HomeMy WebLinkAboutNCC192640_NOT Signed Certification_20230119NCG01 Notice of Termination (NOT) Certification Form
Directions: -
Print this form, complete, scan and upload to the electronic NOT (Rescission) form.
Then, mail the original signed form to the NC ❑EM LR 5tormwater Program at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 6" Floor
1612 Mail Service Center
Raleigh, NC 27699-161.2
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED,
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOT DIGITAL) T40 CFR 122.2.2)
General Permit Certificate of Coverage (COC) No.:
Name of Project: —a
Per NC General Statute 143-215.60 (i), any person who knowingly makes any false statement, representation, or
certification in any application, record, report, plow, or other document filed or required to be maintained under this
Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include o fine not
to exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that:
i, as an authorized representative, hereby request rescission of coverage under the NP€]ES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge
and belief, such information is true, complete, and accurate.
Legally Responsible Organizational Entity: rt--60NtC- FSAIH-0HFS i
Legally Responsib{e Person:
Title of Legally Respo
*Signature:
D-E-i.i I ,-, L4
rson: Egft; 5 t x-t--t-
i 1r4r2�3
Print Name and Title of Signed (only if authorized individual signing differsfrom Legally Responsible Person):
`] 0L(—Z2, 5--K- V
* IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the
construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Port W. Section 8, Item (bj of the. IVCGO10000 permit.
For more information on signatory requirements, see Part IV, Section B, Item (5) of the NCG01(100o permit.