HomeMy WebLinkAbout20150192 Ver 1_Application_20150218
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Pat McCrory Charles Wakild, P.E. John E. Skvarla, III
Governor Director Secretary
Attachment L: Low Impact Bridge Replacement Process
Low Impact Bridge Project No.: _ County__Nash_____
Bridge No._28___ over _ __Big Peachtree Creek________
WBS Element Number 17BP.4.R.55
This project is subject to the Low Impact Bridge Process as agreed to on October 6,
2009. This project meets the documentation requirements and approval procedures
under NEPA, as defined by FHWA, for Low Impact Bridge Replacements. This project
meets the standards of NCDOT’s Minimum Criteria Rules.
Date: 2/12/2015
Applicant Name: NCDOT ______
Applicant Address: NCDOT Division of Highways
P.O. Box 3165_
Wilson, NC 27895-3165________________________________
Primary Contact for Project: Chad Coggins
Phone No.:(252) 296-3532
Is this an after-the-fact application: Yes X No
River Basin: Tar
Stream Classification: C NSW
Regulatory Authorization Options for this Activity
Federal: USACE Nationwide General Permit 3 – Maintenance
State: General Water Quality Certification #3883 and/or Buffer Authorization
Local: None
Project Description
–
NCDOT proposes to replace Bridge #28, which is currently a (7) span 121’ x 24’ bridge, with a 160’ x 35’
(3) span bridge over Big Peachtree Creek in Nash County. Stormwater will be directed to dissipator pad
outside of Buffer Zone 2 in the southwest and northeast quadrants. There are 2023 square feet of
perpendicular impacts to Buffer Zone 1, and 1408 square feet of impacts in Zone 2 that will be associated
with this project.
Signature: _____
Print Name: __Chad Coggins________________
Transportation Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604
Phone: 919-733-1786 \\ FAX: 919-733-6893
Internet: http://h2o.enr.state.nc.us/ncwetlands/
An Equal Opportunity \\ Affirmative Action Employer
TIP NO
1
WBS Element No.17BP.4.R.55
2
3CountyNash
4Bridge Number970028
5DescriptionBridge over Big Peachtree Creek
6BasinTar
7ClassificationC NSW
Stream
8SIN28-68-1
9Typeinland
10Size80'
11Type7 span
Existing Structure
12Size121'X24'
13Suff. Rating26.23
14Type3 span
Proposed Structure
15Size160'X'30'
16USACE (LF)0
Stream
17NCDWQ Impacts (LF)0
18USACE Impacts (AC).01 HC
Wetlands
19Non 404 Impacts (AC)0
20CAMA Impacts (SF)0
21NC DWQ Buffers Impacts (SF)BZ1, 2023 BZ2, 1408
22Buffer Applicaton Required (Y/N)Y
23State Stormwater Permit Required (Y/N)no
24Habitatno
T&E
25Species Presentno
26Bio Conclusionno affect
27Typenone
Moratorium
28Datesno
29Native/Hatcheryno
30Trout Species Presentno
Trout Waters
31Trout Conditions (Y/N)no
32WRC Reviewerno
33CAMAAECsno
34Essential Fish Habitatno /GIS
35Nav.Openingno /GIS
36USCGPermitno /GIS
37HistoricPropertiesno/HEU
38ArchaeologicalResourcesno/HEU
39TribalLandsno /GIS
404(f)Resourcesno /GIS
416(f) \[LWCF\]Resourcesno /GIS
42Wild andScenic Riverno /GIS
43Federal Landsno /GIS
44TVAAreano /GIS
45FEMABuyoutno /GIS
46FEMAFlood Studyyes/MOA been submitted
47USTsHaz Matsno
48Relocateesno /GIS
49LAT36.0474
Location
50LONG78.0966
51Project Comments
Completed by:
Division Environmental Officer