Loading...
HomeMy WebLinkAboutNCC230140_Site Plan or Location Map_20230118cam r uffii icnt n / / AIL -r Est Le ccccrrglished for all dirt jrooc / 211 m� AL 'tr'n 14 //�rorking days o� 9, clenL-cr o s / / ,1, AL / � � / � � � ZOTL AIL AL ji,- c \ c r is shor lcr) II/;wii r-rl/Icl_ion =t i motion AIL p0 ti� m 0 WEST END 73'> -*<21 73 '>� General Erosion Control Notes 1. Only the areas shown shall be disturbed. 2. All disturbed areas shall be grassed and mulched as soon as possible and maintained until pemanent cover Is established. / AIL & & ,Ills � / / / / 3WL AL AIL AL, �IIL 3WL AIL AL \ ?pT K 1 / AIL 3YIL AL \ \ \ I 1 1 \ \ THIS PROJECT IS IN A HIGH -QUALITY WATER ZONE AND ALL REQUIREMENTS / ,•• "/ .. \ AL \ � LQT J \ I 1 � � � REGARDING SENSITIVE AREA / 1- �p I - - - WATERSHEDS SHOULD BE FOLLOWED D / ` \ \ 1� 1 I 11 \\ INCLUDING 7 DAY STABILIZATION. ENGINEERS V / I • AIL PLANNERS � � / / � � � 1 3YIL � AIL • f '� 3JIL� I \\� `\ ' � _- - _ _ _ \ � \ P SURVEYORS // �' AIL 4c-AAL IL�LAIL AL 1 \ \ \ \ MOORMAN,KIZER & REITZEL,INC. Vp I VICINITY MAP , (NOT TO SCALE) CONSTRUCTION SCHEDULE 1. Obtain all necessary permits and plan approvals. Erosion and Sediment Control (E&SC) permit and a Certificate of Coverage (COC) must be obtained before any land disturbing activities occur. A copy of the E&SC permit, the COC and a hard copy of the plan must be kept on site, preferably in a permits box, and accessible during inspection. 2. Install gravel construction entrances first, then silt fences, reinforced silt fence outlets and wattles. 3. Finish clearing and grubbing any necessary areas on the lots as they are started. 4. Begin lot grading and excavation activities 5. Begin or continue with house construction activities. 6. Finish all rough grading and house construction. 7. Install driveways, walks and patios. 8. Begin fine grading of lot areas 9. Final grassing, mulching and stabilizing of lot. In most cases this will involve the installation of sod on the lot. The silt fence will remain in place until the lot is sodded or grassing is stabilized and takes hold. 10. The contractor shall conduct self -inspections of the erosion and sedimentation control measures and complete the following combined self -inspection form found on the DEMLR website https:Hfiles.ne.gov/nedeg/Energya/o20Minerala/o20anda/o2OLanda/o2OResourees/Stormwater/NPDESa/o20 General%20Permits/DEMLR-CSW-Monitoring-Forms-Rev-August-8-2019.pdf. Twelve months of complete inspection forms shall be kept on site and available for inspection at all times. It is recommended a copy be kept in a permits box. (GS 113A-54.1 (e), 15A NCAC 0413.0131, NCGOI Part III Sections A and B) 11. Self -inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and within 24 hours of every rain event of greater than 1 inch. Any needed repairs shall be made immediately to maintain measures as designed. All ESC measures shall be maintained as specified in the construction details on this plan. A rain gauge shall be installed at the project site for monitoring. 12. Inspection and final acceptance letters. When the project is complete, the permittees shall contact DEMLR to close out the E&SC Plan. After DEMLR informs the permittee of the project close out, via inspection report, the permittee shall visit "deq.nc.gov/NCGO1" to submit an electronic Notice oftermination (e-NOT). A $100 annual general permit fee will be charged until the e-NOT has been filled out. DATE: PAGE: Silt Sock Wattle / Silt Sock/ Wattle NOTE: 3" F 3" 1. Other materials providing equivalent protection LOWZ' FLOW Area to be p g q Area to be Protected ... Protected against erosive velocities may be substituted for • use in silt socks or wattles. 