Loading...
HomeMy WebLinkAboutNCC230260_ESC Approval Submitted_20230130ROY COOPER Governor y My.Y lam. ELIZABETH BISER ti. Secretary DOUGLAS ANSEL Q " Interim Director NORTH CAROLINA Environmental Quality January 6, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Toyota Battery Manufacturing, Inc. Attention: April Mason, General Manager, Plant Services 151 Engineering Way Georgetown, KY 40324 RE: Project Name: TBMNC BEV Phase 1 Project ID: RANDO-2023-006 Acres Approved: 325 County: Randolph City: Liberty Address: 5938 Julian Airport Road River Basin: Cape Fear Stream Classification: WS-III Submitted By: HDR Engineering, Inc. Date Received by LQS: December 29, 2022 Plan Type: Revised Dear April Mason: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOL Please direct questions about the eNOI form to the Storinwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible parry must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO10000 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 336-776-9800 Letter of Approval with Modifications Toyota Battery Manufacturing, Inc. January 6, 2022 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Sincerely, Tamera Eqgn, PE Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval c: Dylan Ryan, PE, HDR Engineering, Inc. [Dylan.Ryan@hdrinc.com] Jennifer Gissendanner, PE, HDR Engineering, Inc. [Jennifer.Gissendanner@hdrinc.com] Vickie Miller, HDR Engineering, Inc. [Vickie.Miller@ndrinc.com] Samuel Burton, TEMA [Samuel.Burton@toyota.com] David Lambert, NCDEQ [David.Lambert@ncdenr.gov] Douglas Ansel, DEMLR [Douglas.Ansel@ncdner.gov] Brad Cole, PE, DEMLR [Brad.Cole@ncdenr.gov] Toby Vinson, DEMLR [Toby.Vinson@ncdenr.gov] Sue Homewood, DEMLR [Sue.Homewood@ncdenr.gov] Letter of Approval with Modifications Toyota Battery Manufacturing, Inc. January 6, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: TBMNC BEV Phase 1 Project ID: RANDO-2023-006 County: Randolph Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Additional measures may be required. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving the limits of disturbance for this erosion and sedimentation control plan. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities