No preview available
HomeMy WebLinkAboutNorthBendPFA_Revised PCN Section D-Impacts Summary6. Future Project Plans 6a. Is this a phased project?* Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don’t require pre-construction notification. 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "S." will be used in the table below to represent the word "stream". 3a. Reason for impact * (?) 3b.Impact type * 3c. Type of impact *3d. S. name *3e. Stream Type *(?) 3f. Type of Jurisdiction * 3g. S. width * 3h. Impact length * S1 S2 S3 S4 Add another impact ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 3i. Total permanent stream impacts: Yes No D. Proposed Impacts Inventory Wetlands Streams-tributaries Buffers Open Waters Pond Construction Boat Ramp ConstructionPermanent Other Catawba River Perennial Both 120 Average (feet) 64 (linear feet) 3i. Total temporary stream impacts: 3i. Total stream and ditch impacts: 3j. Comments: 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* 6b. Impact Type *(?)6c. Per or Temp *(?) 6d. Stream name *6e. Buffer mitigation required?* 6f. Zone 1 impact * 6g. Zone 2 impact * Add another impact 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: Zone 1 Zone 2 Total Permanent impacts: Zone 1 Zone 2 Total combined buffer impacts: 6i. Comments: 1. Avoidance and Minimization 129 193 Check all that apply. Neuse Tar-Pamlico Catawba Randleman Goose Creek Jordan Lake Other Boat Ramp & Riprap StabilizationP Catawba River Yes 1,356 (square feet) 659 (square feet) 0.00 0.00 1,356.00 659.00 1,356.00 659.00 E. Impact Justification and Mitigation