HomeMy WebLinkAbout20150246 Ver 1_CAMA Application_201503052 0 1 5 0 2
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory Donald R van der Vaart
Governor Secretary
March 3, 2015
MEMORANDUM
tDENR Q�IC� TO: Karen Higgins, Compliance and Permitting Unit Supervisor D DWR - Water Quality Program MAR 0 5 2015 FROM: Daniel Govoni - WATER RESOURCES Assistant Major Permits Coordinator BUFFER PERMITTING
Division of Coastal Management
SUBJECT. CAMA/DREDGE & FILL Permit Application Review
Applicant: Margaret K. Carwile
Project Location: 117 Peninsula Drive in Manteo, Dare County
Proposed Project: Vinyl bulkhead & backfill
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 03/24/15 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252- 247 - 3330).
If you have any questions regarding the proposed project, please contact Kelly Russell at (252)
264 -3901. When appropriate, in -depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
SIGNED
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached
This agency objects to the project for reasons described in the attached
comments.
DATE
1367 US 17 South, Elizabeth City, NC 27909
Phone 252 - 264 -3901 1 FAX 252 - 264 -3723 , Internet httD //aortal ncdenr orgweb /cm /dcm -home
An Equal Opportunity 1 Affirmative Action Employer
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1 APPLICANT'S NAME- Margaret Carwile Trust
2 LOCATION OF PROJECT SITE. 117 Peninsula Dr, Manteo, Dare County
Photo Index — 2006. 183-7193(V,15) 2000: 183 -2136 (C,10)
1995. 183 -1896 (6,1)
State Plane Coordinates - X. 2989295 Y: 796966
3. INVESTIGATION TYPE- CAMA & D &F
4 INVESTIGATIVE PROCEDURE- Dates of Site Visit — 2/27/15
Was Applicant Present - no
5. PROCESSING PROCEDURE. Application Received Complete - 2/19/2015
Office - Elizabeth City
6 SITE DESCRIPTION
(A) Local Land Use Plan — Dare County
Land Classification From LUP — conservation, transitional
(B) AEC(s) Involved- ES, EW, PTA
(C) Water Dependent yes
(D) Intended Use: private
(E) Wastewater Treatment Existing — community system
Planned -none
(F) Type of Structures. Existing — 4 ft by 50 ft dock
Planned - bulkhead
(G) Estimated Annual Rate of Erosion 1 ft/year
Source - applicant
7. HABITAT DESCRIPTION- [AREA]
DREDGED FILLED OTHER
(A) Estuarine Shoreline
(B) EW, PTA
(D) Total Area Disturbed- 1080 sq ft
(E) Primary Nursery Area: yes
(F) Water Classification: SC Open- no
810 sq ft
270 sq ft
8 PROJECT SUMMARY. The applicant proposes to construct 54 ft of new vinyl
bulkhead an average of 5 ft waterward of normal water level (NWL)
Field Investigation Report
Page 2
Proiect Settinq
The proposed project is located at 117 Peninsula Drive in the town of Manteo in Dare
County The property is located adjacent to a canal that leads to the Roanoke Sound The
size of the property is approximately 10,000 sq ft and is approximately 5 ft above NWL.
Manmade features associated with the property include a 6 ft by 50 ft dock running along
the length of the property The property is vegetated with typical yard grasses. There was
a recent mayor permit issued also to Margaret Carwile Trust for the adjacent lot (115
Peninsula Drive) also for a bulkhead. There are no known sites of archaeological
significance on the property.
The property has approximately 54 feet of shoreline and no delineated wetlands on the site
The adjacent property to the west has a vinyl bulkhead and the adjacent property to the
east also has an existing vinyl bulkhead.
The canal and the Roanoke Sound are classified as SC in this area and are closed to
shellfish harvesting The water depths at the shoreline are approximately 1 ft and at the
proposed bulkhead alignment approximately 2 ft.
Development Proposal
The applicant proposes to construct 54 feet of new vinyl bulkhead and fill behind the
proposed bulkhead The proposed bulkhead alignment is at an average of 5 ft waterward
of NWL with a maximum distance of 8 ft from NWL. This bulkhead alignment is proposed
at this located to line up with the two existing adjacent bulkheads The property has
experienced an excelerated erosion rate due to recent storms The sand for the fill material
would be hauled in from an upland source
Anticipated Impacts
The proposed project would result in the filling of 270 sq ft of Estaurine Waters Public Trust
Area of Environmental Concern and 810 sq ft of Estaurine Shoreline and also 9 cubic yards of
fill material would be placed below NWL Temporary water turbidity would occur in the project
area
Submitted by. Kelly Russell
Date. 3/2/15
IBM Mr -1
-
APPLICUION
Applicant 1 First Name
Margaret
for
(last revised 12/27/06)
® r U l9 2015 `1,
North Carolina DIVISION-OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Project Name (if applicable)
117 Peninsual Dr, Manteo, NC 27954
Applicant 1 First Name
Margaret
MI
K
Last Name
Carwile, Trust
Applicant 2 First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed
Mailing Address
11 Riding Path
PO Box
City
Hampton
State
Va
ZIP
23669
Country
USA
Phone No
757 - 880 - 0758 ext
FAX No
- -
Street Address (if different from above)
City
State
ZIP
Email
maggiekcar @aol com
2. Agent(Contractor Information
Business Name
Emanuelson & Dad Inc
Agent/ Contractor 1 First Name
MI
Last Name
Jeff
K
Emanuelson
Agent/ Contractor 2 First Name
MI
Last Name
Mailing Address
PO Box
City
State
4717 N Croatan Hwy
Kitty Hawk
NC
ZIP
Phone No 1
Phone No 2
27949
252 - 261 - 2212
ext
252 - 202 - 1151 ext
FAX No
Contractor #
252 261 1115
v _ 53
/ C 3 q -1
Street Address (if different from above)
City
State
ZIP
Email
emanuelson @embargmad com
<Form continues on back>
`✓.' '0� -3P,08 .. � ^F,58- aFF'-"�41:ST A,Y4'�v'ai4.i:Cv*�S:�ar4,v a�CJC' "'A ne
1
Form DCM MP -1 (Page 2 of 4) r - - - - -- APPLICATION for ,
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd #
Dare
117 Peninsula Drive
Subdivision Name
City
State
Zip
Peninsula
Manteo
NC
27954-
Phone No
Lot No (s) (if many, attach additional page with list)
- - ext
, I I ,
a in which NC river basin is the project located?
b Name of body of water nearest to proposed project
Pasquotank
Roanoke Sound
c Is the watef identified in (b) above, natural or manmade?
d Name the closest major water body to the proposed project site
®Natur I ❑M nmade ❑Unknown
Roanoke Sound
e Is proposed work within city limits or planning jurisdiction?
f If applicable, list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within
Manteo
4. Site Description
a
Total length of shoreline on the tract (ft)
b Size of enter tract (sq ft )
54'
c
Size of individual lots) CG (1 , ►
�c
d Approximate elevation of tract above NHW (normal high water) or
10, O t, L " V ILf- t) C
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
❑NHW or ®NWL
e
Vegetation on tract
grass
f
Man -made features and uses now on tract
none
g
Identify and describe the existing land uses adiacent to the proposed project site
1 0
h
How does local government zone the tract?
i Is the proposed project consistent with the applicable zoning?
FIRM AE
(Attach zoning compliance certificate, if applicable)
®Yes [--]No ❑NA
j
Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k
Hasa professional archaeological assessment been done for the tract? If yes, attach a copy ❑Yes ®No ❑NA
If yes, by whom?
I
Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
2a2-908.2313,3 ,. 1- 50a -4RCOA T -,vlrsiv �ac� oast�9?�. asAUe ert,rsa
Form DCM MP -1 (Page 3 of 4)
f
"
a Will the project be for commercial, public, or private use?
❑Commercial ❑Public/Government
r
APPLICATION for
Mayor Development Permit
m (i) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the sites ! ❑Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? µ ❑Yes ®No
(Attach documentation, if available)
n Describe existing wastewater treatment facilities
Town of Manteo
o Describe existing drinking water supply source
Town of Manteo
p Describe existing storm water management or treatment systems
Town of Manteo
5. Activities and Impacts
a Will the project be for commercial, public, or private use?
❑Commercial ❑Public/Government
®Private /Community
b Give a brief description of purpose, use, and daily operations of the project when complete
New bulkhead to protect property from erosion
c Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored
Jetting of vinyl bulkhead sheets, vibratory hammer with excavator Install avinyl bulkhead
with tieback rods and backfill (sand
from high ground)
d List all development activities you propose
New vinyl bulkhead (tie into existing bulkhead), sandffll, one load of topsoil and erosion control blanket
e Are the proposed activities maintenance of an existing project, new work, or both?
New
f What is the approximate total disturbed land area resulting from the proposed project?
/000 q Ft or ❑Acres
g Will the proposed project encroach on any public easement, public accessway or other area
❑Yes ®No ❑NA
that the public has established use of?
h Describe location and type of existing and proposed discharges to waters of the state
NA
i Will wastewater or stormwater be discharged into a wetland?
[]Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water?
❑Yes ❑No ®NA
I Is there any mitigation proposed?
❑Yes ®No ❑NA
If yes, attach a mitigation proposal
<Form continues on back>
` •. � �y , ,S�-- a�ad =�fiS7 ti�y�r�_ -.Zf �n3rn a r' -n vMX" -yet
Form,DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
�i�
, 6. ��alitional Informatiori`ry
yr mFA _ _ - n-i', ' ter. ns " " >",. g? :.c�_;,„; f=3� " ✓' .T. .' ..
In addition to this completed�apphcatroh, form;`(MP,7)�the foHoin ing'items�tielow;��f applicable; must be submitted m ord ,r fo'r the application
.. < -_
package to be complete items (a) "= (� are ahvays- applicable to any major ieveOpment application' Please consult ti -,e application
�rnstruotrorrbooklet on,how`to,properly,prepare the, requrred`ltems below- a„ , z< <, a
a A project narrative
b An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the
proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed
c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site
d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties
e The appropriate application fee Check or money order made payable to DENR
f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management
�'Name'Frarik and Lynda }iester,a w ` ' °. :- = -_'' _: Phone No`
�� qtr= _` ,
Address PO Box,457, Manteo :,NC 27954 - -
Name Joseph & Letitia Morabito Phone No
Address 113 Seabreeze Ct, Manteo, NC 27954
Name �� , _ �db;�. >' .`:` Phone'Noa
aF
g A list of previous state or federal permits issued for work on the project tract Include permit numbers, permittee, and issuing dates
h Signed consultant or agent authorization form, if applicable
i Wetland delineation, if necessary
j A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner)
k A statement of compliance with the N C Environmental Policy Act (N C G S 113A 1 -10), if necessary If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act
7.-Cerfif 63ti6h, and Pe`rMA;sign,to;_Enter on-Lantl
I understand that any permit issued in response to this application will allow only the development descrioed in the application
The project will be subject to the conditions and restrictions contained in the permit
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project
I further certify that the information provided in this application is truthful to the best of my knowledge -
Date .1 S— l� Print Name T,6
Signature F E 8 19 2015
Z CM e indicate application attachments pertaining to your proposed project
MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development M1'
❑DCM MP -4 Structures Information
252- 808 -2808 .. 9- 888 -4 COAST .- www.nccoastalmanagement.riet
4717 North Croatan Highway
Kitty Hawk, NC 27949
252 - 261 -2212
252 -202 -1151
252 - 261 -1115 fax
emanueisonna embaramail com
02/10/2015
Attn: Cama
Project narrative - - 117 Peninsula Dr, Manteo — Margaret Carwile -
r
- _ 2015
The project is to consist of installing a new vinyl bulkhead approximately 3 -5 ft into the existing
canal, with approximately 250 sq ft of sand backfill. This is to protect the shoreline from further erosion.
*ance�Ison�
Emanuelson & Dad Inc
Form DCM MP -2
(Except for bridges and culverts)
F D, 9p,5
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1 Be sure to corriprefe all other sections of -the Joint
Application that relate to this proposed project Please include all supplemental information -
Describe below the purpose of proposed excavation and /or fill activities. All values should be given in feet.
1. EXCAVATION ❑This section not applicable
a Amount of material to be excavated from below NHW or NWL in b Type of material to be excavated
cubic yards
c (Q Does the area to be excavated include coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected
❑CW ❑SAV ❑SB
OWL ❑None
(n) Describe the purpose of the excavation in these areas
d High- ground excavation in cubic yards
N(/A-
2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable
a Location of disposal area b Dimensions of disposal area
c (i) Do you claim title to disposal area? d (i) Will a disposal area be available for future maintenance?
❑Yes []No ❑NA ❑Yes ❑No ❑NA
(n) If no, attach a letter granting permission from the owner (n) If yes, where?
e (i) Does the disposal area include any coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected
❑CW ❑SAV ❑SB
❑WL ❑None
(n) Describe the purpose of disposal in these areas
f (i) Does the disposal include any area in the water?
❑Yes ❑No ❑NA
(n) If yes, how much water area is affected?
f"I �
252 -803- 280,3' .. e- 888 -4-R 0AS'l .. .Tei revised: 12,26,06
Access
Other
Channel
(NLW or
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
Breakwater
(excluding
shoreline
NWL)
stabilization)
Length
5'
Width
5'
Avg Existing
2'
Q'
NA
NA
Depth
Final Project
0
NA
NA
Depth
1. EXCAVATION ❑This section not applicable
a Amount of material to be excavated from below NHW or NWL in b Type of material to be excavated
cubic yards
c (Q Does the area to be excavated include coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected
❑CW ❑SAV ❑SB
OWL ❑None
(n) Describe the purpose of the excavation in these areas
d High- ground excavation in cubic yards
N(/A-
2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable
a Location of disposal area b Dimensions of disposal area
c (i) Do you claim title to disposal area? d (i) Will a disposal area be available for future maintenance?
❑Yes []No ❑NA ❑Yes ❑No ❑NA
(n) If no, attach a letter granting permission from the owner (n) If yes, where?
e (i) Does the disposal area include any coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected
❑CW ❑SAV ❑SB
❑WL ❑None
(n) Describe the purpose of disposal in these areas
f (i) Does the disposal include any area in the water?
❑Yes ❑No ❑NA
(n) If yes, how much water area is affected?
f"I �
252 -803- 280,3' .. e- 888 -4-R 0AS'l .. .Tei revised: 12,26,06
3. SHORELINE STABILIZATION El This section not applicable
(If development is a wood groin, use MP -4 — Structures)
a Type of shoreline stabilization
®Bulkhead ❑Riprap ❑Breakwater /Sill ❑Other
c Average distance waterward of NHW or NWL
e Type of stabilization material
vinyl bulkheadmg
g Number of square feet of fill to be placed below water level
Bulkhead backfill Soo Riprap
Breakwater /Sill Other
I Source of fill material
high ground
b Length 54'
Width
d Maximum distance waterward of NHW or NWL
'5-'
f (i) Has there been shoreline erosion during preceding 12
months?
