HomeMy WebLinkAboutNorthBendPFA_Revised PCN Section D-Impacts Summary6. Future Project Plans
6a. Is this a phased project?*
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed
project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization
but don’t require pre-construction notification.
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
"S." will be used in the table below to represent the word "stream".
3a. Reason for impact *
(?)
3b.Impact
type *
3c. Type of impact *3d. S. name *3e. Stream
Type *(?)
3f. Type of
Jurisdiction *
3g. S.
width *
3h. Impact
length *
S1
S2
S3
S4
Add another impact
** All Perennial or Intermittent streams must be verified by DWR or delegated local government.
3i. Total jurisdictional ditch impact in square feet:
3i. Total permanent stream impacts:
Yes No
D. Proposed Impacts Inventory
Wetlands Streams-tributaries Buffers
Open Waters Pond Construction
Boat Ramp ConstructionPermanent Other Catawba River Perennial Both 120
Average
(feet)
64
(linear feet)
3i. Total temporary stream impacts:
3i. Total stream and ditch impacts:
3j. Comments:
6. Buffer Impacts (for DWR)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below.
6a. Project is in which protect basin(s)?*
6b. Impact Type *(?)6c. Per or
Temp *(?)
6d. Stream name *6e. Buffer mitigation
required?*
6f. Zone 1
impact *
6g. Zone 2
impact *
Add another impact
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts:
Zone 1 Zone 2
Total Permanent impacts:
Zone 1 Zone 2
Total combined buffer impacts:
6i. Comments:
1. Avoidance and Minimization
129
193
Check all that apply.
Neuse Tar-Pamlico
Catawba Randleman
Goose Creek Jordan Lake
Other
Boat Ramp & Riprap StabilizationP Catawba River Yes 1,356
(square feet)
659
(square feet)
0.00 0.00
1,356.00 659.00
1,356.00 659.00
E. Impact Justification and Mitigation