Loading...
HomeMy WebLinkAboutNCC224216_ESC Approval Submitted_20230119ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality August 18, 2022 LETTER OF APPROVAL WITH MODIFICATIONS City of Raleigh ATTN: Scott Payne, Interim Director, Parks, Recreation, and Cultural Resources 222 West Hargett Street Raleigh, NC 27601 RE: Project Name: Raleigh Blvd Trail Realignment and Relocation Project Acres Approved: 7.21 Acres Project ID: WAKE-2023-005 County: Wake City: Raleigh Address: 1000 Crabtree Blvd River Basin: Neuse Stream Classification: Other Submitted By: Melissa Ruiz, Stantec Consulting Services Date Received by LQS: July 20, 2022 Plan Type: New/Recreation Dear Mr. Payne, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central D QI) North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609 oemnme aeWim�+e�ui�� /`� 919,791,4200 Letter of Approval City of Raleigh August 18, 2022 Page 2 of 4 office. If the owner/operator of this project changes in the future, the new responsible parry must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this proj ect. Your cooperation is appreciated. Letter of Approval City of Raleigh August 18, 2022 Page 3 of 4 Sincerely, Ivana Barham, PE Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Regional Office file Melissa Ruiz, Stantec Consulting Services [Electronic] Letter of Approval City of Raleigh August 18, 2022 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Raleigh Blvd Trail Realignment and Relocation Project Project ID: WAKE-2023-005 County: Wake Provide stockpile/staging areas at least 50 feet away from storm drain inlets, temporary diversions, channels, and surface water bodies. The stockpile area provided is within 50ft. of surface water body. Identify the location of these areas and structures on the plan sheets. Provide adequate measures around the stockpile areas. A revised Financial Responsibility/Ownership Form and additional fee may be necessary if the total disturbed acreage exceeds the original submittal. (GS113A-57(3), 15A NCAC 04B .0105, 15A NCAC 04B .0106(5), GS113A-57(4), NCGO1 Section ILF) 2. Provide two copies of the plan set (one full-size and one half-size), showing the modifications required for approval. To facilitate DEMLR review, bubble, highlight, or otherwise identify the changes to your resubmittal. Provide one copy of additional items (such as design calculations). Provide a cover letter referencing the project name, project ID, and purpose for submittal. (G.S. 113A-57(4)) Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities