Loading...
HomeMy WebLinkAbout#5064 10-final INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 5064 Laboratory Name: Progress Energy Carolinas – Mayo Electric Generating Plant Inspection Type: Field Maintenance Inspector Name(s): Jeffrey R. Adams Inspection Date: August 26, 2010 Date Report Completed: September 9, 2010 Date Forwarded to Reviewer: September 9, 2010 Reviewed by: Tonja Springer Date Review Completed: September 13, 2010 Cover Letter to use: Insp. Initial Insp. Reg. X Insp. No Finding Insp. CP Unit Supervisor: Dana Satterwhite Date Received: September 13, 2010 Date Forwarded to Alberta: September 13, 2010 Date Mailed: September 13, 2010 _____________________________________________________________________ On-Site Inspection Report LABORATORY NAME: Progress Energy Carolinas – Mayo Electric Generating Plant NPDES PERMIT #: NC0038377 AD DRESS: 10660 Boston Road Roxboro, NC 27573 CERTIFICATE #: 5064 DATE OF INSPECTION: August 26, 2010 TYPE OF INSPECTION: Field Maintenance AUDITOR(S): Jeffrey R. Adams LOCAL PERSON(S) CONTACTED: Dulcie Phillips, Michael Talley and Steve Cahoon I. INTRODUCTION: This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The laboratory was neat and equipment was well maintained. Records were maintained and well organized. Performance testing samples have been analyzed for all certified parameters for the 2009 calendar year and the graded results were 100% acceptable. The laboratory was given a packet containing the Technical Assistance Documents and Quality Assurance Policies for Field Laboratories during the inspection. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: No findings were noted. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing field testing records and contract lab reports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for Progress Energy Carolinas – Mayo Electric Generating Plant (NPDES permit #NC0038377) for March, May and June, 2010. No transcription errors were detected. The facility appears to be doing a good job of accurately transcribing data. V. CONCLUSIONS: No findings were noted during the inspection. The inspector would like to thank the staff for its assistance during the inspection. No response is required. Report prepared by: Jeffrey R. Adams Date: September 9, 2010 Report reviewed by: Tonja Springer Date: September 12, 2010