HomeMy WebLinkAbout20221499 Ver 1_SAW-2022-01011--Preliminary and Approved Jurisdictional Determination_20230118U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2022-01011 County: Wake U.S.G.S. Quad: NC -Raleigh East
NOTIFICATION OF JURISDICTIONAL DETERMINATION
Requestor: Beacon Partners
Address: 500 East Morehead Street, Suite 200
Charlotte, North Carolina 28202
Size (acres) —54 acres Nearest Town Raleigh
Nearest Waterway UT to Neuse River River Basin Neuse
USGS HUC 03020201 Coordinates Latitude: 35.796899
Longitude:-78.528120
Location description: The project site is north of Farmwell Road and Coffey Street, west of Charvoz Circle, and east of Old
Milburnie Road in Raleigh, in Wake County, North Carolina. The preliminary iurisdictional determination evaluation area is
shown as the red outlined "PJD Review Area" depicted on the attached "Aquatic Resource Sketch Mad' exhibit. The
anoroved iurisdictional determination evaluation area is shown as the vellow outlined "AJD Review Area" denicted on the
attached "Aquatic Resource Sketch Mad' exhibit.
Indicate Which of the Following Apply:
A. Preliminary Determination
® There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404
of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The
waters, including wetlands have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate
and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 4/13/2022. Therefore
this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory
mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection
measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any
way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an
appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may
request an approved JD, which is an appealable action, by contacting the Corps district for further instruction.
❑ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of
the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However,
since the waters, including wetlands have not been properly delineated, this preliminary jurisdiction determination may not be
used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an
effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands at the project area, which is not
sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters, including
wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a
timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps.
B. Approved Determination
❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit
requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act
(CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for
a period not to exceed five years from the date of this notification.
❑ There are waters, including wetlands on the above described project area/property subject to the permit requirements of Section
404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this
determination may be relied upon for a period not to exceed five years from the date of this notification.
❑ We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may not be
able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that
can be verified by the Corps.
❑ The waters, including wetlands on your project area/property have been delineated and the delineation has been verified by the
Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly
suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once
SAW-2022-01011
verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided
there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years.
❑ The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps
Regulatory Official identified below on DATE. Unless there is a change in the law or our published regulations, this
determination may be relied upon for a period not to exceed five years from the date of this notification.
❑X There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the
permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA).
You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their
requirements.
Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may
constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or
placement of structures, or work within navigable waters of the United States without a Department of the Army permit may
constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions
regarding this determination and/or the Corps regulatory program, please contact George Lyle Phillips III at (919) 588-9200 or
Geo rge.L.Phillips(&us ace.army.mil.
C. Basis For Determination: See the approved iurisdictional determination form dated 01/18/2023 and
the preliminary jurisdictional determination form dated 1/18/2023.
D. Remarks: N/A
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B.
above)
If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed
you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this
determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Mr. Philip A. Shannin
Administrative Appeal Review Officer
60 Forsyth Street SW, Floor M9
Atlanta, Georgia 30303-8803
AND
PHILIP.A. SHANNINgUSACE.ARMY.MIL
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by 3/17/2023.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.**
Corps Regulatory Official: 5wrge' : (e' P� /it
Date of Preliminary JD: 1/18/2023 Expiration Date of Preliminary JD: Not applicable
Date of Approved JD: 1/18/2023 Expiration Date of Approved JD: 01/17/2028
SAW-2022-01011
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
Copy furnished:
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
A lican;:Beacon Partners File Number: SAW-2022-01011 Date: 1/18/2023
Attached
See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission)
A
PROFFERED PERMIT (Standard Permit or Letter of permission)
B
PERMIT DENIAL
C
❑X
APPROVED JURISDICTIONAL DETERMINATION
D
❑X
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at or http://www.usace.army.mit/Missions/CivilWorks/RegulatoryProgramandPermits.asi)
or the Corps regulations at.33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
Nor -
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division
MR. PHILIP A. SHANNIN
Attn: George Lyle Phillips III
ADMINISTRATIVE APPEAL REVIEW OFFICER
Raleigh Regulatory Office
CESAD-PDS-O
U.S Army Corps of Engineers
60 FORSYTH STREET SOUTHWEST, FLOOR M9
3331 Heritage Trade Drive, Suite 105
ATLANTA, GEORGIA 30303-8803
Wake Forest, North Carolina 27587
PHONE: (404) 562-5136; FAX (404) 562-5138
EMAIL: PHILIP.A.SHANNIN(aUSACE.ARMY.MIL
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day
notice of any site investigation, and will have the opportunit to participate in all site investi ations.
Date:
Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: George Lyle Phillips III, 69 Darlington Avenue, Wilmington, North
Carolina 28403
For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative
Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
APPROVED JURISDICTIONAL DETERMINATION FORM
U.S. Army Corps of Engineers
This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook.
SECTION L• BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD): 1/18/2023
B. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Farmwell Road / Raleigh / Wake County, SAW-2022-01011
C. PROJECT LOCATION AND BACKGROUND INFORMATION: The project site is north of Farmwell Road and Coffey Street, west of
Charvoz Circle, and east of Old Milburnie Road in Raleigh, in Wake County, North Carolina. The preliminary jurisdictional determination evaluation
area is shown as the red outlined "PJD Review Area" depicted on the attached "Aquatic Resource Sketch Map" exhibit. The approved jurisdictional
determination evaluation area is shown as the yellow outlined "AJD Review Area" depicted on the attached "Aquatic Resource Sketch Map" exhibit.
State: NC County/parish/borough: Wake City: Raleigh
Center coordinates of site (lat/long in degree decimal format): Lat. 35.796899 , Long.-78.528120
Universal Transverse Mercator. NAD 83
Name of nearest waterbody: UT to Neuse River
Name of nearest Traditional Navigable Water (TNW) into which the aquatic resource flows: Neuse River
Name of watershed or Hydrologic Unit Code (HUC): 03020201
® Check if map/diagram of review area and/or potential jurisdictional areas is/are available upon request.
❑ Check if other sites (e.g., offsite mitigation sites, disposal sites, etc...) are associated with this action and are recorded on a different JD form:
D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
❑ Office (Desk) Determination. Date:
® Field Determination. Date(s): 10/06/2022
SECTION II: SUMMARY OF FINDINGS
A. RHA SECTION 10 DETERMINATION OF JURISDICTION.
There are no "navigable waters of the U.S." within Rivers and Harbors Act (RHA) jurisdiction (as defined by 33 CFR part 329) in the review area.
[Required]
❑ Waters subject to the ebb and flow of the tide.
❑ Waters are presently used, or have been used in the past, or may be susceptible for use to transport interstate or foreign commerce. Explain:
B. CWA SECTION 404 DETERMINATION OF JURISDICTION.
There are not "waters of the U.S." within Clean Water Act (CWA) jurisdiction (as defined by 33 CFR part 328) in the review area. [Required]
1. Waters of the U.S.
a. Indicate presence of waters of U.S. in review area (check all that apply):'
❑TNW s, including territorial seas
❑ Wetlands adjacent to TNWs
El Relatively permanent waters2 (RPWs) that flow directly or indirectly into TNWs
❑Non-RPWs that flow directly or indirectly into TNWs
❑ Wetlands directly abutting RPWs that flow directly or indirectly into TNWs
❑ Wetlands adjacent to but not directly abutting RPWs that flow directly or indirectly into TNWs
❑ Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs
❑ Impoundments of jurisdictional waters
❑ Isolated (interstate or intrastate) waters, including isolated wetlands
b. Identify (estimate) size of waters of the U.S. in the review area:
Non -wetland waters: linear feet, wide, and/or acres.
Wetlands: acres.
1 Boxes checked below shall be supported by completing the appropriate sections in Section III below.
2 For purposes of this form, an RPW is defined as a tributary that is not a TNW and that typically flows year-round or has continuous flow at least "seasonally" (e.g.,
typically 3 months).
Page 1 of 8 Form Version 10 June 2020
c. Limits (boundaries) of jurisdiction based on: Not applicable.
Elevation of established OHWM (if known):
2. Non -regulated waters/wetlands (check if applicable):'
❑X Potentially jurisdictional waters and/or wetlands were assessed within the review area and determined to be not jurisdictional. Explain:
Based on the Corps site visit on October 6, 2022, the feature labeled "Pond 2" within the yellow outlined "AJD Review Area" has
an ordinary high water mark. However, based on the Corps site visit, this feature was constructed entirely in uplands. There are no
features with ordinary high water marks or hydric soils above "Pond 2" which drain into "Pond 2". "Pond 2" appears to be shallow
throughout and is approximately 20 feet in elevation above the groundwater table below the dam at WL 2200. Additionally, staining
from changes in water levels between rain events were visible in the field providing further evidence that "Pond 2" was constructed
in uplands. As such, per Federal Register pg. 41218, Vol 51, No. 219, 11/13/1986, the "Pond 2" constructed in uplands is not
considered waters of the US.
SECTION III: CWA ANALYSIS
t7 TNWs AND WETLANDS ADJACENT TO TNWs
The agencies will assert jurisdiction over TNWs and wetlands adjacent to TNWs. If the aquatic resource is a TNW, complete Section
I LAA and Section IILDA. only; if the aquatic resource is a wetland adjacent to a TNW, complete Sections I LAA and 2 and Section
I LDA.; otherwise, see Section HLB below.
