Loading...
HomeMy WebLinkAboutSWA000180_Design Calculations_20230105Catawba Village Site Address: 5523-5597 E NC 150 HWY Maiden, NC 28650 Catawba County, NC Owner/Developer: North State Development, LLC 18825 W. Catawba Ave, Suite 250 Cornelius, NC 28031 Stormwater Calculations FOR: Catawba Village December 2022 American Engineering Associates — Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 www.American-EA.com AMERICAN Engineering AMERICAN Engineering Catawba Village Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com ENGINEER CERTIFICATION I HEREBY CERTIFY THAT SPECIFICATIONS CONTAINED HEREIN AND THE ACCOMPANYING CALCULATIONS WERE PREPARED BY ME OR UNDER MY DIRECT SUPERVISION. SIGNED, SEALED AND DATED THIS Z D DAY OF i 'VA 7-op�2 oso�m,,4aY 1M It `6F BY: Barry M. Fav, PE COMPANY: American Engineering Associates — Southeast, PA TITLE: Principal AMERICAN Engineering Catawba Village Stormwater Calculations Table of Contents American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com Title Page No. Narrative 1 Construction Sequence 3 Vicinity Map 5 Soils Map 6 USGS Quad Map 10 Flood Maps ..................................................................................................................... 11 Storm Drain Calculations ..................................................................................................................... System A - 10-Year Analysis Hydraflow Results System B - 10-Year Analysis Hydraflow Results System C - 10-Year Analysis Hydraflow Results System E - ...................................................................................................................... 10-Year Analysis Hydraflow Results Pond Calculations ......................................•.............................I Hydraflow Hydrograph Results and Pond Report Erosion and Sediment Control Calculations Sediment Basin Calculations Temporary Diversion Ditch Calculations Slope Drain Calculations Riprap Apron Calculations Appendices .................. Drainage Area Map Erosion and Sediment Control Plan Phase 1 Erosion and Sediment Control Plan Phase 2 AMERICAN Engineering Catawba Village Stormwater Calculations Site Narrative American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com The proposed project, Catawba Village, is a 240-unit apartment development located in unincorporated Catawba County, North Carolina. The site is located at 5523 to 5597 E. NC HWY 150, Maiden, NC 28650. There will be two driveway connections — one to NC HWY 150 and the other to a private driveway that connect to NC HWY 16 Business. A wet pond will be constructed to provide stormwater quality and detention for the site. The site area is 17.171 acres and is made up of 5 parcels (368615547011, 368615535804, 368615538501, 368615532662 and 368615532208). This development will have approximately 14.83 acres of denuded area. The property is bordered to the east by commercial properties. The northern border of the site is NC HWY 150. South and east of the property and undeveloped land. This construction site includes the clearing and grubbing of existing land, grading of the existing site, and the construction of 240 apartment units along with the accompanying internal roads, sidewalk, utilities, and wet pond. Site development and grading will occur in one stage. That stage will have two phases of erosion control. The sediment basin has been designed for both phases of erosion control. Erosion and sediment control measures were sized using North Carolina Department of Environmental Quality (NCDEQ) requirements. Pre -Development Conditions The project site is located within an area having a zone designation X by the Federal Emergency Management Agency (FEMA) on Flood Insurance Rate Map (FIRM) Numbers 3710368600J, with a date of identification of August 16, 2007. The existing site is vacant land. Stormwater runoff primarily to the southwest of the site. The soil types identified within the project area are CaB and CaC (Cecil sandy loams); and AsB (Appling sandy loam). The soil types identified were used in determining Curve Numbers (CNs) for the onsite and offsite runoff. Post -Development Conditions The proposed site will consist of 240 townhome units (8 separate buildings), an amenity center, paved parking lots with curb and gutter and a concrete sidewalk as well as a wet pond located at the southwestern corner of the property. The site will be mass -graded and the denuded area is approximately 14.83 acres. Offsite roadway improvements are also proposed for NC-150. The hydrologic analysis conducted for the proposed project included the study of both onsite and offsite drainage areas for the temporary sediment basin as well as silt fence control measures. The analysis was conducted using the Soil Conservation Service (SCS) Hydrograph Method, as outlined in SCS Technical Release 55 (TR-55). AMERICAN Engineering Catawba Village Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com Hydrographs calculated using Hydraflow software were used to design the wet pond to treat the first inch of rainfall. The temporary sediment basin have been designed according to NCDEQ and Catawba County requirements. See attached calculations for more design information. The contents of this Stormwater Pollution Prevention Plan (SWPPP) were prepared for North State Development, LLC as the primary permittee seeking coverage under North Carolina's National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges from Construction (CGP). Unless required by the owner, this plan may also be used by secondary permittees to obtain coverage under the CGP. Summary The permanent wet pond and temporary sediment basin have been designed per Catawba County and NCDEQ standards. Furthermore, the sediment basin has been designed to achieve a minimum 80% trapping efficiency as required by the NCDEQ and meet the latest NPDES General Permit for Stormwater Discharge requirements. In conclusion, due to the existing site conditions and proposed development, the proposed project is not anticipated to have any negative impacts on any downstream or adjacent properties. American Engineering Associates -Southeast, PA. AM E RICAN 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226226 E n g i n e e r i n g OFFICE: 704.375.2438 www.American-EA.com Catawba Village Stormwater Calculations Construction Sequence 1. Obtain erosion and sediment control plan approval from Catawba County erosion and sediment control division. 2. 48 hours prior to any land -disturbance activity, set up an on site pre -construction conference with a Catawba county erosion control inspector to discuss the erosion control measures. 3. Make any required modifications to the erosion and sediment control plans. All modifications shall be documented on the on site approved plans. 4. Install gravel construction entrance off NC-150. 5. Install perimeter silt fence, temporary diversion ditch and sediment basin as shown on the plans clearing only as necessary to install these devices. 6. Call for on site inspection by erosion control inspector. When approval is obtained, clearing and grubbing may begin. 7. Limit clearing and grubbing of the site to areas that will be mass graded. Whenever possible, existing vegetation shall remain in place to prevent erosion of the site. 8. Begin mass grading activities. As site is graded and pads built up, the contractor shall minimize the amount of storm water flowing over fill slopes by using diversion ditches and slope drains. Additional measures may be needed as construction progresses. 9. Contractor shall limit drainage areas flowing to the proposed basin to the maximum area that is designated for the basin. This shall be accomplished by adjusting the proposed diversion ditches as the site is graded. 10. Contractor shall meet with the erosion control inspector prior to commencing with phase 2 erosion control measures. 11. Install any remaining phase 2 erosion control measures. 12. Continue mass grading activities. As site is graded and pads are built up, contractor shall minimize the amount of storm water flowing over fill slopes by using diversion ditches and slope drains. Additional measures may be needed as construction progresses. 13. Contractor shall limit drainage areas flowing to the proposed basin to the maximum area that is designated for the basin. This shall be accomplished by adjusting the proposed diversion ditches as the site is graded. 14. Maintain and adjust erosion and sediment control measures as mass grading progress to maintain proper erosion and sediment control. 15. Install inlet protection and other measures as shown on phase 2 plans as proposed storm sewer system is installed. 16. Construction of streets, the associated utilities, and laterals are to be completed and inspected. 3 American Engineering Associates -Southeast, PA. AM E RICAN 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226226 E n g i n e e r i n g OFFICE: 704.375.2438 www.American-EA.com Catawba Village Stormwater Calculations 17. All areas that go unworked for 14 days or more must be stabilized immediately. Stabilization standards should be maintained throughout the construction process. 18. Stripped topsoil shall be stockpiled with silt fence provided around the perimeter of the stockpile. 19. The contractor shall diligently and continuously maintain all erosion control devices and structures. 20. Stabilize the site as areas are brought to grade. 21. Inspect BMP once per every calendar week, per NCDEQ requirements. All inspections and reporting shall be in compliance with the NCDEQ general permit NCG010000, latest edition. 22. Coordinate with the erosion control inspector prior to conversion of the sediment basin into proposed permanent wet pond. 23. When vegetation is established, call for final site inspection and file a notice of termination with Catawba County/NCDEQ. 4 AMERICAN Engineering Catawba Village Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com LOCATION MAP 5 American Engineering Associates -Southeast, PA. A M E RI CA N 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226226 E n g i n e e r i n g OFFICE: 704.375.2438 www.American-EA.com Catawba Village Stormwater Calculations Hydrologic Soil Group —Catawba County, North Carolina 3 - (Catawba Village) 35' 33'2{N �S 35' 33'11'N 49M 49+OX 40M 494010 4NO70 3 Map 5mle: 1:2,670 if piated on A portrait (8.5' x I1") sheet. m Meters IN 0 35 70 140 210 rya A0 1m zm 4m en Mapprojecvon: Nkb Maraca- CiXrleroMr trNteS: WC584 Gdgetlm UT M Zme 17N Wr35&t U�Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 4941W k fya? Ni 35° 33'Ll"N 494i0 &1012021 Page 1 of 4 0 AMERICAN Engineering Catawba Village Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com Hydrologic Soil Group —Catawba County, North Carolina (Gabriel Village Soil Survey) MAP LEGEND MAP INFORMATION Area of Interest WI) p C The soil surveys that comprise your AO were mapped at Area of Interest (A01) o UD 1:15,&N- Sol& I7 D Warning: Sal Map may not be valid at this scale. Sail Rating Polygons 0 A p Not rafted or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the, detail of mapping and accuracy of sail 0 A!D Water Feamres line placement The maps do not show the small areas of Streams and Canals contrasting sails that could have been shown at a more detailed B scale- Transponauon 0 BID — Rails Please rely on the bar scale on each map sheet for map 0 C Inge figrmays measurements- 0 CJD US Randes Source of Map: Natural Resources Conservation Service 0 D Web Sol Survey DRL: Maier Roads Coordinate System: Web Mercator (EPSG:3857) 0 Not rated or rot availabe Local Roads Maps from the Web Sail Survey are based on the Web Mercator Soil Rating lines Baclqlrourb projection, which preserves direction and shape but distorts A distance and area- A projection that preserves area, such as #to ry JQ Anal Photogralchy Albers equalarea conic projection. should be used if more •+r ND accu rate calculations of distance or area are requtied- a This product i s generated from the USDA-NRCS certiried data as .-�► 111113 of the version, date(s) listed below- C Soil SurveyArea: Catawba County, North Carolina Survey Area Data: Version 17. Sep 26. 2017 COD Sol map units are labeled (as space allows) for map scales ,�. D 1:50,000 or larger- . w Not rand or not avaialle Date(s) aerial images were photographed: Apr 8, 2015--Nov28, Soil Rrtig Pam 2017 A The orthophoto or other base map on which the soil lines we re compiled and digitized probably differs from the background ■ AFD imagery displayed on these maps. As a result, some minor g shifting of map unit boundaries maybe evident. ■ WD t15flA Natural Resources i`illilill Conservation Service Web Sal Survey National Cooperative Sal Survey 6114f2016 Page 2 of 4 7 AMERICAN Engineering Catawba Village Stormwater Calculations Hydrologic Soil Group —Catawba County, North Carolina Hydrologic Soil Group American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com Catawba Village Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AsB CaB Appling sandy loam, 2 to 6 percent slopes B 3.9 24.4% 64.5% Cecil sandy loam, 2 to 6 percent slopes A 10.3 CaC Cecil sandy loam, 6 to 10 percent slopes A 1.8 11.1 % Totals for Area of Interest 16.0 100.0% 0 AMERICAN Engineering Catawba Village Stormwater Calculations Description American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie -break Rule: Higher 0 AMERICAN Engineering Catawba Village Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com USGS Topographic Map Portion of DENVER QUADRANGLE — 7.5 Minute Series 10 AMERICAN Engineering Catawba Village Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com mom u 3, 14 AiL i FEMA Flood Map Portion of Panel No. 3710368600J 11 STORM DRAIN CALCULATIONS A4 32 A6 Af. 34 15 13 33 A7 24 16 A9 12 A8 Al A A19 29 A18 A10 11 A16 Al2 28 31 A17 A13 10 30 35 23 27 A20 A15 A14 9 26 A21 A22 8 A2§9 A23 A25 A27 A24 7 37 A34 A33 38 22 5 A26 A35 25 21 A29 A37 20 A36 4 A31 19 36 A38 A30 A32 18 2 1 A39 Outfall Project File: C200074_Storm System A.stm Number of lines: 39 Date: 11/12/2021 Storm Sewers v2020.00 Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) 00 (ft) 00 (ft) (ft) 00 I End 40.673 0.13 10.29 0.90 0.12 7.65 5.0 13.0 5.2 39.67 46.90 7.53 36 0.49 913.02 913.22 915.07 915.36 916.43 922.43 A39-A40 2 1 109.490 0.24 9.64 0.90 0.22 7.22 5.0 12.6 5.2 37.82 47.16 5.65 36 0.50 913.22 913.77 916.10 916.34 922.43 923.08 A32-A39 3 2 12.000 0.36 9.35 0.90 0.32 6.97 5.0 10.7 5.6 38.86 47.16 5.50 36 0.50 913.77 913.83 916.87 916.91 923.08 923.19 A30-A32 4 3 124.722 0.00 9.00 0.00 0.00 &65 0.0 10A 5.7 37�57 47.17 5.32 36 0.50 913.83 914.45 917.34 917.74 923.19 924.86 A29-A30 5 4 83780 0.50 8.80 0.85 0.42 &51 5.0 101 5.7 3714 47.16 5.25 36 0.50 914.45 914.87 918.09 918.35 924.86 923.33 A26-A29 6 5 13.733 0.14 8.02 0.90 0.12 5.84 5.0 10.1 5.7 33.39 47.14 4.72 36 0.50 914.87 914.94 918.78 918.81 923.33 924.75 A24-A26 7 6 49.441 0.05 7.89 0.50 0.02 5.72 5.0 9.9 5.7 32.89 47.16 4.65 36 0.50 914.94 915.19 919.07 919.19 924.75 922.88 A23-A24 8 7 81711 0.24 7.84 0.85 0.20 5.70 5.0 9.6 5.8 33M 47.16 4.68 36 0.50 915.19 915.60 919.41 919.61 922.88 923.88 A22-A23 9 8 63.335 0.09 2.16 0.90 0.08 1.65 5.0 8.2 6.1 M08 15.99 3.21 24 0.50 915.60 915.91 919.94 920.07 923.88 924.91 A14-A22 10 9 105.832 0.06 1.73 0.90 0.06 1.26 5.0 7.9 6.2 7.85 9.09 4.44 18 0.75 915.91 916.71 920.20 920.79 924.91 925.96 Al2-A14 11 10 69.505 0.00 1.67 0.00 0.00 1.21 0.0 7.6 6.3 7.58 9.09 4.29 18 0.75 916.71 917.23 920.96 921.32 925.96 925.64 All-Al2 12 11 59.786 0.11 1.37 0.80 0.09 0.97 5.0 7.3 6.3 6.16 9.09 3.49 18 0.75 917.23 917.68 921.61 921.82 925.64 925.40 A9-Al 1 13 12 75�229 0.11 0.83 0.70 0.08 0.54 5.0 6.9 6.5 3.51 6A6 2M 15 1.00 918.19 918.94 922.00 922.23 925.40 924.94 A5-A9 14 13 M399 0.11 0.48 0.70 0.07 0.34 5.0 6.6 6.5 2�20 8.39 1.80 15 1.00 920.53 920.83 922.36 922.38 924.94 926.88 A3-A5 15 14 80.904 0.17 0.38 0.70 0.12 0.26 5.0 6.0 6.7 1.77 4.63 3.02 12 1.00 921.08 921.89 922.40 922.47 926.88 926.75 A2-A3 16 15 80.000 0.21 0.21 0.70 0.14 0.14 5.0 5.0 7.0 1.01 4.63 2.62 12 1.00 921.89 922.69 922.50 923.11 926.75 925.92 Al -A2 17 11 36.000 0.30 0.30 0.80 0.24 0.24 5.0 5.0 7.0 1.67 6.46 3.97 15 1.00 921.33 921.69 921.76 922.20 925.64 925.31 Al O-Al 1 18 1 112.882 0.21 0.51 0.50 0.10 0.31 5.0 8.4 6.1 1.88 6A6 Z64 15 1.00 914.97 916.10 916.10 916.65 922.43 922.78 A38-A39 19 18 7&063 0.00 0.30 0.00 0.00 0.21 0.0 7.7 6.2 1.30 8.66 5.08 12 3.50 916.35 919.08 916.65 919.56 922.78 923.74 A37�0-A38,0 20 19 44.553 0.03 0.30 0.50 0.01 0.21 5.0 7.3 6.4 1.32 6.55 3.51 12 2.00 919.08 919.97 919.56 920.46 923.74 925.34 A36-A37 21 20 40.691 0.06 0.14 0.70 0.04 0.10 5.0 6.5 6.6 0.63 6.55 2.23 12 2.00 919.97 920.79 920.46 921.12 925.34 926.02 A35-A36 22 21 41 �613 0.07 I 0.07 0.70 0.05 0.05 5.0 5.0 7.0 0.36 &55 1.99 12 2.00 920.79 921.62 921.12 921.87 926.02 925.94 A34-A35 Project File: C200074-Storm System A.stm Number of lines: 39 Run Date: 11/12/2021 NOTES:Intensity = 70.48 / (Inlet time + 12.50) 1 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v202O.00 Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) 00 (ft) 00 (ft) (ft) 00 23 9 80.050 0.34 0.34 0.90 0.30 0.30 5.0 5.0 7.0 2.14 6.46 4.27 15 1.00 920.45 921.25 920.94 921.83 924.91 925.10 A13-A14 24 12 37.534 0.05 0.05 0.90 0.04 0.04 5.0 5.0 7.0 0.31 3.49 0.58 10 1.50 920.44 921.00 922.00 922.01 925.40 925.40 A8-A9 25 20 78.692 0.14 0.14 0.70 0.10 0.10 5.0 5.0 7.0 0.69 4.63 2.35 12 1.00 919.97 920.76 920.46 921.11 925.34 924.65 A33-A36 26 8 M000 0.16 5.45 0.90 0.14 3.85 5.0 9.4 5.9 22.53 29.00 4.59 30 0.50 915.81 916.16 919.94 920.15 923.88 923.25 A21 -A22 27 26 45798 0.59 5.29 0.90 0.53 3.71 5.0 9.3 5.9 21.82 41.01 4A4 30 1.00 917.36 917.81 920.20 920.31 923.25 922.84 A20-A21 28 27 103.687 0.23 0.30 0.50 0.12 0.15 5.0 7.2 6.4 0.95 6.46 0.77 15 1.00 918.22 919.25 920.61 920.63 922.84 923.06 Al 9-A20 29 28 36.783 0.07 0.07 0.45 0.03 0.03 5.0 5.0 7.0 0.22 4.63 0.31 12 1.00 919.50 919.87 920.64 920.64 923.06 929.80 Al 8-Al 9 30 27 67.748 0.04 4.40 0.90 0.03 3.03 5.0 5.2 6.9 21.05 41.01 4.41 30 1.00 917.81 918.49 920.61 920.74 922.84 925.42 A17-A20 31 30 63.016 2.77 2.77 0.68 1.89 1.89 5.0 5.0 7.0 1&23 23.64 7.68 18 3.00 919.24 921.13 921.05 922.49 925.42 925.83 A16-A17 32 13 61.798 0.24 0.24 0.55 0.13 0.13 5.0 5.0 7.0 0.91 8.39 0.74 15 1.00 918.94 919.56 922.36 922.36 924.94 923.92 A4-A5 33 12 102.116 0.13 0.38 0.90 0.12 0.29 5.0 5.4 6.9 2.02 4.57 1.65 15 0.50 918.15 918.66 922.00 922.11 925.40 925.20 A7-A8 34 33 21.013 0.25 0.25 0.70 0.17 0.17 5.0 5.0 7.0 1.23 5.94 1.00 15 0.50 918.66 918.77 922.11 922.12 925.20 922.94 A6-A7 35 30 54�644 1.59 1.59 0.70 1.11 1.11 5.0 5.0 7.0 7.80 10.50 4.41 18 1.00 918.49 919.04 921.05 921.36 925.42 923.27 A15-A17 36 2 101.575 0.05 0.05 0.80 0.04 0.04 5.0 5.0 7.0 0.27 6A6 Z36 15 1.00 917.64 918.66 917.82 918.86 923.08 924.47 A31 -A32 37 5 110.495 0.29 0.29 0.85 0.24 0.24 5.0 5.0 7.0 1.71 6.46 1.43 15 1.00 916.62 917.73 918.78 918.85 923.33 924.17 A25-A26 38 4 97.447 0.16 0.19 0.70 0.11 0.14 0.0 7.0 6.4 0.87 3.59 1.10 12 0.60 916.05 916.63 918.09 918.12 924.86 923.61 A28-A29 39 38 24.548 0.03 0.03 0.70 0.02 0.02 5.0 5.0 7.0 0.16 3.59 0.20 12 0.60 916.63 916.78 918.14 918.14 923.61 924.10 A27-A28 Project File: C200074-Storm System A.stm Number of lines: 39 Run Date: 11/12/2021 NOTES:Intensity = 70.48 / (Inlet time + 12.50) 1 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v202O.00 Storm Sewer Profile Proj. file: C200074—Storm System A.stm Storm Sewers Storm Sewer Profile Proj. file: C200074—Storm System A.stm Storm Sewers Storm Sewer Profile Proj. file: C200074—Storm System A.stm Storm Sewers Proj. file: C200074_Storm System A.stm // • it IK i ii i! Ii !1 ii .li !1 :ii •11 ■��I11■�I■�I■I■■I�■ICI■�I■�I�■I■ � ■■�I��I�I■�I■�I■I■■I�■I�I■�I■�iEail� � ■III��I11■�I■�I■I■■I�■I■�!��I■�I ■lii� �I� i�l� I■�I■I■■■I■■■I■■I����I•i■■mil ■■ I �I � I II I ���' � �EEESIL■ ■ill�I� �1�■■�l.I!!l�III ■!�!! 1 1'. 1• : 7RaIE:�I1�- ■� 1 • • • ! R �71[rC 1 1 ' . "� • tei 1 I�•G.� /YA-�'�" : � r1 1 •1 �- Storm Sewers Proj. file: C200074_Storm System A.stm Elev. (ft) 933.00 • 11 • 11 9 CM M # 4A CO n COrn f 7 7 7 != 7 != 3 7 != 3 .. 7 C 5 C 3 E 7 C 7 {h J S J 0 C J (� C J Q J O C J O C J Q C C 0.9 J d S J S J Q S J 0 i 1 i f 1 f 1 f 1 1 i ■■�� IMEMA ■■ ■■ VOIIIIIIIIIII111�1" MEMO �MillillillI■���7 ■■��1�� ��■/ ►��■��I��■I■III■II ■Wd MEMOON-0.02 In OVA IN \\■11111—M-MOMi I M■ I ■ I ■ I I ■ 11 ■I��II11■�■I■�■I■I■■I■�■I■■I■�■I■�II�II ■II I1�� II11 ■�■ I ■�■ I ■ I ■■ I ■�■ I ■■ I ■�■! 11�1 i ��:J ■III1��1111■�■I■�■I■I■■I■�■I■1111s���1■III■■ ■/�I1��1111■�■I■�■I■I■'�!=��1■■I■�■I■III■■ I■ I1�� II11 ■�■ I ■�_� i i I ■� I!�� I ■_■ I ■�� I!=i I ■■ I�II��Il1l��=—I■��I■I■■I■�■I��I��■I■■�!I■■ �I=� �II��IIAI�■I■■■___■IIII■■�Ii�����is�■_■�_■■L� I�I� ■I■�■I■I■■I■■■■I■I■I■�=�i�■li■ ■■I1�1�IIIII������� ■■� 1 • � ';1 • &"/ 1 •i11/!1-� : C : 1 • tei 1 •�■� • C 7ia'L!I[(9 1 1 ' . -- ■■ �IIIIIr■ 111 fir■■ 111 1 50 100 150 200 250 300 350 400 450 500 550 600 — HGL EGL Reach (ft) Cq M M [{) I� r N CM N 4] CD M � WW ti WEE 41*11I1 933.00 • 11 64.b-o15" @ 1.0 % @ 015% i1• �� 1,50 700 750 800 Storm Sewers Proj. file: C200074_Storm System A.stm Elev. (ft) 939.00 5 {r, C Q ,t N CO q Ca Cl CAM (� �, C3 W + C7 za W I's E> rn� CV C j C j J C J C MNN MPP M VCVN M (?Pf+ P CO (O C" � (7 M M C°3J M N�,r - CM (� (� w �, (� (� V _- (O - + p WWW W W W ,(.a E?? m m iicc m afcc (q C 3 J C �MM M �m(O (O M M CO - N�.,r N C, �, (O - W W W m 6--cc It C 3 J Q C MML in [O R#�t M CO's7' N44. (Q (� �, CO . + CV W W W m ofEE LO C 3 J O C MPP C'?Cn CO CO CO M St V- N a C, �, P - + Ce, W W W va Of.E.E CO i= 3 J O C M'T� �O)W CO M Nt .4 4 Nor 4 o, � � CO _. + ' ' M WWW CO Of5E N- C 3 J C � 00O)CA O) ��� M (A N l0 40 N 6 ";, � M t It WWW w Qfcc CD Go j C 5 C C J 0.9 J 00OO _ �mCO �;; CO aD CO M lO l.f) (b IA O N N C, -i , �, �, CO o� �, �, _. N. _. + + M W W W L W W W CO ofcS m afcc CO CV C 3 J 0 �U) rCV M M NN c6 (D CO _- + ' (O W W (n ir= 939.00 933.00 933.00 927.00 z927.00 921.00 921.00 915.00 909.00 11 M 909.00 o - o 0 0 o 0 50 100 150 200 250 300 350 HGL EGL Reach (ft) 400 450 500 550 600 650 700 Storm Sewers Proj. file: C200074_Storm System A.stm Elev. (ft) 934.00 929.00 5 p Ch C N ' 47 (l C1 (A co �, O W + C7 zi W i j mCi E C 7 J C c�NCV C- CV N CO N C6 C7 N�,r Q �w� V + p WWW W Ej j 63 Q`cc C 7 J 0 C 04h r— C7 h h [O c- N C7 C") - N,rr Q _M�� W W W ca E^ij rn ��c C= 7 J (�C J QC m!MC7 ��C]u) r tD m C � it CO CO C9 C`7 Co d-'7 -VV CM N w�CD CQ CD Co Co + W W W CV W W W W rCjj Ejj [n Ecc [n LL'cc J QC J QC Mhh LO'etV CO Cr! CO Ca '� h W 0) CO 0) Cg Cl) 4'�' C'7 � 4 4 CM N�,r w�� Co Mw� h CoC7 + CO W W W ch W W W W rCjj m Ej j 0) �cc U) Q`cc J 0 C �[i?m '� � � � M CO N � �Ci N _M�� + - may- W W W j j [Y�� 7 J C �� q CID aD iC} LO CJ L6 L6 N 0) + U W W W r6 jj Cn �cc J d C �Cp [O C''� � C�? - In M (6 1� N m �_����� - Co W W W �: j to LL'cc h J QS � a(? m V M N h h N Cl)4) + - - CO W WW m j j �cc o J O C J O NO)4) �''� � '� -t et N O Cn V I LO aQ CO 1+ C) OS N - N �m� w� + - + CO W W W h W W ?: j rCj W Q`cc 0) S 934.0 929.0 924.00 924.00 919.00 919.00 I 914.00 145.798Lf 18" @ 1.00% 914.00 67 748Lf - 3 " @ 1.00° - 30" @ 1.O % 70.00 Lf - 30" CM 0.50% 909A0 T9 0 o 909.00 .. @ 0.5 to - 1 o 0 to OM 0 50 100 HGL 150 200 250 300 350 400 450 EGL Reach (ft) 500 550 600 650 700 750 800 Storm Sewers Proj. file: C200074_Storm System A.stm 1/ ■III1��111■�■I■�■I■I■■I■�■I■�9==9��1�/�i■ 11 :• c�i/1i'. ■I�11��1111■�■I■�■I■I■'�!=��I■■I■■I■■■I I■� ■I1��1111■�■i■��i�l��l!��I��I■■■It■0IMM �I1��1111 ■■I1���1111■�� ■_I■■_■__■I111■■�I�1•��ii■■�■■�7• '���all.■■i1�1!!ll l�■�■l l 11■! i W ffl ■11�-1-�i�iii�d i 1 ` . ■■� 1 1 ���-� � : 1/ i(„i 11' . - ■■�I i • • • 1 • (il/laii+l7-�:1 :1 • Cr1 • 'S/MM� / i / 1 1 11 • i' . -- 1 1 11 1 li 1 it 1 11 1 11 1 01 • 1 11 1 :11 Storm Sewers Proj. file: C200074_Storm System A.stm h CO M N M It LO (O h CO N N N CM 49 CO 5 C =5 C =5 C =3 C C 3 C 5 C 3 7 7 C 7 C C 7 {rZ C -1C -10 C J (� C -1C J C J C J 0C C C C O C J C J O C J 0 Q It N ' MNN ' COr-I- ' mMM ' 10in �o ' Mhh ' ��� ' 00 J OD J In ' V ' (O ' Ct (O q M VNN M I�h M '�mm � *.# C`?mm '� hW6? °DTT CR1CO ' N-M �CDN QNIU Oqm Ct h (D CO CO (O C l 4w7 In Cl) C1 (") tsf N C6 C`7 r- M (*i C') M c'i [") COV 4 V (D (1) 4 M � '� -4 CO N L6 ui In M 10 L6 � M (O h: p7 N n. OD O M OI O) ao M 6� - N,rr N�,r CM N�.,r N��. N N N N N N Elev. (ft) o �, 0 6?ww o Maw N 6'rnw M CD o 0) CO M M 67a�w �rnrn �wrn �rnw �wrn M + - + - - + - - - - + - - + - - + - + - - + + + + + (7 za W p WWW WWW W WWW W CV W W W Cl) WWW M W W W ' W W W LO W W W LO W W W W W W W h WWW h W W m L m E�? E3 m �» m E�? �» m E�� m E�� m E_» m _E» E_>; E>; m E� fAC9 E fA ilcc 0) ��c 0) �cc U) O.cc (o �cc to �cc CO [L"cc W ��E CO �cc CO sec W afcc (n afS 943.00 943.00 �� I ��1� II II I ����'���`Ili■il•■1!■■Il�■��i 4111-- 908.00 ' I I I I I I I I I I I I I I 1 1 908.00 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 HGL EGL Reach (ft) Storm Sewers Proj. file: C200074_Storm System A.stm N C`3 9 C C 7 C 7 C, J OC J O C J C Elev. (ft) 934.00 V �C3 C 3 C j ■III■��II■1���1■�■I■��I■ ■III■��II■1���1■�■I■��I■ ■ICI■��II■1���1■�■I■��I■ ICI■��II■F���1■��I���,�■ ■i■ilia■����■��� 50 HGL 909.00 100 150 200 250 300 350 400 450 500 EGL Reach (ft) Storm Sewers Proj. file: C200074_Storm System A.stm Elev. (ft) 934.00 49 C j RI c 7 0 C C`7 c 7 J Q c V' c 7 J 0 C CO CO C 7 J0 c M f7 -- 7 c 0 934.00 929.00 929.00 924.00 919.00 914.00 909.00 924.00 919.00 914.00 0.60% 909.00 OME MI MWIMIM 0 50 HGL 100 150 EGL 200 250 Reach (ft) 300 350 400 450 i , � ` i • � ` i , � Storm Sewers Proj. file: C200074—Storm System A.stm Elev. (ft) 934.00 929.00 49 =5 0 M C 04 C'i CO C5 ;3 :- W +-6 W C:) w E C E 15 J 0 CW3 C, IN CO " C6 Cli COn 6 0' 03 CD C:) + E-uW --W E >; >; CN E 15 0 -E- CO r- It 1� 0, CIS r-� M ;3 - ;3 LO - 1L -i W --W E :,; ; Fr.S.E CO M E J 0 CC) OD CO + W Ei CIj 'M cn of_ 934.00 929.00 924.00 924.00 — ------- 919.00 919.00 914.00 i 101.575E I %Y 909.00U49 —914.00 909.00 .% 0 25 50 75 100 125 150 175 200 225 250 275 — HGL EGL Reach (ft) Storm Sewers Proj. file: C200074_Storm System A.stm Elev. (ft) 939.00 49 0 s C1 c"i g w a-6 W r 3 J O C t"1 �C4M to �''� C0 4 N ,rT M�� ® WWW C J O E to I�O� NCO CG Nor. ��0 WWW r J Q C [n �'QO t£! 6 Oi C4 c+v WED Ei cn R �E a N J 0 C N CO CD r LO Cn fA N-- N WUl Ei sn � cc In CV J O �r— CO � O NCY c+•, WW S 939.00 933.00 933.00 927.00 927.00 921.00 921.00 915.00 JL M 01 S• nn A915.00 909.00 909.00 44.5 3U - 12" 2.0 % 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 HGL EGL Reach (ft) Storm Sewers Proj. file: C200074_Storm System A.stm Elev. (ft) 933.00 • i! • i! 4 r o cm cm 5 �■■ �■�riSiiiii�llli`i����������iii�iii■ii`'ii�ii■ i 25 50 — HGL 939.00 909.00 75 100 125 150 175 200 225 250 275 300 325 350 375 EGL Reach (ft) Storm Sewers B5 B14 B7 B9 14 B8 15 21 16 13 B10 0B4 B15 12 9 11 20 B3 23 B16 2 22 B2 19 a B11 24 B17 18 B13 B18 17 7 B1 B19 6 B20 5 25 4 B21 26 3 B23 B26 1 Outfall Project File: C200074_Storm System B.stm Number of lines: 27 Date: 11/12/2021 Storm Sewers v2020.00 Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) 00 (ft) 00 (ft) (ft) 00 I End 31.184 0.18 3.99 0.90 0.16 3.35 5.0 13.6 5.1 17.06 19.62 6.80 24 0.75 912.56 912.79 914.05 914.28 914.89 920.54 1327-1328 2 1 30.584 0.23 3.82 0.90 0.20 3.20 5.0 13.5 5.1 16.30 19.52 6.58 24 0.75 912.79 913.02 914.28 914.48 920.54 920.97 B26-B27 3 2 135.895 0.00 3.59 0.00 0.00 2.99 0.0 13.1 5.2 15.45 19.57 6.41 24 0.75 913.02 914.04 914.48 915.46 920.97 924.55 1325-1326 4 3 69.657 0.51 3.19 0.90 0.46 2.63 5.0 11.7 5.4 14.21 15.99 5.75 24 0.50 914.04 914.39 915.51 915.85 924.55 924.76 1322-1325 5 4 34.562 0.00 2.35 0.00 0.00 1.88 0.0 11.5 5.4 10.20 16.00 3.31 24 0.50 914.39 914.56 916.35 916.40 924.76 925.23 B20-B22 6 5 104.231 0.00 2.35 0.00 0.00 1.88 0.0 11.1 5.5 10.36 15.99 3.71 24 0.50 914.56 915.08 916.45 916.60 925.23 925.73 1319-1320 7 6 66.422 0.34 1.94 0.90 0.30 1.60 5.0 10.7 5.6 8.93 15.99 3.29 24 0.50 915.08 915.41 916.85 916.91 925.73 926.05 1313-1319 8 7 92.185 0.10 1.60 0.90 0.09 1.30 5.0 10.2 5.7 7.38 22.62 5.68 24 1.00 916.72 917.64 917.50 918.60 926.05 926.52 1312-1313 9 8 110.045 0.09 0.88 0.90 0.08 0.71 5.0 9.7 5.8 4.13 6A6 5.20 15 1.00 918.39 919.49 919.12 920.31 926.52 926.44 136-13112 10 9 22.630 0.07 0.41 0.70 0.05 0.29 5.0 9.5 5.8 1.67 8.39 2.74 15 1.00 919.49 919.72 920.31 920.23 926.44 925.63 134-136 11 10 38.142 0.07 0.07 0.70 0.05 0.05 5.0 5.0 7.0 0.34 4.63 2.88 12 1.00 921.53 921.91 921.71 922.15 925.63 926.00 133-134 12 8 82.414 0.13 0.40 0.90 0.12 0.34 5.0 7.1 6.4 2.18 6.46 4.29 15 1.00 919.89 920.71 920.39 921.30 926.52 927.64 1310-1312 13 12 22.000 0.18 0.22 0.90 0.16 0.19 5.0 6.7 6.5 1.22 6A6 2.68 15 1.00 920.71 920.93 921.30 921.37 927.64 927.64 138-13110 14 13 23.879 0.04 0.04 0.65 0.03 0.03 5.0 5.0 7.0 0.18 4.63 1.90 12 1.00 921.18 921.42 921.37 921.60 927.64 926.37 137-138 15 9 98.770 0.38 0.38 0.90 0.35 0.35 5.0 5.0 7.0 2.42 6.46 4.43 15 1.00 920.88 921.86 921.41 922.49 926.44 925.95 135-136 16 12 32.160 0.05 0.05 0.65 0.03 0.03 0.7 0.7 7.0 0.22 6.46 1.20 15 1.00 920.71 921.04 921.30 921.22 927.64 926.35 139-13110 17 6 88.595 0.00 0.41 0.00 0.00 0.28 0.0 7.6 6.3 1.74 6.46 4.02 15 1.00 918.06 918.95 918.50 919.47 925.73 927.32 1318-1319 18 17 37.802 0.04 0.41 0.45 0.02 0.28 5.0 7.2 6.4 1.77 6A6 3.61 15 1.00 918.95 919.32 919.47 919.85 927.32 926.25 1317-1318 19 18 52.691 0.00 0.37 0.00 0.00 0.26 0.0 6.8 6.5 1.70 4.63 4.62 12 1.00 919.57 920.10 919.99 920.65 926.25 927.85 B16-B17 20 19 64.488 0.16 0.37 0.70 0.11 0.26 0.0 6.4 6.6 1.73 4.63 3.86 12 1.00 920.10 920.75 920.65 921.30 927.85 926.19 1315-1316 21 20 107.583 0.21 0.21 0.70 0.15 0.15 5.0 5.0 7.0 1.03 4.63 2.76 12 1.00 920.75 921.82 921.30 922.25 926.19 925.90 1314-1315 22 8 20.185 0.22 0.22 0.70 0.15 0.15 5.0 5.0 7.0 1.07 4.63 4.03 12 1.00 920.73 920.93 921.05 921.36 926.52 924.99 1311-1312 Project File: C200074-Storm System B.stm Number of lines: 27 Run Date: 11/12/2021 NOTES:Intensity = 70.48 / (Inlet time + 12.50) 1 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v2020.00 Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) 00 (ft) 00 (ft) (ft) 00 23 10 75.390 0.21 0.27 0.70 0.15 0.19 5.0 8.7 6.0 1.15 4.63 4.11 12 1.00 919.97 920.72 920.31 921.17 925.63 925.27 132-134 24 23 88.877 0.06 0.06 0.70 0.04 0.04 5.0 5.0 7.0 0.31 4.63 1.60 12 1.00 920.72 921.61 921.17 921.84 925.27 925.69 131-132 25 4 72.427 0.33 0.33 0.90 0.29 0.29 5.0 5.0 7.0 2.06 6.46 4.22 15 1.00 919.30 920.02 919.78 920.59 924.76 924.94 1321-1322 26 3 72141 0.38 0.40 0.90 0.34 0.36 5.0 IM 5.3 1.90 6A6 4.12 15 1.00 916.18 916.90 916.64 917.45 924.55 922.90 1324-1325 27 26 42A03 0.02 0.02 0.90 0.02 0.02 5.0 5.0 7.0 0.12 6A6 0.97 15 1.00 916.92 917.35 917.45 917.48 922.90 923.80 B23-B24 Project File: C200074-Storm System B.stm Number of lines: 27 Run Date: 11/12/2021 NOTES:Intensity = 70.48 / (Inlet time + 12.50) 1 0.81; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers v2020.00 Proj. file: C200074_Storm System B.stm Elev. (ft) 938.00 932.00 49 0 03 C Q CO (4 Vf to N cn O W : w az; W E> CMC- C � C � J O C J 0 C 't 0)03 rNN 3S LL'ltiP- '(D 0A CaQ [O 1 - C'a Cl - ;; z; ww a�w C'J [o o Www o Www m E?� va 9�> W �cc rn Ofcc # C J Q C C O C to4tV J �C71M Cn C1d �C'q C+) CA N V ,�- .y- C'? 'd" V- C, z; P- C, rnw ww ifl m Www N Www m E» m E�� 0) �cc in it== LO J O C � ChWCO N WW) Go (A C, O rnw + w- ' c� wW m E» CO WEE W J O C 03W00 M �Q0 LC% 'd COY, rnrn + w- � WOW E» W �cc P.-CO J Q C C 0.9 V)—N J N'T0) M qiF L9f0 in C'7 N In C[I m h OD N �4 C, wrn rnw + w- + WM � WOW � wW E>; m E» w Ir5E CO sec J O-S "t CA C- '� '?'t Cr CO Imo. (A (33 V err ww + W-- co ww m E�� CO �cc o J Q C J Q C ' mNC� rNN 7 Iq 1+CA 00 �rI`: M to i [h (]S CA f^r C q Ca 1+ 6Nfr� (V CNCD �rn rnw + W-- + W-- CO ww r- ww m E�� m E�� CO �cc rn �cc 938.00 932.00 CM J 0 C1P CoCiA fi? LO N C4 CD + + W- CO w m E3 rn afS 926.00 920.00 914.00 926.00 920.00 12" @ 1.00% 914.00 88.877Lf 5.39 Lf 12" @ 1.000 a - 735.42YET-72TLF7 110.045 - 15" 1.00% 908.00 I 908.00 Mo =.Y) 0 100 HGL 200 EGL 300 400 500 Reach (ft) 600 700 800 900 Storm Sewers Proj. file: C200074_Storm System B.stm Elev. (ft) • !1 920.00 CM f- # LO W ti 49 3 ~3 ~3 C) C J C)C J 0C C [)C J nC J QC J OC 0 CO 0.9 J O ■■I/I��I�■I■I��II�■I■�■I■�■I■I■I■ ■��r ��I�■I■I��II�■I■�■I■�■I■I�s■ ■III ■■I���I�■I■I��II�■I■�:I����':�■■ ■III■■I���I�■I■I��II�■I�i��■�■■■ ■■Kill.2iL•!Ii'.Glltteil[I1hY1,-■■-� (i I I' . ----- �iiilii�lii�iL`='�i�iif���■iliil�liitii`�iiii■������ I 4� O) N Cj CD D o) Ww E:.; R.2 Wide . 11 920.00 2U-12"@1.00% 5" @ 1,00% 914.00 908.00 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 — HGL EGL Reach (ft) Storm Sewers Proj. file: C200074_Storm System B.stm Elev. (ft) • !1 920.00 CM i- # LO W P.- Go 49 E 3 3 .. 3 E 3 E 3 E 3 ~; n� C J C)C J C)C J 0C C [)C J nC J QC J OC C nr- i 1 i i 1 i 1 i 1 i ■�r�Il�l�■I■I��II�■I■�■I■�■I���I■ /�I■■I■��I� ?_ice ■■■I�■■�■■�■■� ■■ I ■I■ I ���i■■1.�911■�l1l�J.l.�■�■�■!■�I�1�!l����� �iil lii�lii li`�3i■i ii � � ■ii■iil iii`�i �iii■ � � � � � � � / 938.00 • i/'i v !1 908.00 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 — HGL EGL Reach (ft) Storm Sewers Proj. file: C200074_Storm System B.stm Elev. (ft) 920.00 Cm C-349 �o C C C C 3 C 3 C n C J C) C J C) C J { � C C p C J � C C.0 7 C 7 C 7 C 7 C 0 C J 0 C J Q C J 0 IMBIBE 1 I f f 1 ■�■■�I�I�■■ ���■������I■IM ■�I/���I�■I■I��II�■I■�■I■�I ■I■I� ■�r�Il�l�■I■I��II�■I■�■I■�I �I�II ■�ItI���I�■I■I��II�■I■�■I�e�'�Y■ ■III ■■ I ��� I �■ I ■ I ��I I �■ I � ����■■ _■�� ■■_ I ■I■ I ��n^ti�■■�■�I��■�iiil�`i�� 50 - HGL CCO CyM - C7 Cr7 � C11 CCv y C14 N 0',CrA0 CD 03 www �, ww ;; 9; C CO of C 01011ic 879Lf - 12" @ 1.0 % f - 15° @ 1 A0°lo 00% 914.00 908.00 100 150 200 250 300 350 400 450 500 550 600 650 700 EGL Reach (ft) Storm Sewers Proj. file: C200074_Storm System B.stm Elev. (ft) 920.00 cm i- In 49 E � 5 .. � E n 0 C J [) C J C) C J 0 C C 0 C J 0 C m c J (a C J C C C) C J {) C J 0 IMBIBE f a i III ■Yr�I_�I�■I■I��II�■I■�■I�� I■ ■�II���I�■I■I��II�■I■�■I�_ �Y ■III■■I���I�■I■I��II�■I■��I �1�■� ■III■■I���I�■I■I��II�■I�■'����1�■Y ■���!1■��■��ill'i`i1�■G'�i�Ir'i'i������ 50 100 - HGL 938.00 920.00 U - 15" @ 1.00% )0% 914.00 908.00 150 200 250 300 350 400 450 500 550 600 650 700 EGL Reach (ft) Storm Sewers Proj. file: C200074_Storm System B.stm Elev. (ft) 938.00 920.00 CM 49 C C n C J C) C J C C C4 Cn to C _ r _ C4 () Ism1 i I 1 f III ■� r� ��I�■I�I��11�■I■�■I■I■ ■ter ��I�■I�I��11�■I■�■1�9■ ■��I���I�■I�I��11�■I■�■lilt.■ ■III■■I���I�■I�I��11�■I■��L■■ ■III■■I���I�■I�I��II�■li!■'���■■ ■■ I ■I■ I ����■�■�1��■�iiiiiii■iir ■WI �I����■�■��11,1,4,��� ■������■�Iiii11•iiiy' ii' •ii`�i'i'����� �ii■iiiilliii`�I�iii■��. • . . � , . ����� , 938.00 S5Lf - 12" @ 1 M% 90%00 908.00 100 150 200 250 300 350 400 450 500 550 600 EGL Reach (ft) Storm Sewers Proj. file: C200074_Storm System B.stm • • i 1 1 1 i • . i 1 1 i 1 ■-_■I��I�■���II��II■I■■I■�II��11� ■■r�Il�l�■I■I��II��II■I■■I■�II���I� ■0011r II NOW II■I■ WIN In�! ■�■I���I�■I■I��II��II�Is�_�1����1�� fill ■III■■I���I�■I■I��II���■r■�■■�I!!!1!!�ll� �_�■■�11��-i���■_�-_�_ II--■-�!y,i�i•JYflllit/I111/.7-- ■■ I ■I ■ I � �� i ■■ 1,�/.■9!� �!�■ � ��� ��iiil `iili■� L`=�ii(i i � � ■■1��7 cam, ; • .� - •+ i ��■�I���������� ■■iCii7.2iL•!i�'.Gllttei[11h'Y��-■■-��Gilli�'L!f (e? i /' . ------ i i W 1 ii 1 ii 1 11 1 Ii i •li . i ii i :ii Storm Sewers Proj. file: C200074_Storm System B.stm Elev. (ft) 920.00 N 49 C j C j n C J C) C J C C Ism 1 1 -I tee!=�:������■���■■��� ■■■ ■ ■■■ ■-Z��-�'I li�+l�(CI�1l�r�■--- ��i0iiiliii`='�i■iifii���������� , 25 50 75 100 - HGL EGL 938.00 „ 914.00 908.00 125 150 175 200 225 250 275 300 325 350 Reach (ft) Storm Sewers Proj. file: C200074_Storm System B.stm Elev. (ft) CM 49 []C J CC CO Cq CM 0 Ism 1 i 1 I ■■��i'�i�ili'�i'`�ii�fi�������� 934.00 929.00 914.00 @ 1.00% 909.00 25 50 75 100 125 150 175 200 225 250 275 300 325 HGL EGL Reach (ft) Storm Sewers OudaU C4 Pn400 File: C2UOO74_Smm System C,mm MIA Number of lines: 3 1 Date: 5/1/2022 Storm Sewers v202O.00 Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) 00 (ft) 00 (ft) (ft) 00 I End 49.013 0.15 1.17 0.45 0.07 0.56 5.0 9.0 5.9 3.32 15�97 3.84 24 0.50 912.50 912.74 913.14 913.38 914.83 917.41 C4-05 2 1 172.714 0.37 1.02 0.45 0.17 0.49 5.0 7.4 6.3 3.11 13.65 5.16 18 1.00 913.49 915.22 913.98 915.89 917.41 919.98 C3-C4 3 2 273.071 0.65 0.65 0.50 0.33 0.33 5.0 5.0 7.0 2.28 8.39 3.65 15 1.00 915.22 917.95 915.89 918.56 919.98 921.51 C2-C3 Project File: C200074-Storm System C,stm Number of lines: 3 Run Date: 5/1/2022 NOTES:Intensity = 70.48 / (Inlet time + 12.50) 1 0.81; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers v202O.00 Storm Sewer Profile Proj. file: C200074—Storm System C.stm Elev. (ft) 934.00 N cn 934.00 929.00 Ono nn 100 150 200 250 300 350 400 450 500 EGL Reach(ft) Storm Sewers IIIIII!IIIIIIIIIIIII 111111riplill 111111111�11111 r,1111111 III I 1 1111111 ''111 11111 pil, El Outfall Project File: C200074_Storm System E.stm Number of lines: I Date: 11/15/2021 Storm Sewers v202O.00 Page 1 Station Len (ft) Drng Area Rnoff coeff (C) Area x C Tc Rain (1) (in/hr) Total flow (cfs) Cap full (cfs) Vel (ft1s) Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID Line To Line Incr (ac) Total (ac) Incr Total Inlet (min) Syst (min) Size (in) Slope Dn 00 Up (ft) Dn 00 Up (ft) Dn (ft) Up 00 I End 106.311 0.96 0.96 0.50 0.48 0.48 5.0 5.0 7.0 3.35 10A9 4.17 18 1.00 929.94 931.00 930.64 931.70 931.73 932.79 E1-E2 Project File: C200074—Storm System E.stm Number of lines: 1 Run Date: 11/15/2021 NOTES:Intensity = 70.48 / (Inlet time + 12.50) 1 0.81; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers v2020.00 Proj. file: C200074_Storm System E.stm Elev. (ft) 942.00 939.00 49 942.00 939.00 936.00 936.00 933.00 933.00 930.00 927.00 930.00 927.00 0 10 20 30 40 50 60 70 80 90 100 110 HGL EGL Reach (ft) ----------- ----------- ----------- ----------- Storm Sewers POND CALCULATIONS 1�m EN N LOCATION MAP 1" = 1500' BUD RD. \_ c05 pF1 PRE-DEV POA-1 TOTAL AREA = 22.43 AC CN = 52.4 Tc = 21.8 min. TR55 Tc Worksheet UTILITY EASEMENT DB 3099-590 I I NC HWY #150 SCHEDULE B, EXCEP ON 9 \ /� / APPARENT 60' R\W \ \ \ \ \ \ \ \ UTILITY EASEMENT, DB 3099 586 HOV - - - - - - - - - - - - 4 MPH SIGN \ ��\ \\ �/ DUL B, EXCEPTION�3- \ >8"RCP / C041RED SIGN / UTILITY EASEMENT, DB 1897 741 5 S G HWY 150 S1t;N 0 \ \ QQ - OE Oe -\ \ V \ /NV 92724 / / / / / / UTILITY EASEMENT, DB 3089-617 SCHEDULE B, EXCEPTION 10 & 11 V of \ \�- nF - - c E - ` / SCHEDULE B, EXCEPTION 7 - of -roe of of \ _ - -�e�-! - �- - / / / GEC - OE - - OE - > > \ ' - _ L OE - - OE - - OE\ OE =0E OE �OE�- O� OEM OE - -`_Q Z OE-- /=-6t=-� - _ `_ _ BE=- 9E - 9E -- - - 9° nE nE - �E _61- a I 17 � \ A \ \ \ 0� _ _ �- I FO - FO - - FO - Fly-0_ - F-O�FFp--- Ud _ r0 - N� - F Gn ��_ 'p - JF� FFLT` �� --DF _ O - - O - Fp FOi 0 W_ FO C FOW F FO _ FO Ste= -�S �� FO F'6- FO = �0--F�---- - =EO=O� _ - _ --FE) FO - FO - - FO / F - FO - FO FO - FO - aS"-8.96°/il'F� - FO -9 - �0= - FO FO - - _ O= = FO - - FO _- - CY ' - - / FO FO - 55� /- �F� �p F0= - FO -:77- - - =E0 CFO -v Fes- FAO - -F0 F6-T- O - - F / ( ) RI ELEV ?J2834 Fo T - - F - F�-F \ ( �I PttV Y�---I---f---�- R ELL 3 0----- ' ,- ---- / =�_ �� \ IN IN=921.79 I - /- / /`-- / / j--� �- w1-------------- -- J %- o } _ \ / - 4NV_rUT = 924.92 / / / F4�MT-92-1.59-I I / / / / / / / I / / W 3 1(35 MPH) \ uG - - ` ` \ SIGN -941- \ CHURCH SIGN /NV 9 640 / / ° / / \ � / / \ SHEET FLOW TELECOM CONTROL\- / / / / 7 L =100 FT PANEL BOXES /_ / - S_2% j RAVR-DR VEWAY , o pU6E1CNEARI�GMA� \- , / / / I WELL �- - a // 1 ONE STORORY Y / I / I \ BRCKONE STH6A4f BRICK HtME I I / -1 \ ✓ / / ♦ o / \\ \ \ CROSLAND DENVER HIGHWAY 16 LLC / \- \ \ \ o \\ I I \ \ \ \ � - / \ I I - \ \ DB 2928-1053 PB 51-37, / \ \ \ 15 STORY I I \ \ \ \ \ \ \ \ \ \ / \ FRAI�Vj)f� HOME- 1� SILVER CANTER LLC DB 3335 11 9 COMPUTED --- POINT \-----41 - �\ \ �� - - / ` \\ I/ / EDGE OFPAVEMENT lllS REBAR \ \ \214.33- \ \ \ 935- 93S I \ I S 52°34'1\'W \ \ \ 1.25' PIPE - 30 • \ I \ / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ - - - \ DE VER LAKES PR / r _ _ - - \ \ / \ PARKK NERS ASS DB238$'1%5_ \ \ \ - 925 , - - PB 74-152 / Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 - \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ POA-1 PRE DEVELOPMENT - - _ -_- -_- -_- -- - Hyd.No. 1 Pre _ DRAINAGE AREA - \ 1 Description A B C Totals \\\ �\ \\ \\ \ \\ \\ -\\ ___-__--\-----_\ \\\ 91?s Sheet Flow Manning's n-value = 0.240 0.240 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.48 0.00 0.00 \ \ \ \ ems' \ \ \ \ \ - - Land slope (%) = 2.00 0.00 0.00 \ \ \ \ ` \ \ \ \ \ \ \ \ - \ \ _ -17 ` \ ( \ - J J / Travel Time (min) = 13.68 + 0.00 + 0.00 = 13.68 \ \ \ \ \ \ \ \ \ \ \ \ \ - - - - - - - - - - - - - - - _ \ \ \ / ` \ \ \' \ \ \ \ \ o �, - \ \ \ \ \ \ \ \ \ \ 24' ROAD EASEMENT / \ ` _ Shallow Concentrated Flow \ \ \ \ \ \ \ \ ' \ \ \ \ \ PB 42 102 , 1 Flow length (ft) = 439.00 319.00 238.00 \ \ \ \ \ \\ \ \ I \\ \ \ \ \ \ - - \ \ \ \ \ \ \ \ \ Watercourse slope (%) = 3.50 2.20 0.50 \ \ \ \ l C1dANL FLOII� \ \ \ \ \ Surface description =Unpaved Unpaved Paved \ \ I \ \ \ \ \ \ \ \ \ \ \L = 286 FT\ \ \ \ \ \ \ \ \g \ [-� Average velocity (ft/s) =3.02 2.39 1.44 \ \ \ \ \ \ \ 5\= 3. °a Travel Time (min) = 2.42 + 2.22 + 2.76 = 7.41 \ I / \ \ \ 1 \ n a0.025 \X-SE%AREA = 2 SF Channel Flow , ,POA 1 > X sectional flow area (sqft) = 2.00 0.00 0.00 /I I ETTEP PERIMETER - n\.47 FT 1 I I I L < \ - •\ - - _ L� I I HASH H7PB ARDSHERRILL&ASSOC. DB 202 Wetted perimeter (ft) = 4.47 0.00 0.00 42-102 Channel slope (%) = 3.50 0.00 0.00 < I \ I ) Manning's n-value = 0.025 0.015 0.015 Velocity (ft/s) =6.510.00 0.00 Flow length (ft) ({0})286.0 0.0 0.0 < < �_ _ . \ I I / / ��' \ I I /' SHALLOW CONCENTRATE LOW Travel Time (min) = 0.73 + 0.00 + 0.00 = 0.73 _ - - - - - - / / / / / L=439 Total Travel Time, Tc.............................................................................. 21.80 min - / I / / S :; 3:5% POA-1Pre-Development OVERALL CN VALUES SOILS CN PER COVER TYPE* GROUP OPEN WOODS/GRASS IMPERVIOUS WOODS % OF AREA A 39 43 98 36 71.6% B 61 65 98 60 28.4% *CN va I ues from TR-55 Ta bI e 2-2 Meadow Fair Condition Woods Fair Condition Woods/grass Fair Condition POA-1 Pre -Development COVERAGE AND CN VALUES LAND USE AREA (ac) GROUP CN AREA CN A (ac / CN) B (ac / CN) OPEN 6.92 4.95 1.97 45 313.12 39 61 WOODS/GRASS 6.92 4.95 1.97 49 340.80 43 65 IMPERVIOUS 2.80 2.00 0.80 98 274.40 98 98 WOODS 5.79 160 43 1 247.90 36 TOTAL 22.43 52.4 1176.22 -920 STOR MASTER FUNDING I, LLC DB 3120-1954 \ ) I KILLEE LLC / / / / / / 7- �// / / / 01 Novo OWN r / / MM I WON Now woo woo // // 1 �►/ won won awn I� / � saw wow wow wow wow wow Sol /I \\ \\ \\ \\ II \\\ I\ \\ \\ \ /// // so GRAPHIC SCALE soo \\ \\ \\ \\\ \ \ \�� \\\ \\\ \\\ -\\K_ /' IN FEET 1 inch = 50 ft. Z a00 CO d N a�Mr- •� N co O �o ^ 1 W O r 1,- (n r O D C0 a) WU O > �� aL �m aLU N OU Cq m 00 N O W O Z Q C v0 •L O i E:OpL 00 a�oU °°°° 20 ° AMERICAN°ate ® g ENGINEERING a SE n a ASSOCIATES a Z a° SOUTHEAST o /� Ob C-3881 °°° ` T°OO00000°°° ` �,�a OF NO 3133 z O w IY w Q *** 3 Days Before Digging ** North Carolina 811 811 or 1-800-632-4949 Remote Ticket Entry httD://nc811.oro/remoteticketentrv.htm STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON THE SPECIFIC SITE, NAMED HEREON, CONTEMPORANEOUSLY WITH ITS ISSUE DATE AS LISTED, HEREON, AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. LLjJJ V Q Z Lo LO > 0000 U C4 Z Z U =) Z O Q W m Z a m Q L0a� Q M Q 04 U U Lo JOB NUMBER: C200074 DESIGN BY: BMF DATE: 2/25/2022 SHEET TITLE: PRE DEVELOPMENT DRAINAGE MAP SHEET NO.: 3:1 BUD RD. - - - E MAIDEN RD s w �P O �u _ OE� - OE pE -\ NYCKS pR• - \ \ � QF c L--, N I LOCATION MAP 1" = 1500' POST-DEV POA-1 TOTAL AREA 22.43 AC DETAINED AREA IMPERVIOUS: 6.83 AC PERVIOUS: 7.40 AC OFFSITE: 2.95 AC TOTAL: 17.18 AC CN = 77.0 TC=5MIN UNDETAINED AREA IMPERVIOUS: 0.46 AC PERVIOUS: 4.79 AC TOTAL: 5.25 AC CN = 51.5 TC=5MIN POA-1 Post Development Detained RI7 ETEV = 928.34 IN IN=921.79 G MAC- RIw MARGIN pE�R1NG MAP � \ �� l T \ CROSLAND DENVER HIGHWAY 16 LLC DB 2928-1053 PB 51-37 \ / OVERALL CN VALUES SOILS CN PER COVER TYPE* GROUP OPEN WOODS/GRASS IMPERVIOUS WOODS % AREA A 39 43 98 36 71.6% B 1 61 65 98 60 1 28.4% *CN va I u es from TR-55 Table 2-2 Meadow Fair Condition Woods Fair Condition Woods/grass Fair Condition POA-1 Post Development Detained COVERAGE AND CN VALUES LAND USE AREA (ac) GROUP CN AREA x CN A (ac / CN) B (ac / CN) OPEN 6.83 4.89 1.94 45 309.04 39 61 WOODS/GRASS 0.00 0.00 0.00 0 0.00 43 65 IMPERVIOUS 7.40 5.30 2.10 98 725.20 98 98 WOODS 0.00 0.00 0.00 0 0.00 36 60 OFFSITE 2.95 2.11 0.84 98 289.10 98 98 TOTAL 17.18 77.0 1323.34 POA-1 Post Develooment Undetained OVERALL CN VALUES SOILS CN PER COVER TYPE* GROUP OPEN WOODS/GRASS IMPERVIOUS WOODS OF AREA A 39 43 98 36 71.6% B 61 65 98 60 28.4% *CN values from TR-55 Table 2-2 Meadow Fair Condition Woods Fair Condition Woods/grass Fair Condition POA-1 Post Develooment Undetained COVERAGE AND CN VALUES LAND USE AREA (ac) GROUP CN AREA x CN A (ac / CN) B (ac / CN) OPEN 2.70 1.93 0.77 45 122.17 39 61 WOODS/GRASS 2.09 1.50 0.59 49 102.93 43 65 IMPERVIOUS 0.46 0.33 0.13 98 45.08 98 98 WOODS 0.00 0.00 0.00 0 0.00 36 60 TOTAL 5.25 51.5 270.18 UTILITY EASEMENT, DB 3099-590 F- SCHEDULE B, EXCEPTION 9 NC HWY #150 APPARENT 60' R\W OE / ITILITY EASEMENT, DB 1897-741 45 MPH SIGN HWY 150 SIGN pC CHEDULE B, EXCEPTION 10 & 11 ._, /_ -- , - nF - - OE - OE - DOE OE OE 01110 #4 REBAR CHURCH SIGN -ELECOM CONTROL 'ANEL BOXES Ir SILVER LANTERN, LLC DB 3335-1159 ' I EDGE OF PAVEMENT I ' \ Fj o 930s, 1 \ \ s � o _ ❑ • . a Q1 I V A ❑ ❑ - _ _ a I� V A �❑ a- - - -� \ 0 3 S� - - \ _ DEN - - - - -- VER LAKES A \ ❑ ❑ - - - - - - - - PARK OWNERS ASSO . a ---- c ❑------- - -- - - \ DB2388-1915 L PB 74-152 77 VV � 24' ROAD EASEMENT POA-1 POST DEVELOPMENT �\ \� \\ PB42102 \ \ DETAINED DRAINAGE AREA .I \ I � 1, Ij T I HASH HOWARD2SHE 029 886 L & ASSOC. PB 42-102 W - W w I w I w000, / w - - / / L /��� / / ❑ // / i / _ _ - _ _ ❑ / r 00 _ __� � -�_ ate• .� --- ��--J �/ / / � / i STOR ASTER FUNDING I, LLC DB 3120-1954 KILLEE LLC POA-1 POST DEVELOPMENT DB3141-690 ` UNDETAINED DRAINAGE AREA ���.����- so GRAPHIC SCALE soo ( IN FEET ) 1 inch = 50 ft. Z a00 C0 d N r- a�MM •� r- N M O o ^ 1 W O r � (n r O ) L W U o > �� � L �V00 aW N (1) N U 1 QZ L � O •L ivU E cD 00 a�o� 0�1®®IIIIIAA®� °�� N CA RO��'% w 'm®O °°o oOO //I/ �s =a° AMERICAN° a ® g ENGINEERING o In a ASSOCIATES a Z SOUTHEAST o j ao° C-3881 0 C' , °O0000000°. g�9®AO IuN�® ®CO`,. z 0 N W CC w Q t] *** 3 Days Before Digging ** North Carolina 811 811 or 1-800-632-4949 Remote Ticket Entry httD://nc811.ora/remoteticketentrv.htm STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON THE SPECIFIC SITE, NAMED HEREON, CONTEMPORANEOUSLY WITH ITS ISSUE DATE AS LISTED, HEREON, AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. LLjJJ V Q Z L 00 > Z ZN U =) Q WZO m Z a m Ln 0_ Q L0a� Q M Q N U U Lo JOB NUMBER: C200074 DESIGN BY: BMF DATE: 2/25/2022 SHEET TITLE: POST DEVELOPMENT DRAINAGE MAP SHEET NO.: jL Project Name: Catawba Village Project #: C200074 Date: 4/26/2022 Location: Catawba County, NC Water Quality Calculations: Pond 1 Rv = 0.05 + 0.9 * la Where: Rv = Runoff coefficient (unitless) la = Impervious fraction (unitless) DV = 3630 * Rd * Rv * A DV = Design volume (cu ft) Rd = Design storm depth (in) A = Drainage area (ac) Drainage Area = 17.18 ac Impervious Area = 7.4 ac la = 43.1 Find Treatment Volume for 1" of rainfall: Rv = 0.05 + 0.9 * 0.431= 0.438 DV=3630*1in*0.438*17.18ac= WQv = 27,294 cu ft Size the bleed down orifice to discharge the WQv in no less than 48 hours. WQv Stage from Pond Design: 913.40 ft Water Surface Elevation: 912.50 ft Average Depth: 0.45 ft 27,294 cu ft Q= C*A*(2gh)0" Where: C = 0.6 A = Orifice Area in sf g = 32.2 ft/seC h = Average Depth over Orifice in ft Q = Orifice Dischage in cfs Target Average Release Rate = 0.16 cfs A = Q/ (C*(2gh)0.5) = 0.049 sf = 7.04 sq in Circular Orifice Diameter = 2.99 in Round to Nearest Pipe Size, Use: 2.5 in Acutal Release Rate = 0.11 cfs Actual Drawdown time = 2.87 days Secondary bleeders and/or the control structure overflow shall be set above the WQv stage. POND NO.1 SA/DA Calculations Pond Bottom Elevation: Water Surface Elevation: Bottom of Planting Shelf Elevation: 906.00 912.50 912.00 Stage Forebay Main Pond Vol. Total (cf) Area (so Vol. Incr. (cf) Vol. Cumulativ e (cf) Area (so Vol. Incr. (cf) Vol. Cumulative (cf) 906.00 0 0 0 11,273 0 0 0 907.00 611 306 306 12,596 11,935 11,935 12,240 908.00 1,457 1,034 1,340 13,985 13,291 25,225 26,565 909.00 2,295 1,876 3,216 15,440 14,713 39,938 43,153 910.00 3,236 2,766 5,981 16,954 16,197 56,135 62,116 911.00 4,093 3,665 9,646 18,527 17,741 73,875 83,521 912.00 4,998 4,546 14,191 20,155 19,341 93,216 107,407 912.50 5,952 2,738 16,929 21,838 10,498 103,714 120,643 Forebay Total Volume: 16,929 cf Main Pond Total Volume: 103,714 cf Forebay Volume % of Main Pond: 16.3% Ok Water Surface Stage Elevation = 912.50 ft Main Pond Water Surface Stage Area = 21,838 sf Main Pond Water Surface Storage Volume = 103,714 cf Average Depth = Main Pond Volume/Main Pond Area Average Depth = 4.75 ft Percent Impervious Tributary to Pond = 43.1 % SA/DA Ratio 1.24 Tributary Area to Pond = 17.18 ac Main Pond Surface Area Required = 9,268 sf Main Pond Surface Area Provided at Permanent Pool = 21,838 sf Watershed Model Schematic Hydraflow Hydrographs Extension forAutodesk® Civil 3D® by Autodesk, Inc. v2020 1 2 4 5 Legend Hvd• Origin Description 1 SCS Runoff Pre 2 SCS Runoff Post 3 Reservoir Wet Pond 4 SCS Runoff Post-Undetained 5 Combine Post Total Project: Design Hydrographs.gpw Sunday, 05 / 1 / 2022 Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk®Civil 3DObyAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.430 1 751 9,212 ------ ------ ------ Pre 2 SCS Runoff 29.29 2 718 58,602 ------ ------ ------ Post 3 Reservoir 0.337 2 1440 47,603 2 914.07 48,409 Wet Pond 4 SCS Runoff 0.072 2 744 1,769 ------ ------ ------ Post-Undetained 5 Combine 0.367 2 1440 49,373 3,4 ------ ------ Post Total Design Hydrographs.gpw Return Period: 1 Year Sunday, 05 / 1 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Hyd. No. 1 Pre Hydrograph type = SCS Runoff Peak discharge = 0.430 cfs Storm frequency = 1 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 9,212 cuft Drainage area = 21.790 ac Curve number = 52.4* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 21.80 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(3.000 x 98) + (5.800 x 36) + (11.220 x 49)] / 21.790 Q (Cfs) 0.50 0.45 lox, no 0.35 0.30 0.25 0.20 0.15 Pre Hyd. No. 1 -- 1 Year 1 1 �1 •1 �:I •11 1 :�1 •.1 /:/ // 1 ��1 •/ Q (Cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 1 Pre Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.240 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.48 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 13.68 + 0.00 + 0.00 = 13.68 Shallow Concentrated Flow Flow length (ft) = 439.00 319.00 238.00 Watercourse slope (%) = 3.50 2.20 0.50 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) =3.02 2.39 1.44 Travel Time (min) = 2.42 + 2.22 + 2.76 = 7.41 Channel Flow X sectional flow area (sqft) = 2.00 0.00 0.00 Wetted perimeter (ft) = 4.47 0.00 0.00 Channel slope (%) = 3.50 0.00 0.00 Manning's n-value = 0.025 0.015 0.015 Velocity (ft/s) =6.51 0.00 0.00 Flow length (ft) ({0})286.0 0.0 0.0 Travel Time (min) = 0.73 + 0.00 + 0.00 = 0.73 Total Travel Time, Tc.............................................................................. 21.80 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 2 Post Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 17.180 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.90 in Storm duration = 24 hrs Composite (Area/CN) = [(9.610 x 98) + (8.500 x 77)] / 17.180 Q (cfs) 30.00 25.00 15.00 10.00 5.00 0.00 ' ' 0 120 240 360 480 600 Hyd No. 2 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Hyd. No. 2 -- 1 Year Sunday, 05 / 1 / 2022 = 29.29 cfs = 718 min = 58,602 cuft = 77* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 ' ' ' 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post Reservoir name = Catawba Village Storage Indication method used. Q (cfs) 30.00 25.00 15.00 10.00 5.00 e 600 Hyd No. 3 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond Hyd. No. 3 -- 1 Year Sunday, 05 / 1 / 2022 = 0.337 cfs = 1440 min = 47,603 cuft = 914.07 ft = 48,409 cuft Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) - Hyd No. 2 Total storage used = 48,409 cuft Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Pond No. 1 - Catawba Village Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 912.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 912.50 27,790 0 0 0.50 913.00 30,375 14,535 14,535 1.50 914.00 32,884 31,618 46,153 2.50 915.00 35,460 34,160 80,314 3.50 916.00 38,098 36,767 117,081 4.50 917.00 40,797 39,436 156,517 5.50 918.00 45,533 43,139 199,656 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 2.50 0.00 0.00 Crest Len (ft) = 20.00 2.00 30.00 0.00 Span (in) = 36.00 2.50 0.00 0.00 Crest El. (ft) = 915.00 914.00 916.50 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 906.00 912.50 0.00 0.00 Weir Type = 1 Rect Broad --- Length (ft) = 68.00 0.50 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 912.50 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.50 14,535 913.00 76.10 is 0.10 is --- --- 0.00 0.00 0.00 --- --- --- 0.103 1.50 46,153 914.00 76.10 is 0.19 is --- --- 0.00 0.00 0.00 --- --- --- 0.194 2.50 80,314 915.00 76.10 is 0.25 is --- --- 0.00 6.66 0.00 --- --- --- 6.914 3.50 117,081 916.00 85.68 is 0.24 is --- --- 66.60 18.84 0.00 --- --- --- 85.68 4.50 156,517 917.00 103.79 is 0.07 is --- --- 89.58 s 14.13 s 27.58 --- --- --- 131.36 5.50 199.656 918.00 109.89 is 0.04 is --- --- 96.49 s 13.31 s 143.30 --- --- --- 253.14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Hyd. No. 4 Post-Undetained Hydrograph type = SCS Runoff Peak discharge = 0.072 cfs Storm frequency = 1 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 1,769 cuft Drainage area = 5.250 ac Curve number = 51.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 0.10 0.09 on /: 0.07 0.06 0.05 0.04 0.03 Post-Undetained Hyd. No. 4 -- 1 Year 1 1 �1 •1 �:I •11 1 :�1 •.1 /:/ //I 1 ,�1 •/ Q (Cfs) 0.10 0.09 My; 0.07 0.06 0.05 0.04 0.03 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Hyd. No. 5 Post Total Hydrograph type = Combine Peak discharge = 0.367 cfs Storm frequency = 1 yrs Time to peak = 1440 min Time interval = 2 min Hyd. volume = 49,373 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 5.250 ac Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 Post Total Hyd. No. 5 -- 1 Year 1200 1800 2400 Hyd No. 3 3000 3600 Hyd No. 4 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk®Civil 3DObyAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 15.77 1 729 69,605 ------ ------ ------ Pre 2 SCS Runoff 78.22 2 716 158,259 ------ ------ ------ Post 3 Reservoir 7.292 2 746 146,435 2 915.01 80,757 Wet Pond 4 SCS Runoff 6.425 2 718 14,629 ------ ------ ------ Post-Undetained 5 Combine 9.162 2 720 161,064 3,4 ------ ------ Post Total Design Hydrographs.gpw Return Period: 10 Year Sunday, 05 / 1 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 1 Pre Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 21.790 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.10 in Storm duration = 24 hrs Composite (Area/CN) = [(3.000 x 98) + (5.800 x 36) + (11.220 x 49)] / 21.790 Q (Cfs) 18.00 15.00 12.00 M ME 3.00 M Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre Hyd. No. 1 -- 10 Year Sunday, 05 / 1 / 2022 = 15.77 cfs = 729 min = 69,605 cuft = 52.4* = 0 ft = 21.80 min = Type II = 484 Q (Cfs) 18.00 15.00 12.00 Me] CM 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 2 Post Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 17.180 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.10 in Storm duration = 24 hrs Composite (Area/CN) = [(9.610 x 98) + (8.500 x 77)] / 17.180 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Hyd. No. 2 -- 10 Year Sunday, 05 / 1 / 2022 = 78.22 cfs = 716 min = 158,259 cuft = 77* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Peak discharge = 7.292 cfs Storm frequency = 10 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 146,435 cuft Inflow hyd. No. = 2 - Post Max. Elevation = 915.01 ft Reservoir name = Catawba Village Max. Storage = 80,757 cuft Storage Indication method used. Q (cfs) 0 Wet Pond Hyd. No. 3 -- 10 Year Q (cfs) 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 - Hyd No. 2 Total storage used = 80,757 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Hyd. No. 4 Post-Undetained Hydrograph type = SCS Runoff Peak discharge = 6.425 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 14,629 cuft Drainage area = 5.250 ac Curve number = 51.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 7.00 M. 5.00 3.00 2.00 1.00 Q (Cfs) 7.00 • •, 5.00 4.00 3.00 2.00 1.00 0.00 1 1 1 1 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Hyd. No. 5 Post Total Hydrograph type = Combine Peak discharge = 9.162 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 161,064 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 5.250 ac Q (cfs) 10.00 4.00 2.00 0.00 , , A 0 600 Hyd No. 5 Post Total Hyd. No. 5 -- 10 Year 1200 1800 2400 Hyd No. 3 3000 3600 Hyd No. 4 4200 4800 5400 Q (cfs) 10.00 4.00 2.00 1 0.00 6000 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk®Civil 3DObyAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 50.76 1 727 179,651 ------ ------ ------ Pre 2 SCS Runoff 139.35 2 716 286,993 ------ ------ ------ Post 3 Reservoir 83.87 2 722 274,893 2 915.98 116,481 Wet Pond 4 SCS Runoff 19.10 2 718 38,578 ------ ------ ------ Post-Undetained 5 Combine 98.02 2 720 313,472 3,4 ------ ------ Post Total Design Hydrographs.gpw Return Period: 100 Year Sunday, 05 / 1 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 1 Pre Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 21.790 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.60 in Storm duration = 24 hrs Composite (Area/CN) = [(3.000 x 98) + (5.800 x 36) + (11.220 x 49)] / 21.790 Q (Cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre Hyd. No. 1 -- 100 Year Sunday, 05 / 1 / 2022 = 50.76 cfs = 727 min = 179,651 cuft = 52.4* = 0 ft = 21.80 min = Type II = 484 0.00 I I I I I I I / I I I I I I I\ I 0 120 240 360 — Hyd No. 1 Q (Cfs) 60.00 50.00 40.00 30.00 20.00 10.00 WATIT51 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Hyd. No. 2 Post Hydrograph type = SCS Runoff Peak discharge = 139.35 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 286,993 cuft Drainage area = 17.180 ac Curve number = 77* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(9.610 x 98) + (8.500 x 77)] / 17.180 Q (Cfs) 140.00 120.00 100.00 Post Hyd. No. 2 -- 100 Year Q (Cfs) 140.00 120.00 100.00 .1 1e 40.00 20.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Peak discharge = 83.87 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 274,893 cuft Inflow hyd. No. = 2 - Post Max. Elevation = 915.98 ft Reservoir name = Catawba Village Max. Storage = 116,481 cuft Storage Indication method used. Q (Cfs) 140.00 120.00 100.00 •• •• Q (Cfs) 140.00 120.00 100.00 •• •• 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 Hyd No. 2 Total storage used = 116,481 Cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Hyd. No. 4 Post-Undetained Hydrograph type = SCS Runoff Peak discharge = 19.10 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 38,578 cuft Drainage area = 5.250 ac Curve number = 51.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 21.00 18.00 15.00 12.00 • el am 3.00 Post-Undetained Hyd. No. 4 -- 100 Year Q (Cfs) 21.00 18.00 15.00 12.00 • oe, 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Sunday, 05 / 1 / 2022 Hyd. No. 5 Post Total Hydrograph type = Combine Peak discharge = 98.02 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 313,472 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 5.250 ac Q (Cfs) 100.00 OXIDE ID 40.00 20.00 Post Total Hyd. No. 5 -- 100 Year 0.00 0 120 240 360 — Hyd No. 5 Q (Cfs) 100.00 :1 1I 99 1I 20.00 rn.1 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 4 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 60.0390 12.8000 0.8939 -------- 2 72.1667 13.3000 0.8913 -------- 3 0.0000 0.0000 0.0000 -------- 5 69.7154 12.7000 0.8344 -------- 10 70.4765 12.5000 0.8062 -------- 25 61.3262 11.1000 0.7421 -------- 50 54.5490 10.0000 0.6931 -------- 100 48.9327 8.9000 0.6488 -------- File name: Sherrills Ford.IDF Intensity = B / (Tc + D)^E Sunday, 05 / 1 / 2022 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.58 3.67 3.07 2.65 2.34 2.09 1.89 1.73 1.60 1.48 1.39 1.30 2 5.41 4.36 3.67 3.17 2.80 2.51 2.28 2.09 1.93 1.79 1.67 1.57 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.34 5.15 4.36 3.80 3.37 3.04 2.77 2.55 2.36 2.21 2.07 1.95 10 7.01 5.73 4.87 4.26 3.79 3.43 3.14 2.89 2.69 2.51 2.36 2.23 25 7.80 6.38 5.45 4.78 4.28 3.89 3.57 3.31 3.09 2.90 2.73 2.59 50 8.35 6.84 5.86 5.16 4.64 4.23 3.90 3.62 3.39 3.19 3.02 2.87 100 8.87 7.27 6.24 5.52 4.97 4.55 4.21 3.92 3.68 3.48 3.30 3.14 Tc = time in minutes. Values may exceed 60. ime: W:\2018\C180021 Prestiae - Gabriel Villaae\Calcs\Road and Pond\BMP\9225 Sherrill Ford Road PreciDitation.DcD Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.90 3.50 0.00 4.40 5.10 6.00 6.80 7.60 SCS 6-Hr 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 EROSION AND SEDIMENT CONTROL CALCULATIONS SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.61) Project Information Project Name: Catawba Village Project #: C200074 Designed by: BHE Date: 11/12/2021 Revised by: Date: Revised by: Date: Basin # 1 Phase 1 Basin Type = Sediment (Per NCDNER EC Manual Ch. 6, Sec. 6.61) Drainage Area (ac) = 17.89 Disturbed Area (ac) = 12.19 Runoff Coefficient (c) = 0.50 (Smooth bare packed soil) Rainfall Intensity "i" (in/hr) = 7.07 Flow (Q10) (cfs) = 63.2 Required surface area (sf) = 27,510 Reauired Storaae (cf) = 32.202 Schematic Storage Dimensions: Basin Side Slopes ( x : 1 ) = Storage Depth "Z" (ft) = Bottom Dimension = Top Dimension (sediment storage elevation) = Top of Dam Dimension = Storage Provided (cf) = Surace Area Provided (sf) = Designed Storage Dimensions: (5 min time of concentration - 10 Year Storm) (Q=c*i*drainage area) (435 sf per cfs of Q10 peak inflow) (1800 cf Der acre of disturbed area) (may not be actual size or rectangular shape) 3.0 2.50 200.0 ft x 120.0 ft 215.0ft x 135.0ft 233.0 ft x 153.0 ft 66,281.3 29,025.0 Elev (ft) Area (SF) Volume (CF) 912.5 27,949 0 913 30,375 14,581 914 32,884 46,211 915 35,460 80,383 916 38, 098 117,162 917 40,797 156,609 918 43,533 198,774 Designed Storage Elevation (ft)= 915.00 Designed Surface Area (sf)= 35,460 O.K. > Minimum Minimum Surface Area Designed Storage Volume (cf)= 80,383 O.K. > Minimum Required Storage Bottom Elevation (ft)= 912.5 Top of Dam Elevation (ft)= 918.0 Emergency Spillway Elevation (ft)= 916.5 in #1 - Phase 1 Sizing of Riser Overflow: Qriser (cfs) = 63.2 Riser Diameter (in) _ Spillway Length (ft) = 20.0 Spillway Crest Elevation (ft) = 915.0 Design High Water Depth Over Spillway (in) = 12 Velocity Over Spillway (fps) = 3.1 Emergency Spillway Elevation (ft) = 916.5 Freeboard (ft) = 1.5 Filter Width (ft) = n/a Top of Berm Elevation (ft) = 918.0 Sizing of Emergency Spillway: Qspillway (cfs) = N/A Spillway Length (ft) = 30.0 Spillway Crest Elevation (ft) = 916.5 Design High Water Depth Over Spillway (in) = N/A Velocity Over Spillway (fps) = N/A Freeboard (ft) = 1.5 Top of Berm Elevation (ft) = 918.0 Sizing of Antiflotation Block: Inside Length (ft) = 5 Inside width (ft) = 5 Wall Thickness (in) = 6 Top of Structure = 915.0 Bottom of Structure = 906.0 Bottom Slab Lip (in) = 12 Bottom Slab Thickness (in) = 12 Volume of Structure (cf) = 99 Weight of Structure (lb) = 14,867 Volume of Water Displaced (cf) = 324.4 Weight of Water Displaced (lb) = 20,240 Bottom Slab Size: Bottom Slab Lip (in) = 12 Thickness (in) = 12.00 Weight of Anchor (lb) = 7,350 Factor of Safety = 1.1 (Q10) (Use permanent control structure dimensions) (5' x 5' pre -cast structure) (spillway set from permanent pond design) (Cw=3.0) (1 ft minimum to emergency spillway elev) (8 ft minimum) (Top of Basin Elevation) (20 ft minimum spillway length, Cw=2.6) (1.0 ft min. above sediment storage depth) Depth of the 10 Year flow over the riser does not exceed the emergency spillway (1 ft minimum) (Top of Basin Elevation) Check Culvert Capacity: Invert Elevation Down (ft): 905.65 Invert Elevation Up (ft): 905.99 Pipe Length (ft): 67.70 Slope (ft/ft): 0.0050 Pipe Diameter (in): 36 Mannings: 0.013 Q10 (cfs): 63.2 See attached Culvert Analysis Velocity Q10 (fps): 9.3 O.K. Velocity < 10 fps Skimmer Sizing Faircloth Skimmer Maximum Drawdown Table: Skimmer size (in) 1.5 2 2.5 3 4 5 6 8 1 day 1,728 3,283 6,234 9,774 20,109 32,832 51,840 97,978 2 day 3,456 6,566 12,468 19,548 40,218 65,664 103,680 195,956 3 day 5,184 9,849 18,702 29,322 60,327 98,496 155,520 293,934 4 day 6,912 13,132 24,936 39,096 80,436 131,328 207,360 391,912 5 day 8,640 16,415 31,170 48,870 100,545 164,160 259,200 489,890 6 day 10,368 19,698 37,404 58,644 120,654 196,992 311,040 587,868 7 day 12,096 22,981 43,638 68,418 140,763 229,824 362,880 685,846 Faircloth Skimmer Factor Table: Skimmer size (in) 1.5 2 2.5 3 4 5 6 8 1 day 960 1,123 1,270 1,382 1,601 1,642 1,814 1,987 2 day 1,920 2,246 2,540 2,765 3,202 3,283 3,628 3,974 3 day 2,880 3,369 3,810 4,146 4,803 4,926 5,442 5,961 4 day 3,840 4,492 5,080 5,5286,404 6,568 7,256 7,948 5 day 4,800 5,615 6,350 6,9108,005 8,210 9,070 9,935 6 day 5,760 6,738 7,620 8,2929,606 9,852 10,884 11,922 7 day 6,720 7,861 8,890 9,677111,207 11,491 12,701 13,909 Calculate Skimmer Size Based on Treatment Volume Basin Volume (required) 32,202 Skimmer Size Min. Days to Drain 2 Factor Calculate Skimmer Size Based on Basin Volume Basin Volume (provided) 80,383 Max. Days to Drain 5 Orifice Dia. Calc Orifica Dia. 5 3,283 3.534 in. 3.5 in. Skimmer Size 5 Factor 8,210 Orifice Dia. Calc 3.531 in. Orifica Dia. 3.2 in. Use an Orifice Dia = 3.5 in Culvert Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Friday, Nov 12 2021 S131 PH1 Culvert Invert Elev Dn (ft) = 905.65 Calculations Pipe Length (ft) = 67.70 Qmin (cfs) = 63.20 Slope (%) = 0.50 Qmax (cfs) = 63.20 Invert Elev Up (ft) = 905.99 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 36.0 Shape = Circular Highlighted Span (in) = 36.0 Qtotal (cfs) = 63.20 No. Barrels = 1 Qpipe (cfs) = 63.20 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 9.25 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 8.94 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 908.43 HGL Up (ft) = 909.08 Embankment Hw Elev (ft) = 911.17 Top Elevation (ft) = 918.00 Hw/D (ft) = 1.73 Top Width (ft) = 10.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Ele (R) 919.❑❑ 917.00 915.00 913.00 911 00 WSW 997 ❑0 9R5.00 9❑3 on sat PHt Culwrt 5 10 15 20 25 30 35 40 45 5❑ 55 60 55 70 75 90 95 Ci-1w C.1-1 HGL Embank Hw Depth (R) 13.❑1 11.01 9.01 7.01 501 3.01 101 -0.99 -2 99 9❑ R-h (R) SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.61) Project Information Project Name: Catawba Village Project #: C200074 Designed by: BHE Date: 11/12/2021 Revised by: Date: Revised by: Date: Basin # Basin Type = Drainage Area (ac) = Disturbed Area (ac) = Runoff Coefficient (c) = Rainfall Intensity "i" (in/hr) = Flow (Q10) (cfs) = Required surface area (sf) = Reauired Storaae (cf) = Schematic Storage Dimensions: Basin Side Slopes ( x : 1 ) = Storage Depth "Z" (ft) = Bottom Dimension = Top Dimension (sediment storage elevation) = Top of Dam Dimension = Storage Provided (cf) = Surace Area Provided (sf) = Designed Storage Dimensions: 1 Phase 2 Sediment (Per NCDNER EC Manual Ch. 6, Sec. 6.61) 18.34 12.64 0.50 (Smooth bare packed soil) 7.07 (5 min time of concentration - 10 Year Storm) 64.8 (Q=c*i*drainage area) 28,202 (435 sf per cfs of Q10 peak inflow) 33.012 (1800 cf per acre of disturbed area) (may not be actual size or rectangular shape) 3.0 2.50 200.0 ft x 120.0 ft 215.0ft x 135.0ft 233.0 ft x 153.0 ft 66,281.3 29,025.0 Elev (ft) Area (SF) Volume (CF) 912.5 27,949 0 913 30,375 14,581 914 32,884 46,211 915 35,460 80,383 916 38, 098 117,162 917 40,797 156,609 918 43,533 198,774 Designed Storage Elevation (ft)= 915.00 Designed Surface Area (sf)= 35,460 O.K. > Minimum Minimum Surface Area Designed Storage Volume (cf)= 80,383 O.K. > Minimum Required Storage Bottom Elevation (ft)= 912.5 Top of Dam Elevation (ft)= 918.0 Emergency Spillway Elevation (ft)= 916.5 in #1 - Phase 2 Sizing of Riser Overflow: Qriser (cfs) = 64.8 Riser Diameter (in) _ Spillway Length (ft) = 20.0 Spillway Crest Elevation (ft) = 915.0 Design High Water Depth Over Spillway (in) = 13 Velocity Over Spillway (fps) = 3.1 Emergency Spillway Elevation (ft) = 916.5 Freeboard (ft) = 1.5 Filter Width (ft) = n/a Top of Berm Elevation (ft) = 918.0 Sizing of Emergency Spillway: Qspillway (cfs) = N/A Spillway Length (ft) = 30.0 Spillway Crest Elevation (ft) = 916.5 Design High Water Depth Over Spillway (in) = N/A Velocity Over Spillway (fps) = N/A Freeboard (ft) = 1.5 Top of Berm Elevation (ft) = 918.0 Sizing of Antiflotation Block: Inside Length (ft) = 5 Inside width (ft) = 5 Wall Thickness (in) = 6 Top of Structure = 915.0 Bottom of Structure = 906.0 Bottom Slab Lip (in) = 12 Bottom Slab Thickness (in) = 12 Volume of Structure (cf) = 99 Weight of Structure (lb) = 14,867 Volume of Water Displaced (cf) = 324.4 Weight of Water Displaced (lb) = 20,240 Bottom Slab Size: Bottom Slab Lip (in) = 12 Thickness (in) = 12.00 Weight of Anchor (lb) = 7,350 (Q10) (Use permanent control structure dimensions) (5' x 5' pre -cast structure) (spillway set from permanent pond design) (Cw=3.0) (1 ft minimum to emergency spillway elev) (8 ft minimum) (Top of Basin Elevation) (20 ft minimum spillway length, Cw=2.6) (1.0 ft min. above sediment storage depth) Depth of the 10 Year flow over riser does not exceed the emergency spillway (1 ft minimum) (Top of Basin Elevation) Factor of Safety Check Culvert Capacity: Invert Elevation Down (ft): 905.65 Invert Elevation Up (ft): 905.99 Pipe Length (ft): 67.70 Slope (ft/ft): 0.0050 Pipe Diameter (in): 36 Mannings: 0.013 Q10 (cfs): 64.8 See attached Culvert Analysis Velocity Q10 (fps): 9.5 O.K. Velocity < 10 fps Skimmer Sizing Faircloth Skimmer Maximum Drawdown Table: Skimmer size (in) 1.5 2 2.5 3 4 5 6 8 1 day 1,728 3,283 6,234 9,774 20,109 32,832 51,840 97,978 2 day 3,456 6,566 12,468 19,548 40,218 65,664 103,680 195,956 3 day 5,184 9,849 18,702 29,322 60,327 98,496 155,520 293,934 4 day 6,912 13,132 24,936 39,096 80,436 131,328 207,360 391,912 5 day 8,640 16,415 31,170 48,870 100,545 164,160 259,200 489,890 6 day 10,368 19,698 37,404 58,644 120,654 196,992 311,040 587,868 7 day 12,096 22,981 43,638 68,418 140,763 229,824 362,880 685,846 Faircloth Skimmer Factor Table: Skimmer size (in) 1.5 2 2.5 3 4 5 6 8 1 day 960 1,123 1,270 1,382 1,601 1,642 1,814 1,987 2 day 1,920 2,246 2,540 2,765 3,202 3,283 3,628 3,974 3 day 2,880 3,369 3,810 4,146 4,803 4,926 5,442 5,961 4 day 3,840 4,492 5,080 5,5286,404 6,568 7,256 7,948 5 day 4,800 5,615 6,350 6,9108,005 8,210 9,070 9,935 6 day 5,760 6,738 7,620 8,2929,606 9,852 10,884 11,922 7 day 6,720 7,861 8,890 9,677111,207 11,491 12,701 13,909 Calculate Skimmer Size Based on Treatment Volume Basin Volume (required) 33,012 Skimmer Size Min. Days to Drain 2 Factor Calculate Skimmer Size Based on Basin Volume Basin Volume (provided) 80,383 Max. Days to Drain 5 Orifice Dia. Calc Orifica Dia. 5 3,283 3.578 in. 3.5 in. Skimmer Size 5 Factor 8,210 Orifice Dia. Calc 3.531 in. Orifica Dia. 3.4 in. Use an Orifice Dia = 3.5 in Culvert Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Friday, Nov 12 2021 S131 PH2 Culvert Invert Elev Dn (ft) = 905.65 Calculations Pipe Length (ft) = 67.70 Qmin (cfs) = 64.80 Slope (%) = 0.50 Qmax (cfs) = 64.80 Invert Elev Up (ft) = 905.99 Tailwater Elev (ft) _ (dc+D)/2 Rise (in) = 36.0 Shape = Circular Highlighted Span (in) = 36.0 Qtotal (cfs) = 64.80 No. Barrels = 1 Qpipe (cfs) = 64.80 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 9.46 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 9.17 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 908.44 HGL Up (ft) = 909.12 Embankment Hw Elev (ft) = 911.34 Top Elevation (ft) = 918.00 Hw/D (ft) = 1.78 Top Width (ft) = 10.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 ___. iftl 519.-. 917.00 915.00 913.00 911 00 WSW 9W 00 9❑5.00 903 on 581 PH2 Culvert 5 10 15 20 25 30 35 40 45 5❑ 55 60 55 70 75 90 95 Circular Culvert HGL Embank Hw Depth (R) 13.01 11.01 9.01 7.01 501 3.01 101 -0.99 -2 99 9❑ R-h (R) Hydrology Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Temporary Diversion Ditch Friday, Nov 12 2021 Hydrograph type = Rational Peak discharge (cfs) = 6.172 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 1.760 Runoff coeff. (C) = 0.5 Rainfall Inten (in/hr) = 7.014 Tc by User (min) = 5 OF Curve = Sherrills Ford and NC 150.IDF Rec limb factor = 1.00 Q (cfs) 7.00 N. 11 5.00 3.00 2.00 1.00 0.00 11 0 Runoff Hyd - Qp = 6.17 (cfs) Runoff Hydrograph 10-yr frequency 5 Hydrograph Volume = 1,852 (cuft); 0.043 (acft) Q (cfs) 7.00 . ee, 5.00 4.00 3.00 2.00 1.00 '- 0.00 10 Time (min) Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Temporary Diversion Ditch Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 916.74 Slope (%) = 3.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 6.22 Elev (ft) Section 919.00 918.50 918.00 917.50 917.00 916.50 916.00 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Friday, Nov 12 2021 = 0.70 = 6.220 = 1.47 = 4.23 = 4.43 = 0.77 = 4.20 = 0.98 1 2 3 4 5 6 7 8 9 10 11 Reach (ft) Depth (ft) 2.26 1.76 1.26 0.76 0.26 -0.24 _n 7n 11/12/21, 10:13 AM 6 NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > Temporary Diversion Ditch Name Temporary Diversion Ditch Discharge 6.22 Channel Slope 0.033 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Sandy Loam (GM) S75 ECMDS 7.0 North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern S75 Unvegetated Straight 6.22 cfs 4.29 ft/s 0.69 ft 0.03 1.6 Ibs/ft2 1.43 Ibs/ft2 1.12 STABLE D Underlying Straight 6.22 cfs 4.29 ft/s 0.69 ft 0.03 1.51 Ibs/ft2 0.68 Ibs/ft2 2.23 STABLE D Substrate hftps://ecmds.com/project/149449/channel-analysis/210019/show 1/1 ISO 10,000 166 6,000 EXAMPLE �3� i56 D■42 inches (3.5 f"t) 6. 6, 000 am Ito tfe 144 000 5. r32 4,000 mw 8. test 4. 120 (2) 2.1 7.4 2,000 (31 2.2 T.T 4.- 106 110 In feet 96 1,000 3' 600 _ 84 600 S00 f ' .. 2. 72 400 ` vSoo Z to 60 y 200 � 1.5 = _ z W 54 W `� i00 C a 413 % !r 60 J a = v / 6o a v 42 50 HW ENTRANCE tal C 0 a 40 SCALE TYPE W 36 (I) Square edge wit 3 Lai 33 headwall A .9 a 20 (2) Gr and with a W C 30 headwall = (3) Groove end •6 27 projecting la 24 6 .7 6 To use scale (2) or (3) project 21 5 horizontally to scale (I),then 4 use straight Inclined line through D and 0 scales, or reverse as 3 illustrated. IB 2 BUREAU OF PUBLM ROADS JAN. 1963 15 11.0 HEADWATER SCALES 263 REVISED MAY 1964 5. 4. 1.5 1—1.5 /Temp Slope Drain — Q = CIA 1.0A=1.76ac C = 0.50 1 = 7.07 in/hr Q10 = 6.22 cfs .9 HW/D = 1.0 6 .6 .6 .5 .3.5 . 1— 12 Figure 5-1 Headwater Water Depth for Concrete Pipe Culverts with Inlet Control — English Units Source: www.deldot.gov/information/pubs_forms/manuals/road_design/pdf/supp_figures_chap_6.pdf, page 23 Page 112 20 10 n 3 e Outlet IW = Do + La pipe 1 diameter (Do) T ilwater - 0.5De FES-A40 36" Diameter Q10=39.67cfs La = 20' d50 = 7.2" W=23' 3Do = 9' t = 1.5' �. o� PP60 Appendices 2 N Q F0 Q. Lr O 1 70 I I 1 I .:1 .... 1 _,....1 0 3 5 10 20 39.67 Cfs so 100 200 500 1000 Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3 20 10 n 3 e Outlet IW = Do + La pipe 1 diameter (Do) T ilwater - 0.5Do FES-B28 24" Diameter Q 10 = 17.06 cfs La=14' d50=6" W = 16' 3Do = 6' t = 1.5' �. o� PP60 Appendices 2 N Q F0 Q. Lr O 1 70 '- I i I r '" it I r'I I i I 11' I I I I i i 1 l I'' I...I I 'I I I 1 '.:1.... 1_,..10 3 5 10 20 50 100 200 500 1000 17.06 cfs Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3 20 10 n 3 e Outlet IW = Do + La pipe 1 diameter (Do) T ilwater - 0.5Do FES-05 24" Diameter Q 10 = 7.74 cfs La=14' d50 = 6" W = 16' 3Do = 6' t = 1.5' �. o� PP60 Appendices 2 N Cn Q F0 Q. Lr O 1 70 '- I I I_.L' i IiI -.l..I l i I I I I I I I I I i i i 1 11 1'' I,.I I '.I I I 1 .:i1....1' �0 3 5 10 20 50 100 200 500 1000 7.74 cfs Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3 20 10 n 3 e Outlet IW = Do + La pipe 1 diameter (Do) T ilwater - 0.5Do FES-D2 36" Diameter Q 10 = 11.51 cfs La = 20' d50 = 7.2" W=23' 3Do = 9' t = 1.5' �. o� PP60 Appendices 2 N Cn Q F0 Q. Lr O 1 70 '- I I I_.L' i it I r'I I i II I I I I I I I I i i i 1 11 1'' I,.I I '.I I I 1 .:i1....1' �0 3 5 10 20 50 100 200 500 1000 11.51 cfs Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3 3 e Outlet IW = Do + La pipe 1 diameter (Do) T ilwater - 0.5Do FES-E2 18" Diameter Q 10 = 3.42 cfs La=10' d50 = 6" W = 11.5' 3Do = 4.5' t = 1' �. o� PP60 20 10 n Appendices 2 N Cn Q F0 Q. Lr O 1 70 ' "I I I_. n '" it I r'I I i I I I I I i i i 1 11 1'' I,.I I '.I I I .:i1....1' �0 3 5 10 20 50 100 200 500 1000 3.42 cfs Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3 APPENDICES 00OF BUD RD. RD. BUD Ln ci rn0.) Ln Ln 000' Lz' 4 N N I LOCATION MAP 1" = 1500' LEGEND SANITARY SEWER LINE _ss - WATER LINE _w_ GAS LINE OVERHEAD POWER of FIBER OPTIC LINE FO - _x -x -x - FENCE LINE EASEMENT - - - - - - - SETBACK/BUFFER SITE PROPERTY LINE - - - RIGHT-OF-WAY STORM DRAIN PIPE e, SIDEWALK OPEN SPACE IRIGHT-OF-WAY DEDICATION .'Ne -w- . .. .......... Ile 77-_ - - - - --------- --- - - - - - ------- . ...... 'e. NC HWY #150 ee, APPARENT 6dR\W 0 -JOE - --OE -OEM 0 , OE ­e,44E - IIVV 92724 0E., I- F] OE - - OE - -E '_0'_ np - - nP - _--ap -OF - ------- QF__� 99 / \ I I I / / / / / / / I" *N*.-Nl 0"000M le' Ne, r le' 0000 el 0.18 AC ze IeN B_ 77 40.13 Ac ------ I_ ------- - . . ....... YD Al -DI A2 0.24 Ac 3 B16-JB B15-DI 0.21 Ac Az A3 ANI 0.17 Ac 0.11 AC IN; 16 Ac B14 B14-DI 0.11 5 Ar A.)-Ltl . .04 Ac 0.21 AC B9 B7 e" .05 Ac 0.04 AC =Nor, 'n 0.1 ell lee A6 le, A9 Ile, CROSLAND DENVER HIGHWAY 16 LLC Ne 137- 0.11 AC A7 CB .25 Ac D13 2928-1053 PB 51-37e,,, A7 . ......... 0.13 AC SILVER LANTERtf, LLC T- It A9-CB DB 3335-11?9 4 64 -Al IM, I 1310-8 B13 1116, B5 A8-YD -DI ee, /e ee' --- 0.09 Ac 0.38 Ac FW10 0.10 Ac 10.30 Ac Ag 0.05 Ac V FB6-5 X e' . ..... B13-CB B5-CB. ........ A A A10-CB ­7- B19-JB B21 0.33 Ac A-- Bll-DI 3 4-DI V, B3 B4 C -LtS Al2 - - ----- B22 0.06 Ac 0.51 - - ---- Bll .22 Ac A13-CB \1 7 Ac IN -e'B2 930 0.0 N k 0.21 Ac FA_197T 10.23 Ac e\ ...... L �925 . . . .... 9,30 04 62 -CB 14KIES PR -_ e F A19-DI A18-YD JB Alb P�xwi' ERS ASS DB 2388-1915� AIL-YD�j Ile Ile i;n7 Ac PB 74-152 A34925, rl� ZD 0.09 AC en 4000 ele, 9:u &' en e": B24 1 4000, 0.38 Ac 'el rm. A35-YD . ..... ?0 F BI I - �oe lee 23-DI B24-CB A35 LO.06 Ac A20 A16 DI el lee, 0.59 AC 0.06 Ac Bl_yD B23 A- N.124k 0 A36 e" A2 -DI A22-CB A 11-CB 0.04Ac J B25-JB A33 A17-CB I -YD A33 36 D A38 I 0.14AC 0.16 Ac 0.21 AC e. 0� le, B26 0.23 Ac A24 0. 14 Ac !:u D2-FES I24-CB A2 I A23-DI e �n A IV, gn �A15 C" Ln ARID SHERRILL & ASSOC. 1.5 59 0.05 Ac 9 Ac HASH HO ke, PB 42-102 A25 A3 10 if; 2 AC e" .50 AC B26-CB A26 :13 A3 -CB ON k\ ee' lee le, IA32-CB eA32 A3 two A39-CB o.za Ac 0.05 AC I/ el % /Z CS-FES _m _ _ _ _ _ wel 400,11, C2 t/ C4 00, '00e zr� 1.16 AC 0 zo e' I'll # Ile C3- / _i�l pe C2-Dl STOR; KASIER FUNDING IjLC 'Z_ 01 /e,, 0-1954 -WSj'47-7W D13 312 C4-Dl e­_ ♦ " '64 e461:� \ le KILLEE LLC . .. . .... U3141-69G A I-o" 1-010, 00, e" GRAPHIC SCALE el 11 < 50 0 25 50 100 -T 7-0000' 'e, mono* IN FEET I inch = 50 ft. t)D Q 00 ce) NC Cn LO QCu r- ce) 4 C) 00 ti U) I C U) Lu 0.> 6� b-0 Cn " 0 < C: -C: (0 Lu (1) 04 C'4 00 .E- (1) N0) - 0 z Cu 0 C) -6 a) 00 E cc)) -cru < 00 0 14% 9- 6.00 ERICAN % % 7 a INEERINGOO 0 0 ASSOCIATES a* x % *0 SOUTHEAST iZ §*X, % C-3881 V 00. Rl- OF % z 0 U) 21 Of 6 z 3 Days Before Digging North Carolina 811 811 or 1-800-632-4949 Remote Ticket Entry ht4x//nc811.org/ramteticketentry.htm STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON THE SPECIFIC SITE, NAMED HEREON, CONTEMPORANEOUSLY WITH ITS ISSUE DATE AS LISTED, HEREON, AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. Ld >- 0 C:) Z U-) _j > 00to NZ Z0 =) z 0 LLJ 0 cn r, zF < CY) LLJ M Lo LO 04 L) LO LO JOB NUMBER: C200074 DESIGN BY: BMF DATE: SHEET TITLE: DRAINAGE AREA MAP SHEET NO.: C4.5 11 � 000r-�p 4 - �9 1�7 I I I I , I I , , \ I'll ,,,IIIIII - I- -, -1- .­ ­— _­_ ­ ­_ - � _­ _,_ � j � \ . . ...... I ..... - __ -1 - - I , I I \ I\ ,I, ,N I,- -,,I- - "".". - _11­ __ __ ,I, ", \ / -�', ­_ _� .,- _ - 1-1 CONSTRUCTION START DATE: JANUARY 20221 � 'IN ,-- ­N1 I_ III ,I, \ _ DISTURBED AREA: � I 1 14.49 ACRES � tt \ \ \ "I", IN, N_ ­ .1-- __ - -_ ,_ IN, I.NI "I \ `�� - - /I - - - - --- - - ----- ­ I'll- ­ '\ \ / / / / I / I I \ % � \ \ N�11 I',, IN, ­ I'll- - - - - __ __ - - -11, '­­­ - ,, -1, I\ \ \ / -w- N-,- ___� __ ­11 - IN, 11 NN, 111N I � � t \ \ \ 11�� `­1 -1, I, I- ,,N � _­ _ _11, . .......... ­­­ ,- - - — "%�,_ — _ __ I- - .... . I_ - -11, -, I_ _ ..�� — �� N% 1\ \ __ __ __ - _;11 - -111, - - -- - - - - --------- --- __ __ 1\ IN,'N­1 --- --- --- \ I ( / ,/ Nl_ ,- __ I-- _ 1­1 ..... - -I, 1\ \ / / / / ( I \ �, 111� IN, ,N, 1, 1_�_ __�_ \ \ 1� /) NC HWY #150 / j / / .-e , - -, ­ - - - - - ------- -,- , _ - 1­1 \ \ \ I I / / I � I \ \ I\ "1 ) \ / APPARENT 6d' R\W / 'NN �_, , _ -_ __ \ - - C(E / NN / " r 'i T� �\� .... ,-, \ IN, UTILITY EASEMENT, DB 3099-586 Hw / / / / x __ ,- \ - - . 14-_�� OE I\ ", \ I - -, _ ,, - - - - ------- � - - - __ _� __ 'W� - - DE ;L - 0 " - - -• -741 45 MPH SIGN HWY 150 SIGN - - ,f `­� ---I . - 1 - _\ I `I -I -; � is" RCP UTILITY COVERED SIGN � UTILITY EASEMENT, DB 1897 N , 7 I/ -_ I- _2E,�-_ I OE - � PE I, NN ,N, DULEIB, EXCEPTION13, _� ". EASEMvd, DB 3099-590 / / / / / N`_ UTILITY EASEMENT, DB 3089-617 \ \_ 0�, " "N 11 =_:::�_-0E -,,4* - - I, - . . ..... IIVV 92724 / / / I / 11 SCHEDULE B, EXCEPTION 7 SCHEDULE B, EXCEPTION 10 & 11 -,�OE- - I -�:Z _--Q�- QF­�% SCHEDA&B-, EXCEPTION 9 _N ­ -7 I-- - �­- - - "I - � _� IN I I - __ \4�Q6 b �!� nF_ - - - DE - DE . 41, 1 / ­ --w - � ­"N' -I/-,:- _." - �� �__ \1' III �\ __ . - E _LL4_� - ��_ --- TI ­ .... . / F _::" 1-1 N' / 7 DE _ N _ .� _� " _ "I I - NN I _/ �� ­ - - ­F ­_­- -­ -nE---Q& - 99 mE I- -r--t!� 1 i 1 - - ­ or­r� � --7-­--';n77_- i - -� ­ - `INC \ � IN, DE - - - DE JE -u eH�! .... - -_--G� -----Q[--- @E 9 - I "I ' " -7 - ....- - _ N,�,>_ / ,- - , � Ut- -OE- -0 - DE - � E-- &C- - - %_ N­ ut , ulz � - - - __� - 7.7 77_7 , ­.- 7, - -, - ­7 - "'- - - � ......... ..... .... .. - - � \ 41 - - ....... - - _ _ __ - __ - - - --- - - ----•� ..... - - - - ­ -­ ­-==- ­0- ­_ =- - '___ - . .......... - , I - ., "" __ - 11-11111 - - , - .11,111. - - 1� ­ - _'_ - - - _: ,- - . .......... z ' - I I � IN, * .... GC- I'll - __ .- _ :�- - i , F , �� - / � _­ _­ "I ...... - (A __� OE - - -""- - , - __ , .IN - ­ - `,- -- ­­ ---�' _ ­_ - - - ------- - - , _-4, / w- ­4 ­_ 0 77-7- - -11 ­ y — 1� - "I a - - ---- MEEMEEsso- I 6_ IM1111111111" i .... . -� , jimmmoffim - ir, ",;* -9- AD mmoso" - --or a *ppM=w­- 'i_ 0 EMMEN11 0 0 rpsomom ... 1110101011190 -4o­- * 1111111111111111 iii _w­A a - 1141, \ \ ,7 - , Pon -6 ... . � 11 — - " - I @ — 7— 1 - - 11, \ � ,'I, - N __`�_�_ \ 1� �, / �po - - 0- �1­ I 0 � �, INN, ­N \ /\ 1_, 0- I LEGEND FO - �_o - ­� 1-0 - -FQ,--_ 11___�o _­ -L - \ \ \ - �­ \_ ­� � '_ - = I , I 1 , - - FO 0- -1- 11IN- - - 1N C�� " - - - - i - FU � F,4� ..... ��,WFO - - F - - ',:;�__ - �u - -FO- -F0 - � I�f '— — FO ( III, -� 11- - �, __ A.-�­ - _= �Y,, ,,_,: I - FO - - FO - I ..,,_..",.�... I­u . - //\' ..... u - _,�� � o - Fff- jr&_:��- -­__fcQu� ....... "I'll, - - - - ... Ea�--:7- FO --F �' I ----Fo =FG­ F0---fy60 - - F0 - - F0 F -_ - / I I V = Z,1T3_­ I LLX___1 ss-_ - - �u - - Ff+ JO I .F - - ------ - - �_:: ��10 / I , _�__L=� - -,. _ 1�_____1_C__ W 11- . .... , 1� . . ......... cr- _11-1 - ­­ �­­` _ _ss - SANITARY SEWER LINE 21 1 IN LQ�_�­ 11-1 I � _FQ__ -_ - - 7-_�7 ­p0---" -FO- �, ­­+0 - FO - _EQ ­F0 - - fa, - FO -, FO - - _F0_(_ '11;-, "a ,_- - b 0 \ I ­� - - __ - ?j __ nj,!�:_��L I ZNI - --'M -,zP FO - I F&,­�� h!L� ' VN, 1 /0 / x \ _­ ,,, I, _ ss;.,�s ---_1 ­ -- - - , ; _,J , N,N - - � - - q �___;;&W_ �I w - WATER LINE � Rl� ELEV �i 928'.34' -1 ) I N -Fo . t .1 -1 -,-\rA- I- - I ,Nxwxnm 0# - �� ... ____ 9_j� __ - - - - a - 41 a � � ;9�_07_ - , Y I --,z 111-- 0 ___*_ � IN IN=921.79 14. � /8 " /?CP I - ,,� - - -,,, - - - - ` �_ V - - ' � � r / - "' , � k3G 0 I- "I'll 11ftft ftlftw G - GAS LINE \ _-1-1 t ) 111111111 "I IN �- i�V'66T = 924.92 ' 0 w , 7. * Avolumovoomm to- 0 0 0 Al I N,, , / INV 9 NI I, 1 W40 TEMPO RY SIGN - - �� - 1� / _0E- OVERHEAD POWER \ \ \1 \11 _- , ..... . _­ Iz- ";ii�5� w 0 / II ONStIRUC ION CONCRIETE' I / / N1 -1- I I O.r _F0- FIBER OPTIC LINE � _\ \ \ '�,� N__1 IN, ,I, I I \ . .... - \ I I - / ® 0 I ) E "I / / / WA I I N_ I / / / / . / N - - ----- - ON #4 REBAR - - #4 REBAR CHURCH SIGN / I '1� - -,/ 0 ft / 11 I -N, \ \ I--- \ N' "I I / I / 11, 'p11(w,,,,o. / I I . \ `11\ 141 " I--- , Z' / / e� \1 _x -x -x - FENCE LINE -11 \ \ I I, I 1_� --,�_ " %,�� / \ "'. \ I / / 0 / / 0 / / I I` \ TELECOM CONTROL 'IF " �bl I I I `_ , __� -_ I I / / � 0 \ ) / / / PANEL BOXES EASEMENT \ \ \ - `1_,_ / / / _�_� / I / / 1-1 _N_ / ,�' - - - - - - - SETBACK/BUFFER , 'N' INN I \ ­_ -1 _ __ N-, \ 0 / "I / ) j I ". / / � - N­ IN t/ 9 I AD 7 / 1­1� \ IN -, IN, I, ", __ -, -1 -1 N-1 N / // / I/ � /�, ) .- / ,I, / Ix 0001� ,I ) I.N ", \ I ,IN ...­- -.�- _� - - - SITE PROPERTY LINE I I, NN NI , IN, NI IN, - ', , IN, ,­ 1^ \ III '_� N" / / --- IN I / / / I /-- - � I INI - 11 \ I ".) - - - RIGHT-OF-WAY 11 IN, 11 "IN _. I,- _,N, � "INN `1� \ I/ / ) I - / , / 1-%\ - . ..... - .. . ..... . N_ GRAVEt-DRIVEWAY / /IN, - ..... "', STORM DRAIN PIPE 11��,_, -, 'NI, ".- __ IN, \, \ \ ') o / 11 / / ( / / / I / - I A * 0 * a ft"111111111ow a 0 0 0 1 N,N ,, i( ".I L / -111, - -1 '� -1 \ 0 - � - - 1-11 \ ­ "I - - _/ 17 7=' -7�L 0 a Nimmmus 0 - / - - - o - - - - - EROSION AND SEDIMENT CONTROL NOTES: I Irl ...... �� / " - ) - � ap,kVIGMN I / -11 U%Lkc I- - " I \ - #/ XXX, \ 1, C__�_ - - / - �__l I . ,/ - IN, WELL / a / / ) 11-11 , 1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MAT, IN � Em - " `N� �_ �1__/ W / I- 0, I-, - . - - - - - _/ 1, I VAPAG't!�, - -N, x ___- _T_ \ _/ — , o _!!!!!�� — I — — — INI ?Q�N ��p,�IAG 10 ­­ � - ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. OSIED - 11 ­� \ 11 1, I .- TEMPORARY BERMS MAY BE NEEDED DAILY UNTILTHE SLOPE IS BROUGHTTO GRADE. MoIiI w,jtLxC" _ goo I � / "I' -1 __ .-, \ I --'L�:;-- - Mil __� '-,III � \ \ 1, \ / 400, 1 1 / � \ ONE STORY I--,' \1 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE v?,O?CsED '�\ I / / I ONEST RY BRICK 440ME _1­1 I "I ,IN IN, N,N ,NN / I CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) tog - __� I_ -11 - \\ � � ) I I i I e o i I � BRICK Ht I / __\ _01 ---, '94,13-,,- r---,_ "I III -1 I I / I DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW: __� ___ I - -1- _N' ,,, \ ~ I \ I � ) LIMIT I OF / * t \ \ k \ � I 0 ftmmmft I _F_ � 11 Ill 4" 4 / / - / / /I 7 - ­ / ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 11-11 f 113 L \ \ \� ISTUR ANCE I P.) / 0 \ ),/ I T MPORAkY DIVERSION I \ I -IN` 0 1 1 / VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS 7 /, ," III 6 ) / / ACTIVITY. ALL OTHER R I \ \ � �D I \ o � -1 _­ - L-1- �­­_ I I _(_��. PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING AC IN, � I \ DITCH DRAINAGE AREA I \ ,I, IN, '�, I,_ 1-1 ,,, , I ", "' r , ,,, _dtNERAL NOTES / / DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON \ — I'll, — — — ---------• � _% I \ ) \\ \% I � kp, � NN I , ,,,, I Ile, . \' trr /_ —I,,, — _11. I AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. � \ I ��o 1*11, "I I ) / - ( - , I/ I I I a A� I � \ � ) \ __ ,- � "... .1 - - - ------ I �, " 1. ALL MATERIALS, CONSTRUCTION, AND PLANS ARE TO COMPLY WITH \ -\ \ , ) I I CURRENT NCDEQSTANDARD SPECIFICATIONS AND DETAILS. 3. ALL CUT AND FILL SLOPES AND CHANNEL SIDE SLOPES WHICH ARE NOT TO BE PAVED SHALL BE SEEDED UNTIL A GOOD \ \ - -1 \ � ,I � I ,,, \ v I ,I� "I � \ . / "", IN � STAND OF GRASS IS OBTAINED IN ACCORDANCE WITH THE SEEDING SCHEDULE ON SHEET C7.4. ALL SEEDING WILL BE -_ ­ ..... - IN, I \ \ ,'I I'll 0 1 . N MULCHED. \ \ � � \ I " IN, __ I,- -­ ­­1 �, I,, \ o / 2. CONTACT NORTH CAROLINA ONE CALL SERVICE @) 811 OR N,N \ \ __�! I I,- ) ,- _, IN NN, 1\ \ \ \ \ \ \ \ I- I- I- M. - - - __ IN \ , , I ­ ­_ ­ I "I I IN NN / 800-632-4949 A MINIMUM OF 72 HOURS BEFORE DIGGING. 4. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN (7) DAYS AND WITHIN 24 � U18 \ CROSLAND DENVER HIGHWAY 16 ULC ,- �- \ \ 9 I* � � \ \ \ \ Ill - ", ­ III - __ - - ­1 ft, I N /' .g DB 2928-1053 PB 51-37N, "' 1� ME \ � IN, I'll, I -­ - N,N \ IN ) f 3. ANY SITE GRADING SHALL COMPLY WITH INTENT OF ORIGINAL . , '11� AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE INCH. IF SITE INSPECTIONS IDENTIFY BMPS THAT ARE AMAGED \ \ \ \\ �/ � k7006yN � Is \ \ ,-I, "I I . ........ . - -, _., N_ OR NOT OPERATING EFFECTIVELY, MAINTENANCE MUST BE PERFORMED AS SOON AS PRACTICABLE OR AS REASONABLY \ - \ `\ �*.__ I'll - * DEVELOPMENT GRADING AND DRAINAGE PLANS. PRACTICABLE. ,_ � ", N __� - I,' I ) ......... - I / POSSIBLE AND BEFORE THE NEXT STORM EVENT WHENEVER PRAC \ 1-1 \ \ IT 11\ \ \ \ I` _� / I ,IN \ I � \ \ o \ \ % --,UDIMENT BASI DRAIAASE AREA ", I I_ 11 IN, / / 4. THE CONTRACTOR SHALL VERIFY ALL EXISTING STRUCTURES PRIOR 5. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE I � \N � � I -, of I 'N � \ CPO \ \ 111� I- ..... - - - __ ---- - - - - - ,-, ,,- __ -_ -_ N_ IN� IN, N`1 'N' 11 I TO CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED TO THE BEING PUMPED BACK INTO ANY STORMWATER SYSTEMS, WATER COURSES AND WATERS OF THE STATE (WOS) OR WATERS � � ,,I � ENGINEER. OF THE UNITED STATES (WOU.S.). _11� IN, )�? 1, \ x - - , I N' / : � N\ J` \ \ \ \ - - - - ----, -_ ,N, III \ BASIN NUMBER 1 I'll, I 1-1 N, \ \ 'N, \ \ o - - "_ �� "I / \­ EDGE OF PAVEMENT I I, "N 5. NO BMPS SHALL BE PLACED ON ADJACENT PROPERTY WITHOUT THE 6. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE PHASE: 1 ­-\ k IN, ",I III, \ � %, \ *11� N\ \ ,\ 11 I I- ­ - "N I .�,_ - - ____ 1_�, II, - WRITTEN CONSENT OF THE PROPERTY OWNER. COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL BASIN TYPE - SEDIMENT '\ �-, \ \ x � ) , I �NN, 935, , -, — ( I CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFF$.1TE * v \ \ \ / "I ,IN �,_ 'NN -1 IN,I 1__� 0 6. THE NCDEQSTANDARDS SHALL BE USED ASA GUIDELINE FOR ' SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE - - - ­­` -DRAINAGE AREA TO SB. 17.89 AC 11, , N\ \ �\ \ ,\ N, IN, _`I, -, __ __ __ __ _ _�93,5,, t IMPLEMENTATION AND MAINTENANCE OF BMPS. THE FOLLOWING SITE IS STABILIZED. DISTURBED AREA TO SBo-- 1 12.19 AC NN ­, \ 11 X!� ) \ \ N\ 1-1 1\ "I -,_ IN" 4 _N ,,, IN, - - ----- - - - __ - "_ ... � - - ----- __ - - - - __ - __ -1 -_ IN, ___� 0 \ BMPS: 7. THE CONTRACTOR MUSTTAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY FROM ­_ ,,- "Q10. 63.2 CIFS 11 IN � \ \ \ ,,, -1 - -_ -_ I, --- a SURFACE ROUGHENING CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM `_ - -"'- - REQD. SURFACE AREA: 27,510 SF I N\ 0 \ \ %_ ��, X I- I- �I­ - __ 1, IN, I 1­ -,- _', - -11 ­ - __ ­­_ - - - ­ - ­­ II, -_ PAVEMENT, AS MAY BE REQUIRED. PROV. SURFACE AREA: 35,460 SF `NN, IN IN, \ NN ,I, '111� `N­, IN, ,_ ,I- __1 _', - - - - 1-1 `­­ 0 STABILIZED CONSTRUCTION ENTRANCE __� �--REQD. STORAGE VOL: 32,202 CIF NN \ 0 \ \ TEMPORARY DIVERSCIN IN '�� -_ - - ------- - - - - - - - 1_' ,,, -_ I ­_ \ 0 SILT FENCE 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCE. - _� PROV. STORAGE VOL-.- 80,383 CF I "I, IN \ \ \ \ DITCH DRAJ,NAGE ARE N,_� _� 1-1 ­_ -`_ ­_ III I II, I ­_ -",- "],- _,", �, - 0 HARDWARE FABRIC AND STONE INLET PROTECTION - "BOTTOM ELEV 912.50 11 \ __ __ 'N, , 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW MATERIAL. - - -'- " V. 915.00 1\ \ \1 \ \ X -\- ", - ( 9 N'. I--- I,— __ __ ­`1 �_, -, _­ - •`­_ a CHECK DAMS TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE __� -_ - \ �SN IN, IN NN, ),- -_ I- N __ I- ,_ 0 i a TEMPORARY SEEDING � .... ATER STORAGE ELIE ' THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. - -1111, - - - CLEAN OUT DEPTH-- 1.25' " \N, � \ / IQ \ \ \ IIN ­N, I "I ,,, �D_ �,_ III - ", ­­ `N_ "NI __ - _,", -, IN, N�N �_�_ 10. THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING ARE RECOMMENDED AT A MINIMUM. ACTUAL MEASURE - - ___ ,,- ,TOP OF BERM ELEV,.- 918.00 \ \ / \ I \ \ ,'I -1, N/ I , I I ­_ I , "�_, 1. -,- -,- 111� I- IN- - _ "" . ­ " ­6 - - "I : PERMANENT SEEDING - - • NECESSARY FOR CONTAINMENT OF RUN-OFF SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE FIELD'VERIFIE6. EMER. SPILLWAY ELEV:-- 916.50 \ \ 11�. 11 ", - � �_ � .­ 'N, �', 'N, _­ \ ,I, ­ - , II, 1�- _0 • -N, - MULCHING _­ -­ EMER. SPILLWAY WIDTH: 30' \ I , \ \ \ \11 ,,, t�) .NN, I_ _." - - - -1- -111, - \ __ _ I N ,,j a SOD SKIMMER PIPE DIA-- 5.0" � I "I __ __� - __ � � __\ \ _` _ \ N� ROCK CHECKPAM 19-1s, 'I, - -- ', LIMITS OF ­­ ->I * 11. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE TOWN- ­ ___ DIA.- 3.5" \ * v \ \ \ \ ',I, I "I-% I'- `�­ �NN I �� ­_ - _., - 11 � ___� --- 11 4 � I j 7 __ \ 0 __ � I ­_ ­ ­ -11, ENGINEERING DEPARTMENT. .-� _­_ SKIMMERORIFICE' \ 1, � \ \ IN, I— ,IN N­ N, IN, -_ - _ .- III I -1, N" _� ,, .1-11, - - - ___ \ . .... - - -, DISTURPANCE [TYP.) \ 1% I � _ _ CULVERT PIPE Dlk-- 36" RCP \ \ ,,, "N ".1, `NN N,N - _­ - �— —930— - -, - �_ �1� - _,I - 12. ALL SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. - ---- - -, CULVERT PIPE LENGTH: 67.7 FT k � \ \ IIN IN, 11 1, I- ­ I- I- N, - __ ­ I- I "III �_� - I- "I 0 \ 'N\ - - _ _,� %, _1 � _N ' k / NN, *1 y ... 1� --- , �W_� -, _­ -, - "I - N_ 11�.930__� " _ "k, ,I'll- - - ­ ­­ \ \ ( I- -, 13. AGRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONEACRETHATWAS NOT PREVIOUSLY - ",,INV UP * 905.99 DIVERSION DITCH" N,N ) "I IN -__ I, � ,I, 1-11 � MPbRARY`N __�� � I -",- �j A : SEE,DETAIJL SHEET C74 ,. I ­_ _ __ __ - - - I'll- -, -1 I- III \ D* APPROVED. . ..... - - .._ -11 -11 INV DOWN 905 , 65 % \ III _ _ __ ­­ - . .... -, - - - N,N - - __ � _YER LAKES PR \ � _ _,_ _ _ _ 1, \ - 14. ON -SITE BURIAL PITS ARE NOT ALLOWED, UNLESS WRITTEN APPROVAL IS RECEIVED FROM THE OWNER AND AN ON -SITE .....•�•.... . . .. � ... � - - ----- - -------- - - ­ �11, \ / \ \ v 1.S'bEPTH "I NI _ I_ " �� I_ - __ _" _1 - 0 PARK OW i I DEMOLITION LANDFILL PERMIT IS RECEIVED FROM THE ZONING ADMINISTRATOR. ,,, _ " 1__� - - - "-, __ - - - - _" - _11 "I 11, I--- ___ 0 IN, \ HERS . -' I - - - ----- ­_ - - - - - - ­ - IK 3:1 S16E SLOPES "" N, / I - ­ .- _ I- "I II,I 1_� � _ I- ­­ ­ - - - , "I - - - ----- - - -, NN11 IN, ,,,,I INN "I "I �, _� � \ \ DB 238"915� - / \ S75 UNE'R,(OR EQUALY,, - __ ­N� ____ - -152 15. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN ISAVIOLATION OF THE ­ .I- - IN, � \ 0 1\ I I " \ IN, IN _ '_ NI, ­ __� ­ -11, - - - -1 ­11- - -1 ..... - , ,I, "I --, " PB 74 1 / TOWN/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. - 'N NI "N , ",I 1-1, I II - _ ­­ ­_ ­_ __ __� - I_ _1111- . ..... - 11, ,,, IN- "__ \ \ \ / - \ `11� -- - --- - ".- - ___� - ,_� NIIn ­_ `�,� � 16. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT - ", IN ,I, 1-11 -, 11- -1- - - - - PRE CONSTRUCTION MEETING. - __ __ __ _ _ __� 11�_, NN 1-1 "Ill I'll ­N, IN, 1­1 11 NI - \ \ \ \ \ \ \ 17. A PREWORK MEETING SHALL BE SCHEDULED WITH THE TOWN INSPECTOR PRIOR TO CONSTRUCTION. ." I\ N, I ,,- N-1 N­ I, I- - -,-, -, - -""- __ _ _ -, - __ _­­ - 1� \ N1, � - 11 - - __ .N_ N 11 ',I, - -, - - - -""- __ __ IN, , � "N __ \ \ \,IN / '_ -� III III N`N 1-1.1 v \ - -N, IN, .­ '�_, - 18. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH N�11 , - 1920 - .­ .1- .1N, - - __ _ - -, __ - -, ­_1 IN \ N,N, 1_� IN, I NN� \ \ \ \ \N N- __ � I'll / / AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM ­ _ '�1�11 11N, / go �, I I , \ I- NI ­`_ I, - _,,- ­­­ - I,N, ­N, I--, III, I 11 __ NII / WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. -11 _ - __ 1-I. IN', " 1, ,I, N`SIqFENCE ' ,,, 'N' I• �'' 11-1 \ -I, 11 _ 1_� 1­ _ _'. - - I'll- ­­ - - __ __ __ -",- __ __ _1 ", IN, NI I I I . ...... � "I, 11�� \ .,� -11 �_­BA.%NI, \ \ N \\ 'N 1-1 11 _ __ --l- ­1 / 19. SHOW BMP MEASURES FOR CONCRETE TRUCK WASHOUT AREA, ORADIDTHE FOLLOWING NOTES: , `­11 I- ,10 I �_ `-, - - "N, /_ 1_­1 - - -, N,, ,,,,, \ \ I / I IN, NOUTUET P. , I, I \ I _ - - - ----- ----- - 1-1 -1 _� NIN "' - N�11 ,IN I I- N, . ... . ... ,'I, ,,,, �, I INI CONCRETE TRUCKS SHALL NOTTYPICALLY BE WASHED OUT ON SITE. IF CONCRETE TRUCK WASHOUT IS PERMITTED- 'IN IN 11 I I \ \ ROCK PIPE INLET PRCTECTIOW�_, 1_�, __ -_ ­_ -1 -1 I, \ IN. IN,I "I / \ , \ I/ ON SITE, COORDINATE LOCATION AND BMP'S WITH SITE INSPECTOR. "-, "-, 11� 11 ", 11 ­.N IN ",\ \ -,, ,-I .,000'- \ ­, " _� �, -, ___ "_ ,,I -11 ­_ 1_, 1­N N, N, NIN I ", �, -1 _ ­ __ IN N / \ __� N-1 '\- 1_� / -aa -1 IN, ", I', ­.. 'I,, ", - "', -- , "N ", \, 1_­1 17 \ I I\ �1_ - -1 /'* ONTO SOIL OR PAVEMENT THAT CARRIES STORM WATER RUNOFF. 'INCEJTYP.) ,-I , , _-, 18" TEMPORARY$LOPE DRAIN\ , �,_ - _,� 1-11 -,_ NI /, III -\ L - DO NOT DISPOSE OF CONCRETE TRUCK WASHOUT WASTE BY DUMPING INTO A SANITARY SEWER, STORM AIN I OR 'N' I , o IN, ,I,, 0 -, J I __1 NIIN SILT F Ill _/1`1 I \ I , \ __ I- ­ ......... __ . .... ....... - - - - __ NN, IN, NI, IN, .I, -, I, 'N' IN" \ \1 CONCRETE TRUCK WASHOUT SHALL BE DISPOSED OF IN ACCORDANCE WITH THE FOLLOWING: 1-1. ,I ,I, 'I, 'I,, NN� I \ \, \ 41R�P APRON NN ", � - - - ___ - - - - - _­ 'IN 1_� .__�_ 1,� "I ,,, �11 ", 111� `N� \ \ --- \ 24' ROAD EASEMENT I , IN 111-� -N, I _ _ _ _ - - ,,,,- _ _""_ _, -1 �_� IN N 1\ "I N�11 \ ,-, ,N­ - DESIGNATED AREA THAT WILL LATER BE BACKFILLED (SLURRY PIT) ,IN `1� "I \ _ _ _""_ _ _ IN, 1__� �_ III __ IN '\ \ `11� \ N,N \ � / - DESIGNATED AREA WHERE CONCRETE WASH CAN HARDEN AND BE DISPOSED OF AS SOLID WASTE. 11, III ; \ _,_ ,, , ,,,, \ N11 \ \ - LOCATION THAT IS NOT SUBJECT TO WATER RUNOFF, AND MORE THAN 50 FEET AWAY FROM A STORM DRAIN, I'll \ -, "N `�� \ \ IN `I, OPEN DITCH, OR RECEIVING WATER WAY. "I'll I- - I_ _­ "" NN \ \ -PUMP EXCESS CONCRETE IN CONCRETE PUMP BIN BACK INTO CONCRETE MIXER TRUCK. ',I, N, NN, \ 1� ) 0 \ - CONCRETE WASHOUT FROM CONCRETE PUMPER BINS CAN BE WASHED INTO CONCRETE PUMPER TRUCKS AND \ N I \ \ \ \ '11, 11 IN, "N_ 1-1 I, 'l-N \ "�. I \ / I\ I ) I I I DISCHARGED INTO DESIGNATED WASHOUT AREA OR PROPERLY DISPOSED OF OFFSITE. \ \ 1 '90S / \ \ \ IN, \ "_ - ­­­ - ___ . ......... - - - - - "'N' ,'I- 11 "I -N, IN, N \ I- - I,- \ \ \ \ IN, I O/ / I 1 20. ALL CHEMICAL SPILLS, OIL SPILLS, OR FISH KILLS MUST BE REPORTED TO NCDEQ- CALL THE 24-HOUR EMERGENCY 7 \ 1\ -1 I- \ \ N­ N�_ / / I RESPONSE LINE AT 1-800-858-0368. � / ') k I \ \ `\ ,\ I,- -1 -I, \ \ \ 1 \ \ / / / / 21. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR ALL CONSTRUCTION WORKERS AND SITE VISITORS IN j �a ) I 11-1, \ '� I / \ ) ,I / / I I ACCORDANCE WITH 2006 INTERNATIONAL PLUMBING CODE GENERAL REGULATIONS, SECTION 311. PORTABLE FACILITIES CP N, , -1 - - __ - -I � \ ) I / \ / i I-, / / / HASH HOWARD SHERRILL& ASSOC. SHALL BE PLACED ON LEVEL GROUND AND AWAY FROM STORM DRAINAGE SYSTEMS (DITCHES, CATCH BASINS, ETC.). I I/ / , / ,,,- \ \ \ 1, , "' I I / \ / / / / / � / / / / DB 2029-886 1 DISPOSAL AND HANDLING OF SANITARY WASTE MUST COMPLY WITH STATE AND LOCAL REQUIREMENTS. 11 / � AFFLE I \ > / I I / IN, III / / PB 42-102 22. FINAL GRADES FOR GRASSED AND LANDSCAPED AREAS SHALL REQUIRE A MINIMUM OF 4-6" OF CLEAN TOP SOIL, FREE OF IN, IN ) F � N. 10s'�SACING �_- - -- I "I I/ I / / / / / I'll NI 0 IN' I / " \ DEBRIS AND CONTAMINANTS, AND PREFERABLY OF NATIVE ORIGIN. I- I ,,,, / / 7 1 1 i', " ,I I / / 1-1 IN" ,IN, I'. / /I I 'N/ , / - - -1- -- -, III IN, .I--,' I'll I 11 \ \ j / I/ / / / / I,/ I'll NI 0 1 ­­­ , "N "" \ 23. SILT FENCE SHOWN OFFSET FROM LIMITS OF DISTURBANCE FOR CLARIFICATION PURPOSES. � I 11 I \ 51, MMER\WITH 3.5" ORIFICE I / / 11-1 NNI / 1-1 IN 11 I - ,) - - "/ / I A �, I / /,11.1 " ___1 24. CONCRETE WASHOUT STATION AND STOCKPILES SHOULD NOT BE LOCATED WITHIN 50 FEET OF ANY STORM DRAINS,�- ­ ,_ "N­ - ," 11 , \ \ \ __ - - - -1 / / I I 11_*� NN` I'll � / ) i INI "I 'I / ,I,* 11-1 I'll IN, ) I--, elNI \ \ "' BASINS, OR STREAMS UNLESS NO ALTERNATIVE 15 FEASIBLE. 1�1 -,_­ __ •I , - I 0, 1� \ \ I / '/ / ' / / ,A-A� 1-1 NI 'IN "I NN 11-1 � 11 / I--, / _ - i�6�'I� - ;�4, 9 � ' I ___ , 0- - �LL �i _`o ­ __ ��_ - , - / NN , O/ / I _ : � � ) \ � j _ Q�� _, , z 1� ", , , "_ 11 1�' j eN ,IN I/ 1111� "I __ I'll, IN, , k - 25. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED " ,_1 .I" - ... : w I I I NN N­ ,/ / I "I IN' IN, 'N, I IN, EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE -_ I , ­ _ - __ __ ." , � / NI N1 / N` / z z N", N,N IN, __::�__ 1-1 k DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY III I- _I- -_ II-1 ­_ - / I I "I ,IN N- z z 'r IN' / / N,N N`N /,- -- - _, Ill \ ACTIVITIES ON SITE MUST BE DISPOSED OF AT FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGMENT I �11 I'll NN I 1-1 ­` Z 0 IN`* OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. I __ "_ I- ___ I- ­ -;.- -910 - " -111,11, -, •�11 '1� I � �� I", 'IN, NN, N,I I-,.,, 'N, III N­` 11 / / N" /I ", ,I, "" N,­ 11 "I // - I- - - _____ I 1�1 '1� IN, / / "I, 1-11 // - - 1�1 N� , - _­ / � ... . .. , I - 11 "IN I" I/ _( ) ,I 1;10�� 26. PER SECTION 6.20 OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL,' -­ __ ­- ' ­-, .�_ - 1-1 NN' I, IN .� z / / N/ � /_� / ,/ 1-1 z "I "I 1-1 --- ) DIVERSIONS THAT WILL STAY IN PLACE LONGER THAN 30 WORKING DAYS SHOULD BE SEEDED AND MULCHED AS SOO"S ---- ,- ,-I- - I -1 X" - "III " / / "" .__� , I NN .10, , THEY ARE CONSTRUCTED TO PRESERVE DIKE HEIGHT AND REDUCE MAINTENANCE. -, .­­ - - 11 , - ­ -,- I— I'll __ __ 9113.o, � Ne I 11 1.11 I "N, I I / /7- / II, ­ ­ -1-1 ­ - - 40e / ____ N' ,/ I N, ,/ / , IN, -, IN, 11 OZ , , , I - - - -1 ,,<--j­­ ""' BUD RD. IAIDEN RD. �nGo Z = ? rn a) Ln Ln :) \ I \�,\ 0 % :) N\C,ws 9R - 4 N I LOCATION MAP 1" = 1500' CONSTRUCTION SEQUENCE 1. OBTAIN EROSION AND SEDIMENT CONTROL PLAN APPROVAL FROM CATAWBA COUNTY EROSION AND SEDIMENT CONTROL DIVISION. 2. 48 HOURS PRIOR TO ANY LAND -DISTURBANCE ACTIVITY, SET UP AN ON SITE PRE -CONSTRUCTION CONFERENCE WITH A CATAWBA COUNTY EROSION CONTROL INSPECTOR TO DISCUSS THE EROSION CONTROL MEASURES. 3. MAKE ANY REQUIRED MODIFICATIONS TO THE EROSION AND SEDIMENT CONTROL PLANS. ALL MODIFICATIONS SHALL BE DOCUMENTED ON THE ON SITE APPROVED PLANS. 4. INSTALL GRAVEL CONSTRUCTION ENTRANCE OFF NC-150. 5. INSTALL PERIMETER SILT FENCE, TEMPORARY DIVERSION DITCH AND SEDIMENT BASIN AS SHOWN ON THE PLANS CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 6. CALL FOR ON SITE INSPECTION BY EROSION CONTROL INSPECTOR. WHEN APPROVAL IS OBTAINED, CLEARING AND GRUBBING MAY BEGIN. 7. LIMIT CLEARING AND GRUBBING OF THE SITE TO AREAS THAT WILL BE MASS GRADED. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL REMAIN IN PLACE TO PREVENT EROSION OF THE SITE. 8. BEGIN MASS GRADING ACTIVITIES. AS SITE IS GRADED AND PADS BUILT UP, THE CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. ADDITIONAL MEASURES MAY _`_ "I - _ - ,II -1 NN I, 11-11, IN � - - ---- - I I I I I __ , "I Nl� /I I I OUOUTLET TYIP. - "I'll 11�1111111111..!!!,. I I __ - " P NN' -1 TLET .1 ­- ­ � _..., ­­ -11, - I _" - ." 1-11 ­1 ,­` ` -I' ,_� - Z' ,'I, N,I ,I,' N" �_ , _N� -I-` -III ,; _915— I- - - - - - ___ _\ I "I N" , IN, , I- "I, -,I I-, ,N­ . ......... � ...... - __ __ IN, - - --- ----- - _N/ / / / 1-1 "I, .,� 1-1 "I 6 ,IN IN / - / 1/1 \ 11 I- - "Mmi " I- N, "` / III "4000 I I I - �1, - - 11� N, '1�1� I z NN / /1 ) __ I , ,I- f, -, - " - , N 'N III _­ I- 1­1� 'I * I I 1-1 30' EMERGENCY SPILLWAY ­ , - ­ - ­­ - �1.11 _­­ - - - - / ,0�, ,I, N­, N,­ I - C3,-, __ N' I/ IN, ­-, P� I - �1. I 11 __ , .IN / N' / /* 141 1�, - _iO " ,I -, "_ ,/ "I I- / I . N 4 / .I _1111 ,­` o - -I / 1-1 ASTER FUNDING I I 1-11 ,ELEV. __ /-' I- ,-, III IN, IN NN, N- g 11 _,N I/ 11 I/ \1% STORY ULC I N' 7 0 a 11111111111111111 "I ,I, ____ N`_ , I N,­ �NN I/ 1-1 / / I'll / 1�1 DB 3120-1954 NN ,_ - - - - _­ " ----.--.' ,,, 17, N, _� - ,-I, _� / I/ / a 1-1 / \ BE NEEDED AS CONSTRUCTION PROGRESSES. .­ ,- 16- —CONSTRUCTION OF STREETS, VTWIES,"AND LATERA�ARE TC�gii 7 ,qft*M"- . 11 1-1 I- _ - .III "I 41 ,I,, / / � ­ 9. CONTRACTOR =MIT DRAINAG-E AREAS FLOWING TO THE PROPCISED-BA "I TO THE COMPLETED ANDiNSPECTED. ;::-, _­ __ —1 — — ---- 11 III NN \ 77 __:___.._4L ,,-- 'N`4 ,_�, — -­ I'll N? "I 1.11 z '/ / *,N \� NI — .— __ —11 _ __ _ ,IN ,,,, —P* -_ 11 - _,— lo"' 0 OZ 1-1 / / I'll / / / \ 'I I MAXIMUMAR IS DESIGNATED FO BASIN. TH�IS,SHALC61E ACCOMPLISHED _17-­ ALL AREAS THAT GO U NWORKED+OR14' DAYS OR,MGH MUST BE STA131 U-Z'ED _­ - -, \ ,_ , - � ...... � 0 or" - -0 0- _� I \ N � ,R,Tfli _ " . ...... � - _ - III I / 7______� ,N­ WMNMMNW- I // / I'll / / k BY ADJUSTING _ N, ,./ � -_ II ,_ * / I I ING THE PROPOSED DIVERSION DITCHES AS,THE SITE IS GRADED. .- ­ - IMMEDIATELY. STABILIZATION STAN DARD$,SHO`U LID BE MAINTAINED THROUGHOUT THE _ ,N / ,_!!_� ..--- , -, I-1- "Ill * / ,_ - ,- - - - -, ­_ -"-/- "I'll", - - - I,, 11 NN, -_ I,- I_ - �, � IN, N,N IN' z 0 0,/ // 10. CONTRACTOR SHAUL,1M EET WITH THE EROSION CO4,fTROL INSPEcrOR,PRI'dR TO CONSTRtTCTION PROCESS. __ ,- ­N� " _� I— _-, .,- / LIMITS 'IN � - "_ftA411vtotoo / .0/ / ". 'NI � I I / COMMENCING N(TH PHASEVE0CISION CONTROL MEASURES, --- 18. STRIPPED TOPSOIL SHALL BE STOCKPILEC,WITH-SILOT' FENCE PROVIDEb'AROUND THE -,- DISTURBANCE LIMITS F / // // \ I ,_� NBAN'CE ( ) - I" ,NN - - - - A., 1 - N-1 _ .- __ - - - __ -_ .11, _1 -_ - / N? // �\ I / 11. INSTALL ANY COMMENCING RASE 2 EROSION CONTROL MEASURES. .1-11, PERIMETERrDFTHE STOCKPILE. I- ­N' I- -1 ­- _­_ - - _­ -, __. _ _ I,- N/ 11 I I_ __ 7__��� , / / \ \ I t" / '_ G IES: AS SITE IS GRADED AND PA RE BUILT UP, __ KILLEE LLC _,, ,,, /' ,­ 11" .1 � ___-� ,N­ / / / 12. CONTINUE MASS GRAM GACTIVIT Jl,- THE CONTRACTOR SHALL.DIL'16ENTLY AND CO,NTMOUSLY MAID I — D STRUCTURES,, -' 11 .� --- ­ - ..- - - U3141-69G / / ,I, "I - -_ �,, N_ IN I/ WING OVER FILE " CONTROL DII;yicE&A-N' - ,,- -­­,�� \ CONTRACTOR SHALL MINIMIZE THt'AMOUNT OF STORM WA% �LO I A 11" �1� ___� -, I / _ _ / / , / / / / \ N / � ( I-o" ODIVERSION CHES AND SLOPE DRAINS.,P6DITIONAL MEASURES MAY 20. ,/ / / -, I \ SLOPES BY USIN , STABILIZCfHE SITE AS AREAS ARE,BRO BROUGHT TO GRADE. / ,,,, N­ 1-11, / / / � BE NEEDED *C'ONSTRUCTIrN'PROGRESgS. x ,`121- INSPECT BMP ONCE PER EVERY CALENDAR WEEK, PER NCDEQ R Ut CEMENTS. ALL -,- -­ - __ --- 4 -, 1­_ / / / �, .� ___� / / ') /\ �, \ ,, / / GRAPHIOCALV 1 13. CONTRACTOR SHALL LIMdDRAINAGE,AREAS FLOW TO THE PROPOSED BASIN TO THEN' INSPECTIONS ANDREPORTING SHALL COMPLIANCE=THE NCDEQ GENERAL -I, -1 --�, --- / / / I/ - 'I" / ) / \ < "— -__ \ / ,.,,- MAXIMUM AREA THAT/IS DESIGNATED FOR THE BASIN. THIS SHALL BE ACCOMPLISH,Ed' PERMIT NCG0f0000, LATEST EDITION. " / / / 1�_ SEDIMENT BASIN DRAINAGE AREA, -f \ — / 5 0 N,I 100 ,I, _ BY ADJUSTING THE PROPOSED DIVERSION ES AS THE SITE IS'GRADED. , 22. COORDINATE WITH THE EROSION CONTROL INSP OR PRIOR TO CONVERSION OF THE -T 1_1 IN, / / / /111, \ \ 4000 \ / _ 1 14. MAINTAIN AND ADJUST EROSION AND SEDIMENT CONTROL MEASURES AS MAS�s NSEDIMENT BASIN INTCVPROPOSED PERMANENWET POND. / IN, ,I,, / I I I I / / I M 'weimmm mmm 'twwm \ 7.40000 / I GRADING PROGRESS TO MA1,NfAIN PROPEAROSION AN D 4DIM ENT CO OL. 21/ WHEN VEGETATIGN`IS ESTABLISHED, CAL R FINAL SITE INSPECTION AND FILE A / \ / .-� amon Imuzza wro .4. *Ewmm -1xw=w wwwwN mm.. .=.I I ... ....L... am- wow-1w -4- k \ \ \ / (�N FEE ) / 15. INSTALL INLE,tPROTEcrio AND OTHER MEASURES AS SHOWN ON PHASr2'1PLANS AS J NOTICE OF INATION WITH CATAWBACCOUNTY/NCDE6. ...1. .. .. --ir- � ° \ \ / / / / PROPOSED STORM SEWXsYSTEM IS INSTALLED. ' I TO � $ I ...ffim � I \ \ x I \ \ / / / I inch = -90 ft. t I z t)D <� 00 ce) CL Ilt - N< on LO .0 Cu r— ") CM" -r- 4 U/) Ala) = C) C:) 0 - r,- - w a) , ") I (i)) U) .Lu - Lu S (1) 0 > I.0 b-0 on ,C: C') 0 < ,_ 2 C: 0)(1) 's —C "o Q Lu C,4 (1) (-) C'4 00 — -E— (1) N0)12 C) C: Lu Q_0 z - " CU 0 CD — . u 0 — -2 CD 00 " E cc)) -cru- < 00 0 .. ;z 0 V) 21 Of 6 z 0. t%J111111111, �,#, ,-, 9- .--------. �� `- �-.% -0 r AMERICAN % 7 o � ,a - z 0*1ENGINEERING"0o = 0 0 = = o 3 ASSOCIATES 3 x = = rn 0 0,0 , A% SOUTHEAST *0 iZ z % '? z , �,% C-38B1 .-,,V 41 * 'F .. -10 Co. 0- , , -,"'r., OF P, ,d%%% '11181115100% wMar-an t alralina, I *** 3 Days Before Digging *0 North Carolina 811 811 or 1-800-632-4949 Ticket Entry ht4x//nc811.org/ramteUcketentry.htm STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON THE SPECIFIC SITE, NAMED HEREON, CONTEMPORANEOUSLY WITH ITS ISSUE DATE AS LISTED, HEREON, AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. Ld >- (.D 3r. < X: 0 C:) Z i 0 U-) ul to >: > 00 �_ C.) NZ Z C =) _)0 Z < Lu (-) cn Ir, zF < CY) LLJ M Lo a 3LO < ::R < I :2 �- < W) < 04 L) -) ( LO LO JOB NUMBER: DESIGN BY: BMF DATE: 12/2021 SHEET TITLE: EROSION & SEDIMENT CONTROL PH1 SHEET NO.: C7.0 t ce) BUD RD. SITE INFO z 4 <� 00 L 't N U) LO E CONSTRUCTION START DATE:--JANUARY 2022 C /DEN RD. DISTURBED AREA, 15.04 ACRES al r- (D ce) 2 _r_ C:) 4 0 r,- U) ::5 C:) rn a) (D Ln Ln Cu U) > uj U) '" NC HWY #150 0 U) 0 APPARENT 60'R\W W < _ C: 0) (D -C: (0 I/ Hw (D 04 CE T 04 NN E - - Lu 00 OE --k Z:--OE�--O\E_ 0) N- E- IAIV 92724 N 12 0 __1 NN OE - - OE - - OE _N' w 0 z nE ­-Q& 99 N' E -7 0- OE- OE - _Icrr elf- �__ ............... . OE - 0 9E Q ----a[- Q_ 0� - OE 0E_ a&- -NI 4d - - ------ - . ......... . . .... _777�,� CU 0 +yq . .......... w 151-6­6 REM 0 0 . ..... LOCATION MAP 0 a MEWL-1 Ws . ....... W-W al a-mmmm-a Ar wwwor A a -A -0- ME 0 MIN= 0 a mmma 0-4 ffiff- 4­0 0-6-amEr-w *--I= a 0 1010011-6 IMMEN _41010iii- A-6 mamm 0-A Ammar 9 6 ililloom a 0 OEM 0 a sffi��� cru- 0 6� G, so Fd-f LEGEND .Pe- .0 FCX�, 0- e Fo :E- FO - . ......... FO - t%J1111111111., ss - SANITARY SEWER LINE e 0 0. a 9 *Aam, -0 7CF0 - FO - F ---w.,2_F0 - FO 4 A �Nl % _w_ WATER LINE 77t 9- 1�7_ G - GAS LINE 0 0 0 9 MEMEN \3G AMERICAN % 7 CK PIPE INLET PRCa`E*CTI N . ...... 0 OVERHEAD POWER ok cENGINEERINGO of OVERHEAD M.0 - - - - - - - N1 0 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 ASSOCIATES 3 Z- N, mans r 0 0%` 0 0,0 _F0- FIBER OPTIC LINE TE"M*AftYtONMCTIQN NN, N IN % SOUTHEAST *'iZ N, % FENCE LINE 6ET A,� % C-3881 x -x -x IN, C�N ASHOUT SEDIMENT BASIN DRAINAGE AREA 00 040 1z, SIDEWALK //vv %% EASEMENT NN, 17 --"4,1110F P,\3\ ov - - - - - - - SETBACK/BUFFER N, NN, 9 NN SITE PROPERTY LINE OPEN SPACE _N, NN 'N' N- 000-000 1 ITS OF DISTURBANCE (TYP.) NI Nj N,N - - - RIGHT-OF-WAY RIGHT-OF-WAY DEqCATI,ON -N , N � Na ® seem Slow A ® ...... STORM DRAIN PIPE EROSION AND SEDIMENT CONTROL NOTES: 17 INNER 0 1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MAT, IN 000 SEA( - ADDITION 0 TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. MONO 33046 i TEMPORARY BERMS MAY BE NEEDED DAILY UNTILTHE SLOPE IS BROUGHTTO GRADE. 'N, "N 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE - NN 'N_ ­7 9 CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) N,N DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW: all ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 L VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS IN, PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER Nl N, 'N­, a DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON - - - --------- INLET PROI�Ecrio" (TYP.) NN -N, N, _6MERAL NOTES - - N� Nt I/ I AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. "N' 1. ALL MATERIALS, CONSTRUCTION, AND PLANS ARE TO COMPLY WITH 3. ALL CUT AND FILL SLOPES AND CHANNEL SIDE SLOPES WHICH ARE NOT TO BE PAVED SHALL BE SEEDED UNTIL A GOOD 4 t CURRENT NCDEQSTANDARD SPECIFICATIONS AND DETAILS. STAND OF GRASS IS OBTAINED IN ACCORDANCE WITH THE SEEDING SCHEDULE ON SHEET C7.4. ALL SEEDING WILL BE IN, NN "-N, 2. CONTACT NORTH CAROLINA ONE CALL SERVICE @) 811 OR MULCHED. "N' CROSLAND DENVER HIGHWAY 16 LLC 800-632-4949 A MINIMUM OF 72 HOURS BEFORE DIGGING. 4. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE INCH. IF SITE INSPECTIONS IDENTIFY BMPS THAT ARE DAMAGED DB 2928-1053 PB 51-37 N N, 3. ANY SITE GRADING SHALL COMPLY WITH INTENT OF ORIGINAL OR NOT OPERATING EFFECTIVELY, MAINTENANCE MUST BE PERFORMED AS SOON AS PRACTICABLE OR AS REASONABLY . ........ . N- I DEVELOPMENT GRADING AND DRAINAGE PLANS. POSSIBLE AND BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. a,- -A JL �q K_ 17:7 s-7 4. THE CONTRACTOR SHALL VERIFY ALL EXISTING STRUCTURES PRIOR 5. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE TO CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED TO THE BEING PUMPED BACK INTO ANY STORMWATER SYSTEMS, WATER COURSES AND WATERS OF THE STATE (WOS) OR WATERS N1 ENGINEER. OF THE UNITED STATES (WOU.S.). 'N, ILET PROTECTION (TYP.) 5. NO BMPS SHALL BE PLACED ON ADJACENT PROPERTY WITHOUT THE 6. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE WRITTEN CONSENT OF THE PROPERTY OWNER. CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE al al al al 6. THE NCDEQSTANDARDS SHALL BE USED AS A GUIDELINE FOR COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL NIN V al al v --------- b4- N 1 11 SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SILT FENCE (TYP.1 IMPLEMENTATION AND MAINTENANCE OF BMPS. THE FOLLOWING BMPS: 7. THE CONTRACTOR MUSTTAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY FROM SITE IS STABILIZED. 4_e7, 7L 4 1 1 IN' 1 q • SURFACE ROUGHENING 0 CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM 'N V, 0 STABILIZED CONSTRUCTION ENTRANCE PAVEMENT, AS MAY BE REQUIRED. LIMITS OF DISTURBANCE (TYP) N1_ 0 SILT FENCE 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXITTHE SITE VIA THE CONSTRUCTION ENTRANCE. HARDWARE FABRIC AND STONE INLET PROTECTION 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW MATERIAL CHECK DAMS TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE . ...... •TEMPORARY SEEDING THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. BASIN NUMBER. 1 Ld PHASE: 2 • PERMANENT SEEDING ------ NN, 10. THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING ARE RECOMMENDED AT A MINIMUM. ACTUAL MEASURE BASIN TYPE SEDIMENT V 7� I - - - MULCHING NECESSARY FOR CONTAINMENT OF RUN-OFF SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE FIELD VERIFIED. DRAINAGE AREA TO SB-.- 18.34 AC SOD 11. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY REPRESENTATIVE OFTHE TOWN DISTURBED AREA TO SB:--- 12.64 AC NN, a ENGINEERING DEPARTMENT. 4 t cri Q10 64.8 CFS ---930 61 12. ALL SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. REQD. SURFACE AREA: 28,202 SF k -4 �Nl• 01 •8 ) . PROV. SURFACE AREA: 35,460 SF IN, 13. AGRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY REQD. STORAGE VOL:-- 33,012 CF E `--930-�_ APPROVED. PROV. STORAGE VOL:-- 80,383 CF 92 14. ON SITE BURIAL PITS ARE NOT ALLOWED, UNLESS WRITTEN APPROVAL IS RECEIVED FROM THE OWNER AND AN ON BOTTOM ELEV- - 912.50 . . ... .......... a DENVER LAKES PR PARK OWNERS ASS CLEAN OUT DEPTH-.- 1.25' DB 2388-1915 3 Days Before Digging SITE DEMOLITION LANDFILL PERMIT IS RECEIVED FROM THE ZONING ADMINISTRATOR. STORAGE ELEV: 915.00 15. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS AVIOLATION OF THE l,N TOP OF BERM ELEV�-- 918.00 11_� _1N, [11 - - - I __ , -925, PB 74-152 North Carolina 811 TOWN/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 7 aa, -,%i;;; N ­ EMER. SPILLWAY ELEVm.- 916.50 N' 811 or 1-800-632-4949 16. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE -CONSTRUCTION MEETING. EMER. SPILLWAY WIDTH: 30' -925 N_ 'N_ Remote Ticket Entry SKIMMER PIPE Dlk- 5.0' 17. A PREWORK MEETING SHALL BE SCHEDULED WITH THE TOWN INSPECTOR PRIOR TO CONSTRUCTION. SKIMMER ORIFICE DIk-- 3.5" NN• htt 1 1.org/rempteUcketentry.htm m. NN, z N, STIPULATION FOR REUSE 18. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT SUCH CULVERT PIPE DIA.�-- 36" RCP ai I ASSTOCKPILESOF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TOSTORM CULVERT PIPE LENGTH: 673FT WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. INV UP. 905.99 T7 "N �A _1_. .. N THIS DRAWING WAS PREPARED FOR USE INV DOWN. 9051;.65 N11 - -- - ---- IN, \7" ON THE SPECIFIC SITE, NAMED HEREON, 19. SHOW BMP MEASURES FOR CONCRETE TRUCK WASHOUT AREA, OR ADD THE FOLLOWING NOTES: 7N CONTEMPORANEOUSLY WITH ITS ISSUE AN, NN, SILT FENCE -9 CONCRETE TRUCKS SHALL NOT TYPICALLY BE WASHED OUT ON SITE. IF CONCRETE TRUCK WASHOUT IS PERMITTED 07 DATE AS LISTED, HEREON, AND IT IS NOT ON SITE, COORDINATE LOCATION AND BMP'S WITH SITE INSPECTOR. SUITABLE FOR USE ON A DIFFERENT OUTLET (Typl- NN T jj�l 1-al. -a t PROJECT SITE OR AT A LATER TIME. DO NOT DISPOSE OF CONCRETE TRUCK WASHOUT WASTE BY DUMPING INTO A SANITARY SEWER, STORM DRAIN OR N`N F_ _?USE OF THIS DRAWING FOR REFERENCE OR ONTO SOIL OR PAVEMENT THAT CARRIES STORM WATER RUNOFF. EXAMPLE ON MOTHER PROJECT REQUIRES IN, now THE SERVICES OF PROPERLY LICENSED IN, NN N, AN ARCHITECTS AND ENGINEERS. REPRODUCTION CONCRETE TRUCK WASHOUT SHALL BE DISPOSED OF IN ACCORDANCE WITH THE FOLLOWING: "N­ �,9,20 DESIGNATED AREA THAT WILL LATER BE BACKFILLED (SLURRY PIT) OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED DESIGNATED AREA WHERE CONCRETE WASH CAN HARDEN AND BE DISPOSED OF AS SOLID WASTE. LOCATION THAT IS NOT SUBJECTTO WATER RUNOFF, AND MORE THAN 50 FEET AWAY FROM A STORM DRAIN, N a/ 'N, AND MAY BE CONTRARY TO THE LAW. OPEN DITCH, OR RECEIVING WATER WAY. ­N, -CONCRETE WASHOUT FROM CONCRETE PUMPER BINS CAN BE WASHED INTO CONCRETE PUMPER TRUCKS AND PUMP EXCESS CONCRETE IN CONCRETE PUMP BIN BACK INTO CONCRETE MIXER TRUCK. DISCHARGED INTO DESIGNATED WASHOUT AREA OR PROPERLY DISPOSED OF OFFSITE. . ..... N,N f INUETTROTECTION (TYP.) -CALL THE 24 HOUR EMERGENCY S� \ 0 -1 i 20. ALL CHEMICAL SPILLS, OIL SPILLS, OR FISH KILLS MUST BE REPORTED TO NCDEQ Ld RESPONSE LINE AT 1-800-858-0368. C) -MIN. L 0 21. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR ALL CONSTRUCTION WORKERS AND SITE VISITORS IN 'A M 7 HASH HOWARD SHERRILL& ASSOC. SFAC L ACCORDANCE WITH 2006 INTERNATIONAL PLUMBING CODE GENERAL REGULATIONS, SECTION 311. PORTABLE FACILITIES CFO N, I < z SHALL BE PLACED ON LEVEL GROUND AND AWAY FROM STORM DRAINAGE SYSTEMS (DITCHES, CATCH BASINS, ETC.). 17- DB 2029-886 C) DISPOSAL AND HANDLING OF SANITARY WASTE MUST COMPLY WITH STATE AND LOCAL REQUIREMENTS. r,4)/ , . I / / I PB 42-102 U LO S" SKIIMM IN, v L0 CC) 22. FINAL GRADES FOR GRASSED AND LANDSCAPED AREAS SHALL REQUIRE A MINIMUM OF 4-6" OF CLEAN TOP SOIL, FREE OF WITH �1.511 N, I "I /I DEBRIS AND CONTAMINANTS, AND PREFERABLY OF NATIVE ORIGIN. ORIFICE al al w w --Am- w w W-W -7- 1-1 1 00 F_ 23. SILT FENCE SHOWN OFFSET FROM LIMITS OF DISTURBANCE FOR CLARIFICATION PURPOSES. IN > Z 24. CONCRETE WASHOUT STATION AND STOCKPILES SHOULD NOT BE LOCATED WITHIN 50 FEET OF ANY STORM DRAINS, J 'N *N" Z C-) 0 BASINS, OR STREAMS UNLESS NO ALTERNATIVE 15 FEASIBLE. . .... Yj, 01 'IN N Lu Z 25. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE N, N,N DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY - - ---- IN' N' N,N cn ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT a 0) LLJ M OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. �* -, _1 '1. IN, 61 _,­1 N,­ Lo 26. PER SECTION 6.20 OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, F if N` Lo DIVERSIONS THAT WILL STAY IN PLACE LONGER THAN 30WORKING DAYS SHOULD BESEEDED AND MULCHED AS SOON AS ............. NIL THEY ARE CONSTRUCTED TO PRESERVE DIKE HEIGHT AND REDUCE MAINTENANCE. N_ N/ NN 400p Nl NI N-I 1 11 NN AN L) -- ___N/ 1-11 _ SILT ,FENCE-- - - ------- L0 OUTLET (TYP.) - - ---- NN 40e Lo - - --- ----- -915 N' 400, 0 -Z _L 0 . ..... IN' --l" N* wansm 1l, - 1 40010 lima a/ _u SILT FENCE (TYP.) VON -7,e NN, JOB NUMBER: C200074 IN N. CONSTRUCTION SEQUENCE Mama, STORE k6� #4�ASIIR FUNDING 1, LLC EMERGENCY nR 2 ammm DB 3120-1954 DESIGN BY: BMF a ELEV. 916.50' 1. OBTAIN EROSION AND SEDIMENT CONTROL PLAN APPROVAL FROM CATAWBA COUNTY BE NEEDED AS CONSTRUCTION PROGRESSES. 16. CONSTRUCTION OF STREETS,-TH`tASSOCIATED YWIE5,`AND LATERAL TO`9E 77-- DATE: 11/12/2021 11 N�N NN N,N EROSION AND SEDIMENT CONTROL DIVISION. 9. CONTRACTOR SHALL LIMIT DRAINAGE AREAS FLOWING TO THE PROPOSED BASIN TO THE COMPLETED AND INSPECTED. ......... ........ --plams NO 2. 48 HOURS PRIOR TO ANY LAND -DISTURBANCE ACTIVITY, SET UP AN ON SITE MAXIMUM AREA THAT IS DESIGNATED FOR THE BASIN. THIS SHALL BE ACCOMPLISHED 17. ALL AREAS THAT GO UNWORKED FOR 14 DAYS OR MORE MUST BE STABILIZED NN NN, moor SHEET TITLE: OUTTHE - - l" N` PRE -CONSTRUCTION CONFERENCE WITH A CATAWBA COUNTY EROSION CONTROL BY ADJUSTING THE PROPOSED DIVERSION DITCHES AS THE SITE IS GRADED. IMMEDIATELY. STABILIZATION STANDARDS SHOULD BE MAINTAINED THROUGH N, INSPECTOR TO DISCUSS THE EROSION CONTROL MEASURES. 10. CONTRACTOR SHALL MEET WITH THE EROSION CONTROL INSPECTOR PRIOR TO CONSTRUCTION PROCESS. INLET PRTEcriON N_` NN 71 11 IN' mom 3. MAKE ANY REQUIRED MODIFICATIONS TO THE EROSION AND SEDIMENT CONTROL COMMENCING WITH PHASE 2 EROSION CONTROL MEASURES. 18. STRIPPED TOPSOIL SHALL BE STOCKPILED WITH SILT FENCE PROVIDED AROUND THE IN. U"TS OF DISTURBANCE 0'a PLANS. ALL MODIFICATIONS SHALL BE DOCUMENTED ON THE ON SITE APPROVED PLANS. 11. INSTALL ANY REMAINING PHASE 2 EROSION CONTROL MEASURES. PERIMETER OF THE STOCKPILE. NN (TYP.) > KILLEE LLC EROSION & 4. INSTALL GRAVEL CONSTRUCTION ENTRANCE OFF NC-150. 12. CONTINUE MASS GRADING ACTIVITIES. AS SITE IS GRADED AND PADS ARE BUILT UP, 19. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION N­ 5. INSTALL PERIMETER SILT FENCE, TEMPORARY DIVERSION DITCH AND SEDIMENT BASIN CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING OVER FILL CONTROL DEVICES AND STRUCTURES. DB 3141-690 N_ AS SHOWN ON THE PLANS CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. ADDITIONAL MEASURES MAY 20. STABILIZE THE SITE AS AREAS ARE BROUGHT TO GRADE. 0000/ SEDIMENT 6. CALL FOR ON SITE INSPECTION BY EROSION CONTROL INSPECTOR. WHEN APPROVAL IS BE NEEDED AS CONSTRUCTION PROGRESSES. 21. INSPECT BMP ONCE PER EVERY CALENDAR WEEK, PER NCDEQ REQUIREMENTS. ALL - GRAPHIC SCALE OBTAINED, CLEARING AND GRUBBING MAY BEGIN. 13. CONTRACTOR SHALL LIMIT DRAINAGE AREAS FLOWING TO THE PROPOSED BASIN TO THE INSPECTIONS AND REPORTING SHALL BE IN COMPLIANCE WITH THE NCDEQ GENERAL ;W10L 50 0 25 50 100 CONTROL PH2 7. LIMIT CLEARING AND GRUBBING OF THE SITE TO AREAS THAT WILL BE MASS GRADED. MAXIMUM AREA THAT IS DESIGNATED FOR THE BASIN. THIS SHALL BE ACCOMPLISHED PERMIT NCG010000, LATEST EDITION. W 40010 WHENEVER POSSIBLE, EXISTING VEGETATION SHALL REMAIN IN PLACE TO PREVENT BY ADJUSTING THE PROPOSED DIVERSION DITCHES AS THE SITE IS GRADED. 22. COORDINATE WITH THE EROSION CONTROL INSPECTOR PRIOR TO CONVERSION OF THE Nor - mom= OEM= .0010 EROSION OF THE SITE. 14. MAINTAIN AND ADJUST EROSION AND SEDIMENT CONTROL MEASURES AS MASS SEDIMENT BASIN INTO PROPOSED PERMANENT WET POND. 8. BEGIN MASS GRADING ACTIVITIES. AS SITE IS GRADED AND PADS BUILT UP, THE GRADING PROGRESS TO MAINTAIN PROPER EROSION AND SEDIMENT CONTROL. 23. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION AND FILE A SHEET NO.: mom mxau IN FEET CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING OVER FILL 15. INSTALL INLET PROTECTION AND OTHER MEASURES AS SHOWN ON PHASE 2 PLANS AS NOTICE OF TERMINATION WITH CATAWBA COUNTY/NCDEQ. C7. 1 SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. ADDITIONAL MEASURES MAY PROPOSED STORM SEWER SYSTEM IS INSTALLED. 1 inch = 50 ft. 8N­0E` MAk STANDARD STRENGTH FABRIC WITH WIRE MESH E­ 4' NN .. . .............................. ................................. 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE MESH 1 s7ANK/Alp M77AL 007, 49 nv SIT 1 ENCE . . . . . . . ARDWARE WTAE� sm Rr A FAW 1' ABOVE THE 700 OF WA 7 � v � 1 0,4 I Ht�­ 71 MINIMUM 10 GAUGE ::SILT FENCE FABRI MINIMUM 12-1/2 GAUGE r SKI vj�r"�M� ky p- Q T ��k LINE WIRES INSTALLED TO SECOND INTERMEDIATE WIRES WI E FROM TOP HARDWARE WIRE Lo of 111, "AW I[ 4"a L 441-Ttottor v vA 0 WA01=10. pow I NIM01 sluff. Im P GRADE Epa".. hi Z SO 4 11 �`, M1 Liam .. ............ A ............ ............... U-1 11111. ­7, ................... 1; L L! A qg� Q 7 ---1 All; FETRAORN? 1 0 1 E A 1 WHIAts .. ....... P Ae?", TA, WIFE FEW[ mw'iE,�R Kw 77 GRAVEL FI�TECA' rANRIL AMU KARDWARI7 E ON "'�.IFA`% 1 N V C? STEEL POST 1 RLWAT HDIMEAC WITH HAL? UF SID& 2j1L" SOLID 5 11AN i I-` 'j CD40 A c0TRED V, WIRE MESH 2 RIPIACL 7UNT ah PdAbLD 41 EN�Wk,'I­ 4, !TEEL PU%7 10`'� 10ANK5 -=w­­1 ,got, 1, DRAINAGE AREA CANNOT EXCEED 1/4 ACRE of &A - -- .--SILT FENCE FABRIC 1 INV ma IN WKIII y WE js�QPIR F&STA ANN V PER 100 FEET OF FENCE, 'AN, `]nE.SQN mllAu FDA" �DNDNIONI 7WEL POST �6 2. DO NOT INSTALL SILT FENCE ACROSS FILL SLOPE WPEF57 OTTAF747 APPL !Flo p! 40100, yy STREAMS, DITCHES, WATERWAYS OR OTHER Too Vh "11" FLOW 0', YUEN W&I 14A&T-� AREAS OF CONCENTRATED FLOW 1 SLOPE LENGTHS CANNOT EXCEED CRITERIA SHOWN IN TABLE &62A OF THE NORTH W too CAROLINA EROSION AND SEDIMENT CONTROL 1#1 GRADE Ao NC.DU 1 45 [it P57 W1114ED S 7 PLANNING AND DESIGN MANUAL, ­101 0 NY t 4, REMOVE SEDIMENT DEPOSITED WHEN . � 7' 8' MIN, wAY q 17 fOC--G;,AE --'I'll, ............... 4: A -4 P�7 TY M& q ... .. ..... .. ...... DEPOSITS REACH APPROXIMATELY 112 OF way; a 4&4-1 1 ,-g THE HEIGHT OF THE SILT PENCE, H57 WASHED STMNF 5� SEE NCDENR EROSION AND SEDIMENT 4' MIN� JEV CONTROL PLANNING AND DESIGN MANUAL FOR �L IIR.E CI�� No��I CONDITIONS WHERE PRACTICE APPLIES� 0 Full 7 P ' I PLANNING CONSIDERATIONS & DESIGN -E lqA1ANNp91 r[Nq;AwT1Nh DE"As CRIk"IA C)" CRITERIA, . . . . . . . . . . . . . . . . . . . -A .............. SIDE VIEW 77 ............... - 0, XpIq EDGE DT BXY 191 QW1 Altl� HARD, APF 71 MIT: CATA"A 4- NPIC CATA"A CATAWBA -- — — — — - - — — -- — — SC-1 TEMPORARY SILT FENCE SILT FENCE OUTLET DROP INLET PROTECTION EFFECTIVE1 10/W/2013 -EFFECTIVE, 10/0/2DI3 EFFECTIVE, 10/01/2013 1, CONSTRUCT THE ENTRANCE TO THE SLOPE BRAIN OF A STANDARD FLARED -END SECTION OF PIPE WITH A AA, 50' MINIMUM AND MINIMUM 6-INCH METAL TOE PLATE TRUSS -SECTION —SUFFICIENT TO KEEP — VIEW). MAKE ALL FITTINGS WATERTIGHT. A SEDIMENT ON SITE STANDARD T-SECTION FITTING MAY ALSO BE USED DUMP STRAP MOM" ............................. . ............... ... ..................................... AT THE INLET, l,7� Co '7­ 'K'A �21- -'AC' C'� 'C� 4' IN 2� USE AN EARTHEN DIVERSION TO DIRECT SURFACE 41 BERM L SET FENCE SHOULD BE INSTALLED TO ENSURE RUNOFF INTO THE TEMPORARY SLOPE DRAIN, MAKE Q CONSTRUCTION ENTRANCE IS USED, THE HEIGHT OF THE BERM OVER THE DRAIN CONDUIT 1A REBAR FOR BAG A 12' MIN OR FULL WIDTH Z 4 OF ALL POINTS OF THE 2� IF CONDITIONS ON THE SITE ARE SUCH THAT A MINIMUM OF 15 FT AND AT LEAST 6 INCHES A, NO, REMOVAL FROM INLET DUMP STRAP T 3' WASHED STONE VEHICULAR ENTRANCE THE HUD IS NOT REMOVED BY THE VEHICLE HIGHER THAN THE ADJOINING BERM ON EITHER SIDE, TRAVELING OVER THE STORE, THEN THE TIRES THE LOWEST POINT OF THE DIVERSION BERM X CA AND EXIT AREA, HOLD-DOWN STAKES 34 Ld Of OF THE VEHICLE MUST BE WASHED BEFORE SHOULD BE A MINIMUM OF I FT o. A, THE CONSTRUCTION ENTRANCE EXTENDED. FLOW CAN FREELY ENTER THE Pl% WHICHEVER IS GREATER ENTERING THE PUBLIC ROAD OR THE LENGTH OF ABOVE THE TOP OF THE BRAIN SO THAT DESIGN 15" MIN� 4 P� 3, SEE NCDENR EROSION AND SEDIME NT CONTROL I PROTECT THE OUTLET OF THE SLOPE DRAIN FROM PLANNING AND DESIGN MANUAL FOR CONDITIONS EROSION WITH RIPRAP DISSIPATOR, T SACK— K. WHERE PRACTICE APPLIESj PLANNING 4, SEE NCDENR EROSION AND SEDIMENT CONTROL SEDINIEN CONSIDERATION t DESIGN CRITERIW, PLANNING AND DESIGN MANUAL FOR CONDITIONS WHERE PRACTICE APPLIESj PLANNING CONSIDERATION FTLIANN DESIGN CRITERIA. ,`\-SILT FENCE PLASTIC INLET 11NISHTIAML A I —EIOkNL WE I A RIL CORRUGATED PIPE EXISTING ROADWAY STABILIZE 3T MD'I, IT MIN 13UTLET ot � A NEW CONSTRUCTION— ONO. NOTES� L BAGS SHOULD BE CLEANED OUT — - - ------------- �WA AFTER EVERY RAIN EVENT AND/OR v .,0owv. v IS' MIN, --- A, A.c"- s, MIN, P, Am", ­ AS NEEDED. EXPANSION RESISTANT �0610 low 0; 2, SEE NCDENR EROSION AND SEDIMENT q- (1/4' NYLON ROPE, DUMP STRAP CONTROL PLANNING AND DESIGN 2' FLAT WASHERS) MANUAL FOR CONDITIONS WHERE 2 EACH 4 PRACTICE APPLIESj PLANNING CONSIDERATION A DESIGN CRITERIA, aF7 NO LEV 4 �Mft WOO E FABRIC UNDER STONE SE TION R6a-DETAjL tA14 Rti, CRM-ILMM EPI A IN \V/ I E V -LEL TICLN 01I Ad DEARR 11-- Ln � i E A 1 i I I I - CATA"A ffA"A %000000�!% I omwfv ESC-4 TEMPORARY CONSTRUCTION ENTRANCE ESC-16 TEMPORARY SLOPE DRAIN ESC-17 SILT BAG INLET PROTECTION VE, JO/M/2013 EFFECTIVE 10/01/2013 CFFECTIVEi 10/01/2013 1 r BAFFLES PER tumult-, ELI &A :uRME ......................................................................................... EWA. VAE,­` ARM ATA"M !-A N" F T1- 05 An ITS, too, ,C ...... .... .. .. ..... 00 001 PTANNOR WT ISSMN PA*AL ODR JDTyP%,` 0 WKERE PWA017F APFA R�. R & WANK �TJITERAC� L SUMAN 44f 1E TE NAPDN A 1`01J. L �C SKIMMER EFFECTIVE, 10/01/2( SEDIMENT BASIN DESIGN CRITERIA DRAvINAGE AREA >10 AL. (ACRES) <100 AC. MIN. LENGTH TO WIDTH RATIO 2:1 MAX. LENGTH TO 6:1 WIDTH RATIO MIN. 1800 VOLUME (CU. Fr. REQUIRED PER AC. DISTUREIED) 435 SURFACE (SQ. Fr. AREA PER CFS REQUIRED Q10) IfLAN VILVV I �--Cws NOTES: 1 . REFER TO NCESCPDM SECTION #&WI FOR ADDITIONQ DESIGN SPECIFICATIONS REGARDING LENGTH SEDIMENT EASWS. 2. REFER TO STD. #30.19 10, FOR BAFFLE SPACING AND MIN. INSTAUATION. INFLOW A FIRST WORE IS TO BE CONSTRUCTED OF RIP -RAP. WITH A MIN. HEIGHT OF 3 AND MIN TOPWIDTH OF 2' AVERAGE AREA* WIDTH �ENGTH * AREA OF W&N WATER SURFACE AT TOP OF PRIMARY SPILLWAY CROSS—SECTION VIEW INFLOW DEWATEIRING ZONE FILTER FABRIC - CLEANOUT DEPTH DATA BLOCK (H/2) SKIMMER DEWATEMNG DEVICE L=20' MIN. -RIP RAP BERM; SEE NOTE J3 1' FREEBOARD W 6" MAN DEPTH OF FLOW OVER EMERGENCY SPILLWAY MIN. 1' PRIMARY SPILLWAY (RISER) MIN. '4--- BAFFLE H X 1.5 V SEISIMENT (5' MIN.) STORAGE 4. TURBIDITY CURTAIN (CLDS #30.23) MAY BE USED IN LIEU OF POROUS BAFFLES (CLDS #3019). 5. FLASHBOARD RISER NOT PERMITTED FOR USE IN THE CITY OF CHARLOTTE 6. SKIMMER INVERT ELEVATION = BASIN BOTTOM + 1' MIN. 7. H = SPILLWAY ELEVATION - SKIMMER INVERT ELEVATION EMBANKMENT -T I SRLLAWTAY SPECIFY SEEPAGE CONTROLMEASURES NOT TO SCALE BASIN DRAINAGE AREA (ICRES) DENUDED AREA QVNMIJ Q10 BEN LUME BASIN SURFACE AREA CLEANOUT DEPTH (FF.) H/2 — H (FEET) z (FEET) L (FEET) T (FEET) W (FEET) SKIMMER PIPE DIAMITIER SKIMMER ORIFICE DOIAMMEOTMER REQUIRED Fr.) PROVIDED (CUBIC FT.) REQUIRED PROVIDED SB1 PH1 17.89 12.19 —_LCUBIC 63.2 32,202 8q383 2T510 3V460 115 15 51 30 L5 10 51 3.5 SB1 PH2 18.34 12.64 64.8 33,012 8q383 21202 3t460 115 15 55 30 L5 10 51 3.5 SEDIMENT BASIN (C),O) C C� U) Lo CU r— ce) 4 C,:) CU U) 0 0 C: (.0 LU (1) C14 (-) C'4 00 (1) 04 0) - 120 C: U-1 0 z CU 0 C) �5 00 E ` cu < N3 i6 CARO !1W A c? AMERICAN A -V A Ot ENGINEERING ASSOCIATES 0 A% SOUTHEAST *0 i:�,F �;A A A A 'A'. % C-3881 S W W,4, 00.0.000 A or N %%%% '111811151101, ;i� 0 V) 21 Of 14 0 z I � L I I it 0 1 & 11 3 Days Before Digging *04 North Carolina 811 811 or 1-800-632-4949 Remote Ticket Entry hItyAQ81 1.aqAvmvwQcketentry.htm STIPULATION FOR REUSE THE DRAWING WAS PREPARED FOR USE ON THE SPECIFIC SITE, NAMED HEREON, CONTEMPORANEOUSLY WITH ITS ISSUE DATE AS LISTED, HEREON, AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWNG FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. 0- pop-p-d 01 0 C:) Z 0 U-) ul to 00 0 C*4 Z Z p =) C-) 0 Ld Z C-) ft Z CY) LLJ M Lr) L0 F- L) 04 LO LO JOB NUMBER: C200074 DESIGN BY: BMF DATE: 11/12/2021 SHEET TITLE: EROSION CONTROL DETAILS SHEET NO.: C7.2 11 2' MIN COMPACTED W al CUT OR FILL SLOPE TYPICAL -ORIGINAL GRADE CROSS SECTION NOTEi L CHART TO BE COMPLETED BY DESIGNER 2, SEE NCDENR EROSION ANSI -SEDIMENT CONTROL PLANNING AND DESIGN MANUAL FOR CONDITIONS WHERE PRACTICE APPLIES] PLANNING CONSIDERATION B DESIGN CRITERIA. DITCH ID TYPE WIDTH (W) DEPTH <d) SIDE SLOPE FLOW (Q) VELOCITY LINER TYPE (PARABOLIC, (S) (CFS) (V) (FPS) V, TRAPEZOIDAL) 1 V 0 1.5 FT 3:1 6.22 CFS 4.23 FPS S75 �ALM"A VOL"•,TV TEMPORARY DIVERSION DITCH ESC-5 Ram. 1, ENSURE THAT CULVERT ENTRANCES BELOW THE CHECK DAM ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES, C. THE DRAINAGE AREA IS LIMITED TO ONE HALF ACRE 3, =EXTEND STONE AT LEAST L5 FEET BEYOND THE DITCH BAN K TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM 4, DO NOT USE CHECK DAM IN INTERMITTENT OR PERENNIAL STREAMS, 5, SEE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATIONS & DESIGN CRITERIA. 9' MIN, DEPTH-\ 12' OF NCDOT #5 OR #57 WASHED STONE '5' 151 MIN 1 7- orik 0� 2' MAX, AT CLASS CENTER F1 FILTER CLOTH MATTING/ L THE DISTANCE THAT POINTS STABILIZATION A AND B ARE EQUAL ELEVATION A L CATA"A ESC-3 TEMPORARY CHECK DAM EFFECTIVE� 10/01/2013 LATE WINTER AND -Y SPRING., 5-SL>�TURE, RAIN) - 120 LILIACRE awnne' LB/ACRE LB/ACRE GROUND AGRICULTURAL WITH ASPHALT, NETTING, OR A MULCH 3HTCAN BE USED AS AMULCH / P -CH L FOR ADDUTIONAL INVURMATILIN, �;LL NUIJLNIX LKUALUN ANJJ XLUiKLN1 LUNIKUL rLANNINU ANU 1Jt-Z),1UN MANUAL, NLkT1Ur4 txm 2. FOR PERMANENT SEEDING SPECIFICATIONS, INCLUDING SEED BED PREP, SEASONAL LIMITATIONS FOR SEEDING OPERATIONS, THE KINDS OF GRADES OF FERTILIZERS, TYPE OF SEED, AND THE RATES OF APPLICATION OF LIMESTONE, FERTILIZER, AND SEEB REFER TO NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, SECTION 6,11 FOR PERMANENT SEEDING REQUIREMENTS. ---T— ESC-19 TEMPORARY SEEDING SCHEDULE NPIDES Stormwater Discharge Permit for Construction Activities (NCG01) KEY/ANCHOR MATERIAL AT I/ TOP 13F SLOPE. ---------------------------- -----'--NON-WOVEN GEOTEXTILE FILTER CLOTH FABRIC 4' ABOVE SOURCE WATER KEY/ANCHOR MATERIAL TO TOE OF SLOPE, F CA o ESC-18 EMBANKMENT MATTING STABILIZATION TIMEFRAMES (Effective Aug. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TiMEFRAME EXCEPTIONS Perimeter dikes, swales, ditches, slopes 7 days None IM-TWORP-M High Quality Water (HQW) Zones "F1 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length. F77777�� All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW Zones. t)D Q 00 ce) C N Cn LO • CU r- (1) ce) 4 0 C) C:) C 0 LU 0.> b-0 Cn " 0 < C: C 'D LU (1) C14 (-) C'4 00 (1) 04 Lu 0 z 0- 0 00 Eon < 00 0 W, AX C A "S' %ep-*AM "a % EIRICAN % a ENGINEERING OO 0 0 'S ASSOCIATES a* X A% SOUTHEAST iZ % % C-3881 WCI 41 -10 Co. 00 4"1 00000000 �P W , 418111510% WAS z 0 V) 21 Of W 0 z 3 Days Before Digging North Carolina 811 811 or 1-800-632-4949 Remote Ticket Entry httIx//nc81 1.org/renmteUcketentry.htm STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON THE SPECIFIC SITE, NAMED HEREON, CONTEMPORANEOUSLY WITH ITS ISSUE DATE AS LISTED, HEREON, AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. LLI >- 0 0 z 0 L0 > OC) F- C.) C*4 Z Z C-) =) z 0 LLJ U cn r, zF < CY) LLJ M Lo LO C14 LO LO JOB NUMBER: C200074 DESIGN BY: BMF DATE: 11/12/2021 SHEET TITLE: EROSION CONTROL DETAILS 11 SHEET NO.: C7.3 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HOW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. Stabilize the ground sufficiently authat rain will not dislodge the soil. Use one ofthe techniques in the table below: °Tempmary grass seed covered with straw m other mulches and ta^mn+n °ovummmmna ° Rolled erosion control products with v/ without temporary grass seed , Appropriately applied straw v,other mulch ° Plastic sheeting ° Permanent grass seed covered with straw m other mulches and tamwnon ° se^tex |le fabrics such a,permanent soil reinforcement matting ° Hyd,vsee«/no ° Shrubs v,other permanent plantings covered with mulch ° Uniform and evenly distributed ground cover mKmont torestrain erosion ^ Structural methods such auconcrete, asphalt v, retaining walls � ° Rolled erosion control products with grass seed � 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMSIFlocculants. l. Apply Ouccu|antsa,orbefore the inlets to Erosion and Sediment Control Measures. ]. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMSIFlocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculands in leak -proof containers that are kept under storm -resistant cover | orsurrounded bysecondary containment structures. | PART III SELF -INSPECTION, RECORDIKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amount,. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days an which no rainfall occurred shall be recorded as `zero.` The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3, Name of the person performing the inspection, hours of a rain 4indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken (3) Stormava' er At least once per L identification of the discharge curtails inspected, discharge 7 calendar days 2Date and time. of the inspection, outfalls (SDCs) and within 24 1 Name of the person performing the inspection, hours of a rain 4Evidence of indicators of stormwater pollution such as oil event > LO inch in sheen, floating or suspended solids or discoloration, 24 hours 5Indication of visible sediment leaving the site, & Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per if visible sedimentation is fou no a utside site limits, then a record site 7 calendar days if the fallowing shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 Inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 1 An explanation as to the actions taken to control future (5) Streams or At least once per If the stream or seethed has increased visible sedimentation or a wetlands cossite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain L Description, evidence and date of corrective actions taken, and accessible) event > 1,0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office, per Part 111, Section C, Item (2)(a) ofthis permit. (6) Ground After each phase L The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timetrame or an assurance that they will be provided as soon as passible NOTE: The rain inspection resets the required 7 calendar day inspection requirement. EQUIPMENT AND VEHICLE MAINTENANCE l Maintain vehicles and equipment toprevent discharge offluids. 2. Provide drip pans under any stored equipment. 9. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store inseparate containers and properly dispose as hazardous waste (recycle when poss|b|e). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products toerecycling o,disposal center that handles these materials. � LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g clumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLINA Environmental Quality PART III SELF -INSPECTION, RECORDIKEEPING AND REPORTING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation 'is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial (b) A phase of grading has been completed, Initial and date a copy of the approved E&SC plan or complete, date and sign an Inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures, plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. (40 CFR 122.41] Sediment basins and traps that receive runoff from drainage areas of one acre mmore shall use outlet structures that withdraw water from the surface when these devices need tobedrawn down for maintenance o/close out unless this isinfeasible. The circumstances inwhich itbnot feasible tmwithdraw water from the surface shall berare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: � (a) The E&SCplan authority has been provided with documentation vfthe non -surface withdrawal and the specific time periods vrconditions inwhich itwill occur. The non -surface withdrawal shall not commence until the E&SCplan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dcwateringdischarges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples ofappropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (c) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all clewatering devices, and <U Sediment removed from the clewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters ofthe United States. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER CM Nam &A ELM 2 Dom Or FRA330" CONCRETE WASHOUTS l. Dunot discharge concrete orcement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and atanapproved facility. 3. Manage washout from mortar mixers inaccordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. |flocal standard details are not available, use one ofthe two types oftemporary concrete washouts provided onthis detail. 5. Do not use concrete washouts for clewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must bepumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can beshown that noother alternatives are reasonably available. Ataminimum, install protection of storm drain inlet(s) closest to the washout which could receive spills o,overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad infront ofthe washout. Additional controls may berequired bythe approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post si8na8eonthe washout itself toidentify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags orother temporary structural components when nolonger functional. When utilizing alternative orproprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of inanapproved disposal facility. Fill pit, ifapplicable, and stabilize any disturbance caused hyremoval ofwashout. HERBICIDES, 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 3. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible orwhere they may spill orleak into wells, sturmwaterdrains, ground water o,surface water. |faspill occurs, clean area immediately. 4. Donot stockpile these materials onxhe. HAZARDOUS AND TOXIC WASTE l. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover orinsecondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. SECTIONC: REPORTING 1.Occurrences thatK8w*beReported Pe,mitteesshall report the following occurrences: (a) Visible sediment deposition inastream mrwetland. (W Oil spills if: ° They are ZSgallons mmore, ° They are less than Z5gallons but cannot becleaned upwithin I4hours, ^ They cause sheen onsurface waters (regardless ofvo|ume}'o, • They are within 100 feet of surface waters (regardless of volume). k1 Releases of hazardous substances in excess of reportable quantities under Section 311 ufthe Clean Water Act (Ref: 40CFR11O3and 4O[FR1l7.3)o,Section 1OZofCERCLA (Rat4OCFR3Q2.4)orG.S.143`I15.85. (d) Anticipated bypasses and unanticipated bypasses. k1 Noncompliance with the conditions of this permit that may endanger health orthe environment. 2.Reporting Tlmeframesand Other Requirements After pemmee becomes aware of anoccurrence that must bereported, heshall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) D5x-O3G8. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment * Wfthin24hours, an oral or electronic notification, deposition in a e within 7colendardays, a report thatcontains a description of the stream or wetland sediment and actiort; taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. * If the stream is named on the NC 303fd) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions, (b) Oi I spills and Within 24 hours, an wat or electronic notification, The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item (c) Anticipated * A report at least ten days before the date of the bypass. if possible� bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122,41(m)(3)] effect of the bypass. bypasses [40 CFIR * Within 7 colendardays, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance 'thhI24hours, an oral or electronic notification. with the conditions - Within 7calandardays, a report thatcontains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and * Division staff may waive the requirement for a written report on a case -by -case basis. NORTH CAROLINA Environmental Quality ----' ��� ` in LO �oo ��� "� N N N ��� � � ��w�� wO � �� �� . �U (1) �w �� � 12 0 C: m 0 Z CU 0- d w m 00= 3 Days Before Digging*= North Carolina 811 811 or 1-800-632-4949 Remote Ticket Entry STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON THE SPECIFIC SITE, NAMED HEREON, CONTEMPORANEOUSLY WITH ITS ISSUE DATE AS USTED, H[R[DN, AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT LATER TIME. USE OFTHIS DRAWING FOR REFERENCE OR EXAMPLE ONMOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHrrECT3AND ENGINEERS. REPRODUCTION OFTH|S DRA�|NC FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED U AND MAY BE CONTRARY TO THE LAW. � LU �� �� U U 0N0 ���0 = �� �� 00 �� %� �� �� �� �� '� �� LLJ L) ��_� ��~u � �� �� �= C� L� 00 &� - �� �~ *� &O &O JOB NUMBER: C200074 DESIGN BY: BMF DATE: 11/12/2021 SHEET TITLE: �U������� ����77^�UU U`������� U DETAIL ��U�~ ��K�����77�� �������� U �� �� SHEET NO.: C7.4