary for this finding. IV. PAPER TRAIL INVESTIGATION: No paper trail performed. All of the findings noted during the inspection were adequately address prior to the completion of this report. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Report prepared by: Jason Smith Date: March 2, 2010 Report reviewed by: Chet Whiting Date: March 12, 2010