1. TNW
Identify TNW:
Summarize rationale supporting determination:
2. Wetlandadjacent to TNW
Summarize rationale supporting conclusion that wetland is "adjacent'
B. CHARACTERISTICS OF TRIBUTARY (THAT IS NOT A TNW) AND ITS ADJACENT WETLANDS (IF ANY):
This section summarizes information regarding characteristics of the tributary and its adjacent wetlands, if any, and it helps determine
whether or not the standards for jurisdiction established under Rapanos have been met.
The agencies will assert jurisdiction over non -navigable tributaries of TNWs where the tributaries are "relatively permanent waters"
(RPWs), i.e. tributaries that typically flow year-round or have continuous flow at least seasonally (e.g., typically 3 months). A wetland
that directly abuts an RPW is also jurisdictional. If the aquatic resource is not a TNW, but has year-round (perennial) flow, skip to
Section I LD.2. If the aquatic resource is a wetland directly abutting a tributary with perennial flow, skip to Section IILDA.
A wetland that is adjacent to but that does not directly abut an RPW requires a significant nexus evaluation. Corps districts and EPA
regions will include in the record any available information that documents the existence of a significant nexus between a relatively
permanent tributary that is not perennial (and its adjacent wetlands if any) and a traditional navigable water, even though a significant
nexus finding is not required as a matter of law.
If the waterbody' is not an RPW, or a wetland directly abutting an RPW, a JD will require additional data to determine if the
waterbody has a significant nexus with a TNW. If the tributary has adjacent wetlands, the significant nexus evaluation must consider
the tributary in combination with all of its adjacent wetlands. This significant nexus evaluation that combines, for analytical purposes,
the tributary and all of its adjacent wetlands is used whether the review area identified in the JD request is the tributary, or its adjacent
wetlands, or both. If the JD covers a tributary with adjacent wetlands, complete Section HLBA for the tributary, Section HLB.2 for any
onsite wetlands, and Section HLB.3 for all wetlands adjacent to that tributary, both onsite and offsite. The determination whether a
significant nexus exists is determined in Section I LC below.
1. Characteristics of non-TNWs that flow directly or indirectly into TNW
(i) General Area Conditions:
Watershed size: Choose an item.
Drainage area: Choose an item.
Average annual rainfall: inches
Average annual snowfall: inches
(ii) Physical Characteristics:
(a) Relationship with TNW:
s Supporting documentation is presented in Section III.F.
4Note that the Instructional Guidebook contains additional information regarding swales, ditches, washes, and erosional features generally and in the and West.
Page 2 of 8 Form Version 10 June 2020
❑ Tributary flows directly into TNW.
❑ Tributary flows through Choose an item. tributaries before entering TNW.
Project waters are Choose an item. river miles from TNW.
Project waters are Choose an item. river miles from RPW.
Project waters are Choose an item. aerial (straight) miles from TNW.
Project waters are Choose an item. aerial (straight) miles from RPW.
Project waters cross or serve as state boundaries. Explain:
Identify flow route to TNWS:
Tributary stream order, if known:
(b) General Tributary Characteristics (check all that apply):
Tributary is: ❑Natural
❑ Artificial (man-made). Explain:
❑ Manipulated (man -altered). Explain:
Tributary properties with respect to top of bank (estimate):
Average width: feet
Average depth: feet
Average side slopes: Choose an item..
Primary tributary substrate composition (check all that apply):
❑ Silts ❑ Sands ❑ Concrete
❑ Cobbles ❑ Gravel ❑ Muck
❑ Bedrock ❑ Vegetation. Type/% cover -
El Other. Explain:
Tributarycondition/stability [e.g., highly eroding, sloughing banks]. Explain:
Presence of run/riffle/pool complexes. Explain:
Tributary geometry: Choose an item.
Tributary gradient (approximate average slope): %
(c) Flow:
Tributary provides for. Choose an item.
Estimate average number of flow events in review area/year. Choose an item.
Describe flow regime:
Other information on duration and volume:
Surface flow is: Choose an item.. Characteristics:
Subsurface flow: Choose an item.. Explain findings:
❑ Dye (or other) test performed:
Tributary has (check all that apply):
El Bed and banks
❑ OHWM'(check all indicators that apply):
❑ clear, natural line impressed on the bank ❑ the presence of litter and debris
❑ changes in the character of soil ❑ destruction of terrestrial vegetation
❑ shelving ❑ the presence of wrack line
❑ vegetation matted down, bent, or absent ❑ sediment sorting
❑ leaf litter disturbed or washed away
❑ sediment deposition
❑ water staining
❑ scour
❑ multiple observed or predicted flow events
❑X abrupt change m plant community
'Flow route can be described by identifying, e.g., tributary a, which flows through the review area, to flow into tributary b, which then flows into TNW.