12" Min. 2. Fill silt sock/wattle netting uniformly with compost 12" Min. 2" x 2" �� 2" x 2" to the desired length such that logs do not deform. Stakes Stakes 3. Silt sock/Wattle(s) should be installed parallel to SECTION and a minimum of 10 feet beyond the toe of a SECTION graded slope. Sift Sock/Wattle(s) located below flat areas should be located at the edge of the land disturbance. The ends of the silt sock/wattle(s) should be turned slightly upslope to F<O Max F<O May,. prevent runoff from going around the end of the 0 silt sock/wattle(s). 4. Oak or other durable hardwood stakes with a 2 inch x 2 inch cross section should be driven vertically plumb, through the center of the silt sock/waffle. Stakes should be placed at a maximum interval of 4 feet or a maximum interval Trench into of 8 feet if the sift sock/waffle is placed in a 4 inch Wood Mulch or Comp st ground 4" Min. trench. To 1/2 height of log 5. In the event staking is not possible (ie. when UNTRENCHED INSTALLATION ENTRENCHED INSTALLATION* sockstwaffles are used on pavement) heavy COrlCrete blocks Shall be Used behind the silt 'rH IS APPLICATION MAY NOT BE USED- COMPOSTSOCKSSMALLER THAN 12". sock/waffle to hold it in place during runoff events. ISOMETRIC VIEW MAINTENANCE: 1. Inspect silt sock/waffle at least weekly and after IT 1 i ITa t i fall R Mulch or Compost for Untrenched Socks Area To Be Pr Sheet Flow Silt Sock Work Area Wattle eac nc or grea er ram . emove accumulated sediment and any debris as needed to allow for adequate flow. 2. Silt sock/Wattle must be replaced if clogged or torn. 3. If ponding becomes excessive, the sift sock/waffle may need to be replaced with a larger diameter or a different measure. 4. Reinstall if damaged or dislodged. 5. Silt sockstwaffles shall be inspected until land disturbance is compete and the area above the measure has been permanently stabilized. Envir ILT SOCK / WATTLE FOR PERIMETER AND INLET PROTECTION COMPOST SOCK INITIAL FLOW RATES tect@MPost Sock 8 Inch (200 12 Inch 18 Inch 24 Inch 32 Inch (750 Design Diameter nm) (300 nm) (450 nm) (600 nm) nm) Maximum Slope 600 Feet 750 Feet 1,000 1,300 1,650 Length (G2%) (183 m) (229 m) Feet Feet Feet (305 m) (396 m) (500 m) Hydraulic Flow 7.5 11.3 15.0 22.5 30.0 Through Rate gpm/ft gpm/ft gpm/ft gpm/ft gpm/ft (94 (141 (188 (281 (374 Filter Fabric Construction: CROSS SECTION VIEW 1. strength or extra strength synthetic filter fabrics. Construct the sediment barrier of standard Yn 9 9 2. Ensure that the height of the sediment fence does not exceed 24 inches above the ground. (Higher fences may impound volumes of water sufficient to cause failure of the structure Maintenance: 3. Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next ost. Y PP P P P 1. Inspect sediment fences at least once a week and after each 1 inch or realer P 9 4. Su on standard strength filter fabric b wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the PP 9 Y yP PP rainfall. Make any required repairs immediately. bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wire or plastic zip ties should have a 2. Should the fabric of a sediment fence collapse, tear, decompose, or become minimum pound tensile strength. P 9 ineffective, replace it promptly. 5. it When a wire mesh support fence is used space posts a maximum of 8 feet apart. Supports should be driven securely into the round a PP P P P PP y g 3. Remove sediment de ostts as necessary to provide adequate storage volume P rY P q a9 minimum of 24 inches. for the next rain and reduce pressure on the fence. Take care to audit 6. Extra strength filter fabric with 6 foot post spacing does not require a wire mesh support fence. Securely fasten the filter fabric directly to posts. undermining the fence during cleanouts. Wire or lastic zip ties should have a minimum of 50 pound tensile strength. P P Parea 4 Remove all fencing materials and unstable sediment deposits and bring the 7. Excavate the trench approximately 4 inches wide and 8 inches deep along the proposed line of the posts and upslope from the barrier. to grade and stabilize it after the contributing drainage area has been 8. Place 12 inches of fabric along the bottom and side of the trench. properly stabilized. 9. Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance. 10. Do not attach filter fabric to existing trees. ..\NC -En SILT FENCE DATE: PAGE: 4' MIN. - I SILT FENCE TOP OF SILT FENCE MUST BE AT LEAST ABOVE THE TOP Of THE WASHED STO STEEL FENCE P SQ T WIRE FEN \\\�1 HARDWARE CL TH FILTER OF WASHED STON 4}, BURY WIRE FENCE AND HARDWARE CLOTH FRONT VIEW BURY WIRE FENCE, FILTER FABRIC, AND HARDWARE STEEL FENCE POST CLOTH IN TRENCH SET MAX 2' APAR MIN. 18" INTO SOLID T FILTER FABRIC GROUND ON GROUND NOTES: / 1. Hardware cloth and gravel should overlay the sift fence at least 12 inches. 2. Stone Outlets should be placed on low elevation areas of silt fence and based on field conditions. MAINTENANCE: 1. Per NCG-01, inspect outlet at lest once a week and after each 1 inch or greater rainfall event. Complete any required repairs immediately. BURY 6" OF UPPER EDGE O FILTER FABRIC IN TRENCH 5. Freshen stone when sediment accumulation exceeds 6 inches. 3. Keep mesh free of debris to provide adequate flow. 4. Remove sediment when haft of stone outlet is covered. 5. Replace stone as needed to facilitate de -watering. SECTION VIEW SILT FENCE OUTLET / S P C E / Ay AIL AIL AL 3W�L __AL_ \ III_ \ \ AIL IN / ( \ LOT G \ i AL \ \ w ( w �'R40 I A AL �\� � / / L r \ \ \ y24 AIL AILAIL 'KZ 1 _ \ \ I I ,1i ,1i ]WL`', \ \ J ]IYL]lYL AIL AIL AL LOT A `� AIL AL AL 29 THI PROJECTS IN A HIGIN-QUALITY \ WAT R ZONE ANk ALL REQIJIREMENTy /]111L 3YIL - /AL % I (/ - l / AREA WAT RSHEEGARDS IOU DI VE BE FbL OWV/D / /]lL AL I I \ IN UDING 7 D�4Y STABILIZl4TI0Al. /'� � A-, '. / AL AIIL I LOT�i // / \ / / (� j AIL 3YIL 3YfL 3�, AIL � ]I/YfC]IIIL AIIL AI L�1, . I \ AG to� � \ \ / \ AIL 31YL 3WL �M�, AIL AIL AIL AIL �AL 1 AIL AIIL // ]YfL ]IIIL ]IIIL ]IIIL \ \ :A L AIL AL A6/ A- A- AL AL I / / / / OT B \NAG _.REINFORCED I �,1,� � AIL /`1, � �,1I� � �,1, � � ,1, � D \ \ SIL FENCE \ AL AL /AL AL AL AL AL AL 3YfL � / �/ AL AL AL AL/� / \ % 2 OUTLET V1lIL�3111�AIL 3111E AIL // / / // �1 I ( 1 � I �-\\\ \ AIL AIL 4 WATTLE \ AIL AL / / / o PR NPGE EPc ,1,� /15 ]III_ \ \ J J 1 \ 1 / � � LONIC I 1 \ % \ J 1 I \ I I \ �T STgLf>'�TION I / I l l I I\� � • 3YIL / / � �� � i � I I I \ I 1 \ \ CONSTRUCTION TT\ ' / / AL \ LIMITS SILT FENCE h _-- - �,�� l AL AL 1/ / LOTD_, - THIS PROJECT IS N A HI9 PIOALITY \ -AL WATER ZONE AND LXREQUIREMENTS �i� \ - AIL FjECialRO t ENSITIVE AREA WATERSHEDS S ULD pB�E FOLL-OVVLD \ \ \ \ \ 1 I 1 INCLUDING 7 Y494 �STIOILIZATION. 'COTE I \ \ LOT ---- / \ 526 / D(AINE�SEMAGE MAIL IKIOSK / \ \ 4 yi / SODDING // / `\ 1\ \� \\ 43 \ O LAY SOD IN A STAGGERED •*gel ,,,, PATTERN. AGAINST THE EACH OTHER. ..,I. PS TIGHTLY AGAINST EACH OTHER. I I I I DO NOT LEAVE SPACES AND DO GROUND STABILIZATION SITE AREA STABILIZATION EXCEPTIONS DESCRIPTION TIME FRAME PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES & SLOPES HIGH QUALITY 7 DAYS NONE WATER ZONES (HQW) SLOPES STEEPER 7 DAYS IF SLOPES ARE THAN 3:1 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR FLATTER SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS 14 DAYS NONE (EXCEPT WITH SLOPES FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) Construction: Maintenance: 1. Clear the entrance and exit area of all vegetation, roots, and other objectionable 1. Per NCG-01 inspect at least once a week and after each 1 inch or greater rainfall, material and properly grade it. make any required repairs immediately. 2. Place the gravel to the specific grade and dimensions shown on the plans, and 2. Maintain the gravel pad in a condition to prevent mud or sediment from leaving the smooth it. construction site. This may require periodic topdressing with 2 inch stone. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. g rry p 3. Immediately remove all objectionable materials spilled, washed or tracked onto public 4. Use geotextile fabrics in order to improve stability of the foundation in locations roadways. subject to seepage or high water table. CONSTRUCTION ENTRANCE / EXIT 1r �It� IIII III X��E II II II M- II II I I II --- n *E" *F" •G• "H" HIx16E \ % IIOU� MWSE IIOU� 4 I .E L I - EDGE OF CURB Notes: CU INLET 1. If needed, Tree Protection fencing should be installed along the buffer zone, wetland boundary and/or around protected trees, providing a radius of at least 1.25 feet for each LEGEND inch of trunk diameter. 2. Install Silt Fence on the low elevation sides of each lot. Install Silt Fence outlets shown on FLOW DIRECTION schematic/diagram and field adjusted, if necessary, for placement at low points. If lots are SILT FENCE --x x x_x contiguous and have different land owners or builders, each lot should have individual Silt Fences. SILT FENCE OUTLET ® 3. Install required Silt Fence within 10 feet of property line to ensure there is no conflict with CONSTRUCTION ENTRANCE septic system. It is the responsibility of the builder to ensure the installation of sediment CURB INLET control measures does not impact the septic system and repair area(s). 4. At least one Construction Entrance/Exit is to be installed per lot. 5. Waste bins and other areas dedicated for managing building material waste shall be at least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that no other alternative exists. If this separation cannot be achieved, these areas must be contained behind Silt Fence. 6. Inlets downstream of disturbances should be protected; streets should be swept when sediment from the construction activity is present. ..\NC-Environmental.jpeg 7. Details for Silt Fence, Silt Fence Outlets, Construction Entrances and other measures are provided on additional sheets. Erosion and sediment control details are not drawn to scale. -------- -- ----- - TYPICAL LOT LAYOUT WITH CURB AND GUTTER r`I' / Mai hl NOT OVERLAP. A SHARPENED A.N / '✓ �' MASON'S TROWEL IS A HANDY " TOOL FOR TUCKING DOWN THE \ \ v AND TRIMMING PIECES. BUTTING - ANGLED ENDS 42 CAUSED BY THE AUTO / / / I I \ I \ \\ \ \ INCORRECT MATIC SOD CUTTER MUST BE / MW MATCHED CORRECTLY. CORRECT \ I / \ \ 19 \ 1 / Y � I 1 I / 41 \ 0 � \ I t iIn•iiA'N'il rya \ / I It I I / / 18 ROLL SOD IMMEDIATELY TO WATER TO A DEPTH OF 4" MOW WHEN THE SOD IS ACHIEVE FIRM CONTACT AS NEEDED. WATER WELL ESTABLISHED - IN 2-3 WITH THE SOIL, AS SOON AS THE SOD IS WEEKS. SET THE MOWER LAID. HIGH (2"-3"). APPEARANCE OF GOOD SOD 40\ i SHOOTS -OR GRASSBLAOES_ / GRASS \ SHOO LOBEGREEN AND HEALTH V,MOWEDAT EN CUTTING HEIGHT_ THATCH- GRASS CLIPPINGS ANO OEAO I 1 1\ \ I un LEAVES, UPTO 1/2"THICK_ ROOT ZONE -SOIL AND ROOTS SHOULD BE 1 /2" - 3/4"THICK, WrrH DENSE ROOT MAT \ FOR STRENGTH_ \ \ \ \ I I 39\ A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1"IS AVAILABLE FOR USE. IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL SPREADSHEET. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE. RULE 15A NCAC 04B. 0131 STATES THAT "...DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN." PAGE 1 of 2 LOT EROSION CONTROL PLAN FOR BENJAMIN STOUT REAL ESTATE / I ECM \ \ \ MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION / r�l - -- SERVICES, INC. / / \ Gravel Construction Entrance -The gravel pad should remain in a condition to prevent mud or sediment from leavingThe construction site. This may require periodic topdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sedimet and clean it out as necessary. I I lI I `\ AP PY VALLEY / B 10, PG 26 \ \ TOTAL DISTURBED ACREAGE: 0.9 4 ACRES Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. / 18 Silt Fence - Sediment fences should be inspected at least once a week and after each rainfall event. Any repairs should be made immediately. I \ / I L 0 T G Damaged or decomposed fabric should be replaced promptly. Any sediment deposits that build up against the fence should be removed and disposed \ of properly to insure that The removed sediment does not wash back against the fence. Adequate storage volume should be provided for behind The fence o C at talltimes Take care to not undermine the fence during cleanout operations \ \ 1 �� 38 - - - 77�t Sodding - The sod should be properly maintained to insure that the grass take holds in the areas being secured. The sod should be watered as necessary to maintain adequate moisture in the root mne and prevent dormancy of the sod. The sod should not be mowed to close, since this could inhibit adequate growth and stabilization of the root bed. The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. Grassing and Mulching - The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed, the area should be maintained as needed to insure that all areas are germinating properly. Any bare areas should be repaired, and reseeded as soon as possible. If the time of year does not permit the establishment of a permanent grass, then a temporary grassing should be used until the growing season permits the use of a permanent grass. Diversion Berms - Diversion berms shall be inspected weekly or after each runoff producing rainfall to insure that they are operating as designed and that there have been no In in the berm. Berms shall not exceed 18" in height,and shall be laced n locations that will not interfere with home construction activities. P Once the house contraction is completed and the lot is ready to receive sod, then the berm shall be removed and the material incorporated into the graded lot area and covered immediately with sod. All proper care shall be taken to insure that the berms are installed according to the applicable detail with the berm material compacted sufficiently to insure that the berm remains in place during the course of the construction activities. General - All measures will be inspected and corrections made after runoff producing rainfalls, or at least once per week minimum. The builder will insure that the construction activities on mYparticular lot do not adversely aanY urffect of the installed erosion control measures. If lot construction dictates measures will be relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual. Sodding, seeding and mulching will be maintained to insure proper ground stabilizing cover. Wattles - Wattles shall be inspected after significant rainfall events. Rills or gullies upslope of the wattle and any undercutting is to be repaired. Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height. Removed sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. Reinforced Silt Fence Outlet - Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet Take care to avoid undermining the fence during cleanout. Remove and replace stone as necessary as it becomes clogged with sediment. Remove all fencing materials and unstable sediment deposits and bring the area to gmde and stabilize it after the contributing drainage area has been properly stabilized. 1 1 I I 1 1 1 GRETCHEN PINES 17 I 15' DRP1/E EP'ENT PHASE 2 � MINERAL SPRINGS TWP. MOORE CO., N.C. / m 16 / i /_ / SCALE: 1 "= 100' NOVEMBER 2022 1 EAS M N / / 15, DRP/E i R / \ GRAPHIC SCALE IN FEET 36 �' -100 0 100 200 300 400 15 / MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C. / 15 PHONE (910) 484-5191 FAX (910) 484-0388 License #: F-0106 / i Ira LAST SAVED: 11 /14/2022 7:52 AM LAST PLOTTED: 11/14/2022 10:49 AM PLOTTED BY: Dennis Gilbert FILENAME: G:\CURRENT JOBS\BENJAMIN STOUT REAL ESTATE SERVICES INC\22-2510-04 GRETCHEN PINES-EC\PLANS\EC GRETCHEN PINES -LOT G.DWG