Loading...
HomeMy WebLinkAbout#186_07_2012_FINALINSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 186 Laboratory Name: Town of Boone Jimmy Smith WWTP Inspection Type: Municipal Maintenance Inspector Name(s): Jason Smith Inspection Date: July 10, 2012 Date Report Completed: July 26, 2012 Date Forwarded to Reviewer: July 26, 2012 Reviewed by: Chet Whiting Date Review Completed: July 27, 2012 Cover Letter to use: _ Insp. Initial _ Insp. Reg. X Insp. No Finding _ Insp. CP _Corrected Unit Supervisor: Gary Francies Date Received: 7/27/2012 Date Forwarded to Linda: 8/2/2012 Date Mailed: <� � U ! t 3- ��- LPIWA NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor 186 Ms. Karen Reece Town of Boone Jimmy Smith WWTP P.O. Drawer 192 Boone, NC 28607 Division of Water Quality Charles Wakild, P. E. Director August 2, 2012 Dee Freeman Secretary Subject: North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) Maintenance Inspection Dear Ms. Reece: Enclosed is a report for the inspection performed on July 10, 2012 by Jason Smith. No findings are cited in this report, a response is not required. We appreciate the fine job you and your staff are doing. As a certification requirement, your laboratory must continue to carry out the requirements set forth in 15A NCAC 2H .0800. Copies of the checklists completed during the inspection may be requested from this office. Thank you for your cooperation during the inspection. If you wish to obtain an electronic copy of this report by email or if you have questions or need additional information, please contact us at 828-296-4677. Sincerely, Gary Francies Certification Unit Supervisor Laboratory Section Enclosure Cc Jason Smith Master File DENR DWo Laboratory Section NC Wastewater/Groundwater Laboratory Certification Branch 1623 Mail Service Center, Raleigh, North Carolina 27699-1623 Location: 4405 Reedy Creek Road. Raleigh, North Carolina 27607-6445 Phone: 919-733-3908 \ FAX: 919-733-6241 Internet: www.dwglab.org One NorthCarolina Nat 7 An Equal opportunity \ Affirmative Action Employer LABORATORY NAME: NPDES PERMIT #: ADDRESS: CERTIFICATE #: DATE OF INSPECTION: TYPE OF INSPECTION: AUDITOR(S): LOCAL PERSON(S) CONTACTED: H4 I I :IQ III LollLe al On -Site Inspection Report Town of Boone Jimmy Smith WWTP NCO020621 P.O. Drawer 192 Boone, NC 28607 186 July 10, 2012 Municipal Maintenance Jason Smith Karen Reece and Rudy Broschinski This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: This was an abbreviated audit. Since the last inspection, the laboratory has begun analyzing Turbidity and Fecal Coliform samples for the National Committee for the New River. The laboratory does not charge a fee to perform this service. The laboratory was already certified for Fecal Coliform, and obtained certification for Turbidity in order to analyze these samples. The laboratory was clean and well organized and had all the equipment necessary to perform the analyses. In addition to auditing Fecal Coliform and Turbidity, the effects and requirements regarding the Methods Update Rule were discussed. On May 18, 2012, EPA promulgated changes to the list of Clean Water Act (CWA) methods at 40 CFR Part 136.3. This action, referred to as the Methods Update Rule (MUR) approves new methods, or changes to existing methods, that affects over 100 EPA methods, Standard Methods, ASTM methods, and other test procedures in Part 136 of Title 40 of the Code of Federal Regulations (CFR). The rule also contains a number of clarifications relating to approved methods, sample preservation and holding times, and method modifications. The final rule may be found at: http://water.epa.gov/scitech/methods/cwa/update index.cfm. The North Carolina Wastewater/ Groundwater Laboratory Certification (NC WW/GW LC) program will be asking certified laboratories to move toward implementation of the new rule with changes fully implemented by the end of 2012. Each laboratory will need to review the MUR and evaluate its effect on current laboratory practices. These changes must be made in the laboratory's Standard Operating Procedures and in Quality Manuals, as well as any other place where the method is cited, e.g., reports, benchsheets, logs, etc. During this transition period, inspection reports will refer to the methods employed at the laboratory at the time of the inspection, but will reference the requirements in the most recently approved version of the method. Any difficulties encountered with meeting the requirements of these references by the date due may be addressed in the written corrective action response. Page 2 #186 Town of Boone Jimmy Smith WWTP III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: No findings were noted. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing laboratory benchsheets to data submitted to the National Committee for the New River. Data were reviewed for January, February, and March, 2012. No transcription errors were detected. The facility appears to be doing a good job of accurately transcribing data. V. CONCLUSIONS: No findings were noted during the inspection. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Report prepared by: Jason Smith Date: July 26, 2012 Report reviewed by: Chet Whiting Date: July 27, 2012