Loading...
HomeMy WebLinkAbout#398 12-Final INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: #398 Laboratory Name: Progress Energy Carolinas - Harris Power Plant Laboratory Inspection Type: Municipal Maintenance Inspector Name(s): Jeffrey R. Adams Inspection Date: March 20, 2012 Date Report Completed: April 9, 2012 Date Forwarded to Reviewer: April 9, 2012 Reviewed by: Tonja Springer Date Review Completed: April 23, 2012 Cover Letter to use: Insp. Initial X Insp. Reg. Insp. No Finding Insp. CP ___ Corrected Unit Supervisor: Dana Satterwhite Date Received: April 23, 2012 Date Forwarded to Linda Chavis April 24, 2012 Date Mailed: April 24, 2012 _____________________________________________________________________ On-Site Inspection Report LABORATORY NAME: Progress Energy Carolinas - Harris Power Plant Laboratory NPDES PERMIT #: NC0039586 ADDRESS: 5413 Sharon Harris Road New Hill, NC 27562-0165 CERTIFICATE #: 398 DATE OF INSPECTION: March 20, 2012 TYPE OF INSPECTION: Municipal Maintenance AUDITOR(S): Jeffrey R. Adams LOCAL PERSON(S) CONTACTED: Robert Wilson and Steve Cahoon I. INTRODUCTION: This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: Due to the onsite security requirements by the US Nuclear Regulatory Commission, a laboratory walk- through was not performed during this inspection to save time. An abbreviated audit of benchsheets and DMR reports was performed for all certified parameters off-sight. The laboratory brought data for all certified parameters to an off -sight facility for review. The laboratory is reminded that any time changes are made to laboratory operations; the laboratory must update the Quality Assurance (QA)/Standard Operating Procedures (SOP) document(s). Any changes made in response to the Findings, Recommendations or Comments listed in this report must be incorporated to insure the method is being performed as stated, references to methods are accurate, and the QA and/or SOP document(s) is in agreement with approved practice and regulatory requirements. In some instances, the laboratory may need to create a SOP to document how new functions or policy will be implemented. The laboratory was given a packet containing North Carolina Laboratory Certification quality control requirements and policies during the inspection. The requirements associated with Findings A and C are new policies that have been implemented by our program since the last inspection. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Traceability A. Finding: The laboratory needs to increase the documentation of materials and reagents used or made in the laboratory. Page 2 #398 Progress Energy Carolinas – Harris Plant Requirement: All chemicals, reagents, standards and consumables used by the laboratory must have the following information documented: Date received, Date Opened (in use), Vendor, Lot Number, and Expiration Date (where specified). A system (e.g., traceable identifiers) must be in place that links standard/reagent preparation information to analytical batches in which the solutions are used. Documentation of solution preparation must include the analyst’s initials, date of preparation, the volume or weight of standard(s) used, the solvent and final volume of the solution. This information as well as the vendor and/or manufacturer, lot number, and expiration date must be retained for primary standards, chemicals, reagents, and materials used for a period of five years. Consumable materials such as pH buffers, lots of pre-made standards and/or media, solids and bacteria filters, etc. are included in this requirement. Ref: North Carolina Wastewater/Groundwater Laboratory Certification Policy. pH – Standard Methods, 20th Edition, 4500 H+ B Total Residual Chlorine – Standard Methods, 20th Edition, 4500 Cl D B. Finding: The laboratory is not including units of measure on the laboratory benchsheets. Requirement: All laboratories must use printed laboratory worksheets that include a space to enter the signature or initials of the analyst, date of analyses, sample identification, volume of sample analyzed, value from the measurement system, factor and final value to be reported and each item must be recorded each time samples are analyzed. Ref: 15AC NCAC .0805 (a) (7) (H). Oil & Grease – Standard Methods, 20th Edition, 5520 B C. Finding: The laboratory is not analyzing matrix spikes. Requirement: Unless the referenced method states a greater frequency, spike 5% of samples on a monthly basis. Laboratories analyzing less than 20 samples per month must analyze at least one matrix spike (MS) each month samples are analyzed. Ref: North Carolina Wastewater/Groundwater Laboratory Certification Policy. Comment: This laboratory is only analyzing 2 samples a month. D. Finding: The laboratory is not distilling samples in a water bath at 85 ºC. Requirement: Distill solvent from flask in a water bath at 85 ºC for either solvent system. To maximize solvent recovery, fit distillation flask with a distillation adapter equipped with a drip tip and collect solvent in an ice-bath-cooled receiver. When visible solvent condensation stops, remove flask from water bath. Cover water bath and dry flasks on top of cover, with water bath still at 85 ºC, for 15 mins. Ref: Standard Methods, 20th Edition, 5520 B. (4). Comment: The laboratory is distilling samples in a water bath at 50 ºC. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing laboratory benchsheets and contract lab reports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for November and December, 2011 and January, 2012. No transcription errors were detected. It appears the laboratory is doing a good job of accurately transcribing data. Page 3 #398 Progress Energy Carolinas – Harris Plant V. CONCLUSIONS: Correcting the above-cited findings will help this lab to produce quality data and meet certification requirements. The inspector would like to thank the staff for its assistance during the inspection and data review process. Please respond to all findings. Report prepared by: Jeffrey R. Adams Date: April 9, 2012 Report reviewed by: Tonja Springer Date: April 23, 2012