HomeMy WebLinkAbout20200859 Ver 3_SAW-2018-01144 (signed NWP-MOD)_20230127PERMIT MODIFICAITON ---10/27/21
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2018-01144 County: Union/Stanly U.S.G.S. Quad: NC-Oakboro
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Union County Public Works
John Shutak
Address: 500 N. Main Street, Suite 500
Monroe, NC 28112
Telephone Number: 704-283-3651
E-mail: john.shutak(a,unioncountync.2ov
Size (acres) 1,875 Nearest Town Marshville
Nearest Waterway Rocky River River Basin Yadkin
USGS HUC 03040105 Coordinates Latitude: 35.14193
Longitude: -80.35764
Location description: The review area consists of approximately 40 miles of pipeline right-of-way beginning near Lake Tillery
in the Town of Norwood (Stanly County) and extends southwest to the terminus near the intersection of Secrest Short Cut
Road and North Rocky River Road in Union County. Reference review area description shown in Pre -Construction
Notification package entitled "Figures 1A-1E, Project Vicinity" and Dated 06/10/2020.
Description of projects area and activity: This verification authorizes the permanent wetland and open water impacts of 1.594
acres and 0.255 acres, respectively, along with the temporary stream impacts of 6,607 linear feet, temporary wetland impacts
of 1.165 acres and temporary open water impacts of 0.38 acres to facilitate the development of new water supply lines to a new
water treatment plant. All temporary stream, wetland, and open water impacts will be restored to pre-existing conditions after
the completion of construction.
Applicable Law(s): ❑X Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 12. Utility Line Activities
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed
Conditions, your application signed and dated 7/1/2020, and the enclosed plans Preliminary Construction Drawings dated
5/20/2020. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop
work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this
verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808.
PERMIT MODIFICAITON ---10/27/21
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact Bryan Roden -Reynolds at 704-510-1440or bryan.roden-reynolds@usace.army.mil.
Bryan Roden -Reynolds
Corps Regulatory Official: 2021.10.27 10:53:12 -04'00' Date: 10/27/2021
Expiration Date of Verification: 03/18/2022
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cmapex/f?p=136:4:0
Copy fumished:
Agent: HDR En2ineerin2 of the Carolinas
Anthony Nardo
Address: 440 South Church Street, Suite 900
Charlotte, NC 28202
Telephone Number: 980-337-5004
E-mail: Anthony.nardo(andrinc.com
SAW-2018-01144
SPECIAL CONDITIONS
a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance
with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility
Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby
incorporated as special conditions of this permit authorization.
Action ID Number: SAW-2018-01144 County: Union/Stanly
Permittee: Union County Public Works, John Shutak
Project Name: Yadkin Regional Water Supply Project
Date Verification Issued: 10/27/2021
Project Manager: Bryan Roden -Reynolds
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Bryan Roden -Reynolds
Charlotte Regulatory Office
U.S Army Corps of Engineers
8430 University Executive Park Drive, Suite 615
Charlotte, North Carolina 28262
or
bryan.roden-reynolds@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
MEMORANDUM FOR RECORD
SUBJECT: Department of the Army Memorandum Documenting General Permit
Verification
1.0 Introduction and overview: Information about the proposal subject to one or more of
the Corps regulatory authorities is provided in Section 1, detailed evaluation of the
activity is found in Sections 2 through 4 and findings are documented in Section 5 of this
memorandum. Further, summary information about the activity including administrative
history of actions taken during project evaluation is attached (ORM2 summary).
1.1 Applicant name: Union County Public Works, John Shutak
1.2 Activity Iocation:Latitude: 35.14193 Longitude: -80.35764 Location description: The
review area consists of approximately 40 miles of pipeline right-of-way beginning
near Lake Tillery in the Town of Norwood (Stanly County) and extends southwest
to the terminus near the intersection of Secrest Short Cut Road and North Rocky
River Road in Union County. Reference review area description shown in Pre -
Construction Notification package entitled "Figures 1A-1 E, Project Vicinity" and
Dated 06/10/2020.
1.3 Description of activity requiring verification:This verification would authorize the
permanent wetland and open water impacts of 1.594 acres and 0.255 acres,
respectively, along with the temporary stream impacts of 6,607 linear feet,
temporary wetland impacts of 1.165 acres and temporary open water impacts of
0.38 acres to facilitate the development of new water supply lines to a new water
treatment plant. All temporary stream, wetland, and open water impacts will be
restored to pre-existing conditions after the completion of construction.
1.4 Is this an After -the -Fact verification? No.
1.5 Date PCN determined complete for processing 7/8/2020
1.6 Jurisdiction Determination completed? A Preliminary JD was completed on
10/22/2019.
1.7 Permit authority: Section 404 of the Clean Water Act (33 USC 1344)
1.8 Applicable Permit: NWP 12. Utility Line Activities
1.9 Activity requires written waiver of NWP limits? No.
1.10 Activity requires a waiver from the requirements of a regional condition(s)? No.
2.0 Evaluation of the Pre -Construction Notification
2.1 Direct and indirect effects caused by the GP activity: The direct effects of the
proposed activity in waters would include the loss of jurisdictional waters (as
specified in Section 1.3) and their associated aquatic resource functions. The
proposed activity also has the potential to result in indirect effects to waters
including excess sedimentation in downstream waters, disruption and/or killing
of aquatic life in the direct vicinity of the project area, increase of downstream
flows, and blocking/restricting aquatic life passage transiting in and through the
project area. These indirect effects are expected to be minimal due to design
criteria and Best Management Practices (BMPs) required by Nationwide Permit
General and Regional Conditions. Additionally, indirect effects would be further
reduced through the implementation of BMPs required by state, local, and
Federal ordinances and regulations.
2.2 Site specific factors: The review area consists of single-family residences,
commercial developments, parks, schools, agricultural fields, planted pines,
roadside rights -of -ways, and forested areas.
2.3 Coordination
2.3.1 Was the PCN coordinated with other agencies? No.
Agency coordination with the USFWS is required for the Northern Long Eared
Bat. However, the Corps is not required to wait for a response from the USFWS
Asheville Office in accordance with local procedures.
2.3.2 Was the PCN coordinated with other Corps offices? No.
2.4 Mitigation
2.4.1 Provide brief description of how the activity has been designed on -site to avoid and
minimize adverse effects, both temporary and permanent, to waters of the United States
to the maximum extent practicable at the project site:The applicant provided a
detailed statement describing their efforts to avoid and minimized impacts to
waters of the United States on the project site in the preconstruction notification.
Based on this information, the Corps believes the applicant has avoid and
minimized impacts to waters of the United State to the maximum extent
practicable.
2.4.2 Is compensatory mitigation required for unavoidable impacts to jurisdictional aquatic
resources to reduce the individual and cumulative adverse environmental effects to a
minimal level?
Yes.
Provide rationale: Compensatory mitigation is required to ensure minimal adverse
environmental effects. Compensatory mitigation is required to ensure minimal
adverse environmental effects. The loss of wetlands associated with the activity
is greater than 0.10 acre.
2.4.3 Type and location of compensatory mitigation
Is the impact in the service area of an approved mitigation bank? Yes.
If yes, dor 11,e mitigation bank have appropriate number and resource type of credits
available: No.
Is the impact in the service area of an approved in -lieu fee program? Yes.
If yes, does the in -lieu fee program have the appropriate number and resource type of
credits available? Yes.
Selected compensatory mitigation type/location(s): See Table 1
Table 1: Mitigation Type and Location
Mitigation bank credits
In -lieu fee program credits
x
Permittee-responsible mitigation under a watershed approach
Permittee-responsible mitigation, on -site and in -kind
Permittee-responsible mitigation, off -site and/or out of kind
Does the selected compensatory mitigation option deviate from the order of the options
presented in §332.3(b)(2)-(6)? N/A.
proviu llle IduUIIdI IUI II ie deviation, including the likelihood for ecological
success and sustainability, location of the compensation site relative to the impact site
and their significance within the watershed, and/or the costs of the compensatory
mitigation project (see 33 CFR §332.3(a)(1)):
2.4.4 Amount of compensatory mitigation: 1.73 acres of wetland credit
Rationale for required compensatory mitigation amount: This amount of
compensatory mitigation is necessary to replace the permanent loss of WOUS
and temporal loss at the mitigation site. Permanent wetland conversion impacts
are considered at a compensatory mitigation ratio of 1:1. In addition, open water
impacts were considered at a compensatory mitigation ratio of 0.5:1.
3.0 Compliance with Other Laws, Policies and Requirements
3.1 Section 7(a)(2) of the Endangered Species Act (ESA)
3.1.1 ESA action area: The action area includes the waters of the United States that will
be directly affected by the proposed work or structures and uplands directly
affected as a result of authorizing the work or structures.
3.1.2 Has another federal agency taken steps to document compliance with Section 7 of the
ESA and completed consultation(s) as required? No.
3.1.3 Known species/critical habitat present? No. The Corps has determined that it has
fulfilled its responsibilities under Section 7(a)(2) of the ESA.
