Loading...
HomeMy WebLinkAboutNCC230202_ESC Approval Submitted_2023012411J$ � FEA ROY COOPERS y\ Governor {� ELIZABETH S. BISER` Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality September 19, 2022 LETTER OF APPROVAL WITH MODIFICATIONS T.A. Loving Company Attention: E. Taylor Jeffreys, Chief Financial Officer 3600 Glenwood Avenue, Se 120 Raleigh, NC 27612 RE: Project Name: GCS Visual Performing Arts PK-5 School Mass Grading Permit Project ID: GUILF-2023-009 Acres Approved: 9.15 County: Guilford City: Greensboro Address: Randall Street River Basin: Cape Fear Stream Classification: WS-V, NSW — Jordan Labe Watershed Submitted By: JC Waller & Associates, PE Date Received by LQS: September 16, 2022 Plan Type: Revised Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to come encement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01_. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. North Carolina Depamnent of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1450 Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105 ME 336-776-9800 u Letter of Approval with Modifications T.A. Loving Company September 19, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: GCS Visual Performing Arts PK-5 School Mass Grading Permit Project ID: GUILF-2023-009 County: Guilford Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. No impervious surface may be built in Zone 2 of the riparian buffer. [Courtesy comment, per 15A NCAC 02B .0267] 2. Where 10 feet separation can occur between the bottom of the fill slope and silt fencing, it should occur due to required access for inspection and maintenance. [G.S. 113A-57(3)] 3. This project is located within the Jordan Lake Watershed Buffer. This site must meet all site - specific water quality management plan requirements pursuant to North Carolina Administrative Code 15A NCAC 02B .0267. 4. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [I5A NCAC 4B .01101 5. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 6. The NCGOI has a $100 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCGO1 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through t 5A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities