Loading...
HomeMy WebLinkAboutGW1-2022-00243_Well Construction - GW1_20221216 ;Pent To WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: I 1.Well Contractor Information: Robert Teague 14.WATER ZONES Well Contractor Name FROM TO I DESCRIPTION 2857-A /S 44 NC Well Contractor Certification Number V ®! lg;OOTER CASING f u cased lls OR LINER if a doable B &K Well Drilling Inc FROM TO DIAMETER THICKNESS MATERIAL Company Name 0 11. J ft 6 118 in. SDR-21 I PVC 16.INNER CASING OR TUBING(geothermal closed-loo 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL Lis[all applicable well construction permits(i.e. UlC,C'otarty,State,Yuriunc e,etc.) it. 3.Well Use(check well use): ft. ft. in. ilrrigation ater Supply Well: 17.SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL Agricultural [3Municipal/Public ft. ft. in• Geothermal(HeatinglCooling Supply) Residential Water Supply(single) ft. ft. in. Industrial/Commercial Residential Water Supply(shared) 3ti.GROUT` Geothermal FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft. ft. Monitoring DRecovery Injection Well: ft. ft. l Aquifer Recharge E)Groundwatcr Remcdiation 19.SAND/GRAVEL PACK(if applicable) .. Aquifer Storage and Recovery Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD Aquifer Test ®I Stormwater Drainage ft. ft. Experimental Technology Subsidence Control ft. ft. Geothermal(Closed Loop) OTracer 20.DRILLING LOG attach additional sheets if necessary) Geothermal(Heating/Cooling Coolie Return) Other(explain under#21 Remarks) FROM . •1.0 DESCRIPTION(color,ha ess.soillrock type, rain size•etc.) 1 O ft. I I 17ft. 4.Date Well(s)Completed:)- ! `t ell 1D# S ft ft. 5a.Well Location: ,) �__5 tt. 317 _S- t I_S Factlit l;bwwncr/N'ame ` •JJ Facility ID#(if ap�p�l�icablc) ft. ft. Ph -'cal Address,City' P ft.and Zip ft. 5 d �'t. "� n�� •4' h v � 21.REMARKS J' l f• ^ County Parcel Identification No.(PIN) DEC 1 6 707? i 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field one laUlong is sufficient) 22.Certific 'on: 01'a'LZ/u:�ts N W 6.Is(are)the well(s)OPermanent or Temporary ignaturc of Certified Well Con[ for Date 4v signing this farm.I herehv certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: [DYes or No with 15.4 NCAC 02C.0100 or 15A iyCAC 02C.0200 Well Construction Standards and that a lfthis is a repair,fill but known well construction information plain the nature of the copy nf'rhis record has heen provided to the well owner. repair under#21 remarks section or on the back of this form. ! 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: C SUBMITTAL INSTRUCTIOii S 9.Total well pth below land surface: ) (ft-) 24a. For All Wells: Submit:this form within 30 days of completion of well For multiple wells list all depths ifdifferent(exampTe-3^2,200'a7td 2 a 100') construction to the following: 10.Static water level below top of casing:40 (ft.) Division of Water Resources,Information Processing Unit, lfwater level is above casing,use '+" 1617 Mail Service Center;Raleigh,NC 27699-1617 11.Borehole diameter: 6 /$ (in.) 24b.For Injection Wells: lnladdition to sending the form to the address in 24a Air Rotary above,also submit one copy of This form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 ] `ee-Centgr;Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test: Air Flow 24c.For Water 5t rily 2�Ttitrcti, Wells:•;In addition to sending the form to ChlorTabs 1 vzLbs the address__{e�,j:abil o-_s i�;ai sane copy-;of this form within 30 days of 13b.Disinfection type: Amount: completiolvzow, Emotion7`to the county health department of the county where constructed e _ Revised 2-22-2016 Forth GW-I North Carolina Department of EnY'renmcntal Quadiy-Division of IiTCr Resoutresr