Loading...
HomeMy WebLinkAbout20080867 Ver 2_Certification of Completion_201502184 L RU NR North Carolina Department of Environment and Natural Resources Division of Water Resources Pat McCrory Water Quality Programs Governor Thomas A Reeder John E. Skvarla, III DWR Project No: ?-Qo$ c/ Director Secretary "— �Otr74, Applicant: I C_L-�— Project Name: 401 Water Quality Certification Issued Date. Certificate of Completion __I A11 i i c L 21 i-N I I 1M Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. APPilca Certif/caVjn I, I�t —C � C o 2 p'Z_ hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature- _ � Date Agent's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date. if 'his project was designed by a Certified Professional 1, as a duly registered Professional Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been auth(oriized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: 401 & Buffer Permltang Unit 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 Lomtion 512 N Salisbury St Raleigh, North Carolina 27604 Phone 91 M07 -83001 FAX 919-807-6494 Internet nawalemuaNv om An Equal Opportunity I Almahve Adian Employer