Loading...
HomeMy WebLinkAboutNCC191758_NOT Closeout Documents_20230124North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Anson Project: Burnsville Substation Person financially responsible: Pee Dee Electric Membership Corporation - Anthony E Eason, VP of Engineering & Operations Address: 9825 US Hwy 74 East, Lilesville, NC 28091 1. Project Location: Race Track Road, Polkton Pictures: No River basin: Yadkin-PeeDee Project #: ANSON-2020-001 NCC 191758 2. Weather and soil conditions: dry, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: January 23, 2023 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: January 18, 2023 Time arriving on site: 12:15 PM Time leaving site: 12:30 PM cc: