Loading...
HomeMy WebLinkAbout20150068 Ver 1_Approval Letter_20150303��� ���� NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor March 3, 2015 Mr. Marc L. Hamel., Manager Rail Project Development NCDOT, Rail Division 1553 Mail Service Center Raleigh, NC 27699 Donald van der Vaart Secretary Subject: 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS for Proposed construction of the Pembroke Rail Connector from CSX "A" line to the CSX "SE" line in Robeson Coiulty, Federal Aid Project No. TCSP-0635(5), State Project No. 41099.1.S3, TIP P-4900A & B. NCDWR Project No. 20150068 Dear Mr. Hamel: Attached hereto is a copy of Certification No. 4014 issued to The North Carolina Department of Transportation (NCDOT) dated March 3, 2015. If we can be of further assistance, do not hesitate to contact us. Sincerely, � ��� ay Zimmerman, Di •ector Division of Water Resources Attachments Electronic copy only distribution: Liz Hair, US Army Corps of Engineers, Wilmington Field Office Jim Rerho, Division 6 Environmental Officer Scott Davis, Axiom Environmental, Inc. Colin Mellor, NC Department of Transportation Chris Rivenbark, NC Department of Transportation Dr. Cynthia Van Der Wiele, US Environ►nental Protection Agency Gary Jordan, US Fish and Wildlife Service Travis Wilson, NC Wildlife Resoucces Commission Beth Harmon, Ecosystem Enhancement Program NC Division of Water Resources Raleigh Central Office File Copy 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-63001 Internet: www.nctlenr.gov An Equal Opportunity 1 A(frmative Aclion Employer 401 Water Quality Certi6cation Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS THIS CERTIFICATION is issued in conformity with the requi�•ements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to tlie North Carolina Division of Water Resources (NCDWR} Regulations in 15 NCAC 2H .0500. This certification authorizes the NCDOT to impact 2.22 acres of jurisdictional wetlands, and 541 ]inear feet of jurisdictional streams in T2obeson County. The project shal] be constructed pursuant to the application dated received January 21, 2015 and revisions received on January 26, 2015 and .ianuary 29, 2015. The authorized impacts are as described below: Stream Im acts in the Lumber River Basin Site Station Permanent Temporary Permanent Temporary Bank Total Stream Fill in Fill in Fill in Fill in Stabitizafion Stream Impacts lntermittent Intermittent Perennial Perennial (linear ft) Impact Requiring Stream Stream Stream Stream (linear ft) Mitigation (linear ft) (iinear ft) {linear ft} (linear ft} (linear ft) 3 -L- 53+80 to 55+64 0 0 91 65 77 233 168 4 -L- 62+60 to 62+76 93 22 0 0 46 161 0 5 -L- 90+14 to 90+61 82 22 0 0 43 947 0 Total 175 44 91 65 166 541 168 Total Stream Impact for Project: 541 linear feet Wetland Cm act's in the Lumber River Basin ri arian} Site SEation Fill Rill Excavation Mechanized Hand Total Impscts (ac) (temporary) (xc) Clearing Clearing WetIand Requiring (ac) (ac) (ac} Impact Mitigation (ac} (ac) 1 -L- 26+95 to 27+75 1.06 0 020 0.15 0.03 1.44 1.41 2 -L- 26+95 to27+75 < 0.01 0 0 0.02 0 0.02 0.02 3 -L- 53+80 to 55+64 0.08 0 0.18 0 0 0.26 0.26 6 -L- 102+03 to 104+gg 0.21 0 0.18 0.06 0 0.45 0.45 7 -Y2- 45+43 to 47+00 0.01 0 0 O.Q4 0 O.dS Q.05 Totalx i.36 4 0.56 026 0.03 2.22 2.19 Total Wetland Impact for Project: 2.22 acres. *totals may not match sum of individua[ inipacts due to rounding. The application provides adequate assurance that the discharge of fill material into the waters of the Lumber 12iver basin in conjunction with the proposed development will not resalt in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Caroli�a certifies that this activity wiil not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. This approval is only valid for the purpose and design that you submitted in your applicatian dated received January 21, 2015 and revisions received on January 26, 2015 and January 29, 2015. Should your projecT change, you are required to notify the NCDWR and submit a new applicatian. [f the property is sold, the new owner must be given a copy of this Certification and approval ]etter, and is thereby responsible for complying with ail the conditions. If any additional wetland impacts, or stream impacts, for this project (now ar in tlle future} exceed one acre or 150 linear feet, respectively, additional compensatory mitigation may be required as described in ISA NCAC 2H .0506 (h) (6) and {7}, For this approval to remain valid, you are required to comply with ail the conditions listed belaw. In addition, you should obtain all other federal, state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non-discharge and Water Supp3y watershed regulations. This Certification shalI expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. Condition{s) of Certi�cation: Project Specifc Conditions 1. As a condition of this 40I Water Quality Certification, the bridge demolition and construction must be accomplished in strict compliance with the most recent version of NCbQT's Best Management Practices for Construction and Maintenance Activities. [15A NCAC 02H .0507{d}(2} and t5A NCAC 02H .0506(b)(5}] 2. Bridge piles and bents shall be constructed using driven piles (hammer or vibratary) or drilled shaft construction rnethods. More specifically, jetting or other methods of pile driving are prohibited without prior written approval from the NCDWR first. [1SA NCAC 02H.0506(b)(2)] 3. Na drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters. This water shal l be captured, treated, and disposed of praperly. [ 15A NCAC 02H .0506(b}(3) 4. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as cEosely as possible including pipes or barrels at flood plain elevation and/or sills where appropriate. Widening the stream channel should be avoided. Stream channel widening at the inlet or outlet end oi structures typicalty decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. [ 15A NCAC Q2H.0506(b}(2)] S. Riprap shall not be placed in the active thalweg channel or streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. [15A NCAC 02H.0506(b)(2)] 6. For the 109 linear feet of streams being impacted due to site dewatering activities, the site shaii be graded to its preconstruction contours and revegetated with appropriate native species. [ I SA NCAC 02H.OSOb(b)(2)] 7. The stream channel shall be eacavated no deeper than the natural bed material of the stream, to the maximum extent practicable. Efforts must be made to minimize impacts to the stream banks, as well as to vegetation responsible for maintaining the stream bank stability. Any applicable riparian buffer impact for access to stream channel shall be ternporary and be revegetated with native riparian species. [15A NCAC 02H.0506(b)(2)] 8. Erosion control mattinb placed in riparian areas shall not contain a nylon mesh grid, which can impinge and entrap small animals. Matting should be secured in place with staples, stakes, or wherever possible, live stakes of native trees. Riparian areas are defined as a distance 25 feet Eandward from top of stream bank. [ 15A NCAC 02H.0506(b)(3) and (c}(3)] 9. Aipes and culverts used exclusively to maintain equilibrium in wetlands, where aquatic life passage is not a concern, shail not be buried. These pipes shall be installecf at natural ground elevation. [ i SA NCAC 02H.0506(b)(2} and (b}(3)] 10. The project shall be constructed in accordance with the provisions of the NCDOT's National Pallutant Discharge Eliminatian (NPDES) Stormwater Pe►-mit NCSOdQ250, including the applicable requirements of the NCGO I Q00. [ 1 SA NCAC 42B.02 ] 1]. 11. Compensatory rrtitigation for 168 ]inear feet of impaci to streams is reyuired. We understand that you have chosen to perform compensatory mitigation for impacts to streams through the North Carolina Ecosystem Enhancement Program {EEP), and that the EEP has agreed to implement the mitigation for the praject. EEP has indicated in a letter dated January 13, 2015 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above-referenced project, in accordance with the EEP Mitigation Banking Instrument signed July 28, 2010 12. Compensatory mitigation for impacts ta 2.19 acres of riparian wetlands is required. We understand that you have chosen to perform compensatory mitigation for impacts to wetlands through the North Caralina Ecosystem Enhancement Program (EEP), and that the EEP has agreed to implement the rrtitigation for the project, EEP has indicated in a letter dated January 13, 2Q15 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above-referenced project, in accordance with EEP's Mitigation Banking Instrument signed Juiy 28, 2010. General Conditions ] 3. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one faot for akl culverts wiEh a diameter greater than 4$ inches, and 20 percent of the culvert diameter for culverts having a diacneter fess than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosioii control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilihrium is being rr►aintained if requested in writing by NCDWR. If this condition is unable to be rnet due to bedrock or other limiting features encountered during construction, please contact NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be reGuired. [ 15A NCAC 02H.Q506(b)(2)] 14. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fsh kills. [15A NCAC 02B.0200] 15. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [ 1 SA NCAC d2H.OSOb(b)(2)] 16. The dimension, pattem ancf profile of the stream above and below the crossing shall not be modified. Disturbed floodp[ains and streams shall be restored to natural geamo�phic co�iditions. [15A NCAC 02H.0506(b)(2)] 17. The ase af rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stahilization shall be placed in stream channels in such a manner that it does not impede aqaatic life passage, [15A NCAC 02H.OS06{b}(2}] 18. The Permittee shall ensure that the finai design drawings adhere to the permit and to the permit drawings submitted for approval. [ 15A NCAC 02H .0507 (c) and I SA NCAC 02H .0506 (b}(2) and {c}(2)] 19. Al! work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock benns, cofferdams and other diversion structures shall be used to prevent exeavation in flotiving water. [15A NCAC 02H.0506(b)(3) and (c)(3}] 20. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction af other pollutants into the stream. [I SA NCAC 02H.OSflb(b)(3)] 21. All mechanized equiprr►ent operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.Q506(b)(3)] 22. No rock, sand or othe�• materiaEs shall be dredged from the stream channel except where authorized by this certifcation. [15A NCAC 02H.OSOb(b)(3)] 23. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [ 15A NCAC 02H,0506(b)(3)] 24. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d} of the Clean Water Act) and any other apprapriate requirements of State and Federal law. 1f the NCDWR deiermines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State Qr federal law is being violated, or that fu�ther conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certificatian. [15A NCAC 02B.020Q] 25. All fill slopes located in jurisdictional wetlands shall be placed at stopes no flatter than 3:1, unless otherwise authorized by this certification. [ L SA NCAC 02H.OSQ6(b)(2)] 26. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certiiication and all subsequent modifications, 'rf any, shall be maintained with ihe Division Engineer anci the on-site project manager. [15A NCAC 02H .0507(c) and i5A NCAC 02H .0506 (b)(2) and (c}(2}] 27. The outside buffer, wetland ar water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [t5A NCAC 02H.�501 and .0502] 28. The issuance of this certification does not exempt the Permittee from complying with any and all statu#es, rules, regulations, or ordinances that may be irnposed by other government agencies {i,e. lacal, state, and federal) having jurisdiction, including bui not limited to applicable buffer rules, stormwater management rules, soil erosian and sedimentation control reGuirernents, etc. 29. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [ 15A NCAC 02B.OSOb(b)(2)] 30. Upon completion of the project (including any irnpacts at associated borrow or waste sites), the NCDOT Rail Project Manager shali complete and return the enclosed "Certification of Completion Form" to notify the NCDWR whe� a!1 work included in the 401 Certification has been completed. [ISA NCAC 02H.0502(f�] 31. Native riparian vegetation must be reestablished in the riparian areas within the canstruction limits of the project by the end of the growing season following completion of construction.[ I SA NCAC 2H.0506(b){2)] 32. There shall be no excavation from, or waste disposal into, jurisdictional wetlands ar waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact frorn road construction activities.[15A NCAC 02H.0506(b}(3} and (c)(3} 33. Erosion and sediment contro[ practices must be in full compliance with all specificatians governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and {c)(3): a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance wikh the most recent version of the North Carolina Sectiment a�d Erosion Control Planning nnd Desrgn Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, ar exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For bon�ow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Ca��olifra Sinface Mining Manurd. d. The reclamation measures and implementation must comply �vith the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 34. Where placement of sediment and erosion control devices in wetlands and/or waters is unavoidable, they shall be removed and the natural grade restored upon completion of the project. [15A NCAC 02H.0506(b)(3) and (�)(�)l Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. This Certification shall expire upon the expiration of the 404 or CAMA permit. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office how�s. The Office of Administrative Hearings accepts filings Monday through Friday between the how�s of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919)-431-3000, Facsimile: (919)-431-3100 A copy of the petition must also be served on DENR as follo�vs: Mr. Sam M. Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center This the 3rd day of March 2015 DIVISION OF WATER RESOURCES <� -� . - - e � ��f ' S. Jay Zimmerman, Dii�ector Division of Water Resources WQC No. 4014 ��� ���� NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor NCDWR Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Donald van tler Vaart Secretary Certificate of Completion Upon completion of all work approved within the 401 Water Quality Ce►�tification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. [t is not necessa�y to send certificates from all of these. Applicnnt's Certificatioir I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Age�rt's Certificn�io�r 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built �vithin substantial compliance and intent of the 401 Water Quality Ce►-tification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Eirgi�reer's Cerlificrrlio�r Partial Final 1, , as a duly registered Professional Engineer in the State of Noirth Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Pennittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-63001 Internet: www.ncdenr.gov An Equal Opportunity 1 Affirmative Action Employer