Loading...
HomeMy WebLinkAbout#5280 - 2012 Insp-Final INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 5280 Laboratory Name: Taylor Extended Care Facility Inspection Type: Municipal Maintenance Inspector Name(s): Todd Crawford Inspection Date: December 4, 2012 Date Report Completed: December 5, 2012 Date Forwarded to Reviewer: December 5, 2012 Reviewed by: Jason Smith Date Review Completed: December 6, 2012 Cover Letter to use: Insp. Initial Insp. Reg. Insp. No Finding Insp. CP Corrected Unit Supervisor: Dana Satterwhite Date Received: December 6, 2012 Date Forwarded to Linda: December 7, 2012 Date Mailed: December 7, 2012 _____________________________________________________________________ On-Site Inspection Report LABORATORY NAME: Taylor Extended Care Facility NPDES PERMIT #: NC0047759 ADDRESS: P.O. Box 100 Sea Level, NC 28577 CERTIFICATE #: 5280 DATE OF INSPECTION: December 4, 2012 TYPE OF INSPECTION: Municipal Maintenance AUDITOR(S): Todd Crawford LOCAL PERSON(S) CONTACTED: David Collins I. INTRODUCTION: This laboratory was inspected by a representative of the North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) program to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The facility has all the equipment necessary to perform the analyses. All traceability information is documented on the benchsheets. Current quality assurance policies for Field laboratories and approved procedures for the analysis of the facility’s currently certified parameters were provided at the time of the inspection. Contracted analyses are performed by Environment 1, Inc. (Certification #10). III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Proficiency Testing Comment: The laboratory analyzes additional quality control (i.e., known standards) with Proficiency Testing (PT) samples. The Proficiency Testing Requirements, February 20, 2012, Revision 1.2 document states: Laboratories shall conduct proficiency tests in accordance with their routine testing, calibration and reporting procedures, unless otherwise specified in the instructions supplied by the PT provider. They shall not be analyzed with additional quality control or replicated beyond what is routine for environmental sample analysis. This requirement is a new policy that has been implemented by our program since the last inspection. Notification of acceptable corrective action (i.e., additional quality control standards will no longer be analyzed with PTs) was received by email on December 4, 2012. No further response is necessary for this finding. Comment: The laboratory was not documenting PT sample analyses in the same manner as environmental samples. The Proficiency Testing Requirements, February 20, 2012, Revision 1.2. document states: All PT sample analyses must be recorded in the daily analysis records as for any environmental sample. This serves as the permanent laboratory record. This requirement is a new Page 2 #5280 Taylor Extended Care Facility policy that has been implemented by our program since the last inspection. Notification of acceptable corrective action (i.e., PTs will be documented on the analytical benchsheets) was received by email on December 4, 2012. No further response is necessary for this finding. Comment: The laboratory was not documenting the preparation of PT samples. The Proficiency Testing Requirements, February 20, 2012, Revision 1.2 document states: PT samples received as ampules must be diluted according to the PT provider’s instructions. The preparation of PT samples must be documented in a traceable log or other traceable format. The diluted PT sample becomes a routine environmental sample and is added to a routine sample batch for analysis. This requirement is a new policy that has been implemented by our program since the last inspection. Notification of acceptable corrective action (i.e., PT sample preparation will be documented by dating and initialing the PT preparation instruction sheet and filed with other PT documentation) was received by email on December 4, 2012. No further response is necessary for this finding. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing field testing records and contract lab reports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for August, September and October, 2012. No transcription errors were detected. The facility appears to be doing a good job of accurately transcribing data. V. CONCLUSIONS: All findings noted during the inspection were adequately addressed prior to the completion of this report. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Report prepared by: Todd Crawford Date: December 5, 2012 Report reviewed by: Jason Smith Date: December 6, 2012