Loading...
HomeMy WebLinkAboutNC0081825_Inspection_20221213United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code 1 IN I 2 IL 21IIIIII NPDES yr/mo/day Inspection I 3 I NC0081825 111 121 22/12/13 117 Type 1810I IIIIIIIIIII Inspector Fac Type 19I S I 2011 IIIIIIIIIII IIIIIII I IIIIII P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 I 7° I I 711 172 I N I 73I 1 74 71 I I J I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES Dermit Number) Ansonville WWTP NCSR 1627 Ansonville NC 28007 Entry Time/Date 10:OOAM 22/12/13 Permit Effective Date 21/07/01 Exit Time/Date 12:30PM 22/12/13 Permit Expiration Date 24/01/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Christopher J Mullis/ORC/704-776-8916/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Daniel Lane Wilson,PO Box 106 Ansonville NC 280070106//704-826-8404/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran Facility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) Hughie White of Inspector(s) Agency/Office/Phone and Fax Numbers �Docusigneaby: DWR/FRO WQ/910-433-3300 Ext.708/ Alug / 1Oh -49E06C80007E432... Date 1/6/2023 Signature of Management Mark Brantl Q A Reviewer Agency/Office/Phone and Fax Numbers Date DocuSigned by: y Ilitztj& broxi AWR/FRO WQ/910-433-3300 Ext.727/ 1/9/2023 �E4E1A9691 DB248E... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 31 NPDES yr/mo/day NC0081825 111 121 22/12/13 I17 Inspection Type 18 [j 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Records and log books appeared to be well organized and maintained. The ORC visitation log appeared to be complete and current. Laboratory data was reviewed and all data that was reviewed appeared to be correct, as reported on the DMR's. The facility appeared to be operated and maintained properly with very good housekeeping. At the time of this inspection, the effluent appeared to be very clear with no visible solids. Page# 2 Permit: NC0081825 Inspection Date: 12/13/2022 Owner - Facility: Ansonville WWTP Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable II ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ El ❑ application? Is the facility as described in the permit? • ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ ❑ • ❑ Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑ Comment: Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? • ❑ ❑ ❑ Is all required information readily available, complete and current? • ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? • ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? • ❑ ❑ ❑ Is the chain -of -custody complete? • ❑ ❑ ❑ Dates, times and location of sampling • Name of individual performing the sampling • Results of analysis and calibration • Dates of analysis • Name of person performing analyses • Transported COCs ■ Are DMRs complete: do they include all permit parameters? • ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ • (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified ❑ ❑ • ❑ operator on each shift? Is the ORC visitation log available and current? • ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? • ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility • ❑ ❑ ❑ classification? Page# 3 Permit: NC0081825 Inspection Date: 12/13/2022 Owner - Facility: Ansonville WWTP Inspection Type: Compliance Evaluation Record Keeping Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Comment: A copy of the current permit is not being kept on site. Bar Screens Type of bar screen a.Manual b.Mechanical Are the bars adequately screening debris? Is the screen free of excessive debris? Is disposal of screening in compliance? Is the unit in good condition? Comment: Yes No NA NE ❑ • ❑ ❑ ❑ ❑ ❑ • Yes No NA NE • • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Diffused Is the basin free of dead spots? • ❑ ❑ ❑ Are surface aerators and mixers operational? ❑ ❑ • ❑ Are the diffusers operational? • ❑ ❑ ❑ Is the foam the proper color for the treatment process? • ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? • ❑ ❑ ❑ Is the DO level acceptable? • ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/I) • ❑ ❑ ❑ Comment: Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Yes No NA NE • ❑ ❑ ❑ • ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 4 Permit: NC0081825 Inspection Date: 12/13/2022 Owner - Facility: Ansonville WWTP Inspection Type: Compliance Evaluation Secondary Clarifier Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Disinfection -Tablet Yes No NA NE Are tablet chlorinators operational? • ❑ ❑ ❑ Are the tablets the proper size and type? • ❑ ❑ ❑ Number of tubes in use? 1 Is the level of chlorine residual acceptable? ❑ ❑ ❑ • Is the contact chamber free of growth, or sludge buildup? • ❑ ❑ ❑ Is there chlorine residual prior to de -chlorination? ❑ ❑ El • Comment: De -chlorination Yes No NA NE Type of system ? Tablet Is the feed ratio proportional to chlorine amount (1 to 1)? • ❑ ❑ ❑ Is storage appropriate for cylinders? El El • ❑ # Is de -chlorination substance stored away from chlorine containers? • El El El Comment: Are the tablets the proper size and type? • El El El Are tablet de -chlorinators operational? • ❑ ❑ ❑ Number of tubes in use? 1 Comment: Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ • ❑ Page# 5 Permit: NC0081825 Inspection Date: 12/13/2022 Owner - Facility: Ansonville WWTP Inspection Type: Compliance Evaluation Flow Measurement - Effluent Yes No NA NE Comment: The flow meter was calibrated in October. Pump Station - Effluent Yes No NA NE Is the pump wet well free of bypass lines or structures? • ❑ ❑ ❑ Are all pumps present? • ❑ ❑ ❑ Are all pumps operable? • ❑ ❑ ❑ Are float controls operable? • ❑ ❑ ❑ Is SCADA telemetry available and operational? • ❑ ❑ ❑ Is audible and visual alarm available and operational? • ❑ ❑ ❑ Comment: Effluent Sampling Yes No NA NE Is composite sampling flow proportional? ❑ • ❑ ❑ Is sample collected below all treatment units? • ❑ ❑ ❑ Is proper volume collected? ■ ❑ ❑ ❑ Is the tubing clean? • ❑ El El # Is proper temperature set for sample storage (kept at less than or equal to 6.0 • ❑ ❑ ❑ degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type • ❑ ❑ ❑ representative)? Comment: Compostie samples are collected at timed intervals. Page# 6