Loading...
HomeMy WebLinkAbout#5314_2016_0916_NJ_FINALINSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: Laboratory Name: Inspection Type: Inspector Name(s): Inspection Date: Date Report Completed: Date Forwarded to Reviewer: Reviewed by: Date Review Completed: 5314 City of New Bern WWTP (Field) Field Municipal Maintenance Nick Jones September 6, 2016 September 19, 2016 September 19, 2016 Tonia Springer September 19, 2016 Cover Letter to use: ❑Insp. Initial ❑Insp. No Finding MCorrected ❑Insp. Reg Dins . CP ❑Insp. Reg. Delay Unit Supervisor/Chemist III: Date Received: Date Forwarded to Admin.: Date Mailed: Special Mailinq Instructions: Todd Crawford September 19, 2016 September 20, 2016 September 22, 2016 Water Resources ENVIRONMENTAL QUALITY September 21, 2016 5314 Ms. Cheryl King City of New Bern WWTP (Field) 307 Glenburnie Drive New Bern, NC 28560- PAT MCCRORY DONALD R. VAN DER VAART S. JAY ZIMMERMAN SUBJECT: North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) Maintenance Inspection Dear Ms. King: Enclosed is a report for the inspection performed on September 6, 2016 by Nick Jones. Since the Finding(s) cited during the inspection were all corrected prior to the completion of the enclosed report, a response is not required. The staff is commended for taking the initiative in correcting the Findings in such a timely manner. For Certification maintenance, your laboratory must continue to carry out the requirements set forth in 15A NCAC 2H .0800. Copies of the checklists completed during the inspection may be requested from this office. Thank you for your cooperation during the inspection. If you wish to obtain an electronic copy of this report by electronic mail, or if you have questions or need additional information, please contact me at (919) 733- 3908 ext. 251. Sincerely, Todd Crawford Technical Assistance & Compliance Specialist NC WW/GW Laboratory Certification Branch Attachment cc: Dana Satterwhite, Nick Jones, Master File #5314 LABORATORY NAME: City of New Bern WWTP (Field) NPDES PERMIT #: WQ0003765 WQ0017635 ADDRESS: 307 Glenburnie Drive New Bern, NC 28560 CERTIFICATE #: 5314 DATE OF INSPECTION: September 6, 2016 TYPE OF INSPECTION: Field Municipal Maintenance AUDITOR(S): Nick Jones LOCAL PERSON(S) CONTACTED: Cheryl King I. INTRODUCTION: This laboratory was inspected by a representative of the North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) program to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The facility has all the equipment necessary to perform the analyses. Records are well organized and easy to retrieve. Staff was forthcoming and proactive to adopt necessary changes. All required Proficiency Testing (PT) samples have been analyzed for the 2016 PT calendar year and the graded results were 100% acceptable. Contracted analyses are performed by Environment 1, Inc. (Certification # 10) and City of New Bern WWTP Lab (Certification # 118). Current Quality Assurance Policies for Field Laboratories and Approved Procedure documents for the analysis of the facility's currently certified methods were provided at the time of the inspection. III. FINDINGS REQUIREMENTS COMMENTS AND RECOMMENDATIONS: Quality Control Comment: The laboratory needed to increase the documentation of purchased materials and reagents. The NC WW/GW LC Quality Assurance Policies for Field Laboratories document states: All chemicals, reaaents, standards and consumables used by the laboratory must have the followina information documented: Date Received, Date Opened (in use), Vendor, Lot Number, and Expiration Date. A system (e.g., traceable identifiers) must be in place that links standard/reagent preparation information to analytical batches in which the solutions are used. Documentation of solution preparation must include the analyst's initials, date of preparation, the volume or weight of standard(s) used, the solvent and final volume of the solution. This information as well as the vendor and/or manufacturer, lot number, and expiration date must Page 2 #5314 City of New Bern WWTP (Field) be retained for chemicals, reagents, standards and consumables used for a period of five years. Consumable materials such as pH buffers and lots of pre -made standards are included in this requirement. Notification of acceptable corrective action (i.e., updated pH and Total Residual Chlorine benchsheets containing all required elements of traceability with an implementation date of September 8, 2016) was received by email on September 9, 2016. No further response is necessary for this Finding. Dissolved Oxygen — Standard Methods, 4500 O G-2001 (Aqueous) pH — Standard Methods, 4500 H+ B-2000 (Aqueous) Temperature — Standard Methods, 2550 B-2000 (Aqueous) Comment: The benchsheets for Dissolved Oxygen, pH and Temperature did not document pertinent data: Facility Name. The NC WW/GW LC Approved Procedure for the Analysis of Dissolved Oxygen, the NC WW/GW LC Approved Procedure for the Analysis of pH and the NC WW/GW LC Approved Procedure for the Analysis of Temperature documents state: The following must be documented in indelible ink whenever sample analysis is performed: Facility Name. Acceptable corrective action (i.e., benchsheets were updated to include Facility Name with an implementation date of September 8, 2016) was submitted by email on September 14, 2016. No further response is necessary for this Finding. Dissolved Oxygen — Standard Methods, 4500 O G-2001 (Aqueous) pH — Standard Methods, 4500 H* B-2000 (Aqueous) Chlorine, Total Residual - Hach 10014 ULR (Aqueous) Comment: The benchsheets for Dissolved Oxygen, pH and Total Residual Chlorine did not document pertinent data: Instrument Identification. The NC WW/GW LC Approved Procedure for the Analysis of Dissolved Oxygen, the NC WW/GW LC Approved Procedure for the Analysis of pH and the NC WW/GW LC Approved Procedure for the Analysis of Total Residual Chlorine documents state: The following must be documented in indelible ink whenever sample analysis is performed: Instrument identification. Notification of acceptable corrective action (i.e., benchsheets were updated to include Instrument Identification with an implementation date of September 8, 2016) was submitted by email on September 9, 2016. No further response is necessary for this Finding. Chlorine, Total Residual - Hach 10014 (Aqueous) Comment: The benchsheets for Total Residual Chlorine did not document pertinent data: meter calibration time and the true value of the daily check standard. The NC WW/GW LC Approved Procedure for the Analysis of Total Residual Chlorine document states: The following must be documented in indelible ink whenever sample analysis is performed: Meter calibration time; True value of check standard. Notification of acceptable corrective action (i.e., benchsheets were updated to include meter calibration time and the true value of the daily check standard with an implementation date of September 8, 2016) was submitted by email on September 9, 2016. No further response is necessary for this Finding. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing original records (e.g., laboratory benchsheets, logbooks, etc.) and contract lab reports to electronic Discharge Monitoring Reports (eDMRs) submitted to the North Carolina Division of Water Resources. Data were reviewed for City of New Bern WWTP (NPDES permit # WQ0003765) for January, February and March 2016. No transcription errors were detected. The facility appears to be doing a good job of accurately transcribing data. V. CONCLUSIONS: All Findings noted during the inspection were adequately addressed prior to the completion of this report. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Page 3 #5314 City of New Bern WWTP (Field) Report prepared by: Nick Jones Date: September 19, 2016 Report reviewed by: Tonja Springer Date: September 19, 2016