HomeMy WebLinkAbout19981125 Ver 1_Stormwater Info_20070921Transmittal
~~' '`
1~ Stantec Consulting Services Inc.
2127 Ayrsley Town Boulevard Ste. 300
Charlotte NC 28273
Tel: (704) 329-0900
Fax: (704) 329-0905
Stantec
To: Annette Lucas
Company: NCDENR-401 Wetlands Unit
Address: 2321 Crabtree Blvd. Ste 250
Raleigh, NC 27604
Phone:
Date: September 17, 2007
File: 73200237
Delivery: Fedex
From: Claudia Prado PE
^ For Your Information
^ For Your Approval
^ For Your Review
^ As Requested
RCIeI el l{ie. ~IQlielle~% SLV111111VQLe1 IYIa11Ql~~. elllell~° ~IYIr ~ 1
Attachment:
Copies Doc Date Pages Description
1 09.17.2007 CD-Tiff of Calculations & Exhibits
Ms. Lucas, please find enclosed the supporting data for the proposed revisions to the
previously submitted and approved Blakeney Stormwater BMP#1. We would like to
request a letter be forwarded to us permitting the grading of the pond as shown on the
exhibit map. If you have any questions or comments please contact our office.
STANTEC CON LTING SERVICES INC.
~-~~
CI udia Prado PE
Civil Designer
Tel: (980) 297-7659
Fax: (704) 329-0905
claudia.prado@stantec.com
C.
One Team.lnfinite Solutions.
cp v:\1732\active\73200237\design\doc1237-tm-ncdenr-lucas-20070917.doc
PROJECT
CALCULATIONS
BLAKENEY STORMWATER
CHARLOTTE, NO
CAROLINA
'`~, G~ ~~~' V ,''mss
SS~Q•0 ~ 's
~ ~ ~• O ~ e w
<a SEAL
028405 a
o Q.~.v
<v °
~~
= ~
9, •. F~/GIN Q~
°io~ C ••....•••' ,!G `ate`
Stantec Consulting
2127 Ayrsley Town Blvd.
Suite 300
Charlotte, North Carolina 28273
(704) 329-0900
Stantec PROJECT N0.73200237
DATE: September 17, 2007
MANAGEMENT
Project No. DWQ (to be provided by DWQ)
DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin,
design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed
operation and maintenance agreement. An incomplete submittal package will result in a request for additional
information and will substantially delay final review and approval of the project.
I. PROJECT INFORMATION (please complete the following information):
Project Name : ~1(k K~AlGY C ~2t~E21_Y L A M [~c--ti.t -1"ow-a C' Er~"~-2.
Contact Person: ~t~Gh~~~ ~C!-~~`r ~'c, Phone Number: (1c~~ ~ 32q OgOc:~
For projects with multiple basins, specify which basin this worksheet applies to:
Basin Bottom Elevation Jam- ~~o , O7 ft. (average elevation of the floor of the basin)
Permanent Pool Elevation 'S~1 t7 . o O ft. (elevation of the orifice invert out)
Temporary Pool Elevation 5q 2.25 ft. (elevation of the outlet structure invert in)
Permanent Pool Surface Area 5y ~ J8~ sq. ft. (water surface area at permanent pool elevation)
Drainage Area ~ ~ , 11 I ac. (on-site and off-site drainage to the basin)
Impervious Area 35 , I ac. (on-site and off-site drainage to the basin)
Permanent Pool Volume 2. ~4~,-~2,1o cu. ft. (combined volume of main basin and forebay)
Temporary Pool Volume ~ 32.x'1 ~ q cu. ft. (volume detained on top of the permanent pool)
Forebay Volume ~ 2,21 cu. ft.
SA/DA used o~ . ~ ~ (surface area to drainage area ratio)
Diameter of Orifice ~ in. (draw down orifice diameter)
II. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices manual
(N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code
Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have
been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of
why.
,--~ The temporary pool controls runoff from the 1 inch storm event.
The basin length to width ratio is greater than 3:1.
/ The basin side slopes are no steeper than 3:1.
~ A submerged and vegetated perimeter shelf at less than 6:1 is provided.
Vegetation to the permanent pool elevation is specified.
An emergency drain is provided to drain the basin.
