Loading...
HomeMy WebLinkAboutSW4220201_Design Calculations_202301030., LaBeLta December 15, 2022 Hanes Lake- Phase 2 -Stormwater Calculations Table of Contents: 1. Stormwater Control Measures (SCM) 1-5, Existing SCM A 2. Permanent Vegetated Channel Calculations 3. Energy Dissipators Respectfully submitted, LABELLA Associates.. PC i iCAr ►►►��� f, AL 2 052 � � v Arc I Vif 7— A. S7iO? Pau1AVStimpsun, PE ►►►riii10 Regional Civil Leader/Office Manager C#0430 Firm number 939 Burke Street, Suite H Winston-Salem, NC 27101 p (704) 560-8514 ///ADS,. Project Name: Hanes Lake Phase 2 Location: Winston-Salem, NC Site Designation: SCM 1 SITE CONDITIONS Rainfall Depth Impervious Acreage Total Acreage Time of Concentration I R (Runoff Coefficient) WQ 75% WQv (Treatment Volume) q„ (Unit Peak Discharge) QP(Water Quality Storm) VOLUME BASED SIZING Volume per cartridge Cartridge Type Min. Number of cartridge required Cartridge Flow rate System Flow Rate Release time SEDIMENT BASED SIZING Influent Concentration Annual Rainfall (P) Annual Sediment Load Pretreatment reduction Sediment Load to BayFilter 85% Capture Capacity Cartridge Type Sediment load per cartridge Min. Number of cartridge required Anticipated Maintenance Cycle FINAL DESIGN Cartridge Type Number of Cartridges Precast Size 1 2.50 5.83 6 42.9 0.44 9226 6919 1000 3.97 1250 522 6 11.25 0.15 12.8 60 45 1396 30% 977 830 522 131 7 1.10 522 7 6'x14' approx outlet orifice 2.67 in in ac ac min cf cf csm/in cfs CF gpm cfs hours mg/L in Ibs Ibs Ibs Ibs From Type II Chart (0.25 gpm/SF) Date 12/14/2022 years (must be greater than 1 year) Project: Hanes Lake Phase 2 SCM-1 4 M �+CQ T�� Chamber Model - MC_3500 1- Units - Number of Chambers Imper ai Ch Y He a [or hr�¢ ,.. a,-,: frvisinn f' - +g LL Number of End Caps - �4 Voids in the stone (porosity) - 40 Base of Stone Elevation - 796.86 y ft Amount of Stone Above Chambers - 72 in [rxlUdaPcrlmele Spas mCalcuaepns Amount of Stone Below Chambers - g in Amount of Stone Between Chambers - 6 Irr Area of system - 479p : sf Min. Area - 4144 sf min -area Height of System Incremerrtal Single Cllamt h}al ncre�End incremental Increments{ I7!r---ental Incremental Ch, Cumulative ri+ahe& er (ctiGlc fee Sfngle Cap auh Chambers End Cap Stone EC Arid Slone System Elevation 0-00 et [ct+bir. fee!] cola c fee1J cugln fCef u0i66 fee cubic feat} {iset) 65 0-00 000 0-00 0.00 159-67 F59 67 15$75.13 802-36 64 0-00 0.00 000 0.00 159.67 159.67 15715.46 80228 63 0-00 0.00 0.00 0.00 0.00 159.67 159-67 15555,79 802.19 62 0.00 O.00 0.00 0.00 159.67 159.67 15396.13 802.11 61 0.00 0.00 000 0.00 159.67 159-67 15236-46 802.03 60 0.00 0.00 0.00 0.00 159.67 15967 15076.79 801.94 59 0.00 0.00 0.00 0.00 159.67 159,67 14917.13 801,86 58 0.00 000 0.00 159.67 159.67 14757.46 801-78 57 0.00 0.00 0-00 000 0.00 159-67 159-67 14597.79 801.69 56 0.00 0.00 0.00 0.00 159-67 159.67 14438.13 801.61 55 0.00 0.00 0-00 0.00 159.67 159.67 14278.46 801.53 54 0.06 0.00 000 0.00 159.67 159.67 14118.79 801.44 53 0.19 0.02 4.59 0.00 157.83 162.42 13959-13 801.36 52 0.29 0-04 15.33 0,33 153.40 169,07 13796,71 801.28 51 0.40 0.05 23.22 0.53 150.17 173.92 13627.64 801.19 50 0.69 0.07 31.89 0.72 146.62 179.23 13453.72 801.11 49 1.03 0,09 54.29 0.95 137,57 192.81 13274.49 801.03 48 1.25 0.11 81.24 1.24 126.68 209.15 13081.68 800.94 47 1.42 0.13 98.71 1.50 119.58 219.79 12872.54 800.86 46 1-57 0.14 112.36 1-77 114.02 228.14 12652.74 800.78 45 1.71 0.16 124.28 2.02 109.15 235.45 12424.60 800.69 44 1.83 0.18 134.87 2.28 104.81 241.95 12189.15 800-61 43 1.94 0.20 144.45 2.54 100,87 247.86 11947.20 800.53 42 2.04 0.22 153.08 2.81 97.31 253,20 11699.34 800-44 41 2.13 0.23 161,23 3,06 93.95 258.24 11446.13 800.36 40 2.22 0,25 168.64 3.29 90.89 262.82 11187.90 800.28 39 2.31 0.27 175,71 3-51 87.98 267.20 10925,07 800.19 38 2.38 0.28 182.24 3.72 85.28 271-24 10657.88 800.11 37 2.46 0.29 188.40 3.92 82.74 275.06 10386,64 800.03 36 2.53 0.31 194.27 4.12 80.31 278.70 10111.58 799.94 35 2.59 0.32 199.73 4.31 78.05 282.09 9832.88 799.86 34 2-66 0,33 204.91 209.83 4.50 75.91 285.31 9550.79 799.78 33 2.72 0.35 4.68 73.86 288.37 9265.49 799,69 32 2.77 0.36 214.49 4.86 71.93 291.28 8977.11 799-61 31 2.82 0.37 218.93 5.04 70,08 294.05 8685.84 799.53 30 2.88 0,38 223.15 5.21 68.32 296,68 8391.79 799.44 29 2.92 0.40 227.16 5.38 66.65 299.19 8095.10 799.36 28 2.97 0.41 231.01 5.54 65.05 301.60 7795.91 799.28 27 3.01 0.42 234.62 5.71 63.54 303-86 7494.31 799.19 26 3.05 237.98 5.86 62.13 305.97 7190.45 799.11 25 3.09 0,43 241.21 6.02 60.78 308-00 6884.48 799.03 24 3.13 0.44 0.45 244.45 6,17 59.42 310.03 6576.48 798.94 23 3.17 0.46 247.31 6.31 5822 311.84 6266.44 798.86 22 3.20 0.47 250.09 6.45 57.05 313.59 5954.60 798.78 21 3,23 0.48 252.76 255.26 6.59 55.93 31527 5641.01 798-69 20 3.26 0.49 6.72 54.87 316.85 5325-74 798.61 19 3.29 0.50 257.65 6.85 53.87 318.37 5008-88 798,53 18 3.32 0.51 259,93 6.97 52.91 319.81 4690.52 798.44 17 3.34 0.51 262.12 7.09 51.98 321.19 4370.71 798.36 16 3.37 264-19 7,20 51.11 322.50 4049.52 798.28 15 3.39 0.52 0.53 266.12 7.31 50.29 323.73 3727.02 798.19 14 3-41 0.54 268.01 7.41 49.50 324.92 3403.29 798.11 13 3.44 0-54 269,75 7.51 48.76 326.02 3078.37 798.03 12 3.46 0.55 271.52 7.60 48.02 327.14 2752,35 797.94 11 348 0.56 273.16 7.69 47.33 328.18 2425.20 797.86 10 3.51 0.59 274.82 7.77 46,63 329.22 2097.03 797.78 9 000 0.00 276-90 8.33 45.57 330.81 1767.81 797.69 8 000 0.00 0.00 159.67 159.67 1437.00 797.61 7 0.00 0.00 0.00 0.00 0,00 159.67 159.67 1277.33 797.53 6 0.00 0.00 0.00 0.00 159.67 159.67 1117.67 797.44 5 0.00 0.00 0.00 0.00 159,67 159.67 958.00 797.36 4 0.00 0.00 0.00 0.00 159,67 159.67 798.33 797.28 3 0.00 0.00 0.00 0.00 159.67 159.67 638.67 797-19 2 0-00 0.00 0.00 0.00 159,67 159.67 479.00 797.11 1 0.00 0,00 0.00 0.00 159.67 159.67 319-33 797.03 0.00 0.00 159.67 159.67 159.67 796.94 WQv = 6919 cf WQv elevation achieved at 799.04 BAYSAV E R T E C H N 0 L 0 G I E S " BayFilterTM Sizinr Form Project Contact Information Company Name LaBel la & Associates, PC Date 12/ 14/22 Contact Name Brandon Sherrill FJl;n_iMeer ❑er Develo p ❑C'ontractor Project Name Hanes Lake Phase 2 SCM #1 Email bsherrill@labellapc.com Telephone 704-941-2156 City Winston-Salem Fax State NC Zip 27101 Site Characteristics ®Residential ❑Commercial ❑lndusthal Mixed Additional comments/project information Due Date Design and Sizing Parameters Total Drainage Area (acres) 5.83 111]en-ious Area (acres) 2.50 Required Treatment Flow CFS (if applicable) I Water Quality Volume to be Detained X 75% LJ 100% Other Water Quality Volume O t3) 6919 Ps o'ect Location: C'it Winston-Salem ST NC Regulatory Requirements % Total Suspended Solids Removal % Total Phosphorus Removal (ex. 50%) (ex. 80%) Meet NCDEQ Standards Meet NCDEQ Standards Project Stage ❑C'once teal Design ❑Preliminary Design NFinal Desi+gin Othc r Other Site Specific Sizing Criteria The System Pretreatment Credit shall be 30% if system includes a minimum sediment sump with minimum dimensions of 4' diameter by 2' deep. Thank you for supplying the required information! You're almost done? We will also need. Plan(s) View Profile(s) MKTG0013A# Please email this form and any drawings to Engineering@BaySaver.com Phone 800-BAYSAVER (800.229.7283) Fax 301.829.3747 PROJECT 26-5 t oo� �i-f>tSG SHEET OF � LaBeRa PROJECT NO. Z-q-(-Z-0 1 CALL. BY JRW'S DATE K ZZ Powered by partnership, SUBJECT --5cm I- $40-V15e-D CAZCS SCALE - - J CHECKED BY Vc:� ; v%1Pt:�gvco,)5 AVc_ct= 1�?U a05 4 0. `l0 (0,47-1) 9✓ — Q, 4�36 VQL-Uvvt C-, ; (5.83e-) CF (Q. -1�5 X q zz 7 co, Co�Za G� r2 E-���l�Za�M k� p,11� r = 5r& cr P sr - t)67VejC) 011- or`��6 Qom; ` 35��'F6GF Hanes Lake Phase 2 scm #1 C� 2 PRE -DEVELOPMENT POST-DEV LOPMENT 47 /3\ Suh4 Reach ❑n Llfli{ 2212045_SCM1 Calculation_121222 Table of Contents Prepared by Labella Associates Printed 12/14/2022 HvdroCADC?+ 10.20-2a s/n 09581 © 2022 HvdroCAD Softwwe Solutions LLC TABLE OF CONTENTS Pro6ect Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 3 Area Listing (all nodes) 4 Soil Listing (all nodes) 5 Ground Covers (all nodes) 6 Pipe Listing (all nodes) 1-vr Event 7 Node Listing 8 Subcat 1: PRE -DEVELOPMENT 9 Subcat 2: POST -DEVELOPMENT 10 Pond 3: SCM #1 10-yr Event 15 Node Listing 16 Subcat 1: PRE -DEVELOPMENT 17 Subcat 2: POST -DEVELOPMENT 18 Pond 3: SCM #1 2212045 SCM1 Calculation_121222 Prepared by Labella Associates Printed 12/14/2022 HvdroCADO 10.20-2a s/n 09581 © 2022 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-yr Type II 24-hr Default 24.00 1 2.80 2 2 10-yr Type II 24-hr Default 24.00 1 4.88 2 2212045 SCM1 Calculation_121222 Prepared by Labella Associates HvdroCADD 10.20-2a s/n 09581 © 2022 HydroCAD Software Solutions LLC Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 5.830 61 >75% Grass cover, Good, HSG B (1) 2.500 98 Paved roads w/curbs & sewers, HSG B (2) Printed 12/14/2022 2212045 SCM1 Calculation_121222 Prepared by Labella Associates Printed 12/14/2022 HvdroCAD® 10.20-2 s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 4 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 8.330 HSG B 1,2 0.000 HSG C 0.000 HSG D 0.000 Other 2212045 SCM1 Calculation 121222 Prepared by Labella Associates Printed 12/14/2022 HydroCAD® 10 20-2g s/n 09581 © 2022 H droCAD Software Solutions LLC Page 5 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchme (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 5.830 0.000 0.000 0.000 5.830 >75% Grass cover, Good 1 0.000 2.500 0.000 0.000 0.000 2.500 Paved roads w/curbs & sewers 2 2212045 SCM1 Calculation 121222 Prepared by Labella Associates Printed 12/14/2022 H droCAD® 10.20-2 s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 6 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Width Diam/Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 3 795.19 794.69 49.9 0.0100 0.013 0.0 15.0 0.0 2212045 SCM1 Calculation_121222 Type 1124-hr 1-yr Rainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 H droCAD@ 10.20-2 s/n 09581 © 2022 HvdroCAD Sn€tware Solutions LLC Page 7 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment1: PRE -DEVELOPMENT Runoff Area=5.830 ac 0.00% Impervious Runoff Depth>0.25" Flow Length=687' Tc=11.6 min CN=61 Runoff=1.39 cfs 0.119 of Subcatchment2: POST -DEVELOPMENT Runoff Area=2.500 ac 100.00% Impervious Runoff Depth>2.38" Tc=6.0 min CN=98 Runoff=9.59 cfs 0.496 of Pond 3: SCM #1 Peak Elev=799.11' Storage=13,946 cf Inflow=9.59 cfs 0.496 of Outflow=0.38 cfs 0.237 of 2212045 SCM1 Calculation_121222 Type Il 24-hr 1-yr Rainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 HvdroCAD® 10.20-2 s/n 09581 © 2022 HvdroCAD Software Solutions LLC Pa e 8 Summary for Subcatchment 1: PRE -DEVELOPMENT Runoff = 1.39 cfs @ 12.08 hrs, Volume= 0.119 af, Depth> 0.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description 5.830 61 >75% Grass cover, Good. HSG B 5.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 100 0.0546 0.18 Sheet Flow, Sheet Flow Grass: Dense n= 0.240 P2= 3.41" 2.3 587 0.0796 4.23 Shallow Concentrated Flow, Shallow Concentrated Grassed Waterwav Kv= 15.0 fps 11.6 687 Total w 3 0 U. Subcatchment 1: PRE -DEVELOPMENT Hydrograph 1 Type 11 24-h r 1-yr Rainfall=2.80" Runoff Area=5.830 ac Runoff Volume=0.119 of Runoff Depth>0.25" Flow Length=687' Tc=11.6 min CN=61 p 5 fi 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) c7 Runoff 2212045_SCM1 Calculation_121222 Type 1l 24-hr 1-yr Rainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 N droCADIE> 10.20-2 s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 9 Summary for Subcatchment 2: POST -DEVELOPMENT Runoff = 9.59 cfs @ 11.96 hrs, Volume= 0.496 af, Depth> 2.38" Routed to Pond 3 : SCM #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description 2.500 98 Paved roads w/curbs & sewers, HSG B 2.500 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 2: POST -DEVELOPMENT Hydrograph [-] Runoff Type 11 24-hr 1-yr Rainfall=2.80" 8: Runoff Area=2.500 ac Runoff Volume=0.496 of Runoff Depth>2.38" 0 5 Tc=6.0 min LL 11� CN=98 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2212045 SCM1 Calculation_121222 Type // 24-hr 1-yr Rainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 HvdroCAD® 10.20-2q s/n 09581 [c7 2022 H droCAD Software Solutions LLC Page 10 Summary for Pond 3: SCM #1 Inflow Area = 2.500 ac,100.00% Impervious, Inflow Depth > 2.38" for 1-yr event Inflow = 9.59 cfs @ 11.96 hrs, Volume= 0.496 of Outflow = 0.38 cfs @ 13.34 hrs, Volume= 0.237 af, Atten= 96%, Lag= 82.7 min Primary = 0.38 cfs @ 13.34 hrs, Volume= 0.237 of Routing by Stor-Ind method. Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 799.11' @ 13.34 hrs Surf.Area= 4,380 sf Storage= 13,946 cf Plug -Plow detention time= 234.6 min calculated for 0.237 of (48% of inflow) Center -of -Mass det. time= 143.1 min ( 877.6 - 734.5 ) Volume Invert Avail.Stora a Storage Description #1 797.03' 15,875 cf Custom Stage DataListed below #2A 796.86' 6,130 cf 44.25'W x 98.98'L x 5.50'H BASE STONE 24,088 cf Overall - 8,763 cf Embedded = 15,325 cf x 40.0% Voids #3A 797.61' 8,763 cf ADS _StormTech MC-3500 c +Capx 78 Inside #2 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap 78 Chambers in 6 Rows Ca0 Stora e= 15.6 cf x 2 x 6 rows = 187.2 cf 30,768 cf Total Available Storage Storage Group A created with Chamber Wizard 2212045 SCM1 Calculation_121222 Type // 24-hr 1-yrRainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 H droCAD® 10.20-2q s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 11 Elevation Cum.Store (feet) (cubic -feet) 797.03 0 797.11 479 797.19 639 797.28 798 797.36 958 797.44 1,118 797.53 1,277 797.61 1,437 797.69 1,768 797.78 2,097 797.86 2,425 797.94 2,752 798.03 3,078 798.11 3,403 798.19 3,727 798.28 4,050 798.36 4,371 798.44 4,691 798.53 5,009 798.61 5,326 798.69 5,641 798.78 5,955 798.86 6,266 798.94 6,576 799.03 6,884 799.11 7,190 799.19 7,494 799.28 7,796 799.36 8,095 799.44 8,392 799.53 8,686 799.61 8,977 799.69 9,265 799.78 9,551 799.86 9,833 799.94 10,112 800.03 10,387 800.11 10,658 800.19 10,925 800.28 11,188 800.36 11,446 800.44 11,699 800.53 11,947 800.61 12,189 800.69 12,425 800.78 12,653 800.86 12,873 800.94 13,082 801.03 13,274 801.11 13,454 2212045 SCM1 Calculation_121222 Type // 24-hr 1-yr Rainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 H droCAD®10.20-2 s/n 09581 ©2022 HvdroCAD Software Solutions LLC Page 12 801.19 13,628 801.28 13,797 801.36 13,959 801.44 14,119 801.53 14,278 801.61 14,438 801.69 14,598 801.78 14,757 801.86 14,917 801.94 15,077 802.03 15,236 802.11 15,396 802.19 15,556 802.28 15,715 802.36 15,875 Device Routing Invert Outlet Devices #1 Primary 795.19' 15.0" Round BF1 TO DMH2 L= 49.9' Ke= 0.250 Inlet / Outlet Invert= 795.19' / 794.69' S= 0.0100'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 796.86' 2.7" Vert. EQUIVALENT ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 799.05' 2.5' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=0.38 cfs @ 13.34 hrs HW=799.11' (Free Discharge) L1=BF1 TO D M H 2 (Passes 0.38 cfs of 11.28 cfs potential flow) �2=EQUIVALENT ORIFICE (Orifice Controls 0.28 cfs @ 7.04 fps) __3=Broad -C rested Rectangular We! r(Wei r Controls 0.10 cfs @ 0.67 fps) 2212045 SCM1 Calculation_121222 Type // 24-hr 1-yrRainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 HydroCAD®10 20-2q s/n 09581 ©2022 HvdroCAD Software Solutions LLC Page 13 Pond 3: SCM #1 Hydrograph f 1 Inflow C] Primary F° Inflow Area=2.500 ac 9 Peak Elev=799.11' 8 Storage=13,946 cf 7 4 3 2- 1 f3.36 cFs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2212045 SCM1 Calculation_121222 Type 1124-hr 1-yrRainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 HydroCAD@ 10 20-2q s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 14 Elevation Storage (feet) (cubic -feet) 796.86 0 796.91 88 796.96 175 797.01 263 797.06 530 797.11 917 797.16 1,105 797.21 1,287 797.26 1,463 797.31 1,646 797.36 1,834 797.41 2,022 797.46 2,204 797.51 2,380 797.56 2,563 797.61 2,751 797.66 3,146 797.71 3,531 797.76 3,901 797.81 4,284 797.86 4,676 797.91 5,067 797.96 5,448 798.01 5,814 798.06 6,194 798.11 6,582 798.16 6,969 798.21 7,346 798.26 7,709 798.31 8,084 798.36 8,468 798.41 8,850 798.46 9,222 798.51 9,580 798.56 9,950 798.61 10,329 798.66 10,705 798.71 11,072 798.76 11,425 798.81 11,789 798.86 12,161 798.91 12,531 798.96 12,892 799.01 13,238 799.06 13,596 799.11 13,961 799.16 14,324 799.21 14,677 799.26 15,017 799.31 15,367 799.36 15,723 799.41 16,078 Stage -Area -Storage for Pond 3: SCM #1 Elevation Storage (feet) (cubic -feed 799.46 16,423 799.51 16,753 799.56 17,094 799.61 17,441 799.66 17,785 799.71 18,120 799.76 18,441 799.81 18,771 799.86 19,107 799.91 19,440 799.96 19,763 800.01 20,072 800.06 20,389 800.11 20,712 800.16 21,031 800.21 21,340 800.26 21,635 800.31 21,937 800.36 22,244 800.41 22,546 800.46 22,838 800.51 23,115 800.56 23,399 800.61 23,686 800.66 23,967 800.71 24,237 800.76 24,492 800.81 24,751 800.86 25,010 800.91 25,259 800.96 25,493 801.01 25,707 801.06 25,920 801.11 26,132 801.16 26,337 801.21 26,535 801.26 26,722 801.31 26,911 801.36 27,101 801.41 27,288 801.46 27,471 801.51 27,647 801.56 27,830 801.61 28,018 801.66 28,205 801.71 28,388 801.76 28,564 801.81 28,747 801.86 28,935 801.91 29,122 801.96 29,305 802.01 29,481 Elevation Storage (feet) (cubic -feet) _ 802.06 29,664 802.11 29,851 802.16 30,039 802.21 30,222 802.26 30,398 802.31 30,581 802.36 30,768 2212045 SCM1 Calculation_121222 Type 1124-hr 10-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 HvdroCAD(Ra 10.20-2a s/n O9581 2022 HvdroCAD Software Solutions LLC Page 15 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment1: PRE -DEVELOPMENT Runoff Area=5.830 ac 0.00% Impervious Runoff Depth>1.16" Flow Length=687' Tc=11.6 min CN=61 Runoff=10.22 cfs 0.562 of Subcatchment2: POST -DEVELOPMENT Runoff Area=2.500 ac 100.00% Impervious Runoff Depth>4.26" Tc=6.0 min CN=98 Runoff=16.88 cfs 0.888 of Pond 3: SCM #1 Peak Elev=799.93' Storage=19,605 cf Inflow=16.88 cfs 0.888 of Outflow=7.21 cfs 0.591 of 2212045 SCM1 Calculation_121222 Type ll 24-hr 10-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 H droCAD® 10.20-2a s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 16 Summary for Subcatchment 1: PRE -DEVELOPMENT Runoff = 10.22 cfs @ 12.05 hrs, Volume= 0.562 af, Depth> 1.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.88" Area (ac) CN Description 5.830 61 >75% Grass cover. Good, HSG B 5.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) ft/ft) ftlsec (cfs) 9.3 100 0.0546 0.18 Sheet Flow, Sheet Flow Grass: Dense n= 0.240 P2= 3.41" 2.3 587 0.0796 4.23 Shallow Concentrated Flow, Shallow Concentrated Grassed Waterwav Kv= 15.0 fps 11.6 687 Total Subcatchment 1: PRE -DEVELOPMENT Hydrograph 11 to.x�s Type II 24-hr 10-yr Rainfall=4.88" Runoff Area=5.830 ac 7. Runoff Volume=0.562 of Runoff Depth>1.16" 0 5- Flow Length=687' U. 4 Tc=11.6 min CN=61 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ® Runoff 2212045 SCM1 Calculation_121222 Type/1 24-hr 10-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 HvdroCAD® 10.20-2 s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 17 Summary for Subcatchment 2: POST -DEVELOPMENT Runoff = 16.88 cfs @ 11.96 hrs, Volume= 0.888 af, Depth> 4.26" Routed to Pond 3 : SCM #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.88" Area (ac) CN Description 2.500 98 Paved roads w/curbs & sewers. HSG B 2.500 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) feet fUft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 2: POST -DEVELOPMENT Hydrograph • 1 17 Type II 24-hr ,s. 10-yr Rainfall=4.88" 14- Runoff Area=2.500 ac 13: � Runoff' Volume=0.888 of ;o Runoff. Depth>4.26" 9 Tc=6.0 min LL 8 7. CN=98 1 5 6 T 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) � Runoff 2212045 SCM1 Calculation121222 Type/1 24-hr 10-yr Rainfall=4.88" Prepared by Labella Associates_Printed 12/14/2022 HvdroCADO 10 20-29 s/n 09581 © 2022 H droCAD Software Solutions LLC Page 18 Summary for Pond 3: SCM #1 Inflow Area = 2.500 ac,100.00% Impervious, Inflow Depth > 4.26" for 10-yr event Inflow = 16.88 cfs @ 11.96 hrs, Volume= 0.888 of Outflow = 7.21 cfs @ 12.08 hrs, Volume= 0.591 af, Atten= 57%, Lag= 7.0 min Primary = 7.21 cfs @ 12.08 hrs, Volume= 0.591 of Routing by Star -Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 799.93' @ 12.08 hrs Surf.Area= 4,380 sf Storage= 19,605 cf Plug -Flow detention time=142.2 min calculated for 0.591 of (67% of inflow) Center -of -Mass det. time= 72.2 min ( 802.4 - 730.2 ) Volume Invert Avail Stora a Storage Description #1 797.03' 15,875 cf Custom Stage DataListed below #2A 796.86' 6,130 cf 44.25'W x 98.98'L x 5.50'H BASE STONE 24,088 cf Overall - 8,763 cf Embedded = 15,325 cf x 40.0% Voids #3A 797.61' 8,763 cf ADS MC-3500 c +Capx 78 Inside #2 _StormTech Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.171 = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap 78 Chambers in 6 Rows Cap Stora e= 15.6 cf x 2 x 6 rows = 187.2 cf 30,768 cf Total Available Storage Storage Group A created with Chamber Wizard 2212045 SCM1 Calculation_121222 Type // 24-hr 10-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 HvdroCADO 1020-2 s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 19 Elevation Cum.Store (feet) (cubic -feet) 797.03 0 797.11 479 797.19 639 797.28 798 797.36 958 797.44 1,118 797.53 1,277 797.61 1,437 797.69 1,768 797.78 2,097 797.86 2,425 797.94 2,752 798.03 3,078 798.11 3,403 798.19 3,727 798.28 4,050 798.36 4,371 798.44 4,691 798.53 5,009 798.61 5,326 798.69 5,641 798.78 5,955 798.86 6,266 798.94 6,576 799.03 6,884 799.11 7,190 799.19 7,494 799.28 7,796 799.36 8,095 799.44 8,392 799.53 8,686 799.61 8,977 799.69 9,265 799.78 9,551 799.86 9,833 799.94 10,112 800.03 10,387 800.11 10,658 800.19 10,925 800.28 11,188 800.36 11,446 800.44 11,699 800.53 11,947 800.61 12,189 800.69 12,425 800.78 12,653 800.86 12,873 800.94 13,082 801.03 13,274 801.11 13,454 2212045 SCM1 Calculation121222 Type // 24-hr 10-yr Rainfall=4.88" Prepared by Labella Associates_Printed 12/14/2022 HvdroCAD® 10.20-2a s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 20 801.19 13,628 801.28 13,797 801.36 13,959 801.44 14,119 801.53 14,278 801.61 14,438 801.69 14,598 801.78 14,757 801.86 14,917 801.94 15,077 802.03 15,236 802.11 15,396 802.19 15,556 802.28 15,715 802.36 15,875 _Device Routing Invert Outlet Devices #1 Primary 795.19' 15.0" Round BF1 TO DMH2 L= 49.9' Ke= 0.250 Inlet / Outlet Invert= 795.19' / 794.69' S= 0.0100'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 796.86' 2.7" Vert. EQUIVALENT ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 799.05' 2.5' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=7.10 cfs @ 12.08 hrs HW=799.93' (Free Discharge) L1=BF1 TO DMH2 (Passes 7.10 cfs of 12.65 cfs potential flow) 12=EQUIVALENT ORIFICE (Orifice Controls 0.33 cfs @ 8.27 fps) 3=Broad-Crested Rectangular Weir(Weir Controls 6.77 cfs @ 3.09 fps) 22120451 SCM1 Calculation_121222 Type 11 24-hr 90-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 H droCADD 10.20-2 s/n 09581 ©2022 H droCAU Software Solutions LLC page 21 Pond 3: SCM #1 Hydrograph a Inflow €3 Primary 17 Inflow Area=2.500 ac le- i rx- Peak Elev=799.93' 14- 137 Storage=19,605 cf 72 � 11 0 9; LL 7' 6 4 2- 1 - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2212045_SCMI Calculation 121222 Prepared by Labella Associates H draCADO 10.20-2 s/n 0958 Elevation Storage feet cubic -feet 796.86 0 796.91 88 796.96 175 797.01 263 797.06 530 797.11 917 797.16 1,105 797.21 1,287 797.26 1,463 797.31 1,646 797.36 1,834 797.41 2.022 797.46 2,204 797.51 2,380 797.56 2,563 797.61 2,751 797.66 3,146 797.71 3.531 797.76 3,901 797.81 4,284 797.86 4,676 797.91 5,067 797.96 5.448 798.01 5,814 798.06 6,194 798.11 6,582 798.16 6,969 798.21 7.346 798.26 7,709 798.31 8,084 798.36 8,468 798.41 8,850 798.46 9,222 798.51 9,580 798.56 9,950 798.61 10,329 798.66 10,705 798.71 11,072 798.76 11.425 798.81 11,789 798.86 12,161 798.91 12,531 798.96 12,892 799.01 13,238 799.06 13,596 799.11 13,961 799.16 14,324 799.21 14,677 799.26 15,017 799.31 15,367 799.36 15,723 799.41 16,078 Type 1124-hr 10 yr Rainfall=4. 88" 1 2022 H droCAD Software Solutions LLC Printed 12/14/2022 Stage -Area -Storage for Pond 3: SCM #1 Elevation 'feet 799.46 799.51 799.56 799.61 799.66 799.71 799.76 799.81 799.86 799.91 799.96 800.01 800.06 800.11 800.16 800.21 800.26 800.31 800.36 800.41 800.46 800.51 800.56 800.61 800.66 800.71 800.76 800.81 800.86 800.91 800.96 801.01 801.06 801.11 801.16 801.21 801.26 801.31 801.36 801.41 801.46 801.51 801.56 801.61 801.66 801.71 801.76 801.81 801.86 801.91 801.96 802.01 Storage R cu� b' 16,423 16,753 17,094 17,441 17,785 18,120 18,441 18,771 19,107 19,440 19,763 20,072 20,389 20,712 21,031 21,340 21,635 21,937 22,244 22,546 22,838 23,115 23,399 23,686 23,967 24,237 24,492 24,751 25,010 25,259 25,493 25,707 25,920 26,132 26,337 26,535 26,722 26,911 27,101 27,288 27,471 27,647 27,830 28,018 28,205 28,388 28,564 28,747 28,935 29,122 29,305 29,481 Elevation Storage feet cul,ic-feet 802.06 29,664 802.11 29,851 802.16 30,039 802.21 30,222 802.26 30,398 802.31 30,581 802.36 30,768 Project Name: Hanes Lake Phase 2 Date Location: Winston-Salem, NC Site Designation: SCM-2 SITE CONDITIONS Rainfall Depth 1 in Impervious Acreage 1.48 ac Total Acreage 4.11 ac Time of Concentration 6 min 1 36.0 % R,(Runoff Coefficient) 0.37 WQV 5581 cf 75% WQv (Treatment Volume) 4186 cf q,(Unit Peak Discharge) 1000 csm/in From Type II Chart QP(Water Quality Storm) 2.40 cfs VOLUME BASED SIZING Volume per cartridge 1250 CF Cartridge Type 522 Min. Number of cartridge required 4 Cartridge Flow rate 11.25 gpm (0.25 gpm/SF) System Flow Rate 0.10 cfs Release time 11.6 hours SEDIMENT BASED SIZING Influent Concentration 60 mg/L Annual Rainfall (P) 45 in Annual Sediment Load 844 Ibs Pretreatment reduction 30% Sediment Load to BayFilter 591 Ibs 85% Capture Capacity 502 Ibs Cartridge Type 522 Sediment load per cartridge 131 lips Min. Number of cartridge required 4 Anticipated Maintenance Cycle 1.04 years (must be greater than 1 year) FINAL DESIGN Cartridge Type 522 Number of Cartridges 4 Precast Size 6'x10' approx outlet orifice 1.53 in 12/13/2022 Project: Hanes Lake Phase 2 SCM-2 1 StvrmTdIb h- Chamber Model - ❑G-780 =� Y Units - imperial �x er. r� sANnc L »r^ " .YLLYi' Number of chambers - 112 Voids in the stone (porosity) - 40 ° a Base of Stone Elevation - 784.85 fl Amount of Stone Above Chambers - 12 . ird �caer Stone in [aleuWtfnns Amount of Stone Below Chambers - 9 lin Area of system - 4451 sf Min. Area - 3786 sf min. area Height of Incremental Smgie IncreZ2' IncrcgnenUd Incremental Ch CumufAl ve System Chamber Total hamber Slane I & St Chamber Ele�stian incises (cubic f6ef) feubic feels fcubk Ise+ fcub+t fee c+ahfc ISO faaf 51 0.00 000 148.37 149.37 1ubtb.93 my-w 50 0-00 0.00 148.37 148.37 10527.56 789.02 49 0.00 000 148.37 148.37 10379.20 788.93 48 0.00 000 148.37 148.37 10230.83 788.85 47 0-00 000 148.37 148.37 10082.46 788.77 46 0-00 0.00 148.37 148.37 9934.10 788.68 45 000 0.00 148.37 148.37 9785.73 788.60 44 0,00 0-00 148.37 148.37 9637-36 788.52 43 0.00 0.00 148,37 148.37 9489.00 788.43 42 0.00 0.00 148.37 148.37 9340.63 788.35 41 0.00 0.00 148.37 148.37 919226 788.27 40 0-00 0.00 148.37 148-37 9043.90 788-18 39 0.06 6.48 145.77 152.26 8895.53 788.10 38 0-17 18.67 140-90 159.57 8743.27 788.02 37 0.29 32-10 135.53 167.63 8583.70 787.93 36 0.61 68.44 120.99 189A3 8416.08 787.85 35 0.81 90.76 112.06 202.83 8226.65 787.77 34 0.96 107.41 105.40 212.81 8023.82 787,68 33 1.08 121.29 99.85 221.14 7811.01 787.60 32 1.19 133.02 95.16 228.18 7589.86 787.52 31 127 142.68 91.29 233.98 7361.69 787-43 30 1.36 152.78 87-26 240-03 7127.71 787.35 29 1.45 162.89 83.21 246.10 6887.68 787.27 28 1.53 171.03 79.95 25098 6641.57 787.18 27 1.59 178.20 77 09 255.29 6390-59 787.10 26 1.65 184.97 7438 259.35 6135.30 787.02 25 1.71 191.39 71.81 263.20 5875.96 786.93 24 1.76 197-41 69.40 266.81 5612.75 786-85 23 1.81 203.06 67A4 270.20 5345.94 786.77 22 1.86 208-35 65.03 273.37 5075.74 786,68 21 1,90 213.31 63.04 276.35 4802.36 786.60 20 1.95 217.97 61.18 279.15 4526.01 786-52 19 1.99 222.35 59.43 281.77 4246.86 786.43 18 2.02 226.45 57.79 284.24 3995.09 786.35 17 2.06 230-30 56.25 286.55 3680.85 78627 16 2.09 23391 54.80 288,71 3394.30 786.18 15 2.12 237.28 53.46 290.73 3105.59 786.10 14 2.15 240.42 52.20 292.62 281486 786.02 13 2.17 243-34 51.03 294.37 2522.24 785.93 12 2.20 246.05 49.95 296.00 2227.87 785.85 11 2.22 248.55 48.95 297.50 1931.87 785.77 10 2.24 251.18 47.90 299.07 1634.37 785.68 9 0.00 0-00 148.37 148.37 1335.30 785.60 8 0.00 0-00 148.37 148.37 1186-93 785.52 7 0.00 0.00 148.37 148.37 1038.57 785.43 6 0.00 0.00 148.37 148.37 890.20 785.35 5 0.00 0.00 148.37 148,37 741-83 785.27 4 0.00 0.00 148.37 148.37 593.47 785.18 3 0.00 0.00 148.37 148.37 445.10 785.10 2 0.00 0-00 148.37 148.37 296.73 785.02 1 0.00 0.00 148,37 148.37 148.37 784.93 WQv = 4186 cf WQv elevation achieved at 786.41 BAYSAV E R TECHNOLOGIES® BavFilterTM Sizing Form Project Contact Information Company Name LaBella & Associates, PC Date 12/13/22 Contact Name Brandon Sherrill ®Engineer ❑Developer ❑Contractor Project Name Hanes Lake Phase 2-SCM #2 Email bsherrill@labellapc.com Telephone 704-941-2156 Fax City Winston-Salem State NC Zip 27101 Site Characteristics Due Date Residential ❑Commercial FlIndustrial LjMixed Additional comments/project information Design and Sizing Parameters Total Drainage Area (acres) 4.11 Impervious Area acres 1.48 Required Treatment Flow CFS (if applicable) Water Quality Volume to be Detained 75% 100% Other Water Quality Volume ft)4186 Project Location: City Winston-Salem ST NC RegulatoryRe uirements % Total Suspended Solids Removal I % Total Phosphorus Removal (ex. 50%) (ex. 80%) Meet NCDEQ Standards Meet NCDEQ Standards Project Stage EConceptual Design[]Preliminary Desi m NFinal Design ❑Other Other Site Specific Sizing Criteria The System Pretreatment Credit shall be 30% if system includes a minimum sediment sump with minimum dimensions of 4' diameter by 2' deep. Thank you for supplying the required information! You're almost done! We will also need: Plan(s) View Profile(s) Please email this form and any drawings to Engineering@BaySaver.com Phone 800-BAYSAVER (800.229.7283) Fax 301.829.3747 PROJECT_ LaBeLla PROJECT NO. Powered by partnership. SUBJECT CHECKED BY tilt N �A 1t At, 2y = C), p a 4-t> 3�4 �{ ��si��rs Vb>rv�v�E by = 5o C�j�Cs (Z�v� CF= 3056t F /V& CFJ c SHEET OF CALC. BY DATE SCALE Manes Lake Phase 2 S CM #2 C2 PRE -DEVELOPMENT POST-DEV LOPMENT /3\, SCM #2 Bob4 Beach Link 2212045 SCM2 Calculation_121222 Table of Contents Prepared by Labella Associates Printed 12/14/2022 HvdroCADO 10.20-2q s/n 09581 © 2022 HvdroCAD Software Solutions LLC TABLE OF CONTENTS Pro'ect Re arts 1 Routing Diagram 2 Rainfall Events Listing (selected events) 3 Area Listing (all nodes) 4 Soil Listing (all nodes) 5 Ground Covers (all nodes) 6 Pipe Listing (all nodes) 1-yr Event 7 Node Listing 8 Subcat 1: PRE -DEVELOPMENT 9 Subcat 2: POST -DEVELOPMENT 10 Pond 3: SCM #2 10-yr Event 14 Node Listing 15 Subcat 1: PRE -DEVELOPMENT 16 Subcat 2: POST -DEVELOPMENT 17 Pond 3: SCM #2 2212045 SCM2 Calculation 121222 Prepared by Labella Associates Printed 12/14/2022 HydroCAD@ 10 20-2g s/n 09581 ©2022 HvdroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-yr Type II 24-hr Default 24.00 1 2.80 2 2 10-yr Type II 24-hr Default 24.00 1 4.88 2 2212045_SCM2 Calculation_121222 Prepared by Labella Associates Printed 12/14/2022 H droCAD@ 10.20-2 s/n 09581 D 2022 H droCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 4.110 61 >75% Grass cover, Good, HSG B (1) 1.480 98 Paved roads w/curbs & sewers, HSG B (2) 2212045 SCM2 Calculation_121222 Prepared by Labella Associates Printed 12/14/2022 H droCAD® 1020-2 s/n 09581 © 2022 H droCAD Software Solutions LLC Page 4 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 5.590 HSG B 1,2 0.000 HSG C 0.000 HSG D 0.000 Other 2212045 SCM2 Calculation_121222 Prepared by Labella Associates Printed 12/14/2022 H droCAD® 1020-2 s/n 09581 © 2022 H droCAD Software Solutions LLC Page 5 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchme (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 4.110 0.000 0.000 0.000 4.110 >75% Grass cover, Good 1 0.000 1.480 0.000 0.000 0.000 1.480 Paved roads w/curbs & sewers 2 2212045 SCM2 Calculation 121222 Prepared by Labella Associates Printed 12/14/2022 HydroCAM, 10 20-2g s/n 09581 © 2022 HydroCAD Software Solutions LLC Page 6 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Width Diam/Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 3 783.18 782.21 96.5 0.0101 0.013 0.0 15.0 0.0 2212045_SCM2 Calculation_121222 Type/1 24-hr 1-yr Rainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 HvdroCAD®10.20-2q s/n 09581 ©2022 HvdroCAD Software Solutions LLC Page 7 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment1: PRE -DEVELOPMENT Runoff Area=4.110 ac 0.00% Impervious Runoff Depth>0.24" Flow Length=791' Tc=13.8 min CN=61 Runoff=0.89 cfs 0.084 of Subcatchment2: POST -DEVELOPMENT Runoff Area=1.480 ac 100.00% Impervious Runoff Depth>2.38" Tc=5.0 min CN=98 Runoff=5.90 cfs 0.294 of Pond 3: SCM #2 Peak Elev=786.45' Storage=8,212 cf Inflow=5.90 cfs 0.294 of Outflow=0.16 cfs 0.118 of 2212045_SCM2 Calculation_121222 Type 1124-hr 1-yrRainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 HvdroCADOk 10.20-2q s/n 09581 © 2022 H droCAD Software Solutions LLC Page 8 Summary for Subcatchment 1: PRE -DEVELOPMENT Runoff = 0.89 cfs @ 12.11 hrs, Volume= 0.084 af, Depth> 0.24" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description 4.110 61 >75% Grass cover. Good. HSG B 4.110 100.00% Pervious Area Tc Length Slope Velocity Capacity Description min (feet) (ft/ft) (ft/sec) (cfs) 10.7 100 0.0377 0.16 Sheet Flow, SHEET FLOW Grass: Dense n= 0.240 P2= 3.41" 3.1 691 0.0622 3.74 Shallow Concentrated Flow, SHALLOW CONCENTRATED Grassed Waterway Kv= 15.0 fps 13.8 791 Total Subcatchment 1: PRE -DEVELOPMENT Hydrograph 0.95 0.9 D.es da Type II 24-hr 0.85 0-8 1-yr Rainfall=2.80" 0.75 0.7 Runoff Area=4.110 ac :1.65-. Runoff Volume=0.084 of 0.6 U 0.55 Runoff Depth>0.24" 0.5 0 0.45 Flow Length=791' 04 Tc=13.8 min o.3s 0.3_ CN=61 0,251 0.1E 0.1 0.0E 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2212045_SCM2 Calculation_121222 Type 1124-hr 1-yr Rainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 HydroCADO 10.20-2 s/n 09581 © 2022 H droCAD Software Solutions LLC Page 9 Summary for Subcatchment 2: POST -DEVELOPMENT Runoff = 5.90 cfs @ 11.95 hrs, Volume= 0.294 af, Depth> 2.38" Routed to Pond 3 : SCM #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.80" Area ac CN Description 1.480 98 Paved roads w/curbs & sewers, HSG B 1.480 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 6 5 4-- N 3 0 3 LL 2 1 0 5 Subcatchment 2: POST -DEVELOPMENT Hydrograph Type II 24-hr 1-yr Rainfall=2.80" Runoff Area=1.480 ac Runoff Volume=0.294 of Runoff Depth>2.38" Tc=5.0 min CN=98 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 2212045 SCM2 Calculation_121222 Type 11 24-hr 1-yr Rainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 H droCADO 10.20-2 s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 10 Summary for Pond 3: SCM #2 Inflow Area = 1.480 ac,100.00% Impervious, Inflow Depth > 2.38" for 1-yr event Inflow = 5.90 cfs @ 11.95 hrs, Volume= 0.294 of Outflow = 0.16 cfs @ 14.07 hrs, Volume= 0.118 af, Atten= 97%, Lag= 127.2 min Primary = 0.16 cfs @ 14.07 hrs, Volume= 0.118 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 786.45' @ 14.07 hrs Surf.Area= 3,953 sf Storage= 8,212 cf Plug -Flow detention time=182.3 min calculated for 0.118 of (40% of inflow) Center -of -Mass det. time= 78.6 min ( 812.3 - 733.7 ) Volume Invert Avail.Stora a Storage Description #1 785.02' 9,786 cf Custom Stage DataListed below #2A 784.85' 3,932 cf 30.00'W x 131.78'L x 3.75'H STONE 14,825 cf Overall - 4,994 cf Embedded = 9,831 cf x 40.0% Voids #3A 785.60' 4,994 cf ADS DC-780 +Capx 108 Inside #2 _StormTech Effective Size= 45.4"W x 30.0"H => 6.49 sf x 7.12'L = 46.2 cf Overall Size= 51.0"W x 30.0"H x 7.56'L with 0.44' Overlap 108 Chambers in 6 Rows 18,712 cf Total Available Storage Storage Group A created with Chamber Wizard 2212045 SCM2 Calculation_121222 Type // 24-hr 1-yr Rainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 H droCADO 10.20-2 s/n 09581 © 2022 H droCAD Software Solutions LLC page 11 Elevation Cum.Store (feet) (cubic -feet) 785.02 0 785.10 445 785.18 593 785.27 742 785.35 890 785.43 1,039 785.52 1,187 785.60 1,335 785.68 1,634 785.77 1,932 785.85 2,228 785.93 2,522 786.02 2,815 786.10 3,106 786.18 3,394 786.27 3,681 786.35 3,965 786.43 4,247 786.52 4,526 786.60 4,802 786.68 5,076 786.77 5,346 786.85 5,613 786.93 5,876 787.02 6,135 787.10 6,391 787.18 6,642 787.27 6,888 787.35 7,128 787.43 7,362 787.52 7,590 787.60 7,811 787.68 8,024 787.77 8,227 787.85 8,416 787.93 8,584 788.02 8,743 788.10 8,896 788.18 9,044 788.27 9,192 788.35 9,341 788.43 9,489 788.52 9,637 788.60 9,786 Device Routing Invert Outlet Devices #1 Primary 783.18' 15.0" Round BF2 TO DMH6 L= 96.5' Ke= 0.500 Inlet / Outlet Invert= 783.18' / 782.21' S= 0.0101 T Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 1.23 sf #2 Device 1 783.18' 1.5" Vert. EQUIVALENT ORIFICE C= 0.600 2212045 SCM2 Calculation_121222 Type 1124-hr 1-yr Rainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 HvdroCAD® 10.20-2 s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 12 Limited to weir flow at low heads #3 Device 1 786.41' 2.5' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=0.15 cfs @ 14.07 hrs HW=786.45' (Free Discharge) '�-1=BF2 TO DMH6 (Passes 0.15 cfs of 8.79 cfs potential flow) 12=EQUIVALENT ORIFICE (Orifice Controls 0.11 cfs @ 8.62 fps) 3=Broad-Crested Rectangular Weir(Weir Controls 0.05 cfs @ 0.53 fps) Pond 3: SCM #2 Hydrograph 3 inflow G Prir..ary n Inflow Area=1.480 ac Peak Elev=786.45' Storage=8,212 cf 4 2 0 0" _ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2212045 SCM2 Calculation_121222 Type 1124-hr 1-yrRainfall=2.80" Prepared by Labella Associates Printed 12/14/2022 H droCADD 10.20-2a s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 13 Elevation Storage (feet) (cubic -feet) 784.85 0 784.90 79 784.95 158 785.00 237 785.05 483 785.10 840 785.15 1,012 785.20 1,180 785.25 1,341 785.30 1,509 785.35 1,681 785.40 1,853 785.45 2,021 785.50 2,182 785.55 2,349 785.60 2,521 785.65 2,874 785.70 3,218 785.75 3,549 785.80 3,891 785.85 4,241 785.90 4,588 785.95 4,927 786.00 5,252 786.05 5,588 786.10 5,931 786.15 6,271 786.20 6,603 786.25 6,921 786.30 7,250 786.35 7,585 786.40 7,918 786.45 8,241 786.50 8,551 786.55 8,870 786.60 9,195 786.65 9,518 786.70 9,831 786.75 10,131 786.80 10,439 786.85 10,754 786.90 11,064 786.95 11,365 787.00 11,652 787.05 11,947 787.10 12,247 787.15 12,543 787.20 12,829 787.25 13,101 787.30 13,379 787.35 13,661 787.40 13,936 Stage -Area -Storage for Pond 3: SCM #2 Elevation Storage (feet) (cubic -feet 787.45 14,202 787.50 14,454 787.55 14,710 787.60 14,968 787.65 15,219 787.70 15,458 787.75 15,681 787.80 15,902 787.85 16,120 787.90 16,319 787.95 16,506 788.00 16,680 788.05 16,856 788.10 17,032 788.15 17,203 788.20 17,371 788.25 17,532 788.30 17,700 788.35 17,872 788.40 18,043 788.45 18,211 788.50 18,372 788.55 18,540 788.60 18,712 2212045 SCM2 Calculation_121222 Type // 24-hr 10-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 iivdroCADC 10.20-2q s/n 09581 ©2022 HvdroCAD Software Solutions LLC Page 14 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchmentl: PRE -DEVELOPMENT Runoff Area=4.110 ac 0.00% Impervious Runoff Depth>1.15" Flow Length=791' Tc=13.8 min CN=61 Runoff=6.61 cfs 0.395 of Subcatchment2: POST -DEVELOPMENT Runoff Area=1.480 ac 100.00% Impervious Runoff Depth>4.26" Tc=5.0 min CN=98 Runoff=10.39 cfs 0.526 of Pond 3: SCM #2 Peak Elev=787.02' Storage=11,764 cf Inflow=10.39 cfs 0.526 of Outflow=3.78 cfs 0.340 of 2212045_SCM2 Calculation_121222 Type 1124-hr 10-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 H droCAD®10.20-2 s/n 09581 ©2022 fi draCAD Software Solutions LLC Page 15 Summary for Subcatchment 1: PRE -DEVELOPMENT Runoff = 6.61 cfs @ 12.07 hrs, Volume= 0.395 af, Depth> 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.88" Area (ac) CN Description 4.110 61 >75% Grass cover, Good, HSG B 4.110 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) ft/sec) (cfs) 10.7 100 0.0377 0.16 Sheet Flow, SHEET FLOW Grass: Dense n= 0.240 P2= 3.41" 3.1 691 0.0622 3.74 Shallow Concentrated Flow, SHALLOW CONCENTRATED Grassed Waterway Kv= 15.0 fps 13.8 791 Total Subcatchment 1: PRE -DEVELOPMENT Hydrograph Runoff 7 f,-63 Cfs Type II 24-hr 10-yr Rainfall=4.88" Runoff Area=4.110 ac Runoff Volume=0.395 of 4- Runoff Depth>1.15" .2 Flow Length=791' 3 Tc=13.8 min 2 CN=61 G o- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2212045 SCM2 Calculation_121222 Type/1 24-hr 10-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 HvdroCADO 10.20-2q s/n 09581 © 2022 H droCAD Software Solutions LLC Pacie 16 Summary for Subcatchment 2: POST -DEVELOPMENT Runoff = 10.39 cfs @ 11.95 hrs, Volume= 0.526 at, Deptn> 4.Zb" Routed to Pond 3 : SCM #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.88" Area (ac) CN Description 1.480 98 Paved roads w/curbs & sewers. HSG B 1.480 100.00% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 1Direct Entry, Subcatchment 2: POST -DEVELOPMENT Hydrograph � Runoff Type II 24-hr 10-yr Rainfall=4.88" Runoff Area=1.480 ac 7 Runoff Volume=0.,526 of Runoff Depth>4.26" Tc=5.0 min U. / s CN=98 r . f 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2212045 SCM2 Calculation_121222 Type 1124-hr 10-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 HydroCAD0 10 20-2g s/n 09581 ©2022 HvdroCAD Software Solutions LLC Page 17 Summary for Pond 3: SCM #2 Inflow Area = 1.480 ac,100.00% Impervious, Inflow Depth > 4.26" for 10-yr event Inflow = 10.39 cfs @ 11.95 hrs, Volume= 0.526 of Outflow = 3.78 cfs @ 12.07 hrs, Volume= 0.340 af, Atten= 64%, Lag= 7.3 min Primary = 3.78 cfs @ 12.07 hrs, Volume= 0.340 of Routing by Stor-Ind method. Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 787.02' @ 12.07 hrs Surf.Area= 3,953 sf Storage= 11,764 cf Plug -Flow detention time=128.6 min calculated for 0.339 of (65% of inflow) Center -of -Mass det. time= 57.8 min ( 787.3 - 729.5 ) Volume Invert Avail.Stora a Storage Description #1 785.02' 9,786 cf Custom Stage DataListed below #2A 784.85' 3,932 cf 30.00'W x 131.78'L x 3.75'H STONE 14,825 cf Overall - 4,994 cf Embedded = 9,831 cf x 40.0% Voids #3A 785.60' 4,994 cf ADS DC-780 +Capx 108 Inside #2 _StormTech Effective Size= 45.4"W x 30.0"H => 6.49 sf x 7.12'L = 46.2 cf Overall Size= 51.0"W x 30.0"H x 7.56'L with 0.44' Overlap 108 Chambers in 6 Rows 18,712 cf Total Available Storage Storage Group A created with Chamber Wizard 2212045 SCM2 Calculation121222 Type 1124-hr 10-yr Rainfall=4.88" Prepared by Labella Associates_Printed 12/14/2022 H droCAD® 10.20-2a s/n 09581 © 2022 H droCAD Software Solutions LLC Paae 18 Elevation Cum.Store {feet} (cubic -feet 785.02 0 785.10 445 785.18 593 785.27 742 785.35 890 785.43 1,039 785.52 1,187 785.60 1,335 785.68 1,634 785.77 1,932 785.85 2,228 785.93 2,522 786.02 2,815 786.10 3,106 786.18 3,394 786.27 3,681 786.35 3,965 786.43 4,247 786.52 4,526 786.60 4,802 786.68 5,076 786.77 5,346 786.85 5,613 786.93 5,876 787.02 6,135 787.10 6,391 787.18 6,642 787.27 6,888 787.35 7,128 787.43 7,362 787.52 7,590 787.60 7,811 787.68 8,024 787.77 8,227 787.85 8,416 787.93 8,584 788.02 8,743 788.10 8,896 788.18 9,044 788.27 9,192 788.35 9,341 788.43 9,489 788.52 9,637 788.60 9,786 Device Routing Invert Outlet Devices #1 Primary 783.18' 15.0" Round BF2 TO DMH6 L= 96.5' Ke= 0.500 Inlet / Outlet Invert= 783.18' / 782.21' S= 0.0101 T Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 1.23 sf #2 Device 1 783.18' 1.5" Vert. EQUIVALENT ORIFICE C= 0.600 2212045 SCM2 Calculation_121222 Type 1124-hr 10-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 HvdroCAD® 10.20-2 s/n 09581 © 2022 H droCAD Software Solutions LLC Page 19 Limited to weir flow at low heads #3 Device 1 786.41' 2.5' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=3.65 cfs @ 12.07 hrs HW=787.01' (Free Discharge) 't-1=BF2 TO DMH6 (Passes 3.65 cfs of 9.58 cfs potential flow) �__3=Broad-C 2=EQUIVALENT 0RIFICE (Crifice Controls 0.11 cfs @ 9.34 fps) rested Rectangular Weir(Weir Controls 3.54 cfs @ 2.37 fps) Pond 3: SCM #2 Hydrograph i Inflow Primary " Inflow Area=1.480 ac t, Peak Elev=787.02' 3 Storage=11,764 cf N w 3 O LL 5 37E l: i 1- 0 5 6 7 S 9 10 11 12 13 14 15 16 17 16 19 20 Time (hours) 2212045 SCM2 Calculation_121222 Type 1124-hr 10-yr Rainfall=4.88" Prepared by Labella Associates Printed 12/14/2022 HvdroCAD® 10.20-2 s/n 09581 © 2022 HvdroCAD Software Solutions LLC Page 20 Stage -Area -Storage for Pond 3: SCM #2 Elevation (feet) Storage (cubic -feet) Elevation (feet) Storage cubic -Feet _ 784.85 0 787.45 14,202 784.90 79 787.50 14,454 784.95 158 787.55 14,710 785.00 237 787.60 14,968 785.05 483 787.65 15,219 785.10 840 787.70 15,458 785.15 1,012 787.75 15,681 785.20 1,180 787.80 15,902 785.25 1,341 787.85 16,120 785.30 1,509 787.90 16,319 785.35 1,681 787.95 16,506 785.40 1,853 788.00 16,680 785.45 2,021 788.05 16,856 785.50 2,182 788.10 17,032 785.55 2,349 788.15 17,203 785.60 2,521 788.20 17,371 785.65 2,874 788.25 17,532 785.70 3,218 788.30 17,700 785.75 3,549 788.35 17,872 785.80 3,891 788.40 18,043 785.85 4,241 788.45 18,211 785.90 4,588 788.50 18,372 785.95 4,927 788.55 18,540 786.00 5,252 788.60 18,712 786.05 5,588 786.10 5,931 786.15 6,271 786.20 6,603 786.25 6,921 786.30 7,250 786.35 7,585 786.40 7,918 786.45 8,241 786.50 8,551 786.55 8,870 786.60 9,195 786.65 9,518 786.70 9,831 786.75 10,131 786.80 10,439 786.85 10,754 786.90 11,064 786.95 11,365 787.00 11,652 787.05 11,947 787.10 12,247 787.15 12,543 787.20 12,829 787.25 13,101 787.30 13,379 787.35 13,661 787.40 13,936 Project Name: Hanes Lake Phase 2 Date Location: Winston-Salem, NC Site Designation: SCM-3 SITE CONDITIONS Rainfall Depth 1 in Impervious Acreage 4.72 ac Total Acreage 11.27 ac Time of Concentration 6 min 1 41.9 % R„(Runoff Coefficient) 0.43 WQ„ 17466 cf 75% WQv (Treatment Volume) 13099 cf qu(Unit Peak Discharge) 1000 csm/in From Type II Chart Qp(Water Quality Storm) 7.52 cfs VOLUME BASED SIZING Volume per cartridge 1250 CF Cartridge Type 522 Min. Number of cartridge required 11 Cartridge Flow rate 11.25 gpm (0.25 gpm/SF) System Flow Rate 0.28 cfs Release time 13.2 hours SEDIMENT BASED SIZING Influent Concentration 60 mg/L Annual Rainfall (P) 45 in Annual Sediment Load 2642 Ibs Pretreatment reduction 30% Sediment Load to BayFilter 1850 Ibs 85% Capture Capacity 1572 Ibs Cartridge Type 522 Sediment load per cartridge 131 Ibs Min. Number of cartridge required 13 — > ► V)-s`"- Anticipated Maintenance Cycle 1.08 years (must be greater than 1 year) FINAL DESIGN Cartridge Type 522 Number of Cartridges 13 ��✓ Precast Size 6'x14' approx outlet orifice 4.97 in 12/13/2022 Project: Hanes Lake Phase 2 : SCM3 & BF3 e •� StarmTech Chamber Model - ❑G730 Units- Imperial 'YLES Number of chambers - Voids in the stone (porosity) -Base ofStone Elevation - EO, It qFrldr*P 0Slm shxw irti cbuk sAmount of Stone Above Chambers - m Amount of Slone Below Chambers - in Area of system - 1$458 sf Min Area - 14333 sf min area t s $p51em f 1 lnrr2menEa[ Single Chamber fW� rasa Indernenlal Tpla Chamber foabx mot. Ir1crPJrl8rilai S[vne jcub;c reun llldet[14ttfaf Cli um Uv9 & St Chamber pevalbn r� rea1� r a i 4 45 O.OD 0.00 515.27 51527 34957.65 768.92 44 000 0.00 515.27 515.27 3444239 768.84 43 000 000 515.27 515.27 3392712 768.75 42 0.00 000 515.27 515.27 33411.85 768.67 41 0.00 0.00 51527 51527 3289659 76B.59 40 0.00 0.00 515.27 515.27 32381.32 76850 39 0.06 24.54 505.45 529.99 3186605 76842 38 017 70.68 486.99 557.68 3133606 76834 37 029 121 52 466.66 588.18 30778.39 76825 36 061 25908 411.63 670.72 3019020 76817 35 0.81 343.61 377.82 721.43 2951949 76809 34 0.96 406.64 352.61 759.25 28798.06 76800 33 1.08 459.19 331.59 790.78 28038.81 76792 32 1.19 503.58 313.84 817.41 27248.03 767 84 31 1.27 54016 299.20 839.36 26430.62 76775 30 1.36 57836 283.92 862.28 25591.25 76767 29 1.45 616.67 268.60 885.27 24728.97 76759 28 1 53 64747 256.26 903.75 23643.70 76750 27 1 59 674.60 245.42 920.03 22939-95 76742 26 165 700.24 235.17 935.41 22019.92 767.34 25 1.71 72456 225.44 950.00 21084.52 76725 24 176 747.35 216.33 96367 20134.51 767 17 23 1.81 768.72 207.78 976.50 19170.84 76709 22 186 788.74 199.77 988.51 18194.34 767.00 21 1.90 80754 192.25 999.79 17205,83 766.92 20 195 825 17 18520 1010.37 162D6 04 76684 19 199 84174 17B.57 102031 15195.67 766.75 18 2.02 857.29 172.35 102964 14175.36 too-- 17 2.06 871.86 166.52 1038.39 13145.72 Tali . 16 2.09 88551 161.06 1046.57 1210734 76650 15 212 89826 155.96 1054.22 11060.76 766.42 14 215 91016 151.20 1061.36 10006.54 766.34 13 2.17 92122 14678 1068.00 894518 766.25 12 2.20 93147 142.68 1074.15 787718 76617 11 2.22 940-94 13889 107983 6803.03 76609 10 2.24 950.89 134.91 1085.80 5723.20 766.00 9 0.00 0.00 515.27 515.27 4637.40 765.92 6 0.00 D DO 515.27 515.27 412213 765.84 7 0,00 0.00 515.27 515.27 3606.87 765.75 6 000 0.00 51527 515.27 3091.60 765,67 5 0.00 0.00 51527 515.27 2576.33 765.59 4 0.00 0.00 515.27 515.27 2061 07 76550 3 0.00 0.00 515.27 515.27 154580 765.42 2 0.00 0.00 515.27 515.27 1030.53 765.34 1 0.00 0.00 515-27 515.27 515.27 765.25 W Q Volume: 13347cf W0y %0VAv8d aKeinylFtldn 766 81 BAYSAV ER TECHNOLOGIES® Ba FilterTM Sizing Form Project Contact Information Company Name LaBella & Associates, PC Date 12/13/22 Contact Name Brandon Sherrill ®Engineer ❑Developer ❑Contractor Project Name Hanes Lake Phase 2-SCM #3 Email bsherrill@labellapc.com Telephone 704-941-2156 Fax City Winston-Salem State NC Zip 27101 Site Characteristics Due Date ®Residential ❑Commercial n1ndustrial ❑Mixed Additional comments/project information Design and Sizing Parameters Total Drainage Area (acres) 11.27 Impervious Area (acres) 4.72 Required Treatment Flow CFS (if applicable) Water Quality Volume to be Detained 75% 100% Other Water Quality Volume ft) 13099 Froject Location: City Winston-Salem ST NC RegulatoryRe uirements % Total Suspended Solids Removal % Total Phosphorus Removal (ex. 50%) (ex. 80%) Meet NCDEQ Standards I Meet NCDEQ Standards Project Stage Conceptual Design [jPrehiiiinaa Design Final Design ❑Other Other Site Specific Sizing Criteria The System Pretreatment Credit shall be 30% if system includes a minimum sediment sump with minimum dimensions of 4' diameter by 2' deep. Thank you for supplying the required information! You're almost done! We will also need: Plan(s) View � Profile(s) nnuTrnn i z aye Please email this form and any drawings to Engineering@BaySaver.com Phone 800-BAYSAVER (800.229.7283) Fax 301.829.3747 PROJECT-�efS� �'�� SHEET j OF LaBeRa PROJECT NO. Z1Z21 CALC. BY TWS DATE 3'Z Powered by partnership. SUBJECT ge-na rr'''f �'� 63rL-5s4 t__*r P� SCALE CHECKED BY ��7F4 DQ,Iu� rra scar fi(� CF - �5), 0_�164,Gp) i— /3102 G� 4 , 3 DL-7",�1�►�7a �On�v�rt-s ; 0, 5= �15 Lr PROJECT SHEET 2- OF LaBeLLa Powered by partnership. PROJECT NO. SUBJECT CHECKED BY 'A"I . 7"C r - g9-18 339'25 U� scAk 4 ,;; CALC. BY DATE SCALE — Vanes Lake Phase 2 SCM #3 2 PRE -DEVELOPMENT POST-DEV LOPMENT 3 SCM #3 0ubcat Reach on QUk 2212045 SCM3 Calculation_090122 Table of Contents Prepared by Labella Associates Printed 12/13/2022 HV(IroCADE! 10.20-2q s/n 09581 © 2022 Fl droCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 3 Area Listing (all nodes) 4 Soil Listing (all nodes) 5 Ground Covers (all nodes) 6 Pipe Listing (all nodes) 1-yr Event 7 Node Listing 8 Subcat 1: PRE -DEVELOPMENT 9 Subcat 2: POST -DEVELOPMENT 10 Pond 3: SCM #3 10-yr Event 14 Node Listing 15 Subcat 1: PRE -DEVELOPMENT 16 Subcat 2: POST -DEVELOPMENT 17 Pond 3: SCM #3 2212045 SCM3 Calculation_090122 Prepared by Labella Associates Printed 12/13/2022 H droCAD® 10.20 s/n 09581 © 2022 H droCAD Software Solutions LLC Pa e 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-yr Type II 24-hr Default 24.00 1 2.80 2 2 10-yr Type II 24-hr Default 24.00 1 4.88 2 2212045_SCM3 Calculation_090122 Prepared by Labella Associates Printed 12/13/2022 H droCADO 10.20-2 s/n 09581 © 2022 H droCAD Software Solutions LLC Pacle 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 11.270 61 >75% Grass cover, Good, HSG B (1) 4.720 98 Paved roads w/curbs & sewers, HSG B (2)