Loading...
HomeMy WebLinkAbout#5505_ 2012 INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 5505 Laboratory Name: NCDOT Cedar Island Ferry Terminal Laboratory Inspection Type: Field Maintenance Inspector Name(s): Todd Crawford Inspection Date: December 6, 2012 Date Report Completed: December 10, 2012 Date Forwarded to Reviewer: December 10, 2012 Reviewed by: Nick Jones Date Review Completed: December 10, 2012 Cover Letter to use: Insp. Initial Insp. Reg. Insp. No Finding Insp. CP Corrected Unit Supervisor: Dana Satterwhite Date Received: December 10, 2012 Date Forwarded to Linda: December 14, 2012 Date Mailed: December 14, 2012 _____________________________________________________________________ On-Site Inspection Report LABORATORY NAME: NCDOT Cedar Island Ferry Terminal Laboratory NPDES Permit #: NC0077500 ADDRESS: 3619 Cedar Island Road Cedar Island, NC 28520 CERTIFICATE #: 5505 DATE OF INSPECTION: December 6, 2012 TYPE OF INSPECTION: Field Maintenance AUDITOR(S): Todd Crawford LOCAL PERSON(S) CONTACTED: Larry B. Lupton I. INTRODUCTION: This laboratory was inspected by a representative of the North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) program to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The facility has all the equipment necessary to perform the currently certified parameter analyses. Proficiency Testing (PT) samples have been analyzed for all certified parameters for the 2012 proficiency testing calendar year and the graded results were 100% acceptable. Current quality assurance policies for Field laboratories and approved procedures for the analysis of the facility’s currently certified parameters were provided at the time of the inspection. Contracted analyses are performed by SGS North America, Inc. (Certification #481). The requirements associated with Findings A, B and C are new policies that have been implemented by our program since the last inspection. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Documentation A. Finding: The laboratory needs to increase the documentation of purchased materials and reagents. Requirement: All chemicals, reagents, standards and consumables used by the laboratory must have the following information documented: Date Received, Date Opened (in use), Vendor, Lot Number, and Expiration Date. A system (e.g., traceable identifiers) must be in place that links standard/reagent preparation information to analytical batches in which the solutions are used. Documentation of solution preparation must include the analyst’s initials, date of preparation, the volume or weight of standard(s) used, the solvent and final volume of the solution. This Page 2 #5505 NCDOT Cedar Island Ferry Terminal Laboratory information as well as the vendor and/or manufacturer, lot number, and expiration date must be retained for chemicals, reagents, standards and consumables used for a period of five years. Consumable materials such as pH buffers and lots of pre-made standards are included in this requirement. Ref: Quality Assurance Policies for Field Laboratories. Proficiency Testing Comment: The preparation of the Proficiency Testing (PT) sample for Total Residual Chlorine (TRC) will need to be documented. Dating and initialing the instruction sheet will satisfy the requirement that the preparation of PT samples must be documented in a traceable log or other traceable format. The diluted PT sample becomes a routine environmental sample and is added to a routine sample batch for analysis. B. Finding: The laboratory is not analyzing Proficiency Testing (PT) samples in the same manner as environmental samples. Requirement: All PT samples are to be analyzed and the results reported in a manner consistent with the routine analysis and reporting requirements of compliance samples and any other samples analyzed according to the requirements of 15A NCAC 2H .0800. Ref: Proficiency Testing Requirements, February 20, 2012, Revision 1.2. Comment: The laboratory’s common practice was to analyze a known standard along with the PT sample as additional quality control. Comment: The analysis of PT samples is designed to evaluate the entire process used to routinely report environmental analytical results; therefore, PT samples must be analyzed and the process documented in the same manner as environmental samples. Please document PT sample analyses on the benchsheets in the same manner environmental samples are documented. Dissolved Oxygen – HACH Method 10360 (LDO) C. Finding: The theoretical DO of the moist air calibration verification is not documented. Requirement: The calculated DO value must verify the meter reading within ±0.5 mg/L. Ref: NC WW/GW LC Approved Procedure for Field Analysis of Dissolved Oxygen. Comment: The meter calibration is being verified each day of use and is compared to the theoretical value, it is just not documented that it was acceptable. Recommendation: It is recommended that the theoretical value be documented on the benchsheet to clearly show that the requirement is being met. pH – Standard Methods, 4500 H+ B - 2000 D. Finding: Values were reported that exceed the method specified accuracy of 0.1 units. Requirement: By careful use of a laboratory pH meter with good electrodes, a precision of ±0.02 unit and an accuracy of ±0.05 unit can be achieved. However, ± 0.1 pH unit represents the limit of accuracy under normal conditions, especially for measurement of water and poorly buffered solutions. For this reason, report pH values to the nearest 0.1 pH unit. Ref: Standard Methods, 4500 H+ B-2000, (6). Page 3 #5505 NCDOT Cedar Island Ferry Terminal Laboratory Total Residual Chlorine H. Finding: The facility is reporting values on the Discharge Monitoring Reports (DMRs) without certification. Requirement: Commercial, Municipal, Industrial and Other facilities are required to obtain certification for field parameters which will be reported by the client to comply with State surface water, groundwater, and pretreatment Rules. Ref: 15A NCAC 2H .0804 (a). Comment: An amendment form requesting certification for this parameter was completed during the inspection. Payment of the add parameter fee and an acceptable PT result is required before certification will be granted. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing field testing records and contract lab reports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for September, October and November, 2012. No transcription errors were detected. The facility appears to be doing a good job of accurately transcribing data. V. CONCLUSIONS: Correcting the above-cited findings will help this lab to produce quality data and meet certification requirements. The inspector would like to thank the staff for its assistance during the inspection and data review process. Please respond to all findings. Report prepared by: Todd Crawford Date: December 10, 2012 Report reviewed by: Nick Jones Date: December 10, 2012