'A natural or man-made discontinuity in the OHWM does not necessarily sever jurisdiction (e.g., where the stream temporarily flows underground, or where the
OHWM has been removed by development or agricultural practices). Where there is a break in the OHWM that is unrelated to the waterbody's flow regime (e.g., flow
over a rock outcrop or through a culvert), the agencies will look for indicators of flow above and below the break.
Page 3 of 8 Form Version 10 June 2020
'Ibid.
❑ other (list):
El Discontinuous OHWNL' Explain:
If factors other than the OHWM were used to determine lateral extent of CWA jurisdiction (check all that apply):
❑ High Tide Line indicated by: ❑ Mean High Water Mark indicated by:
❑ oil or scum line along shore objects ❑ survey to available datum;
❑ fine shell or debris deposits (foreshore) ❑ physical markings;
❑ physical markings/characteristics ❑ vegetation lines/changes in vegetation types.
El tidal gauges
❑ other (list):
(iii) Chemical Characteristics:
Characterize tributary (e.g., water color is clear, discolored, oily film; water quality; general watershed characteristics, etc.). Explain:
Identify specific pollutants, if known:
(iv) Biological Characteristics. Channel supports (check all that apply):
El Riparian corridor. Characteristics (type, average width):
❑ Wetland fringe. Characteristics:
❑ Habitat for -
El Federally Listed species. Explain findings:
❑Fish/spawn areas. Explain findings:
❑ Other environmentally -sensitive species. Explain findings:
❑Aquatic/wildlife diversity. Explain findings:
2. Characteristics of wetlands adjacent to non-TNW that flow directly or indirectly into TNW
(i) Physical Characteristics:
(a) General Wetland Characteristics:
Properties:
Wetland size: acres
Wetland type. Explain:
Wetland quality. Explain:
Project wetlands cross or serve as state boundaries. Explain:
(b) General Flow Relationship with Non-TNW:
Flow is: Choose an item. Explain:
Surface flow is: Choose an item.
Characteristics:
Subsurface flow: Choose an item.. Explain findings:
❑ Dye (or other) test performed:
(c) Wetland Adjacency Determination with Non-TNW:
❑ Directly abutting
El Not directly abutting
❑ Discrete wetland hydrologic connection. Explain:
El Ecological connection. Explain:
❑ Separated by berm/barrier. Explain:
(d) Proximity (Relationship) to TNW
Project wetlands are Choose an item. river miles from TNW.
Project waters are Choose an item. aerial (straight) miles from TNW.
Flow is from: Choose an item..
Estimate approximate location of wetland as within the Choose an item. floodplain.
Page 4 of 8 Form Version 10 June 2020
(ii) Chemical Characteristics:
Characterize wetland system (e.g., water color is clear, brown, oil film on surface; water quality; general watershed characteristics;
etc.). Explain:
Identify specific pollutants, if known:
(iii) Biological Characteristics. Wetland supports (check all that apply):
❑Riparian buffer. Characteristics (type, average width):
❑ Vegetation type/percent cover. Explain:
❑ Habitat for -
El Federally Listed species. Explain findings:
❑Fish/spawn areas. Explain findings:
❑ Other environmentally -sensitive species. Explain findings:
❑Aquatic/wildlife diversity. Explain findings:
3. Characteristics of all wetlands adjacent to the tributary (if any)
All wetland(s) being considered in the cumulative analysis: Choose an item.
Approximately acres in total are being considered in the cumulative analysis.
For each wetland, specify the following:
Directly abuts? (Y/N) Size (in acres) Directly abuts? (Y/N) Size (in acres)
Summarize overall biological, chemical and physical functions being performed:
C. SIGNIFICANT NEXUS DETERDIINATION
A significant nexus analysis will assess the flow characteristics and functions of the tributary itself and the functions performed by any
wetlands adjacent to the tributary to determine if they significantly affect the chemical, physical, and biological integrity of a TNW.
For each of the following situations, a significant nexus exists if the tributary, in combination with all of its adjacent wetlands, has more
than a speculative or insubstantial effect on the chemical, physical and/or biological integrity of a TNW. Considerations when
evaluating significant nexus include, but are not limited to the volume, duration, and frequency of the flow of water in the tributary and
its proximity to a TNW, and the functions performed by the tributary and all its adjacent wetlands. It is not appropriate to determine
significant nexus based solely on any specific threshold of distance (e.g. between a tributary and its adjacent wetland or between a
tributary and the TNW). Similarly, the fact an adjacent wetland lies within or outside of a floodplain is not solely determinative of
significant nexus.