IPAC Species in Union/Stanly County:
Stanly County
NAME: Northern Long-eared Bat (Myotis septentrionalis) STATUS: Threatened
NAME: Schweinitz's sunflower (Helianthus schweinitzii) STATUS: Endangered
NAME: Carolina heelsplitter (Lasmigona decorata) STATUS: Endangered
NAME: Michaux's sumac (Rhus michauxii) STATUS: Endangered
NAME: Schweinitz's sunflower (Helianthus schweinitzii) STATUS: Endangered
Effect determination(s), including no effect, for all known species/habitat, and basis for
determination(s): Based on the latest version of the Natural Heritage Program's
NHEO data, there are no protected species located within or in the vicinity of the
action area. The Corps has determined the proposed activity will not directly or
indirectly affect any species subject to the ESA.
3.1.4 Consultation with either the National Marine Fisheries Service and/or the U.S. Fish and
Wildlife Service was initiated and completed as required, for any determinations other
than "no effect" (see the attached "Summary" sheet for begin date, end date and closure
method of the consultation).
The USACE reviewed this project in accordance with (IAW) the NLEB Standard
Local Operating Procedures for Endangered Species (SLOPES) between the
USACE, Wilmington District, and the Asheville and Raleigh U.S. Fish and Wildlife
Service (Service) Offices, and determined that the action area for this project is
located outside of the highlighted areas/red 12-digit HUCs and activities in the
action area do not require prohibited incidental take; as such, this project meets
the criteria for the 4(d) rule and any associated take is exempted/excepted. IAW
the NLEB SLOPES, the USACE sent a Situation 1 email to the Service on June 8,
2020, informing them about this project.
Service Concurrence: as established in the NLEB SLOPES, this project does not
require prohibited intentional take of the NLEB and it meets the criteria for the
4(d) rule; therefore any associated take is exempt and it is not necessary for the
USACE to wait 30 days for the Service to object or concur.
Based on a review of the information above, the Corps has determined that it has
fulfilled its responsibilities under Section 7(a)(2) of the ESA.
3.2 Magnuson -Stevens Fishery Conservation and Management Act, Essential Fish
Habitat (EFH) The NWPs/RGPs were coordinated with the NMFS during the permit
renewal process. NMFS coordination/EFH consultation is required if the activity
affects SAV. This activity does not affect SAV. Therefore, NMFS coordination/EFH
consultation has been completed.
3.2.1 Has another federal agency taken steps to comply with EFH provisions of Magnuson -
Stevens Act? No.
3.2.2 Did the proposed project require review under the Magnuson -Stevens Act? No.
3.3 Section 106 of the National Historic Preservation Act (Section 106)
3.3.1 Section 106 permit area:The permit area includes those areas comprising waters of the
United States that will be directly affected by the proposed work or structures, as well
as activities outside of waters of the U.S. because all three tests identified in 33
CFR 325, Appendix C(g)(1) have been met.
Final description of the permit area: All three test have been met and portions of the
larger project undertaken outside of waters of the U.S. are in the permit area.
Activities undertaken outside WOUS are included in the permit area because
those activities are directly associated and integrally related with the authorized
work and those activities would not occur but for the authorization of the work
within the WOUS.
3.3.2 Has another federal agency taken steps to comply with Section 106 of the National
Historic Preservation Act and completed consultation(s) as required? No.
3.3.3 Known cultural resource sites present and/or survey or other additional information
needed? No. Based on the NCDCR "HPOWEB" service and aerial photographs,
there are no known historic properties located in the permit area or in close
proximity to the permit area.
Effect determination and basis for that determination: The Corps has determined the
proposed activity will have no effect on properties listed or eligible for listing in
the National Register of Historic Places. In a letter to the applicant dated
October 23, 2018, the NCSHPO stated "we conducted a review of the project and
are aware of no historic resources which would be affect by the project.
Therefore, we have no comment on the project as proposed." Since NCSHPO
comment letter in October 2018, the proposed project boundary changed slightly
and the applicant notified NCSHPO (letter dated May 4, 2020). In a letter dated
June 19, 2020, NCSHPO provided the following response "We have determined
that the project as proposed will not have an effect on any historic buildings or
structures.
3.3.4 Consultation was initiated and completed as required with the appropriate agencies,
tribes and/or other parties for any determinations other than "no potential to cause
effects" (see the attached "Summary" sheet for consultation type, begin date, end date
and closure method of the consultation). The Corps has determined that it has fulfilled
its responsibilities under Section 106 of the NHPA.
3.4 Tribal Trust Responsibilities
3.4.1 Was government -to -government consultation conducted with Federally -recognized
Tribe(s)? No. There are no known tribal interests in the project area.
Provide a description of any consultation(s) conducted including results and how
concerns about significant effects to protected tribal resources, tribal rights and/or
Indian lands were addressed. The Corps has determined that it has fulfilled its tribal
trust responsibilities.
3.4.2 Other Tribal including any discussion of Tribal Treaty rights? Select Yes or No.
3.5 Section 401 of the Clean Water Act — Water Quality Certification (WQC)
3.5.1 Is a Section 401 WQC required, and if so, has the certification been issued or waived?
A general WQC has been issued for this permit.
3.6 Coastal Zone Management Act (CZMA)
3.6.1 Is a CZMA consistency concurrence required, and if so, has the concurrence been
issued, waived or presumed? N/A, a CZMA consistency concurrence is not
required.
3.7 Wild and Scenic Rivers Act
3.7.1 Is the projectlocated in a component of the National Wild and Scenic River System, or in
a river officially designated by Congress as a "study river" for possible inclusion in the
system? No. According to http://www.rivers.gov, the proposed project area is not
within a designated or study river.
3.8 Effects on Corps Civil Works Projects (33 USC 408)
3.8.1 Does the applicant also require permission under Section 14 of the Rivers and Harbors
Act (33 USC 408) because the activity, in whole or in part, would alter, occupy, or use a
Corps Civil Works project? No, there are no Corps Civil Works project(s) in or near
the vicinity of the proposal.
4.0 Special Conditions
4.1 Are special conditions required to ensure minimal effects, protect the public interest
and/or ensure compliance of the activity with any of the laws above? Yes.
4.2 Required special condition(s)
Special condition:
a. In order to compensate for impacts associated with this permit, mitigation shall be
provided in accordance with the provisions outlined on the most recent version of the
attached Compensatory Mitigation Responsibility Transfer Form. The requirements of
this form, including any special conditions listed on this form, are hereby incorporated
as special conditions of this permit authorization.
Rationale:See Section 2.4.2.
5.0 Determination
5.1 Waiver request conclusion, if required or select N/A: N/A.
5.2 The activity, with the required mitigation, will result in no more than minimal
individual and cumulative adverse effects on the aquatic environment and will not be
contrary to the public interest, provided the permittee complies with the special
conditions identified above.
5.3 This activity, as described, complies with all terms and conditions of the permit identified
in Section 1.5.
PREPARED BY:
Bryan Roden -Reynolds
2021.10.27 10:52:02 -04'00'
Date: 10/27/2021
Bryan Roden -Reynolds
Compensatory Mitigation Responsibility Transfer Form
Permittee: Union County Public Works, John Shutak Action ID: SAW-2018-01144
Project Name: Yadkin Regional Water Supply Project County: Union/Stanly
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this
form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one
8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the
identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank
ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03040104, Yadkin River Basin
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
0.049
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements:
8-digit HUC and Basin: 03040104, Yadkin River Basin
Stream Mitigation (credits)
Wetland Mitigation (credits)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
0.05
Permitted Impacts Requiring Mitigation*
8-digit HUC and Basin: 03040105, Yadkin River Basin
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
1.808
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements:
8-digit HUC and Basin: 03040105, Yadkin River Basin
Stream Mitigation (credits)
Wetland Mitigation (credits)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
1.68
Mitigation Site Debited:
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are
currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor's Authorized Representative:
Signature of Sponsor's Authorized Representative Date of Signature
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE
Project Manager (address below) is provided with a signed copy of this form.
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's
compensatory mitigation responsibility, dated 7/6/2020 was included with the preconstruction notification.
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE
Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls
of Neuse Road, Wake Forest, NC 27587 (email: todd.tugwell@usace.army.mil). Questions regarding this form or any of the
permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager:
USACE Field Office:
Email:
Bryan Roden -Reynolds
Charlotte Regulatory Office
US Army Corps of Engineers
8430 University Executive Park Drive, Suite 615
Charlotte, North Carolina 28262
bryan.roden-reynolds@usace.army.mil
Bryan Roden -Reynolds
2021.10.27 10:51:35-04'00'
10/27/2021
USACE Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.army.mil
J
0
Z
OZ
UU
7
KZ
~ w
cn 2
Uw
KN
O13
LL Z
O Q
70
Ny
NO
K
U
PLAN AND PROFILE
STA 280+00 TO STA 290+00
D W 15C - PFO
on Impact = 0.014 AC
•
LL
non -jurisdictional
idqt
ii
7�LL II' II
co Q
i° 0- 0,
E E
' I
/'I1
LA
J
0
Z
OZ
I- 0
UU
7
KZ
~ W
cn
Z _
UW
u)
O�
LL Z
Oz
Z
0
N N
o
J 10 J
ID 0
J II III
w as
EE
0
ECO_
oa)a)
r r a J■ ■■■■■■■ ■■■!' �/�
■_:■_�■IM:: I■;
1■1■_� ■■■
■=■■=- ■■M■■ =M1
■_■■_�
■_■■__ _II ��■
■_■■_ �II!ilI!®■■
■=■■=- �=■ �M■■
■=■■=� •I=■ IM■■•'--
■_■■=� ■■I!■dim■!!■■I
EC■■=E1=1=■■■=■ e■■
■_■■_� =� NM■■■
• adxds„. .os ■ :���71�■IS.
• (BL.LNUs) •U111 NO1100 ®- .ry■■�
• ■3 a!!il �1i■■
■_■■_� __■ EI M■EN
■I:■■=••=111E®:m1=■ 8M■i ■
■_■■_� filENE NIBlI!■!E
1•11•1131!x:M:Etal
■=■■=01111U■ ■=•L
■=■■=� ti■ ■l■
■===� WAM■L
12-2
4
_iiMEI
I I; ;..
....... .. ...
Enos
mum
Himm.
■■■■■■■■■
1
1
1
■=� tilt■ ■■=■■■
m� tiil Li■■ ■ii■■
Tt■s■-a:E■■
c 3nvUs) OU .09 NO 1�
(6E6Oil
■E
■■
w
o J
0
O
PLAN AND PROFILE
STA 290+00 TO STA 300+00
roc
ti
u)
to
7,
0 ay
•
v
N
cn
E
0
N
7
E
w�\
a
Fr
•
/
MENEM
MENNEN
VE
.1330
1
ViS
we
55
55
0
PLAN AND PROFILE
STA 340+00 TO STA 350+00
z
Y ? Q_
ce
O c U -
a JuJ0
onQ a ~q
d Z d
az
z—
z p W
0 70 j r Q
z U Q
zO_ �¢
0
PLAN AND PROFILE
STA 360+00 TO STA 370+00
NzCC w
O c (A)
m Q a ~q
ce aZ WaL'
az_
z��
z p W
O0 00 Ce
} r
z O ¢
O z
zO
z
0
0
PLAN AND PROFILE
STA 370+00 TO STA 380+00
z uJ
ce
re 0 1- 7
0 ce 0-
ul 0
<
0 ° 0 ce
cc —
Qo
7 00 g
z ce 0- LL
• z -Z
z o
0 7
<
0
zo <
0 Z
REGU,TORY REVIEW - ESC
REGU,TORY REVIEW
REGU,TORY REVIEW 401/404
U
06.
44
m
�VHdsd)Wnas
lotus #Us)
O21 SONRIdS
83AI8 ANO08
00d1S
PLAN AND PROFILE
STA 400+00 TO STA 410+00
13
01
0
zI-
O Z
I— 0
U U
7
Z
~ w
CO 2
0 0
w
K N
O
LL Z
0
wZ
7 O
y
NO
ce
ss.ns
SINs/S SS
ilruu
6S-L.L.LS SS
N11213
w
ONOI
ape affk.:
SRL-SiS SS
ape la3 A.
i
11111I
i
■i
w
a
301
01
CO
0
PLAN AND PROFILE
STA 570+00 TO STA 580+00
a
wz w
7, Q_
ce
0c Ur
a J uJ 0
0
m1- 0a co
dK Z d
v.az
LJ-
z-
7 z 0 K W
00 00 } r Q
z 0 a ,
zO a
nz z
7
J
0
Z re
Oz
�0
U U
7 F
Z
w
2
00
w
K N
0°
LL Z
oa
w Z
70
N
NO
K
i
El .3A
0
PLAN AND PROFILE
STA 580+00 TO STA 590+00
gqqqqg
\
§\
LJ
PLAN AND PROFILE
STA 1160+00 TO STA 1170+00
1\
'
]
LkJ
z
a
i
J
Z
0
OZ
0
00
7
KZ
~ w
cn
Z _
00
ILI
KN
O�
LL Z
O
w Z
70
Ny
NO
K
,002
N_
0
a
PLAN AND PROFILE
STA 1270+00 TO STA 1280+00
5
a
0
Z K
0 Z
I- 0
U U
7
Z
co 2
~ W
Z
O w
K N
O
LL Z
0Q
W Z
0
N N
O
K
CO
CO
Wffi
AFi
U
PLAN AND PROFILE
STA 1380+00 TO STA 1390+00
r
AA
5