HomeMy WebLinkAbout#5145 11-final
INSPECTION REPORT ROUTING SHEET
To be attached to all inspection reports in-house only.
Laboratory Cert. #: #5145
Laboratory Name: Progress Energy Carolinas – HEEC Outfall 007
Inspection Type: Field Maintenance
Inspector Name(s): Jeffrey R. Adams
Inspection Date: February 22, 2011
Date Report Completed: March 04, 2011
Date Forwarded to Reviewer: March 04, 2011
Reviewed by: Jason Smith
Date Review Completed: March 14, 2011
Cover Letter to use: Insp. Initial X Insp. Reg. Insp. No Finding Insp. CP ___ Corrected
Unit Supervisor: Dana Satterwhite
Date Received: March 15, 2011
Date Forwarded to Alberta: March 16, 2011
Date Mailed: March 16, 2011
_____________________________________________________________________
On-Site Inspection Report
LABORATORY NAME: Progress Energy Carolinas – HEEC Outfall 007
NPDES PERMIT #: NC0039586
ADDRESS: 3932 New Hill-Holleman Road
New Hill, NC 27562
CERTIFICATE #: 5145
DATE OF INSPECTION: February 22, 2011
TYPE OF INSPECTION: Field Maintenance
AUDITOR(S): Jeffrey R. Adams
LOCAL PERSON(S) CONTACTED: Steve Cahoon and William Lohmeyer
I. INTRODUCTION:
This laboratory was inspected to verify its compliance with the requirements of 15A NCAC
2H .0800 for the analysis of environmental samples.
II. GENERAL COMMENTS:
The laboratory was clean and well organized. The facility has all the equipment necessary
to perform the analyses. Records were maintained and well organized, however, some
quality control procedures need to be implemented. Performance testing samples have
been analyzed for all certified parameters for the 2010 proficiency testing calendar year
and the graded results were 100% acceptable.
The laboratory was given a packet containing North Carolina Laboratory Certification
quality control requirements and policy changes during the inspection.
Finding A is a new policy that has been implemented by our program since the last
inspection.
III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS:
Traceability
A. Finding: The laboratory needs to increase the documentation of materials and
reagents used or made in the laboratory.
Requirement: All chemicals, reagents, standards and consumables used by the
laboratory must have the following information documented: Date received, Date
Opened (in use), Vendor, Lot Number, and Expiration Date (where specified). A
system (e.g., traceable identifiers) must be in place that links standard/reagent
Page 2
#5145 Progress Energy Carolinas – HEEC Outfall 007
preparation information to analytical batches in which the solutions are used.
Documentation of solution preparation must include the analyst’s initials, date of
preparation, the volume or weight of standard(s) used, the solvent and final
volume of the solution. This information as well as the vendor and/or
manufacturer, lot number, and expiration date must be retained for primary
standards, chemicals, reagents, and materials used for a period of five years.
Consumable materials such as pH buffers, lots of pre-made standards and/or
media, solids and bacteria filters, etc. are included in this requirement. Ref:
Quality Assurance Policies for Field Laboratories.
Dissolved Oxygen – Standard Methods, 18th Edition, 4500 O G
Comment: The laboratory is not checking the Dissolved Oxygen (DO) temperature
sensor against a National Institute of Standards and Technology (NIST) or NIST
traceable thermometer annually. The Technical Assistance for Field Analysis of Dissolved
Oxygen states: The temperature sensor in the meter must be checked every 12 months
against an NIST certified or NIST traceable thermometer and the process documented
even if the instrument is not used for reporting temperature results. The temperature
correction (even if it is zero) must be posted on the meter as well as in hard copy format
(to be retained for 5 years). The laboratory submitted a copy on February 24, 2011 of
their temperature sensor checks. No further response is necessary for this finding.
Dissolved Oxygen – Standard Methods, 18th Edition, 4500 O G
pH – Standard Methods, 18th Edition, 4500 H+ B
Comment: The laboratory is not posting NIST temperature corrections on the DO and
pH meters. The Technical Assistance for Field Analysis of Dissolved Oxygen and
Technical Assistance for Field Analysis of pH documents state: The temperature
correction (even if it is zero) must be posted on the meter as well as in hard copy format
(to be retained for 5 years). The laboratory submitted notification on February 24, 2011
that the NIST sensor check has been performed and the lab has posted the corrections
(even if zero) on the DO and pH meters. No further response is necessary for this
finding.
Comment: You may have trouble getting your NIST thermometer re-certified. As part of
an initiative to reduce the use of mercury in products, EPA is working with stakeholders
to reduce the use of mercury-containing non-fever thermometers in industrial and
commercial settings. The National Institute of Standards and Technology (NIST), which
is working with EPA on this effort, announced on February 2, 2011 that it will no longer
calibrate mercury-in-glass thermometers for traceability purposes beginning on March 1,
2011. Other vendors may follow this lead. Additional information on the phase-out of
mercury-filled thermometers and selecting alternatives to mercury-filled thermometers
can be found on the following EPA website: http://www.epa.gov/hg/thermometer.htm.
pH – Standard Methods, 18th Edition, 4500 H+ B
B. Finding: The laboratory is not analyzing a post calibration check following
sample analysis.
Page 3
#5145 Progress Energy Carolinas – HEEC Outfall 007
Requirement: If compliance samples are analyzed throughout the day, a post
calibration check (e.g., 7 buffer) must be analyzed mid-day and at the end of the
run (i.e., roughly every 4 hours based on an eight hour day). Calibration checks
must be documented. Ref: Technical Assistance for Field Analysis of pH.
IV. PAPER TRAIL INVESTIGATION:
The paper trail consisted of comparing field testing records and contract lab reports to
Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water
Quality. Data were reviewed for Progress Energy HEEC Carolinas Outfall - 007 (NPDES
permit #NC0039586) for October, November, and December, 2010. No transcription
errors were detected. The facility appears to be doing a good job of accurately
transcribing data.
V. CONCLUSIONS:
Correcting the above-cited findings will help this lab to produce quality data and meet
certification requirements. The inspector would like to thank the staff for its assistance
during the inspection and data review process. Please respond to all findings.
Report prepared by: Jeffrey R. Adams Date: March 04, 2011
Report reviewed by: Jason Smith Date: March 14, 2011