Loading...
HomeMy WebLinkAboutNCC230004_ESC Approval Submitted_20230104ROY COOPER ~�� Governor ELIZABETH BISER Secretary t DOUGLAS ANSEL Interim Director NORTH CAROLINA Environmental Qualify December 7, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Cheek's Water Works, Inc. Attention: G. Martin Cheek Jr., Vice President PO Box 199 Wilkesboro, NC 28697 RE: Project Name: New Self Storage Facility Project ID: WILKE-2023-004 Acres Approved: 5.22 County: Wilkes City: North Wilkesboro Address: Hwy 268 East River Basin: Yadkin Pee -Dee Stream Classification: C Submitted By: Blue Ridge Engineering PLLC Date Received by LQS: November 7, 2022 Plan Type: New Dear G. Martin Cheek Jr.: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.govr`NCGO 1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO10000 permit require that the following documentation be kept on file at the job site: E North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 Winston-Salem, North Carolina 27105 336-776-9800 Letter of Approval with Modifications Cheek's Water Works, Inc. December 7, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: New Self Storage Facility Project ID: WILKE-2023-004 County: Wilkes Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. The deed references this site as a former hazardous substance or waste disposal site. Be advised you will likely require additional permitting from other NCDEQ agencies that may affect this erosion and sediment control plan. We recommend you contact Mr. Paul Williams, Environmental Assistance Coordinator, NC Division of Environmental Assistance and Customer Service to discuss your site. He can be reached at (704) 235-2107 or pawl.e.��-illiams;a;ncdenr.,Yo,.,. Be advised this review is for erosion and sediment control only. 2. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110] 3. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 4. The NCGOI has a $100 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCGO1 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities c d •� PON PON .o *a W Q b PC ' r a� • ~ PC A c� � o Q U U z� •-.5�� po PC P.m 0 o an I~ U o W •� �' z � -�^� o N � ed � r••� � ...r O �. o o ,� � a• � C7 ec U e� a U