The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
The temporary pool draws down in 2 to 5 days.
The forebay volume is approximately equal to 20% of the total basin volume.
pediment storage is provided in the permanent pool.
Access is provided for maintenance.
~ A minimum 30-foot vegetative filter is provided at the outlet.
A site specific operation and maintenance (O&M) plan is provided.
A vegetation management/mowing schedule is provided in the O&M plan.
Semi-annual inspections are specified in the O&M plan.
i A debris check is specified in the O&M plan to be performed after every storm event.
A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan.
A responsible party is designated in the O&M plan.
FORM SW~ 100 09/97 Page 1 of 1
bmp#1
WET POND BMP (Basin # 1) ProjectNo.: 73200238
PROJECT: Blakeney (Formerly Landen Town Center) -CHARLOTTE, NC Designed by: CIP
Checked by: RSK
Date: 3-Apr-07
Pond Draiange Area = as.a1 Acres
Impervious Percentage= 71.0
Impervious Area= 35.1 Acres
Normal Pool Depth= a.o feet
Normal Pool Side Slopes= 3:1
Normal Pool
Surface Area /Drainage Area (%)= 2.44
Surface Area Required= 52,516.11 sq. ft.
Normal Pool Volume= 162,216.14 cu. ft.
Runoff Coefficient for 1" Storm= Rv=o.o5+o.oos(I> Rv= o.ss in.iin.
Volume Required to Detain 1" Storm= (Design Rainfall) *(Rv)*(Drainage Area)
Volume Required to Detain 1" Storm= 2.s4 ac. ft.
Volume Required to Detain 1"Storm= 123,577.87 cu. ft.
Volume Provided to Detain 1" Storm= 132,719.70 cu. ft.
OUTLET STRUCTURES:
Principle Discharge Orifice:
°e^yuir ~d 1° StDrm ..°.elea~e Rate: 1" Storn Detention raleasa over 48 to 120 hours.
1" Storm Volume: z.a4 ac. ft.
48 Hour Release Rate: 0.72 cfs
120 Hour Release Rate: o.2s cfs
Q= Discharge,cfs 0.72
A= Cross-section area of smallest section,ft^2 A,ft"2= 0.0943
g= Acceleration due to gravity, 32.2 ftlsec^2 32.2 Diameter-, in. 4.1581
H= Head on pipe, ft 2.25 Diameter-, in. 3.0
C=Discharge coefficient (0.61-0.65) 0.63
Use Diameter PVC pipe, in.: 3.0 A,ft^2= 0.05
Q= Discharge,cfs 0.37
Release Time, Hrs. 92 OK
Dewatering Discharge Orifice:
Required Dewatering Release Rate: Normal Pool dewatered in less tnan 2a Hours.
24 Hour Release Rate: 1.ss cfs
0= Discharge,cfs 1.88
A= Cross-section area of smallest section,ft^2 A,ft^2= 0.1857
g=Acceleration due to gravity, 32.2 ft/sec^2 32.2 Diameter-, in. 5.8347
H= Head on pipe, ft 4.00 Diameter-, in. 6.0
C= Discharge coefficient (0.61-0.65) 0.63
Use Diameter PVC pipe, in.: 6.0 A,ft^2= 0.20
Q= Discharge,cfs 1.99
Release Time, Hrs. 23 OK
Principle Discharge Structures:
Number of Discharge Risers: 1 Bottom of Basin Elevation: 586.00
Diameter of Princilpe Discharge: 3 in. Principle Discharge Elevation: 590.00