Draw connections between the features documented and the effects on the TNW, as identified in the Rapanos Guidance and discussed in
the Instructional Guidebook. Factors to consider include, for example:
• Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to carry pollutants or flood waters to TNWs, or to
reduce the amount of pollutants or flood waters reaching a TNW?
• Does the tributary, in combination with its adjacent wetlands (if any), provide habitat and lifecycle support functions for fish and other
species, such as feeding, nesting, spawning, or rearing young for species that are present in the TNW?
• Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to transfer nutrients and organic carbon that
support downstream food webs?
• Does the tributary, in combination with its adjacent wetlands (if any), have other relationships to the physical, chemical, or biological
integrity of the TNW?
Note: the above list of considerations is not inclusive and other functions observed or known to occur should be documented below:
Significant nexus findings for non-RPW that has no adjacent wetlands and flows directly or indirectly into TNWs. Explain findings
of presence or absence of significant nexus below, based on the tributary itself, then go to Section IILD:
2. Significant nexus findings for non-RPW and its adjacent wetlands, where the non-RPW flows directly or indirectly into TNWs.
Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands,
then go to Section IILD:
Significant nexus findings for wetlands adjacent to an RPW but that do not directly abut the RPW. Explain findings of presence or
absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section IILD:
Page 5 of 8 Form Version 10 June 2020
D. DETERDIINATIONS OF JURISDICTIONAL FINDINGS. THE SUBJECT WATERS/WETLANDS ARE (CHECK ALL THAT
APPLY):
1. TNWs and Adjacent Wetlands. Check all that apply and provide size estimates in review area:
❑ TNWs: linear feet, wide, Or acres.
❑ Wetlands adjacent to TNWs: acres.
2. RPWs that flow directly or indirectly into TNWs.
❑ Tributaries of TNWs where tributaries typically flow year-round are jurisdictional. Provide data and rationale indicating that tributary is
perennial:
❑ Tributaries of TNW where tributaries have continuous flow "seasonally" (e.g., typically three months each year)are jurisdictional. Data
supporting this conclusion is provided at Section IILB. Provide rationale indicating that tributary flows seasonally:
Provide estimates for jurisdictional waters in the review area (check all that apply):
❑ Tributary waters: linear feet wide.
❑ Other non -wetland waters: acres.
Identify type(s) of waters:
Non-RPWs' that flow directly or indirectly into TNWs.
❑ Waterbody that is not a TNW or an RPW, but flows directly or indirectly into a TNW, and it has a significant nexus with a TNW is
jurisdictional. Data supporting this conclusion is provided at Section IILC.
Provide estimates for jurisdictional waters within the review area (check all that apply):
❑ Tributary waters: linear feet, wide.
❑ Other non -wetland waters: acres.
Identify type(s) of waters:
4. Wetlands directly abutting an RPW that flow directly or indirectly into TNWs.
❑ Wetlands directly abut RPW and thus are jurisdictional as adjacent wetlands.
❑ Wetlands directly abutting an RPW where tributaries typically flow year-round. Provide data and rationale indicating that tributary
is perennial in Section IILD.2, above. Provide rationale indicating that wetland is directly abutting an RPW:
❑ Wetlands directly abutting an RPW where tributaries typically flow "seasonally." Provide data indicating that tributary is seasonal
in Section IILB and rationale in Section III.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW:
Provide acreage estimates for jurisdictional wetlands in the review area: acres.
5. Wetlands adjacent to but not directly abutting an RPW that flow directly or indirectly into TNWs.
❑ Wetlands that do not directly abut an RPW, but when considered in combination with the tributary to which they are adjacent and with
similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisidictional. Data supporting this conclusion is
provided at Section IILC.
Provide acreage estimates for jurisdictional wetlands in the review area: acres.
6. Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs.
❑ Wetlands adjacent to such waters, and have when considered in combination with the tributary to which they are adjacent and with
similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisdictional. Data supporting this conclusion is
provided at Section IILC.
Provide estimates for jurisdictional wetlands in the review area: acres.
7. Impoundments of jurisdictional waters.'
As a general rule, the impoundment of a jurisdictional tributary remains jurisdictional.
El Demonstrate that impoundment was created from "waters of the U.S.," or
❑ Demonstrate that water meets the criteria for one of the categories presented above (1-6), or
❑ Demonstrate that water is isolated with a nexus to commerce (see E below).
'See Footnote # 3.
'To complete the analysis refer to the key in Section III.D.6 of the Instructional Guidebook.
Page 6 of 8 Form Version 10 June 2020
E. ISOLATED [INTERSTATE OR INTRA-STATE] WATERS, INCLUDING ISOLATED WETLANDS, THE USE, DEGRADATION
OR DESTRUCTION OF WHICH COULD AFFECT INTERSTATE COMMERCE, INCLUDING ANY SUCH WATERS (CHECK
ALL THAT APPLY):'"
❑ which are or could be used by interstate or foreign travelers for recreational or other purposes.
❑ from which fish or shellfish are or could be taken and sold in interstate or foreign commerce.
❑ which are or could be used for industrial purposes by industries in interstate commerce.
❑ Interstate isolated waters. Explain:
❑ Other factors. Explain:
Identify water body and summarize rationale supporting determination:
Provide estimates for jurisdictional waters in the review area (check all that apply):
❑ Tributary waters: linear feet, wide.
❑ Other non -wetland waters: acres.
Identify type(s) of waters:
❑ Wetlands: acres.
NON -JURISDICTIONAL WATERS, INCLUDING WETLANDS (CHECK ALL THAT APPLY):
❑ If potential wetlands were assessed within the review area, these areas did not meet the criteria in the 1987 Corps of Engineers Wetland
Delineation Manual and/or appropriate Regional Supplements.
❑ Review area included isolated waters with no substantial nexus to interstate (or foreign) commerce.
❑ Prior to the Jan 2001 Supreme Court decision in "SWANCC," the review area would have been regulated based solely on the "Migratory
Bird Rule" (MBR).
❑ Waters do not meet the "Significant Nexus" standard, where such a finding is required for jurisdiction. Explain:
❑X Other: (explain, if not covered above): Based on the Corps site visit on October 6, 2022, the feature labeled "Pond 2" within the yellow
outlined "AJD Review Area" has an ordinary high watermark. However, based on the Corps site visit, this feature was constructed
entirely in uplands. There are no features with ordinary high water marks or hydric soils above "Pond 2" which drain into "Pond 2".
"Pond 2" appears to be shallow throughout and is approximately 20 feet in elevation above the groundwater table below the dam at WL
2200. Additionally, staining from changes in water levels between rain events were visible in the field providing further evidence that
"Pond 2" was constructed in uplands. As such, per Federal Register pg. 41218, Vol 51, No. 219, 11/13/1986, the "Pond 2" constructed in
uplands is not considered waters of the US.
Provide acreage estimates for non -jurisdictional waters in the review area, where the sole potential basis of jurisdiction is the MBR factors (i.e.,
presence of migratory birds, presence of endangered species, use of water for irrigated agriculture), using best professional judgment (check all
that apply):
❑Non -wetland waters (i.e., rivers, streams):Iinear feet, wide.
❑Lakes/ponds: acres.
❑ Other non -wetland waters: acres. List type of aquatic resource:
❑ Wetlands: acres.
Provide acreage estimates for non -jurisdictional waters in the review area that do not meet the "Significant Nexus" standard, where such a
finding is required for jurisdiction (check all that apply):
❑Non -wetland waters (i.e., rivers, streams):Iinear feet, wide.
❑Lakes/ponds: acres.
❑ Other non -wetland waters: acres. List type of aquatic resource:
❑ Wetlands: acres.
SECTION IV: DATA SOURCES.
A. SUPPORTING DATA. Data reviewed for JD (check all that apply - checked items shall be included in case file and, where checked and
requested, appropriately reference sources below):
1Vrior to asserting or declining CWA jurisdiction based solely on this category, Corps Districts will elevate the action to Corps and EPA HQ for review
consistent with the process described in the Corps/EPA Memorandum Regarding CWA Act Jurisdiction Following Rapanos.
Page 7 of 8 Form Version 10 June 2020
❑X Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: Figure 1— Figure 15
❑X Data sheets prepared/submitted by or on behalf of the applicant/consultant.
D Office concurs with data sheets/delineation report.
❑ Office does not concur with data sheets/delineation report.
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑X U.S. Geological Survey Hydrologic Atlas:
❑USGS NHD data.
❑X USGS 8 and 12 digit HUC maps.
❑X U.S. Geological Survey map(s). Cite scale & quad name: USGS Topographic Map / Raleigh East / 1" = 24,000' / Figure 5
❑X USDA Natural Resources Conservation Service Soil Survey. Citation: NRCS Soil Map / Wake County / Figure 13
® National wetlands inventory map(s). Cite name: National Wetland Inventory / Figure 11
❑ State/Local wetland inventory map(s):
❑X FEMA/FIRM maps: Figure 8
❑ 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929)
❑X Photographs: ❑X Aerial (Name & Date): Aerial Imagery / Figure 7
Or ❑X Other (Name & Date): Site Photos / July 20, 2021, and April 04, 2022
❑ Previous determination(s). File no. and date of response letter:
❑ Applicable/supporting case law:
❑ Applicable/supporting scientific literature:
❑ Other information (please specify):
B. ADDITIONAL COMMENTS TO SUPPORT JD:
Page 8 of 8 Form Version 10 June 2020
PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PJD: 1/18/2023
B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Beacon Partners, 500 East Morehead Street,
Suite 200, Charlotte, North Carolina 28202
C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Farmwell Road / Raleigh /
Wake County, SAW-2022-01011
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project site is north of Farmwell
Road and Coffey Street, west of Charvoz Circle, and east of Old Milburnie Road in Raleigh, in Wake
County, North Carolina. The preliminary jurisdictional determination evaluation area is shown as the red
outlined "PJD Review Area" depicted on the attached "Aquatic Resource Sketch Map" exhibit. The approved
jurisdictional determination evaluation area is shown as the yellow outlined "AJD Review Area" depicted on
the attached "Aquatic Resource Sketch Map" exhibit.
(USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES
AND/OR AQUATIC RESOURCES AT DIFFERENT SITES)
State: NC County: Wake City: Raleigh
Center coordinates of site (lat/long in degree decimal format): Latitude: 35.796899 Longitude:-78.528120
Universal Transverse Mercator:
NAD 83
Name of nearest waterbody: UT to Neuse River
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
❑ Office (Desk) Determination. Date:
® Field Determination. Date(s): 10/06/2022
TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO
REGULATORY JURISDICTION
Site Number
Latitude
(decimal
degrees)
Longitude
(decimal
degrees)
Estimated
amount of
aquatic
resources in
review area
(acreage and
linear feet, if
applicable
Type of aquatic
resources (i.e.,
wetland vs.
non -wetland
waters)
Geographic authority to
which the aquatic
resource "may be"
subject (i.e., Section 404
or Section 10/404)
WL 1000
35.801269
-78.527566
0.802
Wetland
Section 404
WL 1100
35.799807
-78.526783
0.033
Wetland
Section 404
WL 2000
35.801206
-78.532098
0.332
Wetland
Section 404
WL 2100
35.800338
-78.531345
0.006
Wetland
Section 404
WL 2200
35.799805
-78.530658
0.029
Wetland
Section 404
WL 3000
35.801588
-78.531489
0.006
Wetland
Section 404
CH 100
35.800987
-78.527958
292
Non -wetland
Section 404
CH 200
35.800458
-78.531605
241
Non -wetland
Section 404
CH 300
35.801360
-78.532245
143
Non -wetland
Section 404
Pond 1
35.800521
-78.527212
1.331
Non -wetland
Section 404
1. The Corps of Engineers believes that there may be jurisdictional aquatic resources in the
review area, and the requestor of this PJD is hereby advised of his or her option to request
and obtain an approved JD (AJD) for that review area based on an informed decision after
having discussed the various types of JDs and their characteristics and circumstances when
they may be appropriate.
2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide
General Permit (NWP) or other general permit verification requiring "pre- construction
notification" (PCN), or requests verification for a non -reporting NWP or other general
permit, and the permit applicant has not requested an AID for the activity, the permit
applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit
authorization based on a PJD, which does not make an official determination of
jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before
accepting the terms and conditions of the permit authorization, and that basing a permit
authorization on an AJD could possibly result in less compensatory mitigation being
required or different special conditions; (3) the applicant has the right to request an
individual permit rather than accepting the terms and conditions of the NWP or other
general permit authorization; (4) the applicant can accept a permit authorization and
thereby agree to comply with all the terms and conditions of that permit, including
whatever mitigation requirements the Corps has determined to be necessary; (5)
undertaking any activity in reliance upon the subject permit authorization without
requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6)
accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking
any activity in reliance on any form of Corps permit authorization based on a PJD
constitutes agreement that all aquatic resources in the review area affected in any way by
that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction
in any administrative or judicial compliance or enforcement action, or in any administrative
appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or
a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered
individual permit (and all terms and conditions contained therein), or individual permit
denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an
administrative appeal, it becomes appropriate to make an official determination whether
geographic jurisdiction exists over aquatic resources in the review area, or to provide an
official delineation of jurisdictional aquatic resources in the review area, the Corps will
provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that
there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S.
on the subject review area, and identifies all aquatic features in the review area that could
be affected by the proposed activity, based on the following information:
SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items are included in the administrative
record and are appropriately cited:
® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Beacon
Partners
Map: Figure 1— Figure 15
®Data sheets prepared/submitted by or on behalf of the PJD requestor. Datasheets:
® Office concurs with data sheets/delineation report.
❑ Office does not concur with data sheets/delineation report. Rationale:
❑Data sheets prepared by the Corps:
❑Corps navigable waters' study:
❑ U. S. Geological Survey Hydrologic Atlas:
❑USGS NHD data:
❑USGS 8 and 12 digit HUC maps:
® U.S. Geological Survey map(s). Cite scale & quad name: USGS Topographic Map / Raleigh East / V = 24,000'
®Natural Resources Conservation Service Soil Survey. Citation: MRCS Soil Map / Wake County
® National wetlands inventory map(s). Cite name: National Wetland Inventory / Figure 11
❑ State/local wetland inventory map(s):
® FEMA/FIRM maps: Figure 8
❑ 100-year Floodplain Elevation is:
(National Geodetic Vertical Datum of 1929)
® Photographs: ® Aerial (Name & Date): Aerial Imagery / Figure 7
or ® Other (Name & Date): Site Photos / July 20, 2021, and April 04, 2022
❑Previous determination(s). File no. and date of response letter:
❑ Other information (please specify):
IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corns
and should not be relied upon for later iurisdictional determinations.
�et,rye- LY(6- Phi /it
Signature and date of Regulatory
staff member completing PJD
1/18/2023
Signature and date of person requesting PJD
(REQUIRED, unless obtaining the signature is
impracticable)1
1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established
time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action.
C
O
Q
N
N
Q
=
U
Z
N
01
fu
a
O
ru
N
00
LQ
00
fu
fu
C
0
4
Q
o
ai
N
Q*�
00
L
N
L
a
LL
LL
, I
4
L
u
M
b3
O
E
(6
Z
m
Ln
E
0
OV
m
al
}
ru
C
V
i+
ru
U
..
O
a
-j
LL
U
L
LL
cD
c�
P
cq
d
lt�
0
0
0
0
f,q
\
o ;
<_
\%
<
$g
_�D
$
o
M CD
ƒ/ )
E\
o
*,
±J
\\
/�
</
.o
/N U�
o
<
o
E/ /
I
0
k
o
CL
\5
�
\ƒ
Ea
�
\/
�
</
�
�
U
�
�
O
Ln
�
.0
4-J
�
0-
�
\
w
ƒC:)
=<
\
t
75
C'�
[2
CD
�
-
a)
E
2
k
2
2
\
a)
Ic
a
c
2
an
\
\
)
/
2
_
�
S $
\
%70
§
/
=
a
£
t
$
U /
$
.
2 k
C a d
§ E
E
/ 2
3
IE
�a
� 0�
k
q
�
�
¢
/
3
§
c
#
/
0
21
/
o
/
Ln
00
k
Lrj
n
06
�
/
\
«
kai
�
�
\
/
UM—
e
/
7
Ln
0
§
fu u
al
ru
=
u
.
%
..
ƒ
/
0-\
f
�
\
�
/
�
11
No
0
0
N
O
L(1
—4
O
O
O
Ln
O
3/.' L
'V
�r
l
U
U
L
Z3
O
Ln
U
a-+
(6
N
rl-
0
N
a
6
o
fu
L
fu
\
�'�
n
C
r
rn
CU Q- (n
cn
0[
N G
Q
U Z
O
4.)
c
0
O
can
N
0
=
U
Z
21
N
01
fu
2
0
O
fuLO
N
00
06
fu
fa
C
4
Q
,
O
ai
aj
Q,
L
N
L
a
00
UM-
�
, I
4
L
fuM
M
O
E
m
Z
V
m
Ln
0
i+
U
00
fu
al
..
}
ru
0
a
-j
LL
U
L
LL
N
11
No
0
ca
R
Mfo
0
2\�
�50
Ea)
2 t
o
2 k
� E
_ <
)05
E\
2
=<
�o f
=
c�
/
-
c n
a n
R
\
2 I
oc)
5�
0
CD
4
z
<
E
E\
I
T
7 CD
o
G
< \
%
2
0
CL
�
�
�
-
U
4-J
�
�
�
U
\
�
O
\
�
.0
fu
�
�
�
o
\<
\ 00
�
\�
§
2
/
\
ƒ
2
<
�\
%
'E
?
<
= 3
�/
\
Aj
CD
2
�
�
�
5
t \
/
�
�
CCU
2
§ E
U l
u
o[
k
��
3
En
/
0
0
/
o
/
00
k
/
Ln
06
�
/
\
«
ai
E
�
k
�
\
'o
/
e
/
7
Ln
0
0
fu u
al
ru
=
u
.
/
%
\
..
ƒ
/
0
f
11
No