Loading...
HomeMy WebLinkAboutWQ0006317_Monitoring - 12-2022_20230123Monitoring Report Submittal Permit Number #* WQ0006317 Name of Facility:* Colonial Pipeline Company Greensboro Junction WWTF Month: * December Year: * 2022 Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address:* Name of Submitter: * Signature: Date of submittal: Initial Review Upload Document* 2022- 345.92KB 12 WQ0006317 NDAR- 1_NDMR.pdf PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). dreedy@colpipe.com David Y. Reedy II 1 /23/2023 This will be filled in automatically Reviewer: Gerald, Wanda Is the project number correct?* WQ0006317 Is the monitoring report accepted?* Yes NO Regional Office* Winston-Salem Reviewer: _anonymous Review Date: 1/31/2023 m mmm ©mmm ©mmm 0 mmm ©mmm 0 mmm 0 mmm 0 mmm 0 mmm m mmm m mmm m mmm m mmm m mmm m mmm m mmm m =M= m =M= m =M= m =M= M =M= M =M= M =M= m =M= M =M= m =M= M =M= m =M= m =M= m =M= m mmm FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _2_ of _2_ Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? ElCompliant ❑Non -Compliant ElCompliant ❑Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? ElCompliant ❑Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? ElCompliant ❑Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ElCompliant ❑Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert P. Willcox, Jr. Permittee: Colonial Pipeline -Greensboro Junction WWTF Certification No.: 18600 Signing Official: Brian L. Smith Grade: SI Phone Number: (336) 339-9128 Signing Official's Title: Operations Manager Has the ORC changed since the previous NDAR-1? ❑Yes E]No Phone Number: (703) 517-3051 Permit Exp.: 1/31/25 1 /10/23 1:yme� 1 /23/23 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page _1_of_3_ No.: Q111.317 Facility Name: Colonial Pipeline - Greensboro Junction WWTF County:• • • December 11Flow Measuring •• ElInfluent ■ Effluent E]No flow generated Parameter Monitoring •• ElInfluent 0 E]Groundwater Lowering ElSurface Water ••- o0 0 �� � oo• ��•-� ��• oo. o ��. oo. o ��.�� oo ��-�� oo.. ��• oo• � �� • FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page _3_ of _3_ Sampling Person(s) Certified Laboratories Name: Gary Simcox - S&ME, Inc, Name: Pace Analytical Name: Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑Compliant ❑Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective taKen. Anacn aaanional sneeis IT n Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Rob Willcox Permittee: Colonial Pipeline - Greensboro Junction WWTF Certification No.: 18600 Signing Official: Brian L. Smith Grade: SI Phone Number: (336) 339-9128 Signing Official's Title: Operations Manager Has the ORC changed since the previous NDMR? ❑Yes ❑No Phone Number: (703) 517-3051 Permit Expiration: 1/31/2025 44 1 /10/23 464zt a 1!YM4 1 /23/23 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617