Size of Discharge Risers: 48"X48" Concrtet Box Top of Discharge Risers Elevation: 592.25
Diameter of Discharge Barrels: 36 in. Emergency Spillway Elevation : 593.50
Diameter of Dewatering Orifice : 6 in. Top of Dam Elevation : 595.00
73200237-storage2-20070402.x1s Page 1 9/17/2007 9:15 AM
STORAGE#1
STAGE STORAGE (BASIN #1) Project No.: 73200238
PROJECT: Blakeney (Formerly Landen Town Center) -CHARLOTTE, NC Designed by: CIP
Checked by: RSK
FOREBAY A Permanent Pool Date: 3-Apr-07
ELEVATION AREA # STORAGE STORAGE CUMULATIVE CUMULATIVE
(FT) (SF) (AC) (AC-FT) (CU FT) (AC-FT) (CU FT)
587 7,585.00 0.17 0.00 3,792.50 ~ 0.00 ~ 3,792.50
588 9,558.96 0.22 0.20 8,571.98: 0.20- 12,364.48
589 11,623.20 0.27 0.24 10,591.08 0.4-~ 22,955.56
590 13,770.94 0.32 0.29 12,697.07: 0.73 35,652.63
FOREBAY B Permanent Pool
ELEVATION AREA AREA STORAGE STORAGE CUMULATIVE CUMULATIVE
587 1,216.16 0.03 0.00 608.08' 0.00 608.08
588 1,688.27 0.04 0.03 1,452.22 O.U3 2,060.30
589 2?30.90 0,05 0,04 1,959.59 o n;3 4,019.$$
590 2,844.03 0.07 0.06 2,537.47' ~~."4' 6,557.35
WET BMP Permanent Pool
ELEVATION AREA AREA STORAGE STORAGE
(FT) (SF) (AC) (AC-FT) (CU FT)
CUMULATIVE ~ CUMULATIVE
586 20,272.35 0.47 0.00 10136.18. O.uO~' 10,136.18
587 23,050.58 0.53 0.50 21,661.47- 0.5~~ 31,797.64
588 25,897.64 0.59 0.56 24,474.11 10~~, 56,271.75
589 31,798.20 0.73 0.66 28,847.92: 1.72. 85,119.67
590 37,974.79 0.87 0.80 34,886.50 2 52 120,006.17
COMPOSITE Temporary Pool
ELEVATION AREA AREA STORAGE STORAGE
(FT) (SF) (AC) (AC-FT) (CU FT)
590 54,589.76 1.25 0.00
CUMULATIVE ~ CUMULATIVE
591 58,705.46 1.35 1.30 56,647.61 ' `~ .:~(i 56,647.61
592 61,774.30 1.42 1.38 60,239.88' 2.68`- 116,887.49
593 64,883.39 1.49 1.45 63,328.85 4.14- 180,216.34
594 68,030.44 1.56 1.53 66,456.92' 5.66'. 246,673.25
SUMMARY:
Provided: Required:
Normal Pool Surface Area (Surface Area @ Elev. 590.00) 54,589.76 52,516.11 sq. ft.
TOTAL Normal Pool (Volume below Elev. 590.00) 162,216.14 cu. ft.
FORBAY Normal Pool (Volume below Elev. 590.00) 42,209.98 cu. ft.
Forebay Percentage of Normal Pool 26.02 20.00
TOTAL Temporary Pool (Volume between Elev. 590 & 592.25) 132,719.70 123,577.87 cu. ft.
73200237-storage2-20070402.x1s Page 2 9/17/2007 9:15 AM
forebays
FOREBAYS (BASIN # 1) ProjectNo.: 73200238
PROJECT: Blakeney (Formerly Landen Town Center) -CHARLOTTE, NC Designed by: CIP
Checked by: RSK
Date: 3-Apr-07
FOREBAY A
Pond Draiange Area = 4x.41 Acres
Forebay A Draiange Area = 40.73 Acres
Forebay 6 Draiange Area = s.ss Acres
49.41
Forebay A % of Total= o.s2
Forebay B % of Total= o.1s
Forebay Volume Requirements:
Total Forebay Volume Provided = 42,210 cu. ft.
Forebay AVolume = 34,765 cu. ft.
Foreba B Volume = 7,415 cu. ft.
73200237-storage2-20070402.x1s Page 3 9/17/2007 9:15 AM
Multi-Stage-1
Sta e-Dischar e S reedsheet Project No.: 73200237
Use with multi-stage outlet devices Designed by: CIP
PROJECT: Blakeney Heath -CHARLOTTE, NC Checked by: RSK
SWcture: Basin # 1 Date: 14-Oct-05
Orifice Equation: O = CA(2gh)°'S CMSWDM EQ. 7.8
Broad-Crested Weir Equation: O = CL(H~'S) CMSWDM E0.7.4
Blue indicates input values Sharp-Crested Weir Equation: O = [3.27 +0.4(H/Hc)]LH~'S CMSWDM EO.7.1
For Structures that are not used; make area and length zero
Outlet Number of
Type # Equation Size Invert CL Orif. Area Coefficient Length Outlets
Orifice 1 Orifice (in) 3 590.00 590.13 0.0491 0.60 N/A 1
Orifice 2 Orifice (in) 0.00 0.00 0.0000 0.60 N/A
RISER 3 Weir (ft) 2.25 X 3.25 592.25 592.25 11.0000 - 11.00 1
ES 4 Weir (ft) 10 X 1 593.00 593.00 10.0000 3.00 10.OD 1
BARREL 5 Orifice (in) 36 586.00 587.50 7.0686 0.60 NIA 1
Note: Area of Weir is the product of the L x H
Area of Orifice is Area of Circle based on the size in column D
SQ SE
Head (1) Head (2) Head (3) Head (4) Q (1) O (2) Q (3) Q (4) O (total) Q (Barrel) CHECK
Elevation (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) Elevation (cfs)
585.00 0.00 585.00 0.00 0.00 0.00 0.00 #DIV/D! 0.00 #DIVIO! 585.00 0.00 #DIV/0!
585.50 0.00 585.50 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIV(0! 585,50 0.00 #DIV/0!
586.00 0.00 586.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIV/0! 586.00 0.00 #DIV/0i
586.50 0.00 586.50 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIV/D! 586.50 0.00 #DIV/0!
587.00 0.00 587.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIV10! 587.00 0.00 #DIV/O!
587.50 0.00 587.50 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIV/0! 587.50 0.00 #DIV/0!
588.00 0.00 588.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIV10i 588.00 0.00 #DIVlOi
586.50 0.00 568.50 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIVIO! 588.50 0.00 #DIVlO!
589.00 0.00 589.00 0.00 0.00 0.00 0.00 #DIV/O! 0.00 #DIV(0! 589.00 0.00 #DIV/0!
589.50 0.00 589.50 0.00 0.00 0.00 0.00 #DIV/O! 0.00 #DIV/0! 589.50 0.00 #DIV/0!
590.00 0.00 590.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIVlO! 590.00 0,00 #DIV/0!
590.50 0.38 590.50 0.00 0.00 0.14 0.00 0.00 0.00 0.14 590.50 20,84 OK
591.00 0.88 591.00 0.00 0.00 0.22 0.00 0.00 0.00 0.22 591.00 31.84 OK
591.50 1.38 591.50 0.00 0.00 0.28 0.00 0.00 0.00 0.28 591.50 39.91 OK
592.00 1.88 592.00 0.00 0.00 0.32 0.00 0.00 0.00 0.32 592.00 46.60 OK
592.50 2.38 592.50 0.25 0.00 0.36 0.00 4.55 0.00 4.92 592.50 52.45 OK
593.00 2.88 593.00 0.75 0.00 0.40 0.00 24.11 0.00 24.51 593.00 57.71 OK
593.50 3.38 593.50 1.25 0.50 0.43 0.00 52.55 10.61 63.59 593.5D 62.53 OK
594.00 3.88 594.00 1.75 1.00 0.47 0.00 87.87 30.00 118.34 594.00 67.00 TRY AGAIN
594.50 4.38 594.50 2.25 1.50 0.49 0.00 129.04 55.11 184.64 594.5D 71.19 TRY AGAIN
0.00 0.00 0.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIV(0! O.DD 0.00 #DIVlOi
0.50 0.00 0.50 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIVI01 0,50 0.00 #DIV/0!
1.00 0.00 1.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIVIO! 1,00 0.00 #DIV/O!
1.50 0.00 1.50 0.00 0.00 0.00 0.00 #DIV/O! 0.00 #DIVlO! 1.50 0.00 #DIV/O!
2.00 0.00 2.00 0.00 0.00 0.00 0.00 #DIV/01 0.00 #DIV(O! 2.00 0.00 #D1V/0!
2.50 0.00 2.50 0.00 0.00 0.00 0.00 #DIV/O! 0.00 #DIV/O! 2.50 0.00 #DIV/O!
3.00 0.00 3.00 0.00 0.00 0.00 0.00 #DIV/O! 0.00 #DIV(0! 3.00 0.00 #DIV/O!
3.50 0.00 3.50 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIV(0! 3.50 0.00 #DIVIO!
4.00 0.00 4.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIVIO! 4.00 0.00 #DIVIO!
4.50 0.00 4.50 0.00 0.00 0.00 0.00 #DIV/01 0.00 #DIVIO! 4.50 0.00 #DIV/0!
5.00 0.00 5.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIV/0! 5,00 0.00 #DIV/O!
73200237-DETENTION-20051011.x1s Page 1 9/17/2007 12:53 PM
xxx,~xxxxxxx~xx,.,~,.x_x___,._r_______________
* *
* FLOOD HYDROGRAPH PACKAGE (HEC-1)
* JUN 1998
* VERSION 4.1
*
* RUN DATE 17SEP07 TIME 13:26:20
*
*****************************************
X X XXXXX XX XXX XX X
X X X X X XX
X X X X X
XXX XXXX XXXX X XXX XX X
X X X X X
X X X X X X
X X XXXXX XX XXX XX XXX
* *
* U.S. ARMY CORPS OF ENGINEERS
* HYDROLOGIC ENGINEERING CENTER
* 609 SECOND STREET
* DAVIS, CALIFORNIA 95616
* (916) 756-1104
*
*rr*************a~***********************
THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HEC1 (JAN 73), HECIGS, HECIDB, AND HECIKW.
THE DEFINITIONS OF VARIABLES -RTIMP- AND -RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE.
THE DEFINITION OF -AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION
NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY,
DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION
KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM
LINE ID.......1.......2.......3.......4.......5.......6.......7.......8.......9......10
1 ID 73200238 Blakeney Storm Mgmt Plan
2 ID
3 ID *~~~**+x+ ~+*****+x ~****~+x•
4 ID
5 ID Charlotte North Carolina
6 ID WET POND (BASIN 1)
7 ID STANTEC
8 ID 09/17/2007
9 IT 1 0 0 1000
10 IO 5
11 KK lOYEAR EVENT
12 KM 10 YEAR 6 HOUR RAINFALL
13 KO 0 0 0 0 21
14 PB 3.72
15 IN 5
16 PI 0 .011 .Oll .Oll .012 .012 .012 .013 .013 .013
17 PI .014 .014 .015 .015 .016 .016 .017 .018 .018 .023
18 PI .024 .025 .026 .027 .029 .036 .039 .042 .045 .049
19 PI .054 .079 .089 .103 .161 .201 .395 .590 .275 .177
20 PI .112 .095 .084 .057 .051 .047 .043 .040 .038 .030
21 PI .028 .027 .025 .024 .023 .019 .018 .017 .017 .016
22 PI .016 .015 .015 .014 .014 .013 .013 .012 .012 .012
23 PI .011 .011 .011 0.0
24 KO 0 0 0 0 21
25 BA 0.0772
26 LS 0 73.52
27 UD .1000
28 KK l0YRB1ROUTED lO YR STORM EVENT BASIN #1
29 KM COMPUTE HYDROGRAPH FOR POST-DEVELOPMENT ROUTED THROUGH DETENTION BASIN
30 KO 0 0 0 0 21
31 RS 1 ELEV 590.00
32 SV 0.0 0.89 1.97 3.18 4.51
33 SE 590.0 591.0 592.0 593.0 594.0
34 SQ 0 0.14 0.32 4.92 24.51 63.59 118.34
35 SE 590.0 591.0 592.0 592.50 593.0 593.5 594.0
36 KK 50 YEAR EVENT
37 KM 50 YEAR 6 HOUR RAINFALL
38 KO 0 0 0 0 21
39 PB 4.92
40 IN 5
41 PI 0 .016 .016 .016 .017 .018 .018 .019 .019 .019
42 PI .020 .020 .021 .022 .022 .023 .024 .025 .026 .031
43 PI .032 .034 .035 .037 .039 .050 .053 .056 .061 .066
44 PI .073 .103 .116 .134 .208 .259 .508 .750 .354 .229
45 PI .146 .124 .109 .077 .069 .063 .059 .055 .051 .040
46 PI .038 .036 .034 .033 .031 .026 .025 .024 .024 .023
47 PI .022 .021 .021 .020 .020 .019 .019 .016 .018 .017
48 PI .017 .016 .016 0.0
49 KO 0 0 0 0 21
50 BA 0.0772
51 LS 0 73.52
52 UD .1000
LINE ID .......1 .......2 .......3.......4 .......5.......6.......7.......8.......9......10
53 KK 50YRB1ROUTED S OYR STORM EVENT BASIN #1
54 KM COMPUTE HYDROGRAPH FOR POST-DEVELOPMENT ROUTED THROUGH DETENTION BASIN
55 KO 0 0 0 0 21
56 RS 1 ELEV 590.00
57 SV 0.0 0.89 1.97 3.18 4.51
58 SE 590.0 591.0 592.0 593.0 594.0
59 SQ 0 0.14 0.32 4.92 24.51 63.59 118.34
60 SE 590.0 591.0 592.0 592.50 593.0 593.5 594.0
61 ZZ
*
* FLOOD HYDROGRAPH PACKAGE (HEC-1)
* JUN 1998
* VERSION 4.1
*
