HomeMy WebLinkAboutNCC192640_NOT Closeout Documents_20230119SEDIMENTATION INSPECTION REPORT
Iredell County Planning & Development
Erosion Control Section
349 North Center Street/P.O. Box 788
Statesville, NC 28687
Location: Iredell County Project: Fort Dobbs Acres
Person financially responsible: K & T Properties II, LLC, Kevin Klink
Address;141 S Longfellow Lane
Mooresville, NC 28117
Weather and soil conditions: Sunny, 70's, Workable
Is site currently under Notice of Violation? ❑Yes ®No
Inspection
Type
Initial
Routine
❑
Follow-up
❑
Final
Enforcement
�]
Project #: IREDE-2020-021
River basin: Yadkin
Project location: Fort Dobbs Road
Photographic Documentation: ❑Yes ®No
❑Prints ❑Slides ❑Video ❑Digital
Structural BMPs
Functioning
Needs Maintenance
Not Installed
Not Applicable
Construction Entrance
❑
❑
❑
Slit Fence/Outlet
❑
❑
❑
Sediment Basin/Trap
❑
❑
Diversion BermlDitch
❑
❑
Permanent DitcheslChecks
❑
❑
❑
Inlet/Outlet Protection
❑
❑
❑
I
Other:
❑
❑
❑
❑
If structural BMPs are not functioning properly,
note location and corrective action on reverse
side of this form
Vegetative Controls
Adequate
Not Adequate
Absent
Not Applicable
Stream Buffers
❑
❑
❑
Temporary Stabilization
®
❑
❑
❑
Permanent Stabilization
®
❑
❑
❑
If vegetation is not adequate, note location and corrective action on reverse side of this form
Erosion/Sedimentation
No
Yes -Minor
Yes -Moderate
Yes -Severe
Is there ON -SITE erosion occurring?
®
❑
❑
❑
Is there OFF -SITE sediment loss?
®El❑
❑
Did sediment reach a STREAM?
®
❑
❑
❑
If any of the above are "Yes", note the location and corrective action on reverse side of this form
Is site in compliance with S.P.C.A. and rules, and ICLDC? If Not Compliant, check
violations on second page.
Compliant Needs Maintenance Not Compliant
This site is... ® 1
❑ ❑
Sediment Inspection Report Continued
Violations:
❑a. No approved plan. G.S. 113A-57(4) and 15A NCAC 0413 .0107(c) ❑g. Inadequate bufferzone, G.S. 113A-57(1) & &
Appendix H of the ICLDC Appendix H of the ICLDC
❑b. Failure to follow approved plan, G.S. 113A-57(5) and Appendix H ❑h. Graded slopes and fills too steep, G.S. 113A-
of the ICLDC 57(2) or 15A NCAC 04B .0124(d) & Appendix H of
the ICLDC
❑c. Failure to submit revised plan, G.S. 113A-54.1(b) & ❑i. Unprotected exposed slopes, G.S. 113A-57(2)
15A NCAC 048 .0118(a) & Appendix H of the ICLDC & Appendix H of the ICLDC
❑d- Failure to provide adequate groundcover, G.S. 113A-57(3) & ❑j. Failure to install and/or maintain erosion
15A NCAC 04B .0107(b) or 15A NCAC 04B .0124(e) & Appendix H control measures, 15A NCAC 04B .0113 &
of the ICLDC Appendix H of the ICLDC
❑e. Insufficient measures to retain sediment on site, G.S. 113A-57(3) ❑k -Failure to self -inspect G-S. 113A-54.1(e) &
& Appendix H of the ICLDC 15A N.C.A.C. 413.0131 & Appendix H of the
ICLDC
❑f. Failure to take atl reasonable measures, 15A NCAC 04B .0105 01- Other (describe) -
Appendix H of the ICLDC
Potential NPDES Permit Violation? ❑Yes ®No ❑Not Applicable Describe:
Has sedimentation damage occurred since last inspection? ❑Yes ®No If yes, where?
(Check all that apply)
❑Lake/natural watercourse on the tract ❑Lakelnatural watercourse off the tract
❑Other property ❑Roadway ❑Storm sewer
Description:
Degree of damage_ ❑Slight ❑Moderate ❑Severe
Contact made with: No One Inspection report sent to person financially responsible on this [fate: b /-+
Comments f Corrective Actions Needed: Permanent ground cover sufficient to restrain
erosion has been established. No additional self -monitoring or self -inspections are required.
Project is in compliance and released under the _SPCA. Termination of coverage under the
NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by
the permittee. via a Notice of Termination (NOT). The NOT is available at:
https.//cdocs.deq.ne.gov/Forms/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: B. Jordan
Date of inspection: 512122
cc:
Phone: 704-878-5388
Time arriving on site: 1:15 pm
Others present:
Time leaving site: 1:20 prn
Ali erosion andsedintent control irteasures nntsl meel the spinrlardsper rrpprovedErosion Control Plan and the 1Vortlr Carolina Erosion and
Sediment Control Planni+rg and Design Manual