HomeMy WebLinkAboutNCC193107_Annual Fee NOD Letter_20230117ROY CDC) PER
Ca�ernar
EUZABETH S. 815ER
Serretary'
DOUCLAS IL ANSEL NORTH C;AROLINA
fn mm Nrltrw Fnwra entalQuufltp
1 /17/2023
Holder - Edison Foard - Leeper, A Joint Venture
Attn: Blake Long
2330 Eatonton Street
Charlotte. North Carolina 28208
Subject: Notice of Deficiency - Failure to Pay Annual Fee
Invoice No. NCC193107-2022
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 12/1/2022 and was due on 1/1/2023. The annual fee applies to the following construction site:
CLT Central Energy Plant
5501 Josh Birmingham Parkway, City of Charlotte, NC
Mecklenburg County
Certificate of Coverage No. NCC193107
NC Reference No. NCG01-2019-3107
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Danny Smith at danny.smith@ncdenr.gov or me at toby.vinson@ncdenr.gov.
Sincerely,
William E. Vinson, Jr.
Chief of Program Operations
Division of Energy, Mineral, and Land Resources
NonhCamllna 6epanmew er EmlYmrnenear $.ellty I Wnlmn of Energy. Wmeral and Land Re9ouroe5
IME 512 Norllh5aliabury'%r t 11{12h4iI 5rrric Ce Ul I Rk .Noeth Carolina 27694-1b12
414.767.92U0