* RUN DATE 17SEP07 TIME 13:26:20
*
*****************************************
73200238 Blakeney Storm Mgmt Plan
***************************
Charlotte North Carolina
WET POND (BASIN 1)
STANTEC
09/17/2007
10 IO OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IT HYDROGRAPH TIME DATA
NMIN 1 MINUTES IN COMPUTATION INTERVAL
IDATE 1 0 STARTING DATE
ITIME 0000 STARTING TIME
NQ 1000 NUMBER OF HYDROGRAPH ORDINATES
NDDATE 1 0 ENDING DATE
NDTIME 1639 ENDING TIME
KENT 19 CENTURY MARK
COMPUTATION INTERVAL .02 HOURS
TOTAL TIME BASE 16.65 HOURS
ENGLISH UNITS
DRAINAGE AREA SQUARE MILES
PRECIPITATION DEPTH INCHES
LENGTH, ELEVATION FEET
FLOW CUBIC FEET PER SECOND
STORAGE VOLUME ACRE-FEET
SURFACE AREA ACRES
TEMPERATURE DEGREES FAHRENHEIT
* *
* U.S. ARMY CORPS OF ENGINEERS
* HYDROLOGIC ENGINEERING CENTER
* 609 SECOND STREET
* DAVIS, CALIFORNIA 95616
* (916) 756-1104
*
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
**************
* *
11 KK * lOYEAR * EVENT
* *
**************
13 KO OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IPNCH 0 PUNCH COMPUTED HYDROGRAPH
IOUT 21 SAVE HYDROGRAPH ON THIS UNIT
ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED
ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED
TIMINT .017 TIME INTERVAL IN HOURS
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** **x *** *** x** **: *** *** *** ***
**************
* *
11 M 1~lntuc - rev ru~i
**************
24 KO OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IPNCH 0 PUNCH COMPUTED HYDROGRAPH
IOUT 21 SAVE HYDROGRAPH ON THIS UNIT
ISAVl 1 FIRST ORDINATE PUNCHED OR SAVED
ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED
TIMINT .017 TIME INTERVAL IN HOURS
* *
28 KK * l0YRB1 * ROUTED lOYR STORM EVENT BASIN #1
* *
**************
30 KO OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IPNCH 0 PUNCH COMPUTED HYDROGRAPH
IOUT 21 SAVE HYDROGRAPH ON THIS UNIT
ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED
ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED
TIMINT .017 TIME INTERVAL IN HOURS
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
*
36 KK * 50 YEA * R EVENT
* *
**************
38 KO OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IPNCH 0 PUNCH COMPUTED HYDROGRAPH
IOUT 21 SAVE HYDROGRAPH ON THIS UNIT
ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED
ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED
TIMINT .017 TIME INTERVAL IN HOURS
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
**************
* *
36 KK * 50 YEA * R EVENT
* *
**************
49 KO OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IPNCH 0 PUNCH COMPUTED HYDROGRAPH
IOUT 21 SAVE HYDROGRAPH ON THIS UNIT
ISAVl 1 FIRST ORDINATE PUNCHED OR SAVED
ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED
'1'1M1N"1" .V1/ 11CIE ttV1G1GVHL 11v nVVacJ
*** **t *** +t t it *~F* *** *~F* *~k* *** **!~ t** **+t *** **~* *ir* *** *:k* *** *ir i~ *** **:t *** 'k*t *** *ir :t is** *** ie** **t *** *** *** **:t
*****1~t***~F**1~
* *
53 KK * SOYRBl *
* *
**************
ROUTED 50YR STORM EVENT BASIN #1
55 KO OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IPNCH 0 PUNCH COMPUTED HYDROGRAPH
IOUT 21 SAVE HYDROGRAPH ON THIS UNIT
ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED
ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED
TIMINT .017 TIME INTERVAL IN HOURS
PEAK
OPERATION STATION FLOW
HYDROGRAPH AT lOYEAR 118
ROUTED TO l0YRB1 25
HYDROGRAPH AT 50 YEA 193
ROUTED TO 50YRB1 83
RUNOFF SUMMARY
FLOW IN CUBIC FEET PER SECOND
TIME IN HOURS, AREA IN SQUARE MILES
TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD
PEAK 6-HOUR 24-HOUR 72-HOUR
3.25 11. 4. 4.
