Loading...
HomeMy WebLinkAbout20060061 Ver 1_More Info Letter_20060117O~~F W A TFi9QG Michael F. Easley, Governor ~ William G. Ross Jr., Secretary t- North Carolina Department of Environment and Natural Resources Q -~ Alan W. Klimek, P.E. Director - Division of Water Quality January 17, 2006 DWQ Project # 06-0061 Granville County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Bill Wynn -Wynn Construction Crosswind Properties, LLC 1696 Hayes Road Creedmoor, NC 27522 Subject Property: Southfolle Subdivision Ford Creek [TARO1, 28-14, C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Wynn: On January 9, 2006, the Division of Water Quality (DWQ) received your application dated December 16, 2005, to impact 252.5 linear feet of stream, and 10,221 square feet of Zone 1 protected Tar-Pamlico River basin riparian buffer and 14,902 square feet of Zone 2 protected Tar-Pamlico River basin riparian buffer to construct an access road and install a sanitary sewer line at the subject property. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please show all stream impacts including fill slopes, dissipaters, and bank stabilization on the site plan, and match these sites to the impact site numbers on your PCN form. 2. Please clearly label all buffer impact locations on the site plan, and show the quantities associated with these locations. 3. Please locate all isolated or non-isolated wetlands, streams and other waters of the State as overlays on the site plan. 4. Please provide cross-section details showing the provisions for aquatic life passage. 401 Oversight/Express Review Pemutting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.cnr.state.nc.us/ncwetlands N~~` Caro ina ~atura~l~ An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Crosswind Properties, LLC Page 2 of 2 January 17, 2006 5. Please locate any planned sewer lines on the site plan. 6. Please indicate the diffuse flow provision measures on the site plan, and provide design calculation worksheets and an Operations and Maintenance form. 7. Please discuss how you determined Ford Creek/'I'ar River Creek to be intermittent. 8. Please be advised that if affected streams are perennial, mitigation will be required for this project. The mitigation plan must conform to the requirements in 15 A NCAC 2H .0500 and must be appropriate to the type of impacts proposed. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact me in writing and Eric Kulz of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, ~~~ ~ Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/ijm cc: Alan Pytcher, Summit Consulting Engineers, 1000 Corporate Drive, Suite 101, Hillsborough, NC 27278 Eric Kulz, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Filename: 060061sout6folkSD(Granville)On hold