®Yes ❑No RNA
(u) If yes, state amount of erosion and source of erosion amount
information
h Type of fill material
sand
4. OTHER FILL ACTIVITIES El This section not applicable
(Excluding Shoreline Stabilization)
a h) Will fill material be brought to the site? ®Yes ❑No RNA b (i) Will fill material be placed in coastal wetlands /marsh (CW),
If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (vVL)? If any boxes are checked, provide the
(u) Amount of material to be placed in the water number of square feet affected
(m) Dimensions of fill area ❑CW ❑SAV ❑SBA
(iv) Purpose of fill OWL ❑None
backfill behind bulkhead (u) Describe the purpose of the fill in these areas
5. GENERAL
a How will excavated or fill material be kept on site and erosion b What type of construction equipment will be used (e g , dragline,
controlled? backhoe, or hydraulic dredge)')
use erosion control blanket (seeded) on top of fill area excavator to install vinyl sheets for bulkhead Track bobcat to
backfill bulkhead
c (Q Will navigational aids be required as a result of the protect?
❑Yes ®No ❑NA
(u) If yes, explain what type and how they will be implemented
d (Q Will wetlands be crossed in transporting equipment to protect
site? ❑Yes ®No ❑NA
(u) If yes, explain steps that will be taken to avoid or minimize
environmental impacts
s
E E -3 X2015
Applicant Name
Date l
Applicant St t
Protect Name
; "GS+',., 12 2 �'�
ADDlicant: Marearet Carwile 'Trust
Selection
Development Type
Fee
DCM %
DWQ %
(14300 1601 435100093 1625 6253)
(24300 1602 435100095 2341)
I Private, non - commercial
®
development that does not
$250
100%($250)
0%($0)
involve the filling or
excavation of any wetlands
or open water areas
II Public or commercial
development that does not
$400
100%($400)
00/0(so)
involve the filling or
excavation of any wetlands ,
or o` en water areas
Mayor Modification to a _
$250 °
100%($250)
0%($0)
;
CAMA Ma or ermit
III For development that
-
involves the filling- and /or
excavation of ;up to"1 "acre .
of wetlands and /or open
water areas, determine if A,
l
B, C, or D below.a lies
III(A) Private, non-
commercial development, if
$250
100% ($250)
-o%-($O)
Gener`al'Water`Quality
"Certification No 3490 (See
attached )can be applied
r
-
III(B) -ry Public or commercial
_
E
development, if General _
$400
100% ($400)
0% ($0)
Water Quality Certification
No` 3490 (See attached)
can be-apolied
III(C) If General Water
Quality Certification No
$406-
60%($240)
40%($160)
3490 (see-attached) could
=
_
be applied, ,b,ut DCM staff
determined that additional
review and Wntten-DWQ
concurrence is needed
=
because of concerns
related to water quality or
a uatic life
III(D)_ If General Water
Quality Certification No
$400
60% ($240)
40 %-($160)
3490 (see attached) cannot
_ .
be a" lied
°
IV For development that
involves the filling and /or_
$475
60%($285)
40%($190)
excavation of more than
one acre of wetlands and /or
-
open water areas
CHECK NO. 32966 RECEIVED FROM JEFF K. EMANUELSON & DAD, INC. _ $250.00
I, WILLIAM S. JONES JP.., P.L.S., CERTIFY THAT UNDER MY DIRECTION AND SUPERVISION THIS PLAT WAS DRAWN FROM
AN ACTUAL FIELD LAND SURVEY MADE BY ME FROM INFORMATION AS REFERENCED HEREON, AND THAT THE RATIO OF
PRECISION IS 1:10,000 +. WITNESS MY HAND AND SEAL THIS 1st DAY OF JANUARY 2015 .
ALBEMARLE WIL16AWA. J6N JR , P.L.S. L -2532
SOUND
RoANOKE
SOUND
MANTEO
CANAL -
SI TE WOOD WALK / F F 3
S .."' / �...' + ( �7(� r
DOCK I^ Lv� J
VICINITY MAP
N.T.S.
SET
IRON PIN
LOT 20
O
v
rn
W
(V
00
p
co
to
Z
42'22 °E y 50.03'
co
TIE LIN ONLY
I( / /30' CAMA BUFFER &
FViGFA-nVi LINE
LOT 21
19,795 S.F. f
M
r`
J
m
I.J
m
m
I00
o
m
t
r
N
CD
cD
Lo
07
I
L J
20' M.B.L.
WOOD BULKHEAD
(TYP)
EXISTING
IRON PIN ,4`ttatattffff /����
a _
SS
AI- o
e r✓ �..- 2532 0 ��
'moo J ®°
ESUR,e"e g,��.
°nor S' agQt`o.
LOT 22
EXISTING TEL
IRON PIN PE ® C/o
— 50.00' METER —
N31'36'47 °W
EXISTING W EXISTING
Z 50.02'
IRON PIN =1
F I m r SPHALT IRON PIN
PK NAIL AN
PENINSULA DRI VE — 45' PRI VA TE R/w
JOHNNY A.
NOTES:
1) THIS SURVEY IS SUBJECT TO ANY
FACTS THAT MAY BE REVEALED BY A
FULL AND ACCURATE TITLE SEARCH.'
SURVEYOR MAKES NO CERTIFICATION AS TO
BUILDING SETBACK LINES. THEY SHOULD
BE VERIFIED PRIOR TO CONSTRUCTION.
2) FIRM ZONE AE (EL 9)
3720978900) – 9 -20-06
3) 117 PENINSULA DRIVE
4) PIN# 978912963669
5) ELEVATIONS PER NAVD 198&
6) UTILITY EASEMENTS:
SIDE & REAR — 5'
FRONT — 10'
SURVEY FOR
& wife MARGARET K.
LOT 21, THE PENINSULA
PLAT CABINET E, SLIDES 29 &30
TOWN OF MANTEO
DARE COUNTY, NORTH CAROLINA
SURVEYED: 12 -31 -14
0 15 30 60
GRAPHIC SCALE: 1" = 30'
seNP temp orNUa er KO
DACE 1 -3-16
CARwILE
ME Ka 1501
WILLIAM S. JONES JR., P.L.S., P.A. c -13o1
303 WEST ARCHDALE STREET
KILL DEVIL HILLS, N.C. 27948
P: (252) 441 -3673 F: (252) 441 -0925
CONSTRUCTION J013
ENGINEERING
SERVICES, INC. SHEET1140 OF
IN P.0 Box 665, Manteo, NC 27954
(252) 473-9733 CALCULATED BY DATE
FAX (252) 473-4191 ---- I „ -; I . -- , , "
C4ECKED BY DATE
SCALE
8"x3'PT VERTICAL
ANCHOR FILE 5' LONG
AT EA TIE ROD —
10 -0' MIN
L7
2`-<'2" P-- CONT L
CAP 50ARD
2'\6" PT PACE 50AP,,- X6 a T CONT
EACH SIDE - f3OLT TO TIMBER WALES MTH
SHEETS Ni 5116" �, 2 514' 5ia' DIA GA LX BOLT
&ALV CAkFRIIG= BOLTS %v/ (2) Y WASHERS AT
TIE RO',S
5/8'D]/- GAL`/ -, IE
ROD 0 5'-4" c-c I-O?V-
,v,'NUT & 3" OGEE
t% ;SHER EA END
5HOREGUARD
225 SERIES
IA YL
NOTE- ALL TIMBER TO BE PRESSURE
TREATED IN ACCORDANCE WITH
AWPA UC513 FOR WATER EXPOSURE
AND UC4I3 FOR SPLASH ZONE
ALL HARDWARE TO BE HOT DIPPED
GALVANIZED
TYPICAL SECTION OF BULKHEAD
SCALE 3,b" = `-0'
a
Ito
EXISTING 5" Ll!t,
TIMBER PILES
LtZ 7 c-r
=■
D PRODUCT 23'