Loading...
HomeMy WebLinkAbout#672_2016_0719_BS_FINAL INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 672 Laboratory Name: Piedmont Triad Regional Water Authority Inspection Type: Technical Assistance Inspector Name(s): Beth Swanson Inspection Date: 7/19/2016 Date Report Completed: 7/21/2016 Date Forwarded to Reviewer: 7/22/2016 Reviewed by: Nick Jones Date Review Completed: 7/22/2016 Cover Letter to use: Insp. Initial Insp. Reg. Insp. No Finding Insp. CP Corrected Insp. Reg. Delay Unit Supervisor/Chemist III: Gary Francies Date Received: 7/22/2016 Date Forwarded to Admin: 7/27/2016 Date Mailed: _____________________________________________________________________ Special Mailing Instructions: On-Site Inspection Report LABORATORY NAME: Piedmont Triad Regional Water Authority NPDES PERMIT #: NC0087866 ADDRESS: 7297 Adams Farm Rd Randleman, NC 27317 CERTIFICATE #: 672 DATE OF INSPECTION: July 19, 2016 TYPE OF INSPECTION: Technical Assistance AUDITOR(S): Beth Swanson LOCAL PERSON(S) CONTACTED: Kimberlie Temple I. INTRODUCTION: This laboratory was inspected by a representative of the North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) program to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: Ms. Kimberlie Temple accepted the offer of technical assistance after getting two unacceptable results on Suspended Residue Proficiency Testing (PT) samples. The laboratory was given the opportunity to analyze two consecutive quick response PTs with acceptable results in lieu of decertification. During the technical assistance visit, one PT and a discharge sample were analyzed in front of the auditor. The other PT was analyzed the following day and both PTs were within acceptance limits. Suspended Residue was the only parameter reviewed and nothing was revealed as the cause of the unacceptable results. The laboratory submitted their Standard Operating Procedure (SOP) document in advance of the inspection. This document was reviewed and editorial revision requirements and recommendations were made by this program outside of this formal report process. Although subsequent revisions were not requested to be submitted, they must be completed by July 21, 2017. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: No Findings were noted. IV. PAPER TRAIL INVESTIGATION: No paper trail was conducted due to the nature of the inspection. V. CONCLUSIONS: No Findings were noted during the inspection. The inspector would like to thank the staff for their assistance. No response is required. Report prepared by: Beth Swanson Date: July 21, 2016 Report reviewed by: Nick Jones Date: July 22, 2016