INSPECTION REPORT ROUTING SHEET
To be attached to all inspection reports in-house only.
Laboratory Cert. #: 5064
Laboratory Name: Progress Energy Carolinas – Mayo Electric Generating Plant
Inspection Type: Field Maintenance
Inspector Name(s): Jeffrey R. Adams
Inspection Date: August 26, 2010
Date Report Completed: September 9, 2010
Date Forwarded to Reviewer: September 9, 2010
Reviewed by: Tonja Springer
Date Review Completed: September 13, 2010
Cover Letter to use: Insp. Initial Insp. Reg. X Insp. No Finding Insp. CP
Unit Supervisor: Dana Satterwhite
Date Received: September 13, 2010
Date Forwarded to Alberta: September 13, 2010
Date Mailed: September 13, 2010
_____________________________________________________________________
On-Site Inspection Report
LABORATORY NAME: Progress Energy Carolinas – Mayo Electric Generating Plant
NPDES PERMIT #: NC0038377
AD DRESS: 10660 Boston Road
Roxboro, NC 27573
CERTIFICATE #: 5064
DATE OF INSPECTION: August 26, 2010
TYPE OF INSPECTION: Field Maintenance
AUDITOR(S): Jeffrey R. Adams
LOCAL PERSON(S) CONTACTED: Dulcie Phillips, Michael Talley and Steve Cahoon
I. INTRODUCTION:
This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for
the analysis of environmental samples.
II. GENERAL COMMENTS:
The laboratory was neat and equipment was well maintained. Records were maintained and well
organized. Performance testing samples have been analyzed for all certified parameters for the 2009
calendar year and the graded results were 100% acceptable.
The laboratory was given a packet containing the Technical Assistance Documents and Quality
Assurance Policies for Field Laboratories during the inspection.
III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS:
No findings were noted.
IV. PAPER TRAIL INVESTIGATION:
The paper trail consisted of comparing field testing records and contract lab reports to Discharge
Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were
reviewed for Progress Energy Carolinas – Mayo Electric Generating Plant (NPDES permit
#NC0038377) for March, May and June, 2010. No transcription errors were detected. The facility
appears to be doing a good job of accurately transcribing data.
V. CONCLUSIONS:
No findings were noted during the inspection. The inspector would like to thank the staff for its
assistance during the inspection. No response is required.
Report prepared by: Jeffrey R. Adams Date: September 9, 2010
Report reviewed by: Tonja Springer Date: September 12, 2010