Loading...
HomeMy WebLinkAboutNCC221313_NOT Closeout Documents_20230104North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Moore Project: Gretchen Pines, Phase 2 - Lot 30 River basin: Cape Fear Person financially responsible: A & G Residential, LLC - Jamie Godwin, Project #: MOORE-2022-046 Member -Manager NCC221313 Address: 916 Arsenal Avenue, Suite B, Fayetteville, NC 28305 1. Project Location: Gretchen Road, Mineral Springs Twp Pictures: No 2. Weather and soil conditions: sunny/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: January 03, 2023 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Date of inspection: December 30, 2022 Time arriving on site: 12:20 PM Time leaving site: 12:35 PM cc: