Loading...
HomeMy WebLinkAbout#5310 - Final INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 5310 Laboratory Name: West Point Place Inspection Type: Field Maintenance Inspector Name(s): Jeffrey R. Adams Inspection Date: August 1, 2012 Date Report Completed: August 13, 2012 Date Forwarded to Reviewer: August 13, 2012 Reviewed by: Todd Crawford Date Review Completed: August 14, 2012 Cover Letter to use: Insp. Initial Insp. Reg. Insp. No Finding Insp. CP _X _ Corrected Unit Supervisor: Dana Satterwhite Date Received: August 14, 2012 Date Forwarded to Linda: August 16, 2012 Date Mailed: August 16, 2012 _____________________________________________________________________ On-Site Inspection Report LABORATORY NAME: West Point Place NPDES PERMIT #: NC0003522 ADDRESS: P.O. Box 1780 Elizabethtown, NC 28337 CERTIFICATE #: 5310 DATE OF INSPECTION: August 1, 2012 TYPE OF INSPECTION: Field Maintenance AUDITOR(S): Jeffrey R. Adams LOCAL PERSON(S) CONTACTED: Cleve Collins I. INTRODUCTION: This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The laboratory was clean and records were well organized. The system for traceability of consummables is effective, thorough and easy to follow. This facility is only required to monitor when discharging, approximately once a year. As a result, there was no current bench or contract environmental data for review. Proficiency Testing sample data for the 2012 calendar year was reviewed. The laboratory was given a packet containing North Carolina Laboratory Certification quality control requirements and policies during the inspection. Contracted analyses are performed by Microbac Laboratories, Inc. (Certification #11). III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Dissolved Oxygen – Standard Methods, 18th Edition, 4500 O G Comment: The laboratory was not documenting the meter calibration time on the benchsheet. The Approved Procedure for Field Analysis of Dissolved Oxygen document states: The following criteria must be documented whenever sample analysis is performed. 5. Meter calibration and time(s) of calibration. Notification of acceptable corrective action (i.e., an updated benchsheet which includes a space to document the calibration time) was received by email on 08/08/12. No further response is necessary for this finding. IV. PAPER TRAIL INVESTIGATION: No paper trail performed. Page 2 #5310 West Point Place V. CONCLUSIONS: All findings noted during this inspection were adequately addressed prior to the completion of this report. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Report prepared by: Jeffrey R. Adams Date: August 13, 2012 Report reviewed by: Todd Crawford Date: August 14, 2012