Loading...
HomeMy WebLinkAbout20150192 Ver 1_Application_20150218 North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P.E. John E. Skvarla, III Governor Director Secretary Attachment L: Low Impact Bridge Replacement Process Low Impact Bridge Project No.: _ County__Nash_____ Bridge No._28___ over _ __Big Peachtree Creek________ WBS Element Number 17BP.4.R.55 This project is subject to the Low Impact Bridge Process as agreed to on October 6, 2009. This project meets the documentation requirements and approval procedures under NEPA, as defined by FHWA, for Low Impact Bridge Replacements. This project meets the standards of NCDOT’s Minimum Criteria Rules. Date: 2/12/2015 Applicant Name: NCDOT ______ Applicant Address: NCDOT Division of Highways P.O. Box 3165_ Wilson, NC 27895-3165________________________________ Primary Contact for Project: Chad Coggins Phone No.:(252) 296-3532 Is this an after-the-fact application: Yes X No River Basin: Tar Stream Classification: C NSW Regulatory Authorization Options for this Activity Federal: USACE Nationwide General Permit 3 – Maintenance State: General Water Quality Certification #3883 and/or Buffer Authorization Local: None Project Description – NCDOT proposes to replace Bridge #28, which is currently a (7) span 121’ x 24’ bridge, with a 160’ x 35’ (3) span bridge over Big Peachtree Creek in Nash County. Stormwater will be directed to dissipator pad outside of Buffer Zone 2 in the southwest and northeast quadrants. There are 2023 square feet of perpendicular impacts to Buffer Zone 1, and 1408 square feet of impacts in Zone 2 that will be associated with this project. Signature: _____ Print Name: __Chad Coggins________________ Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-1786 \\ FAX: 919-733-6893 Internet: http://h2o.enr.state.nc.us/ncwetlands/ An Equal Opportunity \\ Affirmative Action Employer TIP NO 1 WBS Element No.17BP.4.R.55 2 3CountyNash 4Bridge Number970028 5DescriptionBridge over Big Peachtree Creek 6BasinTar 7ClassificationC NSW Stream 8SIN28-68-1 9Typeinland 10Size80' 11Type7 span Existing Structure 12Size121'X24' 13Suff. Rating26.23 14Type3 span Proposed Structure 15Size160'X'30' 16USACE (LF)0 Stream 17NCDWQ Impacts (LF)0 18USACE Impacts (AC).01 HC Wetlands 19Non 404 Impacts (AC)0 20CAMA Impacts (SF)0 21NC DWQ Buffers Impacts (SF)BZ1, 2023 BZ2, 1408 22Buffer Applicaton Required (Y/N)Y 23State Stormwater Permit Required (Y/N)no 24Habitatno T&E 25Species Presentno 26Bio Conclusionno affect 27Typenone Moratorium 28Datesno 29Native/Hatcheryno 30Trout Species Presentno Trout Waters 31Trout Conditions (Y/N)no 32WRC Reviewerno 33CAMAAECsno 34Essential Fish Habitatno /GIS 35Nav.Openingno /GIS 36USCGPermitno /GIS 37HistoricPropertiesno/HEU 38ArchaeologicalResourcesno/HEU 39TribalLandsno /GIS 404(f)Resourcesno /GIS 416(f) \[LWCF\]Resourcesno /GIS 42Wild andScenic Riverno /GIS 43Federal Landsno /GIS 44TVAAreano /GIS 45FEMABuyoutno /GIS 46FEMAFlood Studyyes/MOA been submitted 47USTsHaz Matsno 48Relocateesno /GIS 49LAT36.0474 Location 50LONG78.0966 51Project Comments Completed by: Division Environmental Officer