3.73 7. 3. 3.
3.23 19. 7. 7.
3.47 15. 5. 5.
BASIN MAXIMUM TIME OF
AREA STAGE MAX STAGE
.OS
.08 593.00 3.73
.OB
.OB 593.68 3.47
*** NORMAL END OF HEC-1 ***
m
w
x
v,
J
z
0
V:\1732\active\73200237\_LD\dwg\73200237_grad-20D51011.dwg AucusT, 2007
2005-10-24 0 :18PM By: cprado 73200237
Notes Client/Project
Stantec Consulting Services Inc. BLAKENEY HEATH
~,~~~`' ~ , 2127 Ayrsley Town Blvd. Ste 300
s
~~ ~~~ Charlotte NC U.S.A.
C~'_ ~ k,.;'%? ` 28273
Tel. 704.329.0900
$'~71'1~C Fax, 704.329.0905
www,stantec.cam
0 400' 600' 800'
1 "=400' ~^ ^ ^ ^
LIMITED PARTNERSHIP
Figure No.
1.0
Title
BMP DRAINAGE
AREA MAP
N(ITFS
BEST MANAGEMENT PRACTICES PLANTING
DETAILS
ARREL
NO PLANTING
MATERIAL WITHIN
nrrF~~ ~
1. WETLAND PLANT SPECIFICATIONS H.A.R.P. SELECTION AND
PLANTING GUIDE FOR AQUATICAND WETLAND PLANTS IN THE
PIEDMONT REGIONOF NORTH CAROLINA.
2. BENCHMARK AND CLEANOUT DEPTH REFERENCED ON PLAN FOR
FOREBAY.
POND #1 PLANTING SCHEDULE
KEY SPECIES (SPACING)* SIZE
LITTORAL SHELF
1 SOFT RUSH (1.0') 1 GAL
2 SWEETFLAG 2.0' 1 GAL
3 BLUE FLAG IRIS 1.0' 1 GAL
4 YELLOW IRIS 2.0' 1 GAL
* SPACING REQUIREMENTS AND NUMBER OF PLANTS NEEDED FOR
UNIFORM COVER IN 1 YEAR
m
Z
x
z
0
ABBREVIATIONS LIST:
GAL=GALLON POT OT=QUART POT LG BR=LARGE, BARE-ROOT
V:\1732\active\73200237\_LD\dwg\73200237_grad-20051011,dwg AUGUST 2007
2005-10-24 D ;18PM Bv: cprado 73200237
Notes Client/Project
Stantec Consulting Services Inc. BLAKENEY HEATH
~L '
,,~/ ~ 2127 Ayrsley Town Blvd, Ste 300 LIMITED PARTNERSHIP
~~~,a'~ Charlotte NC U.S.A.
~~ `'~ '~`3 28273
Tel. 704.329.0900
~~ Fax, 704.329.0905
www.stantec.com
a 400' soo' 800'
1 "=400' ~~~~~,
Figure No.
z.o
Title
BMP PLANTING
DETAIL