HomeMy WebLinkAbout20071475 Ver 1_Triage Check List_20070911Triage Check List
~~ l Project Name:
Date
DwQ#: ~ "
County: ~ae~
To: ^ ARO Kevin Barnett ^ WaRO Kyle Barnes
FRO Ken Averitte ^ WiRO Noelle Lutheran/Joanne Steenhuis
MRO Alan Johnson/Barry Love ^ WSRO Daryl Lamb
^ RRO Eric Kulz
/l~~
1 ele hone : 919) `
rom: ~o~,v~, {~G ~ ~- T p ~
F
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
^ Stream length impacted
~~~
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps.
^ Minimization avoidance issues
^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy
^ Is the application consistent with pre-application meetings?
^ Cumulative impact concern
~r~ 6ul<~e~ ~ecpsse~y?
~